Pulau Pinang · 19 November 2025

15th Assembly, 3rd session, 2nd meeting (Budget 2026) · 569 turns · 58,805 words · official PDF ↗

486 of 569 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.

Absent: Lim Guan Eng (Air Putih), Dato‘ Seri Reezal Merican bin Naina (Bertam), Kumaresan a/l Aramugam (Batu Uban), Lee Khai Loon (AHLI-AHLI YANG HADIR MENGIKUT BAHAGIAN I BAB 3 PERKARA 6A), Dato’ Seri Haji Zulkifli bin Long (Setiausaha Kerajaan Negeri), Dato’ Wan Nor Sakina binti Saad (Penasihat Undang–Undang Negeri), Dato’ Zabidah binti Safar (Pegawai Kewangan Negeri)

(Opening)

Secretary of the HouseEN

Recitation of prayers. Prayers. Oral questions.

Speaker (Speaker)EN

Thank you and good morning. This morning I want to invite Kebun Bunga, please.

Lee Boon HengPKR · PHKebun BungaEN

Thank you, Dato' Seri Speaker. My question is number 31.

No.31 Traffic congestion in Penang is becoming more serious and will get worse ahead of the construction of the LRT Rapid Transit project. What are the short-term and long-term measures that will be implemented to solve this problem?

(a) Is the State Government confident that the construction of the LRT will help solve traffic congestion? Provide reasons.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Seri Speaker and Kebun Bunga.

During the construction of the LRT, traffic congestion is indeed expected, which will involve road diversions, half-lane closures and also heavy works along high-traffic corridors. Throughout the construction period, a TMP, or Traffic Management Plan, has been drawn up by MRTC to ensure the smooth flow of traffic along the LRT alignment and to allow the works to be carried out safely and in a controlled manner. Changes such as lane reductions and temporary diversions are expected to cause some congestion in certain areas, especially during peak hours.

However, the main traffic flow will still be maintained so that the roads can continue to be used by the public. The implementation of the TMP will also involve lane reduction and route diversions on the main roads involved in the construction of the elevated or viaduct alignment, and at stations such as Lebuhraya Tun Dr. Lim Chong Eu, Jalan Sultan Azlan Shah, Jalan Tengah and also Jalan Magazine.

The main mitigation measures, both long-term and short-term, are as follows:

Short-term:

(i) Continuous traffic monitoring using drones and real-time monitoring; (ii) Implementation of free flow traffic, new U-turns, and one-way traffic flows will be introduced in phases at hotspots such as Jalan Magazine, the Bayan Lepas industrial area and also Sunny Point Batu Uban; (iii) Several traffic light junctions will also be reorganised by MRTC to improve vehicle flow; (iv) Scheduling of construction work will be implemented so that heavy vehicles are allowed to operate outside peak hours; (v) Road widening works in the areas around the alignment and certain stations will be carried out to support the LRT construction project and ensure that traffic flow can be maintained throughout the construction period; (vi) Encouraging the use of bus services (CAT George Town) and also (CAT Bridge); (vii) And also the use of Rapid Penang through the Pas Mutiara (Mutiara Pass); (viii) Encouraging civil servants to use Best Komtar; (ix) Encouraging the Rapid on Demand service; (x) Encouraging the use of bicycles; (xi) Enhancing enforcement actions and cooperation with the police to control traffic during peak hours; (xii) And also the industries in the FIZ (Free Industrial Zone) have likewise been advised to plan their own mitigation measures such as more flexible working hours, such as staggered working hours (with permission), carpooling and also trip planning to reduce the impact on workers;

(xiii) Meanwhile, workers in the FIZ area are also advised to use public bus services.

As for the long-term measures, Honourable Member,

(i) Continuing the implementation of free flow traffic at the main junctions; (ii) Establishing a public platform to disseminate information and receive complaints from the public and also road users; (iii) Encouraging the public to use public transport services as I mentioned earlier; (iv) Adopting a long-term urban planning approach that is transit-oriented, or Transit Oriented Development, to emphasise more sustainable mobility.

Honourable Member, for the second question, the State Government is confident that the construction of the LRT will have a major impact in reducing traffic congestion and supporting the aspirations of Penang2030. In terms of mobility, the LRT has a high passenger capacity that can carry up to tens of thousands of users per hour. This directly reduces the number of private vehicles on the road, and at the same time lowers the level of daily congestion, especially along the George Town - Bayan Lepas corridor and also the Penang Bridge.

The LRT also offers more consistent and predictable travel times, because it operates on its own route and is not affected by congestion or flooding. This is in line with the goal of Penang2030, which is to improve the quality of life of the people through a more efficient and modern transport system. From an economic perspective, the LRT is an important catalyst for the growth and competitiveness of the state. It supports the development of the industrial, services and also high-technology sectors by providing stable mobility access to the workforce, investors and also visitors. A strong rail infrastructure is a basic requirement to ensure Penang remains competitive at the regional level.

Meanwhile, from the environmental perspective, the shift from ordinary cars to the LRT will reduce carbon emissions and also air pollution, in line with the commitment to sustainable development. With more users switching to public transport, the energy consumption and carbon footprint of the state can be significantly reduced.

Finally, the LRT is designed to be integrated with public bus services such as the Rapid Penang bus, the CAT Bridge and George Town bus, feeder buses as well as Park & Ride and walking and cycling routes. All of this will create a complete mobility network, and family-friendly services, again in line with the principles of Penang2030. Thank you, Honourable Member.

Speaker (Speaker)

Terima kasih.

Lee Boon HengPKR · PHKebun Bunga

Soalan tambahan.

Speaker (Speaker)

Sila.

Lee Boon HengPKR · PHKebun BungaEN

Tanjong Bunga, I would also like to know whether, in the State Government's plans or in discussions with MRT Corp, it is not only the Laluan Mutiara but also other rail alignments. KOMTAR to Tanjong Bunga. KOMTAR to Air Itam. KOMTAR to Gurney. I would like to know. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. Actually, when MRT makes plans, it does make more holistic plans. Also based on the Halcrow study carried out by the State Government, that is the PTMP study. It forms the basis for the design. Of course, implementation of the whole system must be carried out in phases. And for MRTC, the first phase is this Laluan Mutiara. And of course, just as has happened in the Klang Valley, in Kuala Lumpur, there are also plans for future phases. But let us implement the first phase first, Honourable Member, it will take five to six years. And after that, planning for the subsequent phases will begin, such as the alignment to Seberang Perai, other areas in Seberang Perai, to KOMTAR, to Air Itam and so on. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you. And I would like to invite Pengkalan Kota.

Wong Yuee HarngDAP · PHPengkalan KotaEN

Thank you, Dato' Seri Speaker. My question, question 32.

No.32 What projects have been and are being implemented under the Penang Nature-Based Climate Adaptation Plan (PNBCAP), and what is the progress of their implementation?

(a) To what extent are these projects effective in achieving the objectives that have been set?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member Dato' Seri Speaker and also Honourable Member for Pengkalan Kota who asked about the Penang Nature-Based Climate Adaptation Program (PNBCAP) project.

The State Government, through agencies and local authorities (PBT), has implemented and is implementing several projects under this PNBCAP. Among the projects that have been implemented under the PNBCAP is the upgrading of Union Square. This project is among the examples of the success of this programme, in creating a user-friendly community space in the Core Zone of the World Heritage Site.

Through the implementation of nature-based design elements such as:

(i) Replanting of 37 trees; (ii) Installation of permeable pavements; (iii) Construction of decorative water elements.

Monitoring results show that the surface temperature in the area has dropped by 24°C compared with before the upgrading was carried out. This reduction in temperature not only improves the micro-climate comfort, or microclimate, but also creates a more comfortable public environment that is cooler and also inclusive. This proves that small-scale urban design can have a positive impact on the social well-being of urban communities and climate adaptation.

In addition, an Urban Agricultural Program was also implemented at Lebuhraya Rose, Pulau Tikus, which houses agroponic and hydroponic facilities and sea grape plantings. This programme was carried out in collaboration with the School of Marine and Coastal Sciences, USM.

Apart from functioning as a centre for urban agriculture learning, this programme also aims to strengthen the knowledge and skills of the community in urban agriculture and to support local food security initiatives. Interestingly, this programme also involves retirees as the main caretakers of this agricultural site, who assist in daily maintenance while earning additional income from crop yields. This approach fosters active community involvement in urban agriculture, while helping vulnerable groups by providing small-scale economic opportunities, as well as creating new, more inclusive and resilient social networks.

Also through the PNBCAP, an Age-Friendly Park has been developed at Lengkok Nipah. This project is the result of public engagement with local residents in 2024, which proposed that the former vehicle and container parking site be converted into a green community space friendly to senior citizens. Through this initiative, a total of 67% of the entire 3,365 square metre concrete area has been transformed into green space.

In addition, a total of 12 new trees of the species Samanea Saman and Syzygium Gratum have been planted in this area as part of efforts to improve natural shade and urban ecological balance. This approach has succeeded in creating a safer, conducive and inclusive green environment in line with the PNBCAP objective of enhancing urban green connectivity, or Urban Green Connectivity, as well as the well-being of communities of all age groups, especially vulnerable groups and women.

The Road Upgrading Project around Lebuh Pantai, Persiaran King Edward, Pengkalan Weld and Gat Lebuh Chulia has also been implemented under the PNBCAP. The project area covers a strategic alignment bounded by four main roads, as I mentioned earlier, located within the East Seafront Masterplan area. This area is the lifeblood of social and economic activity in the core zone of the world heritage site, and this project commenced on site on 1 September 2025 and is expected to be completed on 31 December next year. This project aims to improve the quality of public space and the urban road environment through a nature-based design approach.

Among the key elements applied are the planting of new shade trees, the construction of pedestrian walkways with permeable pavements, and the provision of green parking spaces and pocket parks, or pocket park. Upon completion, the project is expected to reduce the overall urban atmospheric temperature by 1°C within 5 to 7 years after the project is completed, reduce the number of car parking bays by 10% to make room for green elements and pedestrian walkways, and accommodate a total of 997 new shade trees along the project alignment. In addition, there are two stormwater management projects implemented under this PNBCAP programme, namely the construction of a flood retention pond at Taman Lintang Nibong Bayan Baru and also the construction of a Blue Green Corridor at Sungai Keluang. Both projects have now reached 50% implementation and are expected to be completed by mid next year. The implementation of these projects will reduce the risk of flooding in these areas. Overall, these projects are expected to improve micro-climate comfort, strengthen urban green connectivity, contribute to reducing the urban heat island effect, or Urban Heat Island Effect, and address flood disasters in line with the objectives of the PNBCAP. Thank you, Honourable Member.

Wong Yuee HarngDAP · PHPengkalan KotaEN

Supplementary question. Thank you to the Honourable Member for Tanjong Bunga for a very comprehensive answer, but there is still a supplementary question.

How is the PNBCAP aligned with the Penang Green Agenda, the Penang2030 Vision and the state's direction towards a low-carbon economy, and also will the PNBCAP initiative be expanded further to other areas besides the City of George Town and Lengkok Nipah, Bayan Baru and so on. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. It seems it was not comprehensive enough. There are two supplementary questions. Firstly, as I mentioned, the PNBCAP is very much aligned with the vision and goals of Penang2030, and also with (Penang Green Agenda), because our target is to achieve a reduction in carbon footprint or carbon footprint. Therefore, the initiatives under this PNBCAP certainly support the core of Penang2030, which emphasises a greener, more inclusive city, and in addition we can transition to a lower-carbon economy through more efficient energy use and also nature-based solutions or, within the PNBCAP, Nature-Based Solutions.

So, to measure the success of the alignment that we have made, several KPIs are used, including reduction of carbon emissions in intervention areas, increased green space coverage and shade trees, which is also in line with (Penang Green Agenda), effectiveness of climate mitigation and adaptation projects, for example, reduction of flooding, improvement of drainage and also increased use of low-carbon mobility including more comfortable and safer walking and cycling routes.

So, all of this is aligned, Honourable Member, with (Penang Green Agenda) and Penang2030. As for the question of whether the PNBCAP initiative can be expanded, for the existing scope, which is based on the allocation of 10 million, what is it, 10 million US Dollars that was given by UN-Habitat, the allocation has indeed, what is it, been fully used and is only sufficient for the projects I have just mentioned.

However, if the implementation model of these projects succeeds, perhaps we can replicate it using other allocations of funds in other areas. For example, what we are doing in George Town, at King Edward Square, Beach Street and Gat Lebuh Chulia, if it succeeds, we can also do it using other allocations, whether from PBT or the State Government or from other international sources, we can replicate it in other areas in George Town, and also the dual-function flood retention pond that we built at Taman Lintang Nibong, this concept can also be replicated and built in Seberang Perai, and other areas. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you, KOMTAR. Please.

Teh Lai HengDAP · PHKomtarEN

Good morning Dato' Seri Speaker, my question, question 33.

No.33 The Penang State Government has made great efforts in implementing the Go Green initiative, but to what extent is it effective?

(a) Since the implementation of the Waste Segregation at Source Policy, what results and effectiveness have been achieved so far?

(b) What is the level of effectiveness of enforcement of the ban on the use of plastic straws and single-use plastics in the state?

Thank you, Yang di-Pertua Dato' Seri Speaker, thank you, YB KOMTAR. Penang is the only state in all of Malaysia that has a special entity under the state government to implement green and sustainability initiatives, namely the Penang Green Council, through collaboration with Penang Island City Council (MBPP) and Seberang Perai City Council (MBSP). Various efforts are being implemented towards making Penang a low-carbon and resilient state, including the implementation of a zero-carbon city policy, more efficient solid waste management, a ban on single-use plastics, the use of solar energy and electric vehicles, and the recognition of the Penang Green Building Certificate.

The State Government also plans for development under the Rumah MutiaraKu initiative to be carried out with a sustainable approach through the implementation of green building standards. In this regard, RMKu projects will be certified with green certificates such as the Green Building Index or an equivalent, to ensure that every development not only meets the need for affordable housing but also contributes to the state's goal of a low-carbon state and environmental well-being. These initiatives reflect the state's, the State Government's, continued commitment towards a green, sustainable and competitive Penang by 2030.

Penang is the only state in all of Malaysia that recognises that all affordable houses, namely Rumah MutiaraKu, must have a green certificate before they can be handed over. As Penang residents and the Penang Government, we feel very, very proud, yes. The source separation policy was implemented on 1 July 2024 and succeeded in raising public awareness and recycling rates under MBPP and MBSP. The results of the implementation of this policy can be seen through the increase in recycling rates recorded under the administration of MBPP and MBSP. From 2023 to this year, the rate has indeed increased.

The Penang Green Council also plays an important role in the implementation of this policy through several key initiatives. One is the introduction of the Sustainable Directory, which is an online platform displaying more than 220 premises based on 5R practices, including recycling centres and bulk shops. Second, we always, the Penang Green Council always holds Eco Talk sessions, which are environmental education briefings on source separation. Up to today, 140 sessions have been carried out since 2018 in schools, communities and the corporate sector.

Recycling competitions, programmes such as I am Eco Champ, a PET bottle competition with Toray, and E-Harvesting with Dell have successfully encouraged public participation and collected 14 tonnes of PET bottles for recycling. The Environmental Awareness Roadshow 2025 (Penang Green Council) organised various events such as Earth Day, Water Day, the Penang Hill Festival, Clean Malaysia Day and the Penang2030 Festival, to strengthen sustainability awareness.

The Penang Green Market is another platform, and this platform is a zero-waste lifestyle education platform, with only 5 sessions throughout 2025. It attracted an average of about 500 to 600 visitors per session and more than 5,000 visitors during the special edition of the Penang2030 Festival. Overall, the implementation of this policy jointly between the local authorities and the Penang Green Council has proven the State Government of Penang's continued commitment to strengthening recycling capacity and sustainable lifestyles throughout the state.

The Penang Green Council has conducted several studies to assess the effectiveness of the single-use plastic ban. The Face Out Single Use Plastic Bags Survey 2023 shows that the public and traders in Penang are increasingly ready to stop using plastic drinking straws. The impact of the implementation of the No Plastic Day campaign and the increase in the plastic bag charge from 20 sen to RM1 since 2021 has reduced demand for plastic bags by 78% between 2020 and 2021. Besides that, the final phase study of single-use plastics 2024 found that 82% of respondents agreed that this initiative has succeeded in reducing the use of and dependence on single-use plastics, proving the strong support of the public for the state's green policy.

The Penang Green Council intends to distribute about 100,000 reusable recycle bags, to encourage our society to get used to a new way of life in which recycling bags can be taken wherever they go. Up until now, we have distributed about 35,000 bags (eco bags), as we call them, which can be recycled and reused, up to today 35,000, and we target to reach 100,000 before the end of 31 August this year. That's all, thank you.

Teh Lai HengDAP · PHKomtarEN

Thank you, the Honourable Member for Perai. So, what are the main challenges faced by the State Government in increasing the level of compliance with the source separation policy, especially in densely populated areas, whether it's apartments, or flats. So, what are the main challenges faced by the local authorities or the State Government.

As the white people say, old habits die hard. Our way of life, we have already accustomed ourselves to our way of life. We are used to throwing all rubbish into one bin. Learning takes time. Currently, I am working together with the Penang Green Council and the EXCO for Local Government to find as many ways as we can to teach the people of Penang to practise source separation of waste, which is from the home. Everything starts at home, and we also have such sessions in schools as well. We teach our children how to separate waste at source.

Compared with the past, we put everything in one bin. This is a big challenge, but it is not impossible to achieve. I think it can be achieved. Meanwhile, at the school level, the Penang Green Council runs Green School programmes. These Green Schools, if they practise this system, we give green certificates to such schools, and this includes offices too, yes. Offices that follow us, our concept of Penang greening, we give greening certificates to both. Thank you.

Zulkefli bin BakarBERSATU · PNPenantiEN

Supplementary question, YB EXCO. In Mukim 18, Bukit Langkap, Seberang Perai Tengah, the Penanti area, yes, my area, there is a hill area there called Bukit Langkap. Okay. So when speaking about the Go Green initiative, it is indeed appropriate for me to raise here that the hill has been gazetted under Section 4, Land Acquisition Act. Okay. So that development in the industrial sector can take place there. So, this area was previously gazetted as a forest reserve and the residents there objected. Perhaps the EXCO cannot answer now because they need to look at the data, but I am informing here for the record. So, is there a need for the State Government to develop the hill which has indeed been gazetted as a green area and is well known for the Duri Hitam durian plantations. Thank you.

Thank you for that question, YB Penanti. I have not heard about this story. According to the Forestry Department, the increase every year for forest reserves has been increasing, never decreasing at all. We only give approval to pass through forest reserves if it is necessary to make a route. We have never approved forest reserves to be developed. This is news to me. I hope Penanti can give me more information, yes, I have never heard about this, and every month I hold meetings with the Forestry Department and it has never been raised at all. If there is more evidence I would appreciate it, I can take further action. Thank you.

Speaker (Speaker)EN

Thank you, KOMTAR.

Teh Lai HengDAP · PHKomtarEN

Supplementary question, one more. Food waste is one of the largest components of solid waste sent to the landfill in Penang, where organic waste makes up between 40 and 45% of the total waste. So, what efforts are being taken by the State Government or the local authorities to reduce food waste or food waste going to the landfill. So, what efforts will be taken.

Thank you KOMTAR. Indeed, domestic waste disposal, especially food, I think Malaysia is one of the countries that wastes the most food. So, if we can recycle this and compost this, it can become fertiliser and various other things. But we do not yet have one, perhaps this is a question for the Local Government, so I will try to answer. Indeed, we have an anaerobic digester at Ampang Jajar where food waste disposal can be converted into biogas there. There is indeed one. Like at Valdor the other day, animal waste disposal can produce gas, right, food can too. At Ampang Jajar we have an anaerobic digester that can do that.

Speaker (Speaker)EN

Thank you. Batu Lancang, please.

Ong Ah TeongDAP · PHBatu LancangEN

Thank you, Dato' Seri Yang di-Pertua. My question is number 34.

No. 34 State the total kilometres of roads under MBPP's maintenance and

what is the annual maintenance cost since 2020?

(a) Will MBPP repair roads under JKR's maintenance when many complaints are received?

(b) Is it true that MBPP will take over roads under JKR's maintenance?

(c) If so, when will this takeover take place?

H'ng Mooi LyeDAP · PHJawiEN

Thank you, Dato' Seri Yang di-Pertua. Allow me to answer question number 34 together with question number 42, which is related to MARRIS.

No. 42 Given that Seberang Perai City Council (MBSP) received MARRIS allocations of RM131.6 million in 2024, but this decreased to RM99.2 million in 2025, what is the main factor for the reduction of the MARRIS allocation to MBSP for 2025?

(a) What is its impact on road maintenance works, drains and public facilities in the Seberang Perai area?

Batu Lancang asked about the total kilometres of roads under MBPP's maintenance and also what the annual maintenance cost has been since 2020. The total length of roads under the maintenance of Penang Island City Council (MBPP) is 349.96 kilometres and the total maintenance cost for the period from 2020 until September 2025 is RM95.2 million. The breakdown of maintenance costs by year is as follows: in 2020 RM17.6 million, 2021 RM16.6 million, 2022 RM15 million, 2023 RM20.3 million, 2024 RM16.1 million and until September 2025 is RM9.6 million. The total is RM95.2 million.

MBPP is not responsible for repairing roads that are under the maintenance of JKR because the scope of road maintenance has been determined based on the current guidelines in force and the scope of each agency. MBPP carries out road maintenance works based on the MARRIS 4.0 guidelines updated on 1 October 2024 and the Guidelines for Infrastructure Maintenance Management between departments and government agencies in Penang which took effect from 1 August 2019.

However, if there are many complaints related to roads under JKR's supervision, MBPP will take appropriate action as follows: forwarding the complaints to JKR for attention and further action. Dealing officially with JKR to expedite the repair process. Helping to provide temporary measures such as installing warning signs or closing lanes for the safety of road users. Based on the decision of the State Executive Council Meeting (MMKN) Number 10 of 2025 on 4 April 2025 and confirmed on 16 April 2025. MBPP will take over roads under JKR's maintenance for roads within housing estate areas and town roads outside the George Town City Limit, effective from 1 January 2028. MBPP will take over roads under JKR's maintenance for roads within housing estate areas and town roads outside the George Town City Limit, effective from 1 January 2028.

To answer the question from Bagan Jermal, which is regarding the MARRIS allocation disbursed to Seberang Perai City Council. The formula for distributing MARRIS allocations is based on the total receipts from the Ministry of Finance (MOF) in the relevant year. For 2024, the State Government received RM221 million from MOF. Of that amount, MBPP and MBSP received allocations of RM136.7 million for state road maintenance purposes. However, the State MARRIS Committee also has to take into account the annual average receipts from MOF as well as the need to distribute MARRIS allocations to 13 other departments such as the District Office, JKR, and the Drainage and Irrigation Department (JPS), which also require MARRIS allocations.

To answer what the impact is on road maintenance works, drains and public facilities in the Seberang Perai area. The State MARRIS Committee took note of the impact of the reduction in the distribution of MARRIS allocations to MBSP for 2025. Therefore, a special meeting chaired by myself was held on 17 June 2025. The meeting agreed that an additional allocation of RM8 million be channelled to MBSP on top of the existing allocation to ensure that routine maintenance works involving roads, drains and public facilities covered under MARRIS can continue as usual. MBSP agreed with this decision and has carried out coordination of work appropriately.

Speaker (Speaker)

Terima kasih.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Seri Speaker, supplementary question. Thank you to the explanation by YB EXCO that the MMK has decided that maintenance works will be taken over by MBPP in January 2028. My question is, will the total maintenance cost increase. How much will the maintenance cost increase after taking over the work from JKR. Will the MARRIS allocation channelled to MBPP also increase. After MBPP takes over road maintenance work from JKR, what are JKR's further duties in road maintenance? That's all.

H'ng Mooi LyeDAP · PHJawiEN

Thank you, Batu Lancang. The estimated annual maintenance cost for MBPP after taking over roads from JKR is estimated at approximately RM47 million. This estimated cost takes into account the total length of existing roads maintained by MBPP, at 349.96 kilometres, and the estimated total length of roads to be taken over from JKR, at 605.04 kilometres. Apart from road maintenance costs, MBPP will also face constraints in allocations for the provision of machinery and infrastructure as well as increased costs in staff management. It is expected that the cost for providing machinery, infrastructure and maintenance is around approximately RM11 million. The management cost to finance the emoluments involved is approximately RM6 million annually.

With the addition of road length taken over from JKR, amounting to 605.04 kilometres, the MARRIS allocation channelled to MBPP needs to be increased to enable MBPP to carry out maintenance work effectively. In relation to, after MBPP takes over road maintenance from JKR, what are JKR's further duties. MBPP will not take over all roads under JKR's maintenance. Based on the proposal for coordination by the department responsible for state road and town road maintenance on the island side of Penang, which was approved by the State Executive Council Meeting on 9 April 2025, there are 156 kilometres of state roads that will remain under JKR's maintenance.

Therefore, JKR will not provide staff, machinery or offices to MBPP. Thus MBPP needs to apply for additional resources such as staff, machinery and offices for the maintenance of the roads taken over. Thank you.

Speaker (Speaker)EN

Thank you, and I would like to request the next question, Air Itam, please.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Thank you, Dato' Seri Speaker. My question is question number 36.

No. 36 What are MBPP's plans in the development of construction and demolition waste facilities, given that projects such as the Silicon Island, LRT and STP2 have started but the land lease contract for the Batu Maung Refuse Transfer Station will end in 2037?

(a) Is MBPP permitted to reclaim the sea for the purpose of developing waste disposal facilities on the island side?

H'ng Mooi LyeDAP · PHJawiEN

Thank you, Dato' Seri Speaker. To answer the question raised by Air Itam. The development of the construction and demolition waste management facility has been awarded to PLB Engineering Sdn. Bhd. through the agreement for the rehabilitation and development of the Jelutong rubbish disposal site between the State Government and the Island Development Corporation (PDC). Under the terms of the agreement, PLBE is required to develop a permanent facility for construction waste management operations for a period of 20 years. At present, a temporary facility of 10 acres has been provided on land jointly owned by MBPP and MBSP in phase 3 of the Pulau Burung rubbish disposal site by PLBE. However, the distance and transport time for waste to Pulau Burung affect the costs and operational efficiency of the stakeholders involved in the collection and disposal of construction waste.

In this regard, the provision of a construction waste management facility, or at least a transit facility, on the island should be considered to support the smooth functioning of the existing waste management ecosystem. In this context, MBPP has applied to PDC, as the landowner of the Batu Maung Transfer Station, to extend the lease period by a further 30 years to enable the facility to be developed. However, the application was rejected by PDC. MBPP intends to submit another appeal to the State Government so that a reconsideration can be given in the interest of residents on the island. In addition, MBPP also plans to develop an Integrated Solid Waste Management Centre that will cover domestic waste, bulk waste, and construction and demolition waste on the said site.

To answer question A, whether MBPP is permitted to reclaim land for the purpose of developing a waste disposal facility on the island. Good question. Permission to reclaim land for the purpose of developing a waste disposal facility on the island is subject to compliance with the Environmental Impact Assessment, that is the EIA, and is also subject to approval by the State Government. That's all. Thank you.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Dato' Seri, my supplementary question. First supplementary question. At present, how do MBPP and MBSP manage construction and demolition waste? Second, does MBPP intend to identify a new site for construction and demolition waste disposal after the TPSJ is closed? Thank you.

H'ng Mooi LyeDAP · PHJawiEN

Thank you, Air Itam. At present, all construction and demolition waste from MBSP and MBPP is disposed of at the Pulau Burung Rubbish Disposal Site and also at the Ampang Jajar Rubbish Disposal Site by soil burial, that is sanitary landfill. As for MBPP, MBPP does not manage construction or demolition waste directly. This service is managed by private waste haulers appointed directly by developers or owners of premises. However, any developer or owner of premises undertaking a development project or renovation of premises is required to appoint waste haulers who hold a valid disposal permit from MBPP, and it is stipulated in the Building Plan permit that the quantity of materials disposed of must be reported back to MBPP.

At present, all construction waste on the island is disposed of at the Jelutong Rubbish Disposal Site (TPSJ). And after the end date of TPSJ's operation, which is 30 November 2025. All construction waste and demolition waste must be sent to an approved site, namely either Ampang Jajar on the Seberang Perai side at the Ampang Jajar Rubbish Disposal Site or at the Pulau Burung Rubbish Disposal Site. Does MBPP identify a new site for the disposal of construction or demolition waste? Starting 1 December, as I mentioned earlier, all construction and demolition waste haulers on the island are advised to dispose of waste at the Integrated Solid Waste Management Centre, that is at Ampang Jajar or at Pulau Burung.

Speaker (Speaker)EN

Thank you. Pinang Tunggal, please, Pinang Tunggal. Pinang Tunggal, hello.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Thank you, Dato' Seri Speaker. The monsoon season is almost here. My question is number 37.

No. 37 What are the guidelines for applying for RMKu A, RMKu B and RMKu C houses, and how are these guidelines complied with?

(a) List the RMKu A and RMKu B houses that have been built since 2020

up to the present, according to the State Assembly constituency.

(b) What efforts have been made to reduce the waiting period?

(c) What action will be taken against owners who fail to comply with the guidelines?

Thank you, Dato' Seri Speaker. Thank you, Pinang Tunggal, who always cares for me very much about housing. You always ask me about housing issues, yes. The Penang State Housing Board has been entrusted with the registration of applications for 'Rumah MutiaraKu' in the Housing Information System, that is SMP, as a proactive step towards wider digital usage. Applications for RMKu, and the downloading and uploading of documents, have been fully implemented online, that is online, beginning August 2023, which was after I was entrusted as EXCO for Housing. So, the website that must be visited to obtain all information regarding applications or updates is www.lpnpp.gov.my. The procedures or guidelines relating to online applications are as in the attachment, which will be placed on the Honourable Member's table after the end of the Oral Question session.

For your information, all guidelines or conditions stated must be complied with before the offer letter can be issued. The screening process will be carried out in three stages, where the first stage is a check on the adequacy and completeness of documents and conditions. The second stage is verification of documents and conditions, while the third stage is the process of selecting and verifying the names of applicants who are eligible to be offered, through a committee chaired by me, namely the AMMK for Housing and Environment.

Based on the ledger records updated by the Penang State Housing Board until October 2025, the total number of completed Rumah MutiaraKu type A and Rumah MutiaraKu type B units built since 2020 is 8,567 units, consisting of 3,420 RMKu A units and 5,147 RMKu B units according to district as stated in the table below, namely Attachment B, which will be placed on the Honourable Member's table after the question session. The State Government takes note of the rather long waiting period to obtain an offer, especially for RMKu A and B units. However, at present, with several initiatives taken by the State Government, the waiting period has now become only three to six months. The State Government, through the Penang State Housing Board, has carried out a data refinement process for all applicants in the Housing Information System, where most applicants who had previously registered have lost their eligibility due to several factors, particularly the current household income limit.

All applicants who are still interested and eligible must update their current data so that the application remains active. Applicants who fail to update will be categorised as inactive applicants and will not be considered for an offer. This will reduce the number of applications and the waiting time. However, this offer is also subject to the supply of these units from private developers or the State Government. The Penang State Housing Board is always concerned about the problems, issues and constraints faced by the state's residents in the process of this update or registration of Rumah MutiaraKu applications. We understand that factors such as time constraints, distant office locations and access to technology may be obstacles for some applicants.

Accordingly, the Penang State Housing Board, as the agency responsible for managing Rumah MutiaraKu applications, has taken a proactive step by carrying out an Outreach Programme known as Meet the Customer Day, which was introduced since I was appointed EXCO for Housing. There have been many changes made, such as the waiting period for Rumah MutiaraKu offers being shortened to three to six months, the application date being updated, and complete documents.

Therefore, up to now the number of applications on the waiting list is only 6,249 in the Housing Information System. This shows the achievement and commitment of the State Government through the leadership of the EXCO for Housing and the Penang State Housing Board. Furthermore, the staff of the Penang State Housing Board are also very sensitive and caring by opening many application counters and updating to assist the public in updating applications online every three months. Programme announcements are also held regularly at strategic locations close to residential areas to ensure that they can access more easily and quickly without having to come to the Penang State Housing Board office. Apart from that, announcements of activities and programmes have also been uploaded to the official social media accounts of the Penang State Housing Board.

For example, the office of the EXCO and the Penang State Housing Board have organised the Rumah MutiaraKu and Penang Property Expo for 2025, which was held at Mydin Bukit Mertajam on 1 to 2 November, last month. This initiative not only facilitates the registration and update process, but also gives residents the opportunity to obtain information directly, check application status and submit any enquiries or complaints. The State Government has set several conditions for applicants for subsidised houses provided by the State Government. The details of the conditions that have been set are as in Attachment A, which will be placed on the Honourable Member's table after the Oral Question session. For applicants who do not meet the conditions that have been set, their applications will be rejected at the screening and verification stage. Thank you.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Supplementary question. I would like some clarification. Earlier, the Honourable EXCO mentioned that the waiting period has been shortened from three months to six months. Does that mean you just apply, or within the next few months you get a house already? Is that so?

Thank you, Pinang Tunggal. I too am waiting for Pinang Tunggal's question as well. Actually, it is like this. Once registered, if this is a new application or it has been updated, within three to six months, we can offer the house with the condition that the type of house requested is available in the requested zone. If not, you have to wait a bit longer. We do not build all five or six types of houses simultaneously in all districts. It is according to the district and according to the availability of that type of house. For example, if a developer must provide compliance-price units at RM42,000 in the SPU, but when it has not yet reached the time to be provided, we must wait until the time it has to comply, when the compliance units are built first, then we can offer them. If it has been updated and the unit is available, within three to six months, it will definitely be offered. Thank you.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

So, what this means is that the three to six months is a process lah. Process. Thank you. Process is also okay. Only, I want to draw attention to one more thing. Because yes, the three to six month process is good, but waiting is subject to availability lah. Okay. What I said yesterday is very important. Because in the areas that we have just offered to people as RMKu A houses, suddenly there are 30, 40 units not occupied. Although the Housing Board has no control over what will happen to the houses after we sell them, it gives a bad image to the State Government. People all want houses, wait four, five years, and suddenly see the houses there, overgrown with weeds. So we have to think of a method, how to overcome this, with permission lah. Because the image of the State Government becomes bad because people see, what is this? How do we control house prices? How do we, people want houses but the houses are there, people don't, people... Because I am afraid there are syndicates or someone who gives money to certain people, you buy in your name, and at the time, sell. This is not 1 or 2 houses, 10, 20, 30 houses. And one more thing, there are many houses. Affordable houses.

Indeed, there are many. In Setia Fontaines they cannot sell thousands. Why? Because the price is expensive. That is another matter. That is for next time lah. Thank you.

Thank you. There is no syndicate appointed by the Penang State Housing Board. We do not appoint syndicates or agents. It is like this. When someone registers, we update to see whether they are eligible to buy or not. This is based on their income. For example, if the applicant wants to buy a house at RM42,000, their salary cannot exceed RM2,500. If their salary exceeds RM2,500, they are automatically rejected and are not offered that kind of unit. And the applicant must change their category to B, where their salary does not exceed RM3,500. So they must make such a registration. So based on that concept, based on that condition, we offer units to people who are truly eligible to get those units. If the unit is still empty and unoccupied, there must be personal problems of each individual. It may be that they have not finished the school term before moving, or perhaps there are some personal reasons. But the unit is indeed given only to those who are eligible. And this selection is under my office, which I personally chair the HOPE Committee, and the selection is made by me together with my team at the Penang State Housing Board. Syndicate elements will not exist there. We indeed screen very thoroughly before we offer these units to individuals. I think it is likely they have personal matters, and it is just that the time to move has not yet come. It is not for investment, there can be no investment. If we talk about investment, the RM42,000 house, banks do not even want to lend. How can you make an investment? We also do not offer it for cash sale. If they are eligible to pay RM42,000, they are no longer poor, they are rich. So indeed the element of investment for category A and B houses, I think there is definitely none, YB. Thank you.

Speaker (Speaker)EN

Give it to Bagan Lalang... (interruption)

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Let the owner have it lah... (interruption)

Speaker (Speaker)EN

Just ask once lah, earlier.

Kumaran KrishnanDAP · PHBagan DalamEN

Thank you, Dato' Seri Speaker. I would like to thank the EXCO and also the Penang State Housing Board for speeding up the waiting period for ownership of Rumah MutiaraKu type A and B. But my question is, we know there are still developers who have been required to build compliance houses, especially Mutiara type A and B houses, but they still have not built them, and they have their reasons and also infrastructure issues. There are developers who build houses other than MutiaraKu A and B but request a period of time to build MutiaraKu A and B. What actions are being taken, and how can we speed up that process so that the people of Penang can own Rumah MutiaraKu Type A and B more quickly? Thank you.

Thank you, Bagan Dalam. This issue is indeed under review with the EXCO and the local authorities (PBT). There are indeed several projects where the compliance units have been deferred for construction. There may be projects with constraints that we have to help so that they can complete the houses that have already been sold first. Then they will place a deposit with us as a commitment that they will build the low-cost houses. There are indeed several such cases. I have also held several meetings with the EXCO for Housing, and now we are listing the developers who still owe us these units, and we will take appropriate action. May I ask for a little more time, I have only been the new EXCO for 27 months. In these 27 months I have brought many changes, but I need time to overcome these problems gradually. I am confident that within my term I can overcome all these debts. Thank you. What is it?

Daniel Gooi Zi SenDAP · PHPadang LalangEN

The CM said another five years.

Speaker (Speaker)EN

Thank you. Thank you. Three supplementary questions have already been used up.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Just one last one, this is a bonus question.

Speaker (Speaker)

Bonus.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

I want to quote back, I want to quote back. I appreciate LPN lah. To me they do the best lah. But I want to tell the Honourable EXCO and everyone here, that area I mentioned earlier with many empty houses, with many weeds, which is tarnishing the image of the state, is being rented out at RM800, RM900. RMK A houses. That area is rented out at RM800. In Okey, in Lake View, okay, we can talk about many places, but I give one example lah. I state there are facts. Want to see? There are, there are, there are, I'll look for it later. Okay, so I, because this tarnishes the state's image. People see the state as not knowing how to handle it. People wait 5, 6 years, then suddenly there are many houses, and I did not say syndicate. I did not mention it. I said there are other people who use them for certain purposes. You apply, you take a few. I am worried this is happening. It will not happen until there are so many empty ones. Sorry. Thank you.

Okay, as for that, the Honourable Member for Pinang Tunggal need not worry, because we have a moratorium period during which such houses may not be sold within 10 years. So, if someone wants an investment of RM42,000 and waits 10 years to make a profit, I myself would not invest. So I think Pinang Tunggal need not worry about that. For houses where the grass is overgrown, we as the government are only responsible for providing the houses. Homeowners must take responsibility for looking after their own property. If it becomes a very big problem, the residents there can make a report to the local authority (PBT) to take further action. That is all we can do.

Thank you. I know Pinang Tunggal loves me. I am still open to questions if there are any, thank you.

Speaker (Speaker)

Berapit sila.

Heng Lee LeeDAP · PHBerapitEN

Thank you Dato' Seri Mr Speaker, my question is question 38.

No. 38 State the developments of the "Stop the Bully" campaign launched in 2017.

(a) If the campaign has been discontinued, what new initiatives have been introduced to tackle the increasingly serious bullying cases in schools?

(b) Provide detailed information, including the total expenditure that has been used.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Okay, thank you Dato' Seri Mr Speaker, and to the one who asked, from the Honourable Member for Berapit. This relates to the Stop The Bully campaign launched in 2017. The question asked by Berapit was, if the campaign has been discontinued, what new initiatives have been introduced to tackle the increasingly serious bullying cases in schools? Provide detailed information, including the total expenditure that has been used.

According to the records of the Penang State Education Department (JPN), the Penang State Education Department does not have any official information regarding the Stop The Bully campaign launched in 2017. This includes information on the implementing party, the progress of implementation, or the total expenditure that has been used for the programme.

Among the State Government's initiatives in tackling the increasingly serious bullying cases in schools is the organisation of the Penang Goes Orange (PGO) programme, conducted by the Penang Women's Development Corporation (PWDC) through collaboration with the Penang State Education Department and related agencies, with the theme Hentikan Buli, Saya Prihatin and Kindness For Wellness, Stop Bullying Tahun 2023.

The objectives of this programme are as follows: to raise awareness about physical and cyber bullying issues, to encourage a caring attitude and reject violence, and to build a safe and harmonious Penang society. In addition, in tackling the increasingly worrying issue of bullying in educational institutions, the Ministry of Education Malaysia (KPM) has introduced several initiatives under the current action plan, among them the Professional Circular Letter of the Ministry of Education Malaysia No. 12 of 2023 entitled Implementation of the Guidelines for the Management of Bullying Misconduct in Educational Institutions under the Ministry of Education Malaysia, which details the procedures for prevention, intervention, investigation and disciplinary action against bullying cases in schools.

Secondly, the Dormitory Raid Programme is implemented as a continuous monitoring measure in collaboration with KPM, the State Education Department, District Education Offices and the Royal Malaysia Police (PDRM) through surprise inspections (spot checks) to assess the level of safety, discipline and compliance with SOPs in hostels, and anti-bullying awareness and education programmes through the organisation of talks, workshops and character campaigns at school level with the involvement of external agencies such as PDRM, the National Anti-Drugs Agency (AADK), Malaysia Crime Prevention Foundation (MCPF) and local non-governmental organisations (NGOs), to build a safe and ethical school culture. The total expenditure for the implementation of the Penang Goes Orange (PGO) programmes with the theme Hentikan Buli, Saya Prihatin and Kindness For Wellness, Stop Bullying amounted to RM164,281.25.

Heng Lee LeeDAP · PHBerapitEN

Supplementary question. Thank you, the Honourable Member for Batu Maung. However, my question concerned the Stop The Bully campaign, which had a press statement published on 2018, January, January 4 in the Chinese newspapers and also in English. This is, let me repeat a little of the content of that news report. At that time, the EXCO for Women and Welfare, the Honourable Chong Eng herself, together with PDRM, held a press conference. And at that time PDRM also said that PDRM in Penang had focused on 37 schools as crime hotspots, where there may be high rates of school crime in Penang, and the police would adopt those schools and carry out patrols twice a month.

At that time, the Honourable Member for Padang Lalang, who was then the EXCO, also said that the programme was a collaborative programme organised by the State Government of Penang together with the State Welfare Department and also in collaboration with PDRM. And at that time, a Q&A was circulated by the State Welfare Department after 21 July 2017 because the State Government had held a Roundtable Discussion on Stop The Bully. Parties involved in that discussion included PDRM, State Welfare, local authorities (PBT), parties from health, and also NGOs.

Speaker (Speaker)EN

Okay, good question.

Heng Lee LeeDAP · PHBerapitEN

Yes. So I want to ask, I did not get the answer I wanted, and I want to ask what about the response from the Stop The Bully campaign? After it was launched, we have nothing, even though a questionnaire was distributed to schools, but until now I have not been able to get an answer online. What are the results, the results of that questionnaire? And the campaign seems to have stopped without any announcement. So I ask for an answer from that campaign. Thank you.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Okay, I think I deviated from the question and also from the answer from the Department. Because when a case relates to Stop The Bully, it means it is related to the Penang State Education Department. That is why the response from the Penang State Education Department said here that it does not have any information. From Berapit earlier, we identified that it relates to the State Welfare Department and the EXCO for Women and Welfare at that time. However, the programmes for Stop The Bully have been implemented even though that was in 2018, and it was launched once again in 2023. So many programmes have been held at state level by JPN, the Penang State Education Department. I can hand over to the Honourable Member in writing after the session.

Heng Lee LeeDAP · PHBerapitEN

Thank you, the Honourable Member for Batu Lancang. I understand. Sorry, not Batu Lancang but Batu Maung, Batu Maung. I understand, I understand if there was a mistake and a misunderstanding because Stop Bully, they think it is about education. But here I want to ask Dato' Seri Mr Speaker, as a backbencher it is difficult for me to write each question and direct it to which department. So I feel this is a State Government programme. I hope we should have a complete answer from the Sitting of the House, and I also hope that for the question I directed, I can get a full answer. Thank you.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Yes, because when this question relates to education and schools, because this question is specifically about tackling the increasingly serious bullying cases in schools, the Secretariat will direct this question to the relevant EXCO, namely the EXCO for Education. That is why the answer is the response from the relevant department and agency, namely the Penang State Education Department. It is hoped that the Honourable Member will be specific, as mentioned in the earlier remarks, mention the State Welfare Department, mention the State Welfare Department. Mention the EXCO for Women and Welfare so that it is easy to direct based on the question to be raised.

Heng Lee LeeDAP · PHBerapitEN

Yes, yes, thank you Honourable Member. But I have already mentioned the name of the campaign, the name of the campaign is specific. Do not say school or hospital, but it is a State Government programme. Thank you.

Speaker (Speaker)EN

For this matter, let it be a case for all of us. Sometimes questions like this, at the early stage, I want to reject. Yes, because it is connected with the Ministry. However, sometimes I see that some questions can also be referred to the Education Department to help provide an answer. That is not a problem, but the question must be clear. Many questions I rejected because they were also not clear enough, so I will reject them. So, if such problems arise, perhaps I will tighten it further when I conduct my review. Do not later be blamed on me. But if possible, if the EXCO in the winding-up can help with this issue, and then I would like to proceed to the next question, 39. Please.

Tan Hooi PengDAP · PHSeri DelimaEN

Thank you Dato' Seri Mr Speaker. My question is question 39.

No. 39 In line with the Active Ageing Action Plan and the age-friendly city initiative, Pulau Pinang, particularly Pulau, is expected to achieve Age-Friendly City status by 2025. What are the latest developments in efforts to achieve this status?

(a) What areas of improvement (gaps) have been identified as a result of engagement with stakeholders?

Lim Siew KhimDAP · PHSungai PinangEN

Yes, thank you Dato' Seri Mr Speaker, and thank you to Seri Delima for the oral question raised. The State Government of Penang continues to record progress towards achieving age-friendly state status by 2030 through the implementation of the Age-Friendly City Initiative (with permission) under the guidance of the World Health Organization (WHO).

The Penang Island City Council (MBPP) has been a member of the Global Network for Age-Friendly Cities and Communities (GNAFCC) (with permission) since 28 July 2023 and is now at the end of Phase 1, monitoring and evaluation, and will enter Phase 2 after receiving the gap report from the Malaysia Healthy Ageing Society (MHAS).

So, seeing the success of implementation in the island area, the State Government is now expanding this initiative to Seberang Perai through the planning of the Seberang Perai Strategic Action Plan (Age-Friendly City), namely AFCSP Seberang Perai by the Seberang Perai City Council. This plan is expected to begin in 2026, making Penang not only an Age-Friendly City, but an age-friendly state as a whole.

The areas of improvement that have been identified as a result of the stakeholder engagement session on 23 August 2025 cover several main aspects under the eight (8) domains of the World Health Organization (WHO) Age-Friendly City.

So, among the notable areas of improvement is public transport, where a lack of access to age-friendly services, particularly to Hospital Pulau Pinang, has been identified. To address this issue, MBPP has approved the implementation of a free Central Area Transit (CAT) bus service starting 1 January 2026 with an allocation of RM1.7 million a year. The bus route will cover a distance of eight (8) kilometres from KOMTAR to Hospital Pulau Pinang.

In terms of social support and community, senior citizens have voiced the need for more social activities and community networks to address the problems of social isolation and mental health. In response, the State Government of Penang has introduced the Mutiara Volunteer Programme as a social support initiative for senior citizens, persons with disabilities (OKU) and low-income families.

Through this programme, volunteers conduct regular visits and community activities together with Members of Parliament, State Assemblymen, the Social Welfare Department and NGOs such as Tzu-Chi Society to ensure that senior citizens continue to receive attention and ongoing social support. In addition, the Social Welfare Department (JKM) also provides counselling services and psychosocial support to senior citizens who need emotional assistance and guidance, especially those who live alone or face mental health problems.

The State Government has also launched the Celik Warga Emas Campaign in collaboration with JKM, which focuses on five (5) main components of senior citizen development, namely Celik Sosial, Celik Digital, Celik Kewangan, Celik Hak Bersuara and Celik Penuaan Aktif. This initiative aims to empower senior citizens to remain competitive, knowledgeable and actively play a role in society in line with the principles of active and inclusive ageing that form the basis of the Penang Age-Friendly City development.

In terms of the participation of senior citizens in the workforce, the State Government and MBPP have implemented various initiatives to ensure that senior citizens remain active and productive. Through the Senior Citizens Empowerment Programme, MBPP provides opportunities for retirees such as teachers, engineers and administrative officers to return to service. Since this programme was launched in July 2025, a total of eight (8) senior citizens have been re-employed at MBPP, thereby helping to improve economic well-being and recognise their experience as community assets.

In addition, the Public Toilet Cleaning Programme under MBPP's jurisdiction also involves the participation of senior citizens in its implementation. So, a total of eight (8) public toilets around Penang have been identified for maintenance. The workforce consists of trained senior citizens who are paid a monthly allowance to ensure the cleanliness of public facilities is always assured. Complementing this effort, Community Service Contracts have also been awarded to residents in public housing areas for cleaning and security purposes, on the condition that at least 75% of job opportunities in these fields are given to senior citizens.

Furthermore, the Urban Farming Project at Lebuhraya Rose has also been mobilised as a community economic model that is age-friendly, where senior citizens are responsible for managing, monitoring and cultivating the garden. Thank you.

Tan Hooi PengDAP · PHSeri DelimaEN

Supplementary question. Thank you, the Honourable Member for Sungai Pinang, for the very comprehensive answer. My only supplementary question is, what approaches and also steps have been taken by the State Government of Penang to encourage active ageing and the participation of senior citizens in community and volunteer programmes, rather than viewing the ageing process only from the perspective of welfare assistance alone.

And my second question is, how does the State Government ensure the sustainability of the programmes implemented, so that they do not become one-off programmes and are able to attract more senior citizens to continue participating actively in the community. That is all.

Lim Siew KhimDAP · PHSungai PinangEN

Terima kasih atas soalan tambahan daripada Seri Delima. Seri Delima selalu prihatin atas isu warga emas. Jadi buat masa ini, seperti yang saya katakan tadi iaitu Kempen Warga Emas Celik merupakan satu-satunya program fokus yang dilaksanakan di bawah portfolio MMK saya dengan kerjasama rapat JKM. Kempen ini bukan sekadar menyalurkan bantuan kewangan tetapi mengangkat peranan PAWE sebagai peneraju utama dalam usaha memperkasa warga emas. PAWE iaitu Pusat Aktiviti Warga Emas. Jadi kempen ini merangkumi pelbagai komponen yang menekankan pembangunan kapasiti, pengupayaan diri, literasi pelbagai bidang serta peningkatan kesejahteraan holistik sebagai elemen penting dalam menghadapi cabaran populasi menua di negeri ini. Penembak, pendekatan ini menegaskan bahawa kesejahteraan warga emas memerlukan lebih daripada sekadar bantuan material. Ia memerlukan peluang untuk terus aktif, berilmu dan terlibat dalam komuniti. Jadi, Kerajaan Negeri melihat usaha ini sebagai inisiatif jangka panjang dalam mempersiapkan negeri menghadapi realiti penuaan penduduk.

Selain itu, Kerajaan Negeri juga melibatkan golongan warga emas dalam sambutan Hari Warga Emas peringkat negeri yang diadakan setiap tahun sebagai satu bentuk penghargaan, kesedaran dan sokongan moral kepada mereka selaras dengan komitmen kita untuk membina sebuah negeri yang inklusif dan mesra usia. Sejajar dengan Agenda Penang2030 untuk meningkatkan penyertaan warga emas dalam aspek kesukarelawan, Kerajaan Negeri juga dalam perancangan untuk meluaskan Program Sukarelawan Mutiara di PAWE. Program Sukarelawan Mutiara di PAWE bagi memupuk semangat kesukarelawan dalam kalangan warga emas serta memperluaskan jaringan sosial mereka terutamanya melalui aktiviti seperti tanya khabarlah, tanya khabar rakan sebaya sekaligus menyokong kesejahteraan mental dan sosial mereka.

Berkenaan dengan soalan berkenaan kelestarian program-program, Kerajaan Negeri melalui Pejabat MMK Pembangunan Sosial sentiasa memastikan program warga emas dilaksanakan secara berterusan dan tidak bersifat sekali sahaja melalui beberapa pendekatan strategik.

Pertama, iaitu Pejabat MMK terus bekerjasama dengan Pusat Aktiviti Warga Emas (PAWE) melalui JKM dengan menghubungkan PAWE dengan pelbagai kepada pelbagai agensi Kerajaan, pihak swasta dan rakan strategik lain. Kerjasama ini bertujuan memastikan program yang dianjurkan selaras dengan Kempen Warga Emas Celik serta menerima sokongan yang berterusan.

Yang kedua, setiap PAWE menerima peruntukan tahunan sebanyak RM50,000 daripada pihak Kementerian Wanita, Keluarga dan Masyarakat bagi penganjuran program. Dan namun, pada tahun ini sempena Bulan Warga Emas tahun, Kerajaan Negeri melalui MMK Pembangunan Sosial turut menyediakan peruntukan kewangan RM2,000.00 kepada setiap PAWE di Pulau Pinang untuk melaksanakan program berkaitan Warga Emas Celik dan inisiatif tersebut mendapat sambutan baik daripada sembilan (9) buah PAWE yang telah ditubuhkan di Pulau Pinang. Peruntukan khas ini turut dalam pertimbangan untuk diteruskan pada tahun hadapan bagi menggalakkan kesinambungan program dan memastikan PAWE kekal aktif.

Kerajaan Negeri juga, telah merancang penganjuran Jelajah PAWE sebagai usaha untuk meningkatkan keterlibatan secara berkala di lapangan. Jelajah ini turut membolehkan Kerajaan Negeri memahami dengan lebih dekat keperluan, minat dan cabaran warga emas di setiap komuniti, sekaligus. Ada sikit, sikit ja lagi. Jadi membolehkanlah supaya, supaya mereka warga emas dapat akses kepada pelbagai sumber melalui jaringan rakan kerjasama. Jadi banyak lagi lah kalau I think I gulung lah maybe later.

Speaker (Speaker)EN

Oh, soalan tambahan pun ada begitu banyak.

Lim Siew KhimDAP · PHSungai PinangEN

Sebab saya sudah ada dalam.

Speaker (Speaker)EN

Oh, you sudah ramalkan soalan tambahan ini ya.

Lim Siew KhimDAP · PHSungai Pinang

Bukan, dia.

Speaker (Speaker)EN

Okey, okey. Ini I nak dengar soalan satu lagilah. Permatang Pasir, sila. Terima kasih Sungai Pinang.

Amir Hamzah B Abdul Hashim @ Md. HashimPAS · PNPermatang PasirEN

Dato’ Seri Speaker, soalan saya nombor 40.

No.40 To what extent does the State Government intend for drain and waterway cleaning works to be given to Pertubuhan Peladang Kawasan (PPK) to improve the quality of work compared with the existing arrangement?

(a) When will the pilot project begin and what is the target location?

40.

Speaker (Speaker)

40.

40.

Speaker (Speaker)EN

(interruption) Eh, betul lah. Sila. (interruption)

Rashidi bin ZinolUMNO · BNSungai AchehEN

Terima kasih Permatang Pasir. Dato’ Seri Yang di-Pertua, yang ini saya jawab soalan yang saya tak gulung eh. (unclear). Kerajaan Negeri Pulau Pinang melalui Jabatan Pengairan dan Saliran (JPS) melaksanakan semua kerja-kerja perolehan berdasarkan tata cara dan peraturan perolehan semasa yang berkuat kuasa. Sehubungan dengan itu, mana-mana kontraktor atau Pertubuhan Peladang Kawasan (PPK) yang memenuhi keperluan dan syarat perolehan adalah layak untuk menyertai tawaran kerja di bawah JPS. Bagi kerja-kerja pembersihan parit dan tali air, perolehan dilaksanakan berdasarkan pekeliling dan garis panduan Kementerian Kewangan Malaysia di mana proses tawaran dibuat secara terbuka dan telus.

Setiap syarikat atau pertubuhan yang menepati syarat kelayakan boleh mengemukakan tawaran untuk dipertimbangkan. Dalam masa yang sama, Lembaga Kemajuan Pertanian atau MADA akan menambah baik spesifikasi teknikal dan keperluan kerja pembersihan bagi memastikan mutu pelaksanaan kerja adalah berkualiti, menyeluruh dan memberi kesan positif kepada keberkesanan sistem saliran di kawasan pertanian.

Tiada projek rintis yang dicadangkan untuk dilaksanakan di bawah pelaksanaan kerja-kerja pembersihan parit dan tali air melalui PPK. Walau bagaimanapun, Kerajaan Negeri melalui JPS akan mempertimbangkan pelaksanaan projek rintis pada masa akan datang setelah penilaian menyeluruh terhadap keberkesanan dan keupayaan pelaksanaan tempatan seperti PPK yang dibuat. Itu sahaja. Terima kasih.

Speaker (Speaker)EN

Bagi soalan tambahan. Bagi.

Amir Hamzah B Abdul Hashim @ Md. HashimPAS · PNPermatang PasirEN

Itu ja. Apa ini, apa soalan ini berpunca daripada dulu ini memang PPK yang buat. Dan PPK ini dia buat PPN ke PPK ke unit kawasan. Dan mereka sendiri yang mengusahakan sawah itu. Dan orang yang cuci pun orang itu juga. Dari dulu dia dicuci keseluruhan atas dan bawah kan. Sekarang ini disebabkan oleh, oleh apa kontraktor, dia cuma cuci bahagian atas sahaja dan tidak bahagian dalam. Dan soalan dia, adakah apa spec ini telah ditukar. Cuma cuci di luar saja, tidak di bahagian dalam. Yang keduanya soalan dia, adakah apa-apa, apa-apa komplain daripada petani berkenaan dengan cuci. Adakah memuaskan cuci itu.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Parit ke air.

Rashidi bin ZinolUMNO · BNSungai AchehEN

Terima kasih Permatang Pasir. Sebenarnya projek ini kalau kita ikut sejarah dulu memang kita ada rekod yang kita beri kepada PPK. Kemudian kita juga perlu melihat daripada sudut pandang kontraktor-kontraktor yang terlalu ramai. Dan dia bukan menyelesaikan masalah kerana kontraktor terlalu ramai, kalau semua bagi kat PPK, maka akan jadi satu masalah kepada pihak kontraktor yang lain. Dan kalau kita tengok pengurusan dari segi pengairan, dari segi pengorekan, cuci cuci jalan ladang dan sebagainya. Kebanyakan yang dibuat walaupun diberi kepada PPK, banyak juga di sub kepada kontraktor-kontraktor dan anak-anak, anak watan ataupun komuniti-komuniti setempat. Begitulah yang berlaku hari ini, dan kita mungkin akan melihat dari segi keberkesanan dan penilaian yang seterusnya. Pada masa yang sedia ada, laporan yang kita dapat memanglah agak lebih telus bila kontraktor-kontraktor terlalu ramai. Kita ada 1,700 kontraktor kalau kan ni ikut G1 di Pulau Pinang. Jadi PPK ni ada dalam dalam beberapa bilangan saja. Jadi ruang yang kita buka ni bila penilaian secara tender dan cabut undi dan sebagainya, ini lebih keterbukaan dan lebih telus dan Insya-Allah untuk apa yang dihajatkan oleh YB Permatang Pasir, kita akan bincang bersama pihak JPS untuk penilaian seterusnya. Okey, terima kasih.

Speaker (Speaker)EN

Terima kasih. Maka Ahli-ahli Yang Berhormat, 1 jam 30 minit untuk sesi soalan lisan pun telah tamat selaras dengan peraturan-peraturan Majlis Mesyuarat Dewan Undangan Negeri Pulau Pinang.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Dato’ Seri Speaker. Jawapan kepada soalan-soalan lisan yang telah dijawab sebentar tadi akan diletakkan di atas meja-meja ahli yang bertanya dan akan dimasukkan dalam penyata rasmi. Dan saya juga memohon selaras dengan Peraturan 6A (1), Peraturan-peraturan Majlis Mesyuarat Dewan Undangan Negeri supaya masa bersidangan hari ini, 19 November, hari Rabu dilanjutkan sehingga jam 6:30 petang. Terima kasih.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Saya mohon menyokong.

Speaker (Speaker)EN

Terima kasih. Ahli-ahli Yang Berhormat, Yang Amat Berhormat Ketua Menteri telah pun kemukakan usul di bawah Peraturan 6A (1) untuk melanjutkan tempoh masa persidangan hari ini 19 November 2025, hari Rabu dilanjutkan sehingga jam 6:30 petang. Ahli-ahli Yang Berhormat, yang setuju katakan setuju. (Setuju) Setuju ya? Yang tidak setuju katakan tidak. Usul dipersetujui. Terima kasih. Okey, sebelum kita masuk ke agenda seterusnya, ada Yang Berhormat kata Speaker tak pernah berpantun. Saya kata tak berapa pandailah. I try lah. I try hari ini. Teluk Ayer Tawar dengar baik-baik ya.

"Awal pagi makan roti Gardenia, (laughter) Yalah Umi Sheika bagi roti Gardenia. Masuk Dewan tunggu ucapan penggulungan, Yang Berhormat EXCO mohon siap sedia, jawapan sudah bagi jangan berulang."

Saya minta apa nama, Pantai Jerejak, buka tirai. Yang sudah bagi tolong ya.

Winding-Up of Supply Bill 2026 and Motion on Development Estimates YearBill

Fahmi bin ZainolPKR · PHPantai JerejakEN

Bismillahirrahmanirrahim. Dato’ Speaker, the Most Honourable Chief Minister, the Honourable Members of the State Executive Council, the Honourable Members of the State Legislative Assembly, heads of departments, members of the media, and ladies and gentlemen. Assalamualaikum warahmatullahi wabarakatuh, salam sejahtera, salam Penang2030 and salam Malaysia MADANI.

First, allow me to record my highest appreciation and also congratulations to the Most Honourable Chief Minister of Penang for successfully tabling the Supply Bill 2026 and the Development Estimates Motion 2026, which were held last Friday. On this occasion, I also extend my highest congratulations to all the Honourable Members who took part in the debate. The critical discourse, incisive ideas and progressive views expressed clearly prove that this House continues to flourish as a platform for democracy, intellect and accountability to the people.

Dato’ Seri Speaker, the State Government wishes to express its deep appreciation to the Federal Government for approving two wishlist project proposals under the MMK of Agrotechnology, Food Security and also Cooperative Development.

The first is a study on the feasibility of developing a Tuna Port in the State of Penang towards national food security, and the second is the empowerment of the Penang Fishermen's Market. This approval proves that the agro-food agenda for the State of Penang is not merely supported, but elevated as the core of the nation's food security strategy. In the same breath, I would also like to record my highest aspirations to all agencies and departments in the State of Penang, for their exceptional commitment in successfully running the State-level Farmers', Breeders' and Fishermen's Day Programme held at MARDI, Seberang Perai on 25 to 27 July. What is more gratifying is that Penang obtained second place for the best booth category among all State Governments during the National Farmers', Breeders' and Fishermen's Day held in Kota Kinabalu, 1 to 3 August 2025. This is an achievement in uplifting the standing of the State's agro-food sector on the national stage. And it proves that

this excellence is not a coincidence, but the result of the determination and collective work of the entire state machinery.

Dato’ Seri Speaker, following the aspiration for national food security, the State Government is always committed to ensuring that we are at a high level of self-sufficiency. In ensuring food supply remains stable, not fragile, and not exposed to shocks from the weather, the economy or pressures in global supply chains. In this regard, once again the State Government wishes to record its highest aspirations to the Most Honourable Prime Minister of Malaysia for organising the food security programme that optimises the use of land. A programme that has been implemented over the past two years, which had never been introduced before, with a total of RM300 million allocated by the Ministry of Finance in collaboration with KPKM (Ministry of Agriculture and Food Security) and also the State Government. Alhamdulillah, in 2025, the State Government obtained a total of RM5.35 million, which shows a significant increase compared with RM1.35 million in 2024. This is proof of the Federation's confidence in the capacity of the State of Penang in steering the nation's agro-food agenda.

The programmes approved in 2025, I must mention and I must discuss in this House. Among them are:

First, the Photosynthesis Enhancer Solution Programme for paddy farmers in the State of Penang with an allocation of RM1.622 million. This project was carried out this year, with paddy yields increasing by 30% from 4 to 5 metric tonnes per hectare to 6 and also 7 tonnes per hectare. It shows an additional return of RM1,500 per hectare and its application cost is only RM320 per hectare. Alhamdulillah, farmers, for example in Sungai Acheh, Nibong Tebal and also in Bukit Inderamuda, Permatang Pauh, have received benefits, as well as other districts.

Second, special aid of Brac and Protect 2 for cage fish farmers in Penang with an allocation of RM350,000. With a total of 1,200 units of BP2 distributed to 40 farmers at four locations, including Batu Maung, Pulau Aman, Pulau Jerejak and also Sungai Udang. This technology has successfully controlled the threat of marine leeches and also reduced farmers' losses.

Third, the Programme for the Release of Fish and Prawn Seeds into Inland Waters and also Clam Seeds into Marine Waters of the State of Penang with an allocation of RM880,000. So far, a total of 281,114 fish and prawn seeds as well as 15,505 kg of clam seeds have been released into marine waters, while RM1.24 million worth of fish and prawn seeds have been released into inland waters. This has served to enrich the stock of the state's marine food resources.

Fourth, the Smart Agriculture Project for paddy cultivation in the paddy granary areas of the State of Penang with an allocation of RM498,000. With an integrated warning system, control of pest seeds, water level monitoring and automatic farm mechanisation.

Fifth, Agricultural Engineering Assistance to meet the agricultural engineering and farm mechanisation needs for food security for the State of Penang amounting to RM500,000. With two tractors and also one mini combine harvester to increase the capacity of paddy farmers.

Sixth, the provision of agricultural automation mechanisation incentives to nine Farmers' Cooperatives amounting to RM500,000. With 674 cooperative association members having received these benefits.

And seventh, the provision of incentives for agro-based industry projects to home-based food producers, known as home-based food, with an allocation of RM1 million. Assistance such as equipment, training, typhoid injections, sales programmes and also product quality improvement amounting to RM5,000 to RM8,000 per participant. Income will increase, food safety will improve, packaging will be more professional and also production capacity will surge to penetrate the market, among the benefits obtained from this programme. So far, we are grateful that the programmes mentioned earlier are being actively implemented in the field, and the State Government is further seeking the allocation that has been provided by the Federal Government for 2026, by using technology application approaches to ensure that our supply is more secure.

Dato’ Speaker, Dato’ Seri Speaker, the agricultural sector over these past decades has often been talked about from mouth to mouth, that although Penang continues to stand proudly as an industrial and also tourism state, the agricultural sector remains the mainstay of the state's food security and also a robust contributor to the national economy. For example, paddy cultivation has become the main source of livelihood for farmers in Kepala Batas, cage fish farmers in Sungai Udang have penetrated international markets, for example in Thailand, China and also Europe. And also, while fruits and vegetables, including Penang durian, continue to stand as premium brands in domestic and also global markets. Moreover, based on official statistics, the agricultural sector contributes 2.2% to Malaysia's agriculture and 1.9% to the economy of the State of Penang, with a value added of RM2.2 billion out of the state's total economy amounting to RM116 billion. Of the subsectors, fisheries contribute 40%, crops 33% and livestock 27%. Meanwhile, aquaculture contributes RM709 million, with 31% of the total.

It is clear that Penang's agricultural sector is not merely a complement to the economy, but a pillar of rural sustainability and a source of livelihood for tens of thousands of families of farmers, breeders and also fishermen. In line with the views of the Most Honourable Prime Minister, development cannot only prosper the cities, but must also include the paddy fields, farms and villages that supply food to the nation. In the context of agricultural land management, the limited land area of the state demands optimal, strategic use of land founded on innovation. In line with the aspirations of Penang2030, the State Government always emphasises the modernisation and also diversification of sustainable agriculture in line with the SDG sustainable development goals, including the target of zero hunger. Evidence from the crop subsector records a cultivated area of 4,248 hectares with sales value of RM837.05 million, covering a total of 13,341 agricultural holdings. Therefore, agriculture not only supports economic growth, but ensures the continuity of the people's food supply in an era of global uncertainty.

Dato’ Seri Speaker, in response to the question of the Honourable Member for Permatang Berangan, the State Government always supports efforts to strengthen food security. However, decisions on the total development of TKPM, whether Ara Kuda, Mayfield or Taman Agroteknologi, fall under the purview of PERDA. Nevertheless, these projects remain relevant and significant in empowering agro-entrepreneurs and increasing

agro-food productivity since 2007 until now. At the same time, TKPM Ara Kuda continues to show commendable performance by receiving a four-star rating through the star rating assessment.

Dato’ Seri Speaker, in response to the question of the Honourable Member for Telok Ayer Tawar, the Honourable Member for Permatang Berangan, the Honourable Member for Pulau Betong and the Honourable Member for Pinang Tunggal, regarding assistance to paddy farmers, the State Government is always prudent and Insya-Allah we will assess the application by taking into account the financial position of the State Government.

With all due respect, allow me to summarise several major agricultural project proposals identified for implementation in 2026. The pilot project for planting Ratoon Rice, the State Government is now in the process of signing a strategic cooperation with Fujian Agriculture and Forestry University (FAFU), China. For the development of Ratoon Rice Technology, which makes possible two harvests from only one planting. Technical discussions are being carried out by the State Government together with the State Agriculture Department, MARDI Malaysia, and also the said University to ensure the readiness of implementing this technology in the State of Penang.

In line with this, the pilot project of Ratoon Rice is now underway at the Bukit Merah Paddy Station over an area of eight hectares using the local variety MR297. With field implementation including ploughing, bund clearing, pest control, land preparation and also broadcasting of seeds showing an orderly start based on scientific methodology. The Ratoon method has proven to save operating costs because farmers do not need to replant every season. Paddy regrows from the existing stubble. It helps save on seed costs, planting wages, labour, and also land preparation. As a result, Ratoon Rice has the potential to increase farmers' income because harvesting can be done more than once without a significant increase in cost. This method supports sustainable agriculture, optimises land use, maintains soil fertility, reduces erosion and minimises the use of chemicals.

Dato’ Seri Speaker, the Vertical Farming Project Within Buildings, (with permission) Indoor Vertical Farming. Another core initiative for 2026 is the Vertical Farming Project Within Buildings, Indoor Vertical Farming (with permission). In this post-digital decade, vertical farming technology has emerged as a modern orientation to increase food production in urban areas that lack land, through a high-intensity vertical planting system, driven by automation and centralised control. It is suitable for existing buildings such as warehouses, offices, shophouses or even portable containers.

The State Government sees this technology as a catalyst for the urban agriculture ecosystem and wishes to record its highest appreciation to the MARDI Headquarters for its commitment in helping Penang adopt this technology. For the reference of all members of the public, there may be those who question it, there may be those who feel there should be a re-evaluation, a need to assess this project or programme. In fact, the MARDI Headquarters in Serdang has been running this project since 2008. I invite the public present, heads of departments and all members of the public who wish to see it for themselves, to visit MARDI Serdang. But if you want to see it up close, you can go to the Peninsula House Common Farming Restaurant, which was developed by the private sector with a vertical farming model within a building in George Town alone.

There will be time for us to see it. If you want to go further, you can look at Johor, namely at the Nusajaya Industrial Park in Johor, in collaboration with Syarikat Agritek, a private company from Malaysia and Singapore, opening the largest indoor vertical farm in Malaysia, with an area of 52,000 square feet which was opened from July 2025. Further afield, go and see Johor. Closer to home, we can look at George Town, and it is very suitable for Penang, which has limited land, and also to consider the agricultural value, the value of the plants grown, which carries a more premium and also higher value.

Thus, this is in line with the call of the Most Honourable Prime Minister to be determined to think out of the box by cultivating innovation and increasing crop production despite the challenge of land constraints. We as a society, especially in the State of Penang, must look at technology. Our land is not enough, if we want to compare with Sarawak or Johor, their land is very large. But we in Penang must think outside the box to ensure that agro-food does not fall behind.

Next, Dato' Seri Speaker, the Organic Pineapple Project Based on the Urban Farming Concept. Next, the State Government, in collaboration with the Malaysian Pineapple Industry Board (LPNM). I would like to extend my thousand thanks to the Director-General of LPNM for extending a helping hand in introducing the Organic Pineapple Project Based on the Urban Farming Concept, the first of its kind in Malaysia. This futuristic approach allows organic pineapples to be grown not only on conventional agricultural land, but also in urban areas, housing estates, multi-storey buildings, and also through the plant bag method.

In line with the suggestion of our Honourable Chief Minister, this project elevates premium, high-value crops to meet the increasingly growing market demand. Currently we have ordinary pineapples. For Penang, we are trying to grow organic pineapples with a higher value compared with ordinary pineapples. This initiative transforms the paradigm of agriculture, proving that farming activities are no longer bound by the extent of land, but are based on technology, innovation and efficiency, that modern agriculture can flourish amid civilisation and food economics can take root in metropolitan spaces without compromising the sustainability of nature. Thank you to LPNM, the Malaysian Pineapple Industry Board.

The Livestock Sector. Dato’ Seri Speaker, in these past decades, within the framework of the MADANI Development Agenda which demands harmony between economic progress, environmental sustainability and the well-being of the people, the State Government continues to be steadfast and consistent in implementing the State Livestock Enactment to modernise the poultry and also pig industries. As often expressed by the Most Honourable Prime Minister, development is not merely growth in numbers but the building of people, social justice and also the dignity of the people.

Therefore, the Penang Department of Veterinary Services is mobilised as the implementing machinery, the main machinery, in a proactive and also far-sighted manner. Accelerating the upgrading to closed housing systems so that the state's livestock can emerge competitive, ethical and also resilient. I also wish to convey my appreciation to the Honourable Chief Minister for approving a total of RM4.25 million in 2026. A proof that policy is not rhetoric but a determination expressed in action.

Following on from that, the State Government is committed to increasing livestock productivity through the Livestock Industry Development Programme under the state development budget. Based on the Interim Agriculture Census 2024, the livestock sector remains the backbone of Penang's agro economy with a contribution of 44%, namely RM1.54 billion of the state's total agricultural sales value. The value of livestock output has, meanwhile, consistently exceeded RM1 billion since 2019, with a projection of RM1.91 billion in 2024. In 2025 alone, 44 breeders received allocations totalling RM955,000 Ringgit covering construction, renewal, farm upgrading, procurement of breeding stock, home plot development, equipment, and also AAT. Clearly, breeders are not only assisted but empowered to become players capable of competing in the modern livestock ecosystem.

In addition, the Napier Grass Planting Pilot Project on the UiTM Bertam leased land aims to produce livestock feed at a more competitive cost, and at the same time reduce dependence on imports. A total of 10 acres have been cultivated with 15 tonnes of Napier successfully produced, symbolising an innovative solution approach replacing a culture that repeats problems. In the context, the context of modern livestock systems, the upgrading of closed housing, the provision of buffer zones, the implementation of zero-discharge sewage and also compliance with good farming practices continue to be the priority of the State Government.

However, taking into account the historical reality that there are farms that preceded housing development, exemption from buffer zones is permitted on condition that compliance with the enactment is total and uncompromising. Here, the principle of wise justice emerges, namely firm in principle, fair in implementation, in line with the view of Professor Syed Muhammad Naquib Al-Attas that justice lies not only in the text of the law but in the wisdom of its implementers. Based on the latest data for 2025…

Mohd. Sobri bin SalehPAS · PNPermatang BeranganEN

Mohon mencelah Dato' Seri Speaker, mohon mencelah. Boleh. We welcome the State Government's intention to promote livestock farming carried out in closed farms. And just now the Honourable Member for Pantai Jerejak mentioned the existence of farms that are older than the housing estates, yes. We do not dispute the existence of the farms,

the existence of those farms. However, what we want to ask is that the control of waste discharge, that faeces, be prevented from being released into the river. So, if possible, I would like to invite the Honourable Member for Pantai Jerejak, let us go down along the Sungai Kereh and meet the residents there. To see for ourselves the pollution, yes. We, we do not, we do not prevent the pig farmers who are there, who already exist in Kampung Selamat. However, we want to ask that we can control the solid waste or waste discharge from the pig pens in Kampung Selamat. Yes. If you want to go down, let me know, I can bring you.

Fahmi bin ZainolPKR · PHPantai JerejakEN

Thank you. Honourable Member, yes. I will follow up on that answer in my next argument. Based on the latest data for 2025, there are 101 pig farms with a population of 115,267 pigs, compared with 106 farms with 161,882 pigs in 2024.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Yes, Pantai Jerejak, I want to ask: how many pigs are there in total over there now?

Fahmi bin ZainolPKR · PHPantai JerejakEN

I will follow up on the answer.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Ha, it's all right, please answer later.

Fahmi bin ZainolPKR · PHPantai JerejakEN

All farms have shifted to the closed-house farming system with regular monitoring of Biochemical Oxygen Demand (BOD). Livestock waste in Seberang Perai Selatan has been sent to the Kampung Valdor biogas plant as a step towards advancing economic productivity with ecosystem sustainability.

Evidence that progress is never built by plundering nature, but by harmonising profit with sustainability. At the same time, the planning of the First Beef Ruminant Livestock Centre in Penang will become a catalyst for diversifying the livestock industry, increasing the local meat supply, and strengthening the state's food security. In line with the words of Norman Borlaug, Nobel Peace Laureate and also the father of the Green Revolution, "Food is the moral right of all who are born into this world" (with permission). This initiative is a shield of the people's strategy so that the people of Penang are always assured of the right to obtain food that is quality, sufficient and also safe, without depending on outsiders.

In response to the Honourable Member for Sungai Dua and also the Honourable Member for Permatang Berangan. The district of Seberang Perai Utara recorded a reduction of almost 50% in the pig population in 2025: 61,554 pigs compared with 111,723 pigs in 2024.

The use of UMAS (Useful Microbes Active Solution) continues with weekly supplies for odour control in polluted areas. Next, HRB Q Tech Sdn. Bhd., a private company, has carried out a pilot study at two farms in Kampung Selamat, and so far BOD readings below 50 ppm have been achieved after the pond cleaning work. If monitoring fails to be achieved, another private company, Timeless Green Sdn. Bhd., will take over based on its proven success in Kampung Valdor. This is control at the farm level being carried out by the State Government and also the private sector to help reduce the problems that have been raised by the Honourable Member for Sungai Dua and also Permatang Berangan. This is at the farm level.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

This is Pantai Jerejak, Pantai Jerejak. What is the problem now? The pollution keeps happening. They keep discharging it directly. So this has become a big problem, large-scale pollution. So when it keeps happening, it causes distress to these residents, and the river fishermen themselves are also affected. So if people say that continuous discharge is happening, this is something that is not good. One pig, I read, discharges 4 kg. If there are 65,000 there now, how many kilos does that discharge a day? Surely they cannot contain this faeces; it is discharged straight into the drain. This is the problem we have.

Fahmi bin ZainolPKR · PHPantai JerejakEN

Correct. Let me continue with…

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

That is why we say the government needs to look into this matter. So, full stop.

Fahmi bin ZainolPKR · PHPantai JerejakEN

Let me continue with my arguments, and here I can get an answer.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Full stop, full stop. Fine, we are just going to let it pass as if nothing is there. As if no one says anything, no enforcement.

Fahmi bin ZainolPKR · PHPantai Jerejak

Sedang, sedang.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Our rivers are being destroyed.

Fahmi bin ZainolPKR · PHPantai JerejakEN

Wait, wait, I am still, I am still in the middle of my speech. Let Sungai Dua listen to mine later. Teluk Ayer Tawar, I want to continue with my speech.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Just a little. A little from me. Just now.

Fahmi bin ZainolPKR · PHPantai JerejakEN

No, I won't give way. I will not give way. I will not give way.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

No, I won't give way.

Fahmi bin ZainolPKR · PHPantai JerejakEN

Wait a moment. Let me continue.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Sikit ja.

Fahmi bin ZainolPKR · PHPantai JerejakEN

You can tell your story later.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

However, if the government can give an assurance to take the faeces to, to Tambun, Valdor, if the government can guarantee, give an assurance in the near future to overcome this pollution problem, take the waste and bring it to Valdor. That is what should be done.

Fahmi bin ZainolPKR · PHPantai JerejakEN

We are doing it. We are doing it. The government is doing it.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Don't just conduct studies; we need to, need to, need to resolve it immediately.

Fahmi bin ZainolPKR · PHPantai JerejakEN

We are doing it, we are doing it. Okay, we are doing it. Okay, this control is at the farm level. That is, at the farms, the efforts of these two companies, namely HRB Q Tech, which is looking at the farms in Kampung Selamat, and also Timeless Green Sdn. Bhd. What does Timeless Green do? It collects this waste and brings it to Kampung Valdor right now. Right now Timeless Green is implementing the collection of this waste at Kampung Valdor. However, we are asking it to come in. Now we are facing a shortage of waste instead. Once Timeless Green has set up the technology, built it, collected the waste and produced biogas. Right now the problem we face in Kampung Selamat is a shortage of pigs. There is no more faeces at all, and it has decreased by almost 50%. Sorry, sewage material. Okay, not enough. Implementation has already been carried out.

As for control at the level outside the farm, that is in the river. The final cooperation, cooperation is being studied together with NAHRIM. In strengthening water treatment where waste water is channelled to the NAHRIM treatment ponds for decontamination before returning to the river in a controlled manner. We are studying this cooperation. With NAHRIM managing the final stage, while the two companies, namely the private sector I mentioned earlier, will focus on pond cleaning at the waste management stage. This approach reflects the implementation of, with permission, Whole of Government, Whole of Society, where all resources are mobilised, and no party washes its hands of responsibility. The private sector, the livestock breeders and also the State Government itself.

Up to November 2025, a total of 10 compound offences amounting to RM60,000 have been issued, compared with 23 compounds amounting to RM156,000 in 2024. And for the information of this august House, in Valdor, no more complaints have been received, and the mechanisation and implementation in Valdor we are trying to apply in Kampung Selamat. The drop in complaints compared with 2024 indicates that the improvement is not merely recorded in reports but is truly on the ground. As for the poultry sector, a total of 178 licensed farms have been recorded.

Goh Choon AikPKR · PHBukit Tambun

Minta laluan.

Mohd. Sobri bin SalehPAS · PNPermatang BeranganEN

I wish to interject. I wish to interject. Yes, okay, okay.

Goh Choon AikPKR · PHBukit TambunEN

Okay. Dato' Seri Speaker. Thank you to Pantai Jerejak. Timeless Green in Kampung Valdor, from planning to implementation today, has taken approximately close to 10 years. Because it started around 2006 and was only implemented this year. And it has now shown success. There is indeed no longer any odour problem after 50 years, Sungai Dua. It is not easy. But the design for Kampung Valdor was for 60,000 pigs. At the beginning of implementation it was 20,000. Now it has increased to 35,000, and there are efforts to bring in from outside, at Simpang Ampat and Kampung Jawi.

My question is, why has Timeless Green not been continued in Kampung Selamat, and why not try opening it up to other companies to carry out studies and implement the management of this sewage waste? Second, Sungai Dua may have earlier suggested bringing it directly to Kampung Valdor. Has the Department of Environment (JAS) and also the EXCO for Agriculture ever studied whether, in terms of transport, it would be cheaper than building a new power station at Kampung Selamat? That is my question.

Mohd. Sobri bin SalehPAS · PNPermatang BeranganEN

Mr Chairman, please, please allow an interjection.

Speaker (Speaker)EN

Wait, wait, let him make the issue clear. May I? If so, I will let you assist me.

Fahmi bin ZainolPKR · PHPantai JerejakEN

Thank you to Bukit Tambun, where this issue has been resolved in the area of Kampung Valdor for almost 60 years. This is proof that the State Government is not keeping quiet. The problem that arises is when we lack sewage waste to be brought to Kampung

Valdor, that is it. And also, if a new plant is built in Kampung Selamat, it will incur very high costs. Because the faeces are decreasing now, and also if it is brought to Kampung Valdor, it travels a very long distance, and we also do not want to restrict Timeless Green to only playing a role. We open space for whichever party can help quickly; we open the space and the door. We do not want to wait until there is a lot of waste before we can solve the problem. That's why space has been opened to any private party or individual who can compete to help solve this problem. I hope this problem can be resolved just as it was in Kampung Valdor, as in Kampung Selamat.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

So it takes 10 years, and river folk will be polluted for 10 years?

Fahmi bin ZainolPKR · PHPantai JerejakEN

Honourable Member, I understand too. I am trying.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

If you understand, then, then, don't talk rubbish.

Fahmi bin ZainolPKR · PHPantai Jerejak

Melelong.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

I, I want to ask, request (Interruption)

Fahmi bin ZainolPKR · PHPantai JerejakEN

I also do not want to, do not want to argue unscientifically and so on. I mentioned it earlier.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Okey, okey.

Fahmi bin ZainolPKR · PHPantai JerejakEN

We have resolved it in Kampung Valdor, and our efforts are being made in Kampung Selamat with two actions we are taking, cooperation with NAHRIM. I want to continue with my speech. Thank you, we have given the space.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

(Interruption) Why at Telok Ayer Tawar won't they allow this space? They allow space for others. Why won't they allow…

Fahmi bin ZainolPKR · PHPantai JerejakEN

I don't want to, I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Why won't you? Pantai Jerejak, I am asking.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Saya minta.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Saya minta.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Saya minta.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Saya minta.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Saya minta.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Saya minta.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Saya minta.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Saya minta.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I won't allow it.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

I am asking why, why can others be allowed and I cannot ask? (Interruption) Tasek Gelugor Parliament, Telok Ayer Tawar too.

Speaker (Speaker)EN

Okay, okay, let's continue.

Fahmi bin ZainolPKR · PHPantai JerejakEN

I want to continue. As for the poultry sector, I have already spent about 10 minutes. For the poultry sector, 178 farms have been recorded as licensed, with a population of 14,110,000 birds. All farms with a population of 20,000 birds and above are required to upgrade to closed-house systems by 2030. So far, 20 farms have completed their upgrades

while another 18 farms are in progress. To ensure a smooth implementation, the State Government proposes extending the planning permission exemption to 2027. This is very important to ensure that these poultry farms are closed. Right now they are open. We want them closed so that problems of pollution, or waste disposal, can be resolved in a good condition.

As a result, Penang is now a national reference in applying the modern farm concept through the Pig Farming Enactment (2016) (with permission) and also the Poultry Farming Enactment (2020), in line with GPP LANTERA PLANMalaysia. Penang remains the only state in Malaysia that has institutionalised this concept comprehensively through a complete and enforceable legal framework. This is proof that the government does not wait for fate to change circumstances, but changes circumstances through policy, strategy and planned implementation. Even when storms come, this administration has not wavered in steering the course until the state returns to being peaceful, orderly and prosperous.

This year alone, Penang has been tested by the ASF outbreak. However, the effectiveness of the Closed Housing System has succeeded in limiting infection to only 2,545 birds involving five farms, starting 8 October 2025, compared with 27,344 birds from 21 farms in 2023. This shows that the spread of the outbreak can be contained provided that modern farm concept can be implemented well. To conclude all that has been said, the state's livestock strategy is not merely a matter of sector administration, but a vehicle for protecting small breeders, ensuring the food security of the people and preserving the sustainability of the environment.

Fisheries sector, Dato' Seri. For two decades, the State Government has consistently championed the tuna landing industry as the maritime lifeblood of Penang. This state has its own record since the 1990s when Batu Maung became the centre for tuna administration from the Indian Ocean before its operations were moved to the Butterworth Deep Water Terminal in 2015. More proudly, the port of Penang has also been gazetted as one of the main tuna ports in our country. This momentum has become more prominent as landings rose from 431,000 kg worth RM7.76 million in 2024 to 3.051 million kg as of September 2025 recorded at the Butterworth Deep Water Terminal. This is a clear indicator that the state's maritime ecosystem continues to be competitive and also strategic. The more we talk about tuna,

the more foreign and local vessels will come to Penang. Thank you to those who often mention the tuna industry.

Just like the maritime thinker pioneered by Alfred Thayer Mahan in his book, The Influence of Sea Power Upon History, with power, in his book it is said, a nation's maritime power lies in the strength of its sea and the food that sustains its people. That reality is reflected in the strength of this state's tuna sector. I seek the support of all parties for us to further strengthen this industry. Therefore, the study on the possibility of developing the Penang Tuna Port towards national food security, under the RMK13, is believed to become an accelerator for systematic, high-impact tuna sector growth. The Government will examine the economic, logistics, manpower, investment, technology and supply chain spectrum based on data from various technical agencies.

In answer to the question from the Honourable Air Putih, the implementation of the study will be fully coordinated by LKIM (Lembaga Kemajuan Ikan Malaysia, Malaysian Fisheries Development Authority) in the near future through strategic engagement to ensure that the study findings are accurate, comprehensive, and based on the well-being of the people as well as fishing communities. Among the feasibility studies to be carried out, the proposed ones include Traffic Impact Assessment (FIA), Social Impact Assessment, Marine Facilities Security Assessment (MFSA), hydraulic studies, coastal-related studies such as the Integrated Shoreline Management Plan (ISMP) Negeri Pulau Pinang 2010, National Coastal Erosion Study for Malaysia 2015, Garis-Garis Panduan Jabatan Pengairan Saliran, Garis Panduan Kawalan Hakisan untuk Projek Pembangunan di Zon Pantai and also the Rancangan Fizikal Zon Pesisiran Pantai Negara, Marine Risk Assessment (MRA) and also other related studies.

Dato' Seri Speaker, the Marine HDPE Round Cage Pilot Project in the waters of Pulau Gedung, Penang. This pilot project is a modern solution replacing traditional wooden cages with HDPE cages that are sturdier, safer and also more productive. The cage, with a diameter of 19 metres and a depth of 5 metres, is suitable for high-value species such as Bawal Emas, Kerapu, Jenahak and also others.

For this pilot project, six months of Bawal Emas farming is proposed. One cage is capable of producing 16 tonnes of fish with an ROI of nearly 48%, based on an operating cost of RM238,000.00 and a revenue value of around

RM352,000.00. Apart from high returns, these HDPE cages guarantee structural durability, low maintenance costs and an operating period exceeding three years, making them the best choice for commercial-scale marine livestock industry.

Dato' Seri Speaker, the Sirehmax Application Pilot Project for aquaculture farmers as an alternative to antibiotic use. This product is a feed supplement which inhibits the growth of gram-positive bacteria, gram-negative bacteria and fish parasites. In addition, it increases the health level and resistance of livestock by 80% to 90%. This initiative is in line with global demands, which reduce dependence on antibiotics and mainstream organic treatment and responsible aquaculture practices for the sake of national food assurance and access to export markets.

To organise the aquaculture ecosystem systematically, five ZIA (Aquaculture Industrial Zones) have been gazetted or proposed on 24 July 2024. Among them are Perairan Sungai Dua, Perairan Pulau Aman, Perairan Batu Maung, Perairan Pulau Betong and Perairan Pulau Jerejak. In line with the restructuring of the industry, this Committee intends to introduce new strategic sites to be gazetted as Aquaculture Industrial Zones in order to improve production control, strengthen the supply chain and also ensure the long-term sustainability of aquaculture development.

Dato' Seri Speaker, at present the State Government continues to plan and implement high-impact programmes to foster a cooperative entrepreneurship culture, in empowering the business capacity of cooperatives so that they remain sustainable in the currents of the modern economy. This is because cooperatives are not merely an economic complement, but an instrument of social development that ensures the well-being of the people can be enjoyed inclusively.

In the meantime, the State Executive Council (MMK) Cooperative Development Committee wishes to record its highest appreciation to the State Government for approving an allocation of RM200,000.00 for the implementation of the Geran Mutiara MADANI in previous years, namely 2024 and also 2025. It has become a catalyst for forming a more comprehensive and competitive cooperative ecosystem. A total of 43 cooperatives, comprising 32 adult cooperatives and 11 school cooperatives, have received benefits from this assistance. It is not the first time, but for the first time, Micro Cooperatives, Medium Cooperatives and also cooperatives that have never received government assistance have been given space and also

opportunity to receive the benefits of this Geran Mutiara MADANI. This manifests the principle of inclusive economic justice. Accordingly, the State Government intends to continue the grant initiative in the coming years.

Dato' Seri Speaker, in the arena of state economic development, the State Government continues to shoulder the trust and undivided determination in empowering the cooperative sector. In the administration of MMK Cooperative Development, the strategies formulated are not merely fulfilling administrative routine, but are indeed a manifestation of structural transformation based on policy, innovation and integrated implementation. As the saying goes,

"If the bamboo is not split, how can one obtain the sago?"

This renewal requires collective commitment for extraordinary results. Among the core initiatives to be realised are:

(i) K-Shop Website Usage Workshop: 70 active cooperatives have been involved in accelerating cooperative digitalisation through e-commerce platforms, enhancing marketing capacity and product competitiveness beyond physical location limits; (ii) Penang MADANI Cooperative Carnival Berdaya Koperasi: 20 state-original product producer cooperatives have been involved in strengthening economic networks and product visibility by becoming drivers of the community economy; (iii) Darjah Koperasi MADANI 2025: with 100 cooperatives involved across five districts: Seberang Perai Utara, Seberang Perai Selatan, Seberang Perai Tengah, Barat Daya and also Timur Laut, in delivering information directly and business opportunities to the grassroots as well as coordinating strategic synergy between cooperatives, agencies and also the State Government; (iv) Asas Keusahawanan Koperasi Workshop (AKSI): A total of 120 students at secondary school level from 30 schools have been involved in this AKSI Programme by presenting, by applying products introduced by secondary school students; and then (v) Saringan Aksi: State-level final AKSI Programme, 16 school cooperatives competed and also five were selected as the best among cooperatives in

enhancing a culture of intellectual competition and business innovation among school cooperative students towards professionalism and also competitive creativity.

I wish to extend my heartiest congratulations to Koperasi SM Dato' Haji Mohd. Nor Ahmad for becoming the AKSI 2025 Champion, who will represent, will represent the State of Penang at the national level by creating a new innovation for worm-based compost. Not only at government level, but also at secondary school level, participation in creating new innovations in technology-based technologies.

Dato' Seri Speaker, ultimately all these initiatives prove the commitment of the State Government in uplifting cooperatives as a progressive, inclusive and also sustainable people's economic institution. Therefore, with permission, Allah Subhanahu Wa Ta'ala and our shared unity of thought, Penang's cooperative sector will continue to write pages of success. Not only recorded in figures, but carved in history as a legacy of economy that prospers all the people. In conclusion, as a state firmly committed to driving quality improvement in line with the aspirations of the mission and also vision of Penang2030, the State Government will continue to put in comprehensive efforts by focusing fully on agriculture, fisheries, livestock and also cooperative development in order to ensure high-quality, sustainable and also high-impact results for the people. As the saying goes.

"If good seeds fall into the sea, they become islands."

Every agenda that is arranged, every agenda that is arranged with a clear vision will certainly produce achievements of value for the state and also the people. With this, I support the 2020 Budget. That is all, Wabillahi Taufiq Wal Hidayah Wassalamu'alaikum Warahmatullahi Wabarakatuh.

Mohd Sobri bin SalehPAS · PNPermatang BeranganEN

Dato' Seri, yes. Can this be a little?

Speaker (Speaker)EN

Wrong button. Next time, get in quickly. Here. Okay, thank you. Thank you, Pantai Jerejak. I would like to request the next EXCO, what's the name, Perai. Please.

Honourable Dato' Seri Yang di-Pertua Speaker, the Honourable, the Most Honourable Chief Minister of Penang, the Honourable Members of the State Executive Council, the Honourable Members of the State Legislative Assembly, ladies and gentlemen. First of all, I wish to record my highest gratitude that we are once again able to gather at the Second Meeting of the Third Session of the 15th State Legislative Assembly, to carry out the responsibility of resolving matters of public interest for the welfare and progress of the people of the State of Penang.

I also wish to record my appreciation for the trust given to me to lead the portfolio of Housing and Environment. This responsibility gives me, and the departments under this portfolio, the space to continue improving the state's housing system, and ensuring that efforts to conserve and sustain the environment are carried out in a more orderly and effective manner. Not forgetting, my words of appreciation and thanks to the Most Honourable Chief Minister for the Budget speech and the tabling of the Supply Bill and Development Estimates 2026, which emphasise the welfare of the people, sustainable development and the well-being of the people of the State of Penang. Next, allow me to begin this winding-up speech by touching on issues relating to the Tamil National-Type Schools, the housing issue, followed by the Environment, which are among the priorities in the State Government's development agenda.

Honourable Dato' Seri Yang di-Pertua Speaker, one of the greatest challenges faced by most Tamil national-type schools in Penang is the issue of land ownership. Some schools have operated for decades but still do not have permanent ownership status, causing development processes to be unable to proceed perfectly. Under the leadership of the Special Committee on Tamil National-Type Schools, the main focus has been given to resolving these land problems.

As a result, a total of eight Tamil National-Type Schools have succeeded in reaching full settlement or are in the final settlement phase.

I take this opportunity to extend my million thanks to my Deputy Chairman, namely Bagan Dalam, who has always been with me in overcoming all problems regarding Tamil schools in Penang.

(1) Malakoff National-Type School: Land titles have been issued, and are in the process of registering the ownership transfer; (2) Sungai Ara National-Type School: The process of handing over the grant has been completed last year; (3) Juru National-Type School: An understanding with the PDC party has been reached. PDC agreed to allocate a plot of land, measuring 12 acres to the school's LPS (School Management Committee); (4) Alma National-Type School: Part of the land is in the process of ownership transfer and the remaining part will be discussed with the ADUN for the area, namely the ADUN, Machang Bubuk; (5) Mayfield National-Type School: A meeting with the Armed Forces Fund Board (LTAT) will take place on 27 November this month, to find a final solution for this school; (6) Palaniandi National-Type School: One lot of government land has been transferred to the LPS. As for the other two lots, they are in the process of land acquisition; (7) Transkrian National-Type School: The Tamil National-Type School Transkrian is in the process of filing a case at the High Court for the transfer of ownership from the name of the English President to the school's LPS; (8) Tamil National-Type School Transkrian: One lot of land has been identified, and is now in the process of negotiation with the new landowner and the LPS of Ladang Transkrian, Ladang Krian.

These measures are a clear commitment of the State Government to ensure the sustainability and future of Tamil schools are secured in terms of ownership rights and development planning.

Honourable Dato' Seri Yang di-Pertua Speaker, apart from resolving historic issues, the State Government is also drawing up future plans to meet the educational needs of the Tamil community. On this occasion too, I wish to congratulate the Honourable Member for Bagan Dalam once again for always helping me overcome all issues relating to school infrastructure.

Fahmi bin ZainolPKR · PHPantai JerejakEN

Congratulations twice.

Yes. I must thank those who help me carry out my duties professionally. As Deputy Chairman of Infrastructure for Tamil schools, who have worked tirelessly to ensure infrastructure projects run professionally and smoothly. In addition, I, together with the Honourable ADUN for Bagan Dalam, am working to add one more Tamil National-Type Primary School, following the continuing rise in the existing number of pupils. If this proposal is successfully implemented, the total number of national-type schools in Penang will increase from 28 to 29.

Regarding the proposed construction of a Tamil National Secondary School. This matter is still under discussion and study because the committee needs to examine various factors first, such as approval from the Ministry of Education and others. If this proposal is successfully realised, this school will be the first secondary school in Malaysia. This will be a great achievement for our committee. We must work tirelessly to ensure we obtain all the approvals so that we can establish the first Tamil secondary school in Malaysia, namely in Penang

Kumaran a/l KrishnanDAP · PHBagan DalamEN

Dato' Seri, may I have the floor. Thank you, Dato' Seri Mr Speaker. Thank you for the announcement Dato' Seri made earlier regarding the application I brought, namely the establishment of the first Tamil secondary school in Penang, and for the information of this August House.

Every time I visit Tamil schools in Penang under the Special Committee on Tamil Schools, not only in my constituency but in other areas, I see the faces of young children full of hope and full of dreams. They want to become engineers, doctors, teachers and so on. But when they complete Year 6, their dreams are somehow thwarted because they cannot continue their further studies in their mother tongue. So with that, I, with deep humility,

humbly appeal to the State Government to expedite the application for the construction or approval of the first Tamil secondary school, and as was also mentioned earlier, we already have a plot of land measuring four acres that has been set aside for the construction of a Tamil school in my constituency, in Bagan Dalam. So I request that this matter be brought directly to the attention of the Honourable Minister of Education and also the Most Honourable Prime Minister so that approval can be granted for the sake of our children's future. We are not requesting this school for political purposes. Not for other purposes, but because our children have the right to dream, and the right to make those dreams come true. So, I express my full support and thanks to the Honourable EXCO member and also the Penang State Government for considering my application. Thank you.

Thank you, the Honourable Member for Bagan Dalam. In total, the number of students in Tamil schools is more than 5,000. If we take into account that 10% enter secondary school, it is certainly possible to establish one school in Penang, lah. We will examine it together later, okay. In addition, I also intend to introduce special education classes in each of the 28 existing Tamil National-Type Schools. This is to meet the needs of pupils who require special learning support. However, this proposal is also still under study and needs to be refined before it is implemented.

The Special Committee on Tamil National-Type Schools also focuses on improving leadership capacity and teacher skills. Various programmes, training and workshops have been organised together with the State Education Department and the Headmasters' Council, involving headmasters, senior assistants and also teachers

to ensure that school administration is more professional and school development can be planned more systematically.

Dato' Seri Mr Speaker. I would like to inform all the Honourable Members in this August House. I, together with the committee members, have succeeded in obtaining a plot of land measuring 1.5 acres on a lease basis from the private sector to make it the main field for SJK Bayan Lepas and also a parking area for teachers. In addition, for the first time in the history of SJKT administration, we have held a sports carnival. A SJKT Penang Sports Day Carnival on 12 April at Batu Kawan Stadium. This inaugural event involved all 28 Tamil National-Type Schools in this state and more than 1,000 participants consisting of pupils, teachers and parents.

Gooi Zi SenDAP · PHPadang LalangEN

I also support it.

Yes. Thank you. This carnival successfully nurtured sporting spirit, strengthened relations between schools and encouraged community involvement in the development of SJKT students' character. It did not stop there. Through this committee, a Tamil National-Type Schools Contingency Fund was also established, managed by the Honourable Member for Bagan Dalam, a special fund created to ensure Tamil schools receive emergency assistance promptly whenever urgent needs arise. This fund functions as a quick financial support without having to go through lengthy bureaucratic processes. At the same time, it ensures schools can continue operating smoothly and pupils are not affected. This committee is responsible for coordinating and channelling special allocations for the development of Tamil schools through state grants and special funds. In 2025 alone, a total of RM2.3 million has been distributed to 28 Tamil schools and 14 kindergartens, covering infrastructure improvements, training courses, purchase of school equipment and various other learning needs.

On this occasion, I also express my disappointment with the Honourable State Assemblyman for Sungai Bakap, who has never asked about or shown concern for the development of SJK Sungai Bakap. Nevertheless, I and the ministry remain committed and will ensure that the development of the school continues to be realised.

Dato' Seri Mr Speaker. Next, may I respond to the follow-up questions on housing issues, referring to the question raised by the Honourable Member for Sungai Dua regarding the selection and offering process of Rumah MutiaraKu. I wish to emphasise to the Honourable Members that the selection and offering process of Rumah MutiaraKu is implemented through the Housing Outcome Performance Committee meeting, namely the Housing Outcome Performance Committee (HOPE), in short called (HOPE), transparently based on a transparent and integrity-based housing information system without interference from interested parties. At this time, there is no proposal to appoint or involve any representatives of the people, whether from the opposition or from the government coalition or the opposition, to join this HOPE meeting.

Up to 31 October 2025, the HOPE meeting has sat 16 times and a total of 5,560 housing offers have been given to the people of Penang. Next, to answer the question raised by the Honourable Member for Bukit Tambun, the Taman Murai Jaya Low-Cost Apartment Project was 100% complete on 31 December 2024 and is now in the process of obtaining the Certificate of Completion and Compliance, namely CCC, and handing over of vacant possession, namely Handing Over Vacant Possession, and is expected to be completed before the end of this year, December 2025.

Dato' Seri Mr Speaker, I...

Goh Choon AikPKR · PHBukit Tambun

Minta pencerahan.

Let me interrupt first. Okay. Yes.

Goh Choon AikPKR · PHBukit TambunEN

Yes. Yes. Thank you, Dato' Seri Speaker. Thank you, Perai. That is my question. Completion in December, and now it is already November. Why does the CCC take almost one year. Second, I have made applications many times for something, in terms of balloting or allocation to applicants, because there are hundreds of applicants. There are only 38, but until now no party has contacted me, after I have submitted written questions and also verbally for a long time. Thank you, Perai.

The dream will become a reality in the 12th month. To answer the earlier question. When we select contractors or developers who build these compliance units, there is also a slight problem. So the possibility of not getting that qualifying certificate is because the technical requirements were not fulfilled. So that takes about one year. The local authority will not directly issue the CCC letter if the building is not completed as approved. That is the delay, and I myself have gone to the site, and it appears the building is already completed. In the 12th month, our great hope is that we can get the CCC, and after that we will contact the Honourable Member's office for the balloting or offering of the units, and so on.

Dato' Seri Mr Speaker. I also welcome the Federal Government's proposal to draft the Urban Renewal Bill, which also received support from the Honourable Member for Batu Lancang and the Honourable Member for Kebun Bunga. The Urban Renewal Bill is expected to be tabled for its second reading in December 2025.

Meanwhile, the State Government through the Penang State Housing Board has adopted the Penang Urban Renewal Guidelines, which prioritise the protection of owners' rights through a consent process that is in line with the law, and retain original residents through replacement units that are newer and with a one-to-one basis and also with a wider floor construction. Complete with modern facilities.

Dato' Seri Mr Speaker, in response to the issue raised by the Honourable Member for Pulau Betong regarding the abandoned projects of Quinton Apartments and Seri Bayu Apartments. Although this matter is an obligation of the Ministry of Housing and Local Government, the Penang State Government, as a government that is concerned about the welfare of the people, has taken a proactive step by appointing a financing partner to carry out the restoration works of the projects concerned so that the interests of the buyers continue to be protected.

The new timeline for both projects is being coordinated with the liquidator and financing partner under the supervision of the State Government. The current target is to complete the projects in the fourth quarter of 2026 or the first quarter of 2027, subject to approval of the recovery plan and the launch of construction works.

This is a bit sad. The state assemblyman never met me. Maybe he met me in a dream the other day. We met in this House one year ago and I told the state assemblyman that we are helping to complete the project. It is not that we are not doing work like yesterday, okay. We are indeed moving forward and this project will happen. When it is ready for handover or the commencement of the continuation works, we will inform the state assemblyman. It has not yet been ready to be announced, because if we announce now, someone might sabotage it, okay. We must be patient.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Dato' Seri Mr Speaker, I would like some clarification. Yes.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Can I get an explanation on when the continuation of this project will start. Then, which company will take over. The company that went bankrupt.

Okay, perhaps the state assemblyman did not hear my explanation earlier. We will start work between the end of this year or early next year. That is the start, yes. Completion, possibly at the end of next year or the quarter after that, 2027. We cannot mention names yet. Because we have not, we do not want anyone to sabotage it at this time. This is a very sensitive project on both fronts and we are trying to rescue this project at the state level. That is a very, very good initiative. If I am not mistaken, this is the second project of the Penang State Government under the Penang Government's attempt to revive an abandoned project.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

One more request, if there are any engagement sessions later, please inform my YB, inform me.

Certainly, certainly we will inform you.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Okay, thank you.

Only, if we are not ready, we cannot inform yet, okay. When we are ready, we will inform the state assemblyman. Dato' Seri Mr Speaker, in response to the question from the Honourable State Assemblyman for Sungai Bakap, based on a check by the Penang State Housing Board and MBPP, we have never received any official complaint from the buyers of Casa Ria Apartment regarding building defects. If this matter is referred to the State Government, the Penang State Housing Board will advise buyers on their rights under Act 118 and to liaise with the developer. Buyers have a defects liability period, namely DLP (Defects Liability Period), of 24 months after receiving the keys. All claims must be copied to a lawyer.

If the developer refuses to act, buyers may lodge a complaint with the Home Buyers Claims Tribunal (TTPR) under the KPKT. What I find puzzling is that Sungai Bakap cannot solve the problems of Sungai Bakap, and now wants to go to Sungai Ara.

Abidin bin IsmailPAS · PNSungai BakapEN

Permission to interrupt, the Honourable Member for Perai. Thank you, Dato' Seri Mr Speaker. Although this issue is outside my constituency, when the complainant lodged the complaint at the ADUN Sungai Bakap Service Centre, I had to take note of their appeal. Pardon me to the ADUN concerned. Okay, regarding the information from the Honourable Member for Perai. The issue raised after the Defects Liability Period, namely 24 months, has been submitted to the developer for repair. But it could not be done by the developer. So the issue arises here, when leaking or seepage occurs, whether we like it or not, even in financial difficulty, the occupants have to do it themselves, bear it themselves. So the EXCO of the Honourable Member for Perai stated there is Act 118, and later, God willing, we will meet behind. We ask that the issues raised by the buyers be resolved. Thank you very much. Do not be disappointed, do not cry.

Not only is the Penang State Government caring, the Penang State Housing Board is also caring. Whatever housing problems you have are always welcome to come to our office for negotiation. If we cannot give a decision, at least we can give advice on how to overcome this problem. And for the Honourable Member's information, if the Defects Liability Period has expired, unless it is a structural failure, unless it is a structural failure, the buyer must repair the house because that is natural wear and tear. That is in Act 118.

Apart from answering the Honourable Members, the following are the initiatives of the Penang State Housing Board. Throughout my holding of the portfolio of EXCO for Housing, amendments and improvements to the Rumah MutiaraKu guidelines and the introduction of a new category of Rumah MutiaraKu, namely a category B2 and category D, were introduced during my tenure as EXCO for Housing. The MADANI Home Campaign from 1 June 2025 to 31 May 2026 to stimulate the property market, including the new property market and also the completed one, namely the overhang product. The annual Rumah MutiaraKu and Penang Property Expo involving developers, financial

institutions and government agencies, and providing key services of the Penang State Housing Board.

We also have Customer Meet-Up Days and quarterly outreach programme sessions to improve the service quality of the Penang State Housing Board. Six sessions have been held up to 31 October. And also applications for Rumah MutiaraKu, namely we assist buyers in registering in the online registration system created by our staff at the Penang State Housing Board. And also this concerns an outreach programme for the ADUN for Pinang Tunggal, my colleague. He once asked to hold an outreach programme session at the KADUN Service Centre of Pinang Tunggal.

We in the Government also do not permit such activities in service centres. We will hold such activities at public venues. Not at political venues. We place them at public venues, all six programmes we have held were at places like C-Mart and shopping malls. We have been at Gurney Paragon and similar places. Up to today, we have done many. But to answer the Pinang Tunggal question, we will arrange an outreach programme at SPU in a short time.

Zulkefli bin BakarBERSATU · PNPenantiEN

Permission to interrupt, YB. YB, I am trying to get an answer to something I feel I have been asking for a long time. What are the doubts and problems that prevent the HOPE Committee from allowing the opposition to attend the committee, because at least we would know what is happening and perhaps also hear what the Honourable EXCO answers. We already know this from the meeting.

I think the Honourable Member went for coffee, perhaps. Yes, I have already explained earlier.

Speaker (Speaker)

Dah, dah.

Whether opposition or government, I do not allow it. I don't want any political interference in the selection process.

Zulkefli bin BakarBERSATU · PNPenantiEN

But the earlier answer the YB gave us was that you would consider it, lah.

We can sit down and discuss. I have made a proposal, I want to have a session, for the good of our Members from the Opposition, to understand how the Board operates. I want to have a briefing session for all Opposition Members so that Members also know our process, so that they do not always blame us, because they lack knowledge of our operations. I want to hold a session with all Opposition ADUNs where the Board will give a briefing on how we operate, our SOPs and how selection and so on are done. At least the Opposition will understand its process so that next time if they want to ask questions, with me too they will know the facts, which are true, yes.

Zulkefli bin BakarBERSATU · PNPenantiEN

Let us appreciate it, because we also know the YB is good, yes. The YB is indeed very good at this work, only we want to understand it further.

No matter whether Government or Opposition. We do this only for the people of Penang, yes. The committees under the Housing Portfolio, we have set up several committees under my Housing Portfolio since I was entrusted as EXCO for Housing. The Penang Bumiputera Property Control Committee. With all due respect, I hand it over to YB TKM 1 as Chairman of this committee because it concerns Bumiputera units. The Penang State-Level New Concept Housing Management Committee, and also

the Committee on the Use and Purchase of MutiaraKu Housing Quota, the MutiaraKu Housing Development Committee, the Urban Renewal Committee, the MMK Housing Committee, the Appeals Committee, the Performance and Achievement Committee, namely HOPE, and the Legal Enforcement Action Committee. We have many committees to ensure our work runs smoothly and that we can provide the housing that the people of Penang need.

Honourable Dato' Seri Mr Speaker, for the information of the Honourable Members, under the resident relocation programme, the State Government has successfully relocated more than 1,000 families. Among the projects that we have successfully completed is the relocation of 272 residents in the Ladang Kalidonia project, where 112 units for Phase 1 have already been handed over, while 160 units in Phase 2 are under construction. And 68 residents in the Ladang Byram project have just been handed the keys to their completed homes. The residents involved have been offered houses on a hire-purchase basis. For the Byram project residents, we sell them on a hire-purchase basis, while for the Kalidonia residents we give them free of charge because these are former estate workers.

At present there are four more squatter resident relocation projects that were planned for implementation after I was given the assignment as EXCO. Number one, the Kampung Hujung Batu Project involving the relocation of approximately 340 families in the Bagan Dalam area. Second, the Kampung Main Road Project involving 128 families. Third, the Kampung Manis Project involving 278 families. And fourth, Kampung Sungai Kecil involving 23 families. If all these projects are developed, we will be able to supply approximately 10,000 MutiaraKu houses across these four projects, to meet the wishes of Penang buyers who have waited so long for their turn to buy a house.

Honourable Dato' Seri Mr Speaker, next, allow me to respond to the matters raised concerning environmental issues. As everyone knows, the challenges relating to the environment are becoming increasingly complex.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

The Honourable Member for Perai.

I haven't finished this paragraph yet.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

Sorry, just a brief interruption. Before moving on to the environment.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

Regarding the questions and queries I raised in my debate about Kampung Bagan Serai. Will it be answered by the Honourable Member for Perai or by another Honourable Member? Because 117 families have been waiting so long and only receive an allowance of approximately RM300 a month for house rent. Only RM350 house rent. So I ask for that explanation. Thank you, Honourable Member for Perai.

I have not forgotten. Whenever there is a housing topic, I always must answer. For this question, YB Sungai Acheh will answer later, yes. Don't worry. We have an understanding, Sungai Acheh will answer. I always get fewer questions because the answers are already prepared. So, nobody wants to ask me in this session, yes. Honourable Dato' Seri Mr Speaker, next, allow me to respond to the matters raised concerning environmental issues. As everyone knows, the challenges relating to the environment are now increasingly complex and require strong commitment and cooperation from various parties to be addressed and tackled effectively. The question raised by the Honourable Member for Sungai Puyu concerns the gazettement issue of Middle Bank.

As we are aware, Middle Bank is the largest seaweed area in the northern waters and is the only most important ecological asset in Penang's waters. Middle Bank is an area that should be protected and handled with full attention. The State Government recognises the importance of this area but is of the view that gazettement must be carried out strategically because several major development projects are underway in nearby areas, such as the rehabilitation of the Jelutong disposal site, the IJM project, the construction of a work platform and the planned widening of the port. Immediate gazettement could give rise to legal implications that would affect the implementation of these strategic projects. Although development is carried out around Middle Bank, the government ensures that the core ecosystem areas are not disturbed and that all projects comply with the EIA and environmental mitigation measures. At this time, gazettement cannot be implemented due to administrative, legal and agency coordination requirements. However, the State Government remains committed to preserving Middle Bank through continuous monitoring, responsible development practices and science-based policies, while assessing suitable long-term protection mechanisms in the interest of the people and the sustainability of the state.

Honourable Dato' Seri Mr Speaker, besides that, I would like to share that starting this September, the State Government has taken more proactive steps by introducing the Penang State Day Plastic-Bag-Free Campaign. Under which plastic bags are no longer supplied to consumers every day. As an additional initiative to support this campaign, the State Government has provided reusable bags for distribution to the people of Penang. A total of 100,000 bags will be distributed and so far we have distributed approximately 35,000 bags. This step is not only to reduce the use of plastic bags, but also to be a symbol of the State Government's practical support for eco-friendly lifestyles and sustainable practices.

Honourable Dato' Mr Speaker, in conclusion, before I end this winding-up speech, my sincerest thanks go to Honourable Dato' Seri Speaker for carrying out his duties with such patience and fairness.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Dato' Seri, I think you have not yet answered about environmental pollution.

Pollution where?

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

The pig waste, this, this is also within this jurisdiction.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

So what's it called, I want to know how, what action, what's it called, the environment, regarding the pollution from pig waste? Ah, this is under what's it called the environment as well. The environment is also involved.

Sungai Dua. The pigs are not mine, the pig dung is not mine either. The problem of pollution is mine. Yes? Okay. The problem is, earlier I did want to help my colleague answer the question. But I didn't want to interrupt earlier. The problem is like this. Originally I took over that portfolio to look after Valdor Biogas because my colleague at that time, that place was full of pig waste and I wanted to help him because I did not want him to go there. That place is too dirty for him to enter. I just helped him. The portfolio belongs to my colleague. However, the YB had two questions just now. YB Sungai Dua had two questions. One, why not bring the waste from Kampung Selamat to Valdor? That absolutely cannot be done. To bring pigs dozens of kilometres to send there, economically doesn't make sense and from logistics too, doesn't, doesn't make sense. So, the very good suggestion is to set up another biogas plant in Kampung Selamat. And…

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

If, say, while it's being completed, are they going to let it be dumped into the drains again?

Okay. Can Sungai Dua prove that everyone dumps? Everyone dumps…

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

It's not everyone who dumps.

A handful of irresponsible farmers who dump. Some also process the waste.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

That's fine, but we are in that river, that river is polluted.

Saya faham.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

On a large scale.

We understand. And the Department of Environment monitors and also issues summonses. When the stuff is discharged into the river at night when we are not there, it's also difficult to catch them.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Ah, that's their problem.

It's not that we don't want to do it, we do it. Almost every month, dozens of summonses are issued. Of course they will still dump. But it's not 100% of the farm operators who dump. Only a handful who are irresponsible dump. Anyway, the State Assemblyman for Pantai Jerejak is working with another operator, not Timeless Green but another operator, to set up another anaerobic what do we call that? digester to supply biogas there.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Never mind the biogas, I don't want to know. So what about the impact, how do we deal with the impact that is happening now? Yes. What is worse, how do we treat this river? Who is responsible for treating it? The river that is badly affected, as a result of the disposal or pollution that is happening now, who is going to treat this river?

It, it has two Sungai Dua. One is a preventive measure and the other is a corrective measure. Because these people are irresponsible and dump into the river, we have to take corrective measures. As a preventive measure, we must provide a centre to process this waste before the discharge water can enter the river. Give us time. He is indeed working with a new contractor who has already provided a concept on how we can overcome this problem. Even for a pregnancy you have to wait 10 months, yes? Give us the chance to plan and be sure this problem will be resolved within the time frame. We are not running away from our responsibility, we are doing it, we have already interviewed many operators, not enough, it hasn't reached our level, and now we have found a contractor who I think can be on a par with Timeless Green. So, we will deal with him.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Honourable Member for Perai, let me interject briefly. Honourable Member, thank you for the idea you gave earlier. But we must be sensitive and we must study everything. Today the Honourable Member thinks, many people buy houses along the rivers where pig waste is discharged and many restaurants have opened there. When guests who have never experienced the fragrance that is inhaled come and stop to eat there, they will also get to smell that good fragrance. It has been 60 years of a good fragrance. What has Valdor proposed? Valdor has been resolved for 60 years. In Tasek Gelugor and Kampung Selamat it has been roughly 60 years or more too. Why could it be resolved at Valdor? Why couldn't it be resolved at Tasek Gelugor? We ask, this is not why we come into the House, we are not here to point fingers, this person is wrong, that person is wrong. But we in this House are a place for discussion, a place to solve problems. Today many people have bought houses, perhaps several thousand units, tens of thousands of units there. That's all, Honourable Member for Perai.

Thank you, Honourable Member for Ayer Tawar. Faeces must smell, no matter what kind of faeces it is. Everything must smell. But we must ensure preventive measures. Give us time. We are also in the process of setting up a Water Board that will take on such responsibility to ensure effluent discharge complies with the permitted standard. So, it's not that we are running away from our responsibility, we are still studying, we certainly want to do it. If we can do Valdor, why can't we do Kampung Selamat? We will definitely do it. Give us time. We will handle it. We do not want to do it hastily and get entangled with that project. We must examine carefully so that the contractor we select can really give us what we want, rather than rushing the job and then having it abandoned. Yes? Thank you.

Lee Boon HengPKR · PHKebun BungaEN

Dato' Seri Speaker, I just want to make sure whether the monkey issue is under MMK Environment or not? Because it hasn't been answered yet.

The forest is mine, the monkeys are mine too. Under my portfolio, the Forestry Department and the Department of Wildlife and National Parks (Perhilitan), yes? If there is a monkey problem, monkey nuisance, you may contact my office or the Perhilitan Office. We always help, we are ready to help. Yes?

Lee Boon HengPKR · PHKebun BungaEN

Okay. Ah, I'll interject briefly, Dato' Seri. Mr Speaker, because I feel this issue has become serious. As I debated yesterday in my speech, the monkeys will act aggressively and they attack. They attack members of the public. So, I hope the State Government takes this matter seriously. We certainly do not want it to become a very big issue later, especially in Taman Botani. So, I thank you because the Department of Wildlife and National Parks (Perhilitan) once held a meeting with me. However, the problem they face is that they told me that previously the State Government did channel special allocations to the Department of Wildlife and National Parks to tackle this problem. But for these past two years they have not received any allocation from the State Government to solve this problem. So, that's why I want to ask, is there a plan by the State Government to provide a special allocation to the Department of Wildlife and National Parks, or are there measures the State Government will take so that this issue does not become serious. We can see, yesterday I already shared videos with all the journalists too. This issue of monkeys is very serious in my area. That is what I really emphasise and I hope there will be a more positive answer from the State Government. Thank you, Perai.

Thank you, Kebun Bunga. Indeed, the allocation cannot be said to be very large. Under my MMK there is a little. So if there is such a problem, as EXCO I can also help, yes. If there is a problem like that, please let us know, we can set traps to catch them and release them in the forest.

Chee Yeeh KeenDAP · PHBagan JermalEN

Dato' Seri Speaker, may I still interject, yes?

Last paragraph I finish first can?

Chee Yeeh KeenDAP · PHBagan Jermal

Okey.

Honourable Dato' Mr Speaker, in conclusion, before I end this winding-up speech, my sincerest thanks go to Honourable Dato' Seri Speaker for carrying out his duties with such patience and fairness. I would also like to invite all the Honourable Members in this House to continue working with the State Government, particularly regarding the Housing and Environment portfolios, to ensure affordable housing for the people and green environmental conditions can be implemented for the well-being of the people in the future. With that, I respectfully move the motion of support. Thank you.

Speaker (Speaker)EN

Thank you, Perai. Please, Padang Lalang.

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, Honourable Dato' Seri Yang di-Pertua, the Most Honourable Chief Minister, fellow EXCO members, fellow Honourable Members, and all the heads of government agencies who are with us today. Greetings of peace, greetings of Penang2030, and greetings of Malaysia Madani to all. First of all, on this auspicious and blessed day, I would like to thank you for the opportunity to take part in the winding-up session for the Appropriation Bill 2026 during the Second Meeting of the Third Session of the 15th Penang State Legislative Assembly.

Honourable Dato' Seri Yang di-Pertua, I would like to take this opportunity to thank all the Honourable Members who have raised issues and questions closely related to the portfolios of Youth, Sports and Health during this sitting. I would also like to take this opportunity to provide clarification and explanation on the issues and questions that have been raised during this session. By the grace and blessings of God, I would like to extend congratulations and well done to the Most Honourable Chief Minister, who tabled the 2026 Budget last Friday. The Budget that has been tabled will continue to strengthen and accelerate the achievement of the Penang 2030 vision, to ensure that all the people of Penang also feel the benefits of the rapidly growing socio-economic development of the State of Penang.

Honourable Dato' Seri Yang di-Pertua, the State Government today is committed to strengthening the youth development ecosystem comprehensively. Young people today play not only the role of innovation leaders, but also become strategic partners in the formation of national policy. Therefore, the government will continue to expand programmes for skills enhancement, entrepreneurship, digitalisation, as well as youth participation spaces in the decision-making and policy process, so that their aspirations and views are truly translated into action. So, regarding the desire of young people to be heard, I have indeed fulfilled it through the rural youth empowerment initiative by introducing the Jelajah Belia series to reach youth, especially those in rural areas, and to encourage their involvement in community programmes. In this series, engagement sessions are conducted in a relaxed manner to give the State Government a space to listen to suggestions, views and ideas of young people directly and in person. For this year, a total of 10 programmes have been implemented involving 2,487 young people, who showed a warm response and active public participation from them in strengthening communities in rural areas.

Honourable Dato' Seri Yang di-Pertua, if we look, there are indeed many efforts not only from the State Government, but with the strong support of the Federal Government, we can see that many initiatives and efforts have been set in motion, especially in terms of youth development. If we look at young people who are working, the employment mobility incentive of up to RM1,000 has now been introduced, and to support those who venture into the Gig Economy, the i-Saraan Plus system with a 20% matching or up to RM600 a year has also been introduced, particularly under the KESUMA Ministry. So, apart from that, skills, entrepreneurship and agricultural training are also instilled in young people through various strategic programmes. Among them, the K-Youth and TVET Programme under Khazanah Nasional, which allocates a total of RM200 million to provide opportunities for youth without degrees, while under the MARA Protege Programme, an allocation of RM8 million is provided to help technical graduates become successful entrepreneurs.

Furthermore, the Sejati MADANI Programme also encourages youth to venture into urban agriculture and vending machine businesses. The Federal Government also provides RM150 million under Mikro BSN financing to encourage youth in the field of entrepreneurship. This is further enhanced by reintroducing the MADANI Housing Credit Guarantee Scheme for young people to purchase their first home, where eligibility is for those aged 18 up to 65, where financing is approved up to RM500,000 for the house purchase and they get 1 financing period of 35 years. These are among the aspects we can see of efforts carried out together with the Federal Government to help our young people.

So, Honourable Dato' Seri Yang di-Pertua, in line with the C2T1 Strategic Initiative under the Penang2030 Vision, which aims to increase youth participation in state development, I am pleased to inform this House today that the youth volunteers, which is a programme under the Penang Youth Development Corporation, have recorded registrations of 8,367 young people from across the State of Penang who willingly stepped forward to become volunteers and have participated and engaged in various programmes at international, national, state and community levels. These include the ASEAN Senior Economic Officials Meeting, with respect, the Penang2030 Festival, the Water Distribution Aid Mission in line with the water supply disruption the other day, and also Malaysia Clean-up Day.

Apart from that, the Rakan Muda programme under the Ministry of Youth and Sports also provides an allocation of RM40 million to support youth involvement in various sports activities, volunteerism, healthy lifestyles and also various other youth development programmes. So, the State Government also does not lag behind in channelling allocations to youth in this state to ensure this group remains active, where under the Youth Development Fund policy, this year alone a total of RM99,800 has been approved to a total of 47 youth organisations to implement 59 programmes that benefit a total of 10,809 young people.

In addition, an allocation of RM1.35 million has been channelled through the Penang Youth Committee (JBPP), enabling young people in this state to continue actively implementing programmes at the level of each State Legislative Assembly (DUN) seat. Among the initiatives that have been used under the allocation provided under this JBPP are workshops and counselling for youth who have completed SPM, the Ihya' Ramadan Programme, Food Bank, Basic Drone Operation Workshop, and Basic Photography Course. I am informed that the Honourable Pulau Tikus and the Honourable Seri Delima also held a coffee-brewing workshop, which is uniquely aimed at increasing capacity and providing direct benefits to these young people. So, up to October 2025 under this JBPP, a total of 169 programmes have been carried out involving 22,845 young people who have received benefits from this initiative. Thus, it is clear that these continuous efforts provide valuable opportunities and experiences for the young generation in this state.

Honourable Dato' Seri Yang di-Pertua, next year, 2026, is an important year especially for youth organisations, where the transition of the youth age limit, the definition will officially be lowered from 35 years to 30 years. Nevertheless, the State Government will ensure that this transition does not bring any issues or challenges and we will continue to provide strong support especially to these youth groups and organisations. We commit that, although the age definition for youth is lowered from 35 years to 30 years, the existing policies across all government agencies involving this youth category, we still maintain the age of 35. For example, under housing, we do not, if we lower the age limit, we do not deny those within that age range from continuing to apply. This is also the same for other incentive programmes offered whether under the State Government or under the Federal Government. So we want to ensure there is a soft landing, with respect, to ensure that youth in our state can continue to be competitive.

Honourable Dato' Seri Yang di-Pertua, in response to the question from the Honourable Leader of the Opposition, but he is not in the House. We often stress that the programmes we hold are not only focused on ensuring there is mere attendance. If we wanted attendance, it would be easy to hold big programmes and provide food, but no. In fact, the programmes and initiatives planned especially under the Penang Youth Development Corporation together with the State Youth and Sports Department of Penang, we are indeed focused on outcomes. What are the benefits and results for the participants from the youth group when they finish attending the programmes we hold.

So, I thank the Honourable Leader of the Opposition for raising this issue, and indeed we can see, among others, our programme in cooperation with PERKESO, MyFutureJobs for youth looking at employment opportunities. We have cooperated with PERKESO to arrange face-to-face interview sessions for them. So we set a date through the programme, we directly invite the employers involved to continue offering face-to-face interview sessions to ensure they get what they want and that there are results produced from organising a programme of this scale.

So, as I mentioned earlier, there are indeed many programmes like this that we hold. It is not just about providing food and drinks. That is already outdated. Indeed, if we run programmes without adding value, young people will certainly not take part. It is better to stay home and watch TikTok, right? So we indeed need to plan more thoroughly and carefully to ensure that the objectives of organising each of these programmes can bring benefits to these young people.

So, Honourable Dato' Seri Yang di-Pertua, I will now turn to the sports portfolio. Having emphasised the State Government's commitment to youth development as the backbone of the nation's future, allow me to turn to an important factor that becomes a vehicle for character building, discipline and national spirit, namely sports. For the information of this Honourable House, next year, 2026, is an important year for the sports sector, where we will face the organisation of the Sukan Malaysia (SUKMA) 2026 Games which will be held in the State of Selangor.

If in 2024, we succeeded in achieving fourth place out of 15 states with 41 gold medals and 43 silver medals, then next year our main target, which has in fact been set by the Most Honourable Chief Minister himself, has placed a great burden and responsibility on us to try to convert the 43 silver medals I mentioned earlier, convert silver to gold medals in the upcoming SUKMA Games, and it cannot be denied that achieving this target is not something easy. However, with good and careful planning, I am increasingly confident that our Penang State contingent will continue to win.

Our athletes now do not only train on their own, but the State Government also helps them train in a more systematic way. This year too, we will apply sports science to the existing sports, and the progress of the SUKMA Training Squad will be evaluated in detail and professionally. Every decision made is based on data and scientific analysis, and not solely on assumptions or field experience alone. We do not want merely to send athletes to compete, but we want to send them to win with style, with dignity.

Honourable Dato' Seri Yang di-Pertua, in pursuing success, the aspects of recovery and balance of athletes' bodies are something we emphasise greatly. Athletes are continuously monitored to ensure they get adequate rest, quality sleep and healthy nutrition as part of daily discipline. The main obstacle that often arises when we reach the sports event, the main obstacle that often hinders us, is when our athletes suffer injuries. They are unable to compete in the sports event and this will waste our opportunity to achieve success and medals. So, this is among what is often emphasised under the Penang State Sports Council. Generally, the success of state sports does not depend solely on athletes, because behind them stand coaches, officials, physiotherapists, nutrition experts and psychology experts, for one team, one contingent moving with a shared mission.

Honourable Dato' Seri Yang di-Pertua, with regard to SUKMA 2026, I think perhaps in my winding-up debate, I will touch on this because later there will be an oral question from the Honourable Pengkalan Kota, and I will explain it more thoroughly then. I now wish to bring the attention of this Honourable House also to the organisation of the Southeast Asian Games or SEA Games which will take place in the State of Penang in 2027. Our state has also been entrusted as one of the co-host states for the organisation of this prestigious sports event together with fellow states, namely Sarawak, Johor and the Federal Territory of Kuala Lumpur. The State Government has agreed for the State of Penang to become the sports organiser for Snooker and Billiards with an allocation of RM15 million.

However, there was an additional proposal received from the Ministry of Youth and Sports for us to also organise the sports of Sepak Takraw, Judo, Table Tennis and also Boxing. With pleasure, I would like to inform that all preparations for the organisation are being carried out with great care and planning. In fact, we have just recently had a delegation visit held not long ago to the country of Thailand, where Thailand is the host country for the SEA Games this year, and by 20 December, our country will officially receive the hosting from Thailand to become the host organiser for the SEA Games in 2027. And I am confident that by the organisation of the SEA Games in 2027, this state will be fully prepared, thereby making the event one of the greatest successes and leaving a legacy that is very proud for future generations.

Honourable Dato' Seri Yang di-Pertua, for this year, apart from the allocation of RM350,000 under the MMK Sports Committee, our community is also provided with the Community Sports Fund, which is a fund channelled through the Penang State Youth and Sports Department to help organise community-level sports development programmes. So for this year alone, a total of RM1.2 million has been channelled to 93 applications with a participation report of 22,858 participants who have benefited from the organisation of these community-level sports programmes. Not only that, the Ministry of Youth and Sports also provides Sports Matching Grants to registered sports bodies to organise high-performance and high-impact sports programmes at state, national and also international levels. We have succeeded in using these Sports Matching Grants to organise an international-level 3x3 Basketball this year, and also a new sports trend, Tug of War, which was organised in the State of Penang, has benefited from these Sports Matching Grants. So under this grant, a total of 17 associations from the State of Penang have received Sports Matching Grants with a total amount of RM1.16 million. Of these 17 associations, three (3) are associations registered with the Registry of Societies (ROS). Meanwhile, 14 associations are those registered under the Office of the Sports Commissioner (PJS).

Honourable Dato' Seri Yang di-Pertua, apart from the sports funds we have received, we continue to boost local sports development through the Mass Sports Programme. The main purpose of this sport is towards the formation of a sports culture and the strengthening of national integration through comprehensive community involvement in the State of Penang. The provision of sports for all at community level comprehensively is implemented through four (4) main units, namely sports development and promotion, fitness, recreation and motorsports, and persons with disabilities and senior citizens. For 2025, a total of 224 Mass Sports programmes have been implemented throughout the State of Penang. Covering 29 programmes at state level and 195 programmes at district level. And the total allocation for these Mass Sports programmes amounts to RM881,670.00 with total participation of more than 333,768 people.

Honourable Dato' Seri Yang di-Pertua, what I have raised indeed we can feel. I believe many representatives of the people, Honourable Members, may be able to feel that there are many sports events this year. Almost every weekend, all Honourable Members are indeed involved. That is actually an effort that we are trying to develop. Not only do we want to develop performance and prestige in the sports sector of our state. It certainly contributes to a healthier lifestyle, which will help us to further improve the level of health of the people in the State of Penang.

So, for the development of sports facilities in our state, for the information of this Honourable House, at present, several sports development projects are being actively implemented. These include the construction of an athlete hostel at the building of the Penang State Sports Council located in the Batu Uban area. The Sony Sports Complex in the Seberang Jaya area, I congratulate that the synthetic field has begun operations. And currently being actively carried out for other complexes to complete other sports facilities. Improvements to facilities at existing stadiums, as well as the Pinang Tunggal Community Sports Complex and various other projects.

And we also thank the Federal Government, where the approval under the recent RMK also involves upgrading works also at the Bertam Sports Complex under the local authority (PBT). However, that allocation will be channelled from the Ministry of Youth and Sports later. Not forgetting also the Honourable Bagan Dalam, there is a football field that is currently under development as well. We are trying to obtain available resources so that we can implement development projects for sports facilities and infrastructure in this state. All these initiatives are part of the State Government's commitment to improve sports facilities, nurture athletic talent and strengthen sports infrastructure for the welfare of the people.

Honourable Dato' Seri Yang di-Pertua, referring to the question from the Honourable Kawasan Penaga, who raised the issue of the Pasir Gebu football field. I take note and I welcome the proposal from the Honourable Member. Indeed, if we look, the field is located right by the roadside only. It is indeed rather dangerous, not only dangerous to users of the field, but for road users as well. So I will review the application and consider it. Nevertheless, do not worry Honourable Penaga, there is a project, namely a football field nearby at Pasar Penaga. That indeed is.

Pekan Penaga.

Gooi Zi SenDAP · PHPadang LalangEN

Yes, yes. Pekan Penaga. That one is indeed in the pipeline, and we will begin implementing the development project for the field next year. Honourable Dato' Seri Speaker, I will also continue with the issue raised by many elected representatives this time. Honourable Sungai Dua, Honourable Bukit Tambun, Honourable Seberang Jaya and also Honourable Kebun Bunga, regarding the development of football. I would like to record my appreciation to all elected representatives, whether from the government side or from the opposition side, who consistently support the development of football sport in our state.

Yes, it cannot be denied that the position of Penang FC at present is quite challenging. However, Honourable Members, the State Government is always committed to continuing to improve the performance and standing of this team. The other day, the Honourable Pinang Tunggal said, our last game, that's right, we lost narrowly to Imigresen FC (1-0). But when we won against Negeri Sembilan FC, nobody gave any support. We lost narrowly to the champions Johor Darul Ta'zim (2-1) the other day in the FA Cup. We did manage to hold them in the first half. However, we lost to a free kick in the second half.

But we are indeed trying our utmost to further improve performance. Given that we did indeed receive a sum of RM8 million from the State Government. Nevertheless, we are always striving with the resources available. We can be proud to tell everyone, up to now. Under the management under the State Government, Penang FC is the only one, among the teams that have never owed player salaries. We have no salary issues; we manage the team well and there is no particular issue relating to salaries that has arisen in Penang FC.

For the information of Honourable Members, several player restructuring measures are being carried out professionally. Among them, the import player from Malawi, Limbikani Oscar Mzava, has agreed to be released. We could see that although we had signed the player, we felt there was an issue with his performance, and we have succeeded in releasing the player without incurring any compensation or the like. He is being replaced by another international player from the Philippines, OJ Porteria, to ensure the team remains competitive. Regarding the performance of the import player from South Korea, Lim Inkyu, the management is still giving him the appropriate space and time to reach the optimum level of fitness set by the team.

However, the other day when the Honourable Leader of the Opposition said the player might have been bought from Shopee. If football players can be bought from Shopee, I ask the Leader of the Opposition to help. We channel the allocation, tell him to go and look at Shopee. Indeed, if we look at football sport, it has many challenges. Not only do we have to ensure we have players who are good and whose performance is sufficiently good. There are many other factors, especially in terms of the quality of refereeing and so on. Many factors will affect performance. Nevertheless, as I stated earlier, we do not deny the current situation of Penang FC. Out of eight (8) league matches, we managed to record only one (1) victory, over Negeri Sembilan FC. But we will try our utmost on the 23rd of next month, when we will travel to Kota Kinabalu to face Sabah FC. So I hope all elected representatives can continue to give their support to our Penang FC team.

Goh Choon AikPKR · PHBukit TambunEN

Seeking clarification. Honourable Dato' Seri Speaker and the Honourable Padang Lalang. I thought the state assemblymen (ADUN) in Penang have always supported Penang FC. And they have never not supported the development of football in the State of Penang. Our question is more about the State Government's way out of managing this football team. Because the annual grant of RM8 million is equivalent to the amount for preparing for the SUKMA 2026 Games. SUKMA, for which we target 60 gold medals, only receives RM8 million. But for one team, also RM8 million.

And with this RM8 million, we also cannot produce local players. That is the first point. And second, when facing defeat, the State Government and also the Honourable Padang Lalang become the target. Including, what, demands for a management overhaul. The problem is not on the management side, because I agree with the Honourable Padang Lalang. Penang, with JDT and Selangor only, three states only, that have never owed players. In terms of management there is no problem. But it must not become a burden on the State Government's finances. That's all. Thank you.

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, my colleague from Bukit Tambun. Indeed, I'm coming to that, lah, to answer the question raised. We understand, indeed, if we look at the comparison raised by the Honourable Bukit Tambun. The Penang State Sports Council, which has to look after many more types of sport, receives the same allocation, almost the same as compared with Penang FC. But Honourable Bukit Tambun, now we can see that indeed many State Governments have also begun to let go. For example, there are many of our neighbouring states that are no longer able to manage a Super League team. But I would like to point out that Penang FC is now the only state team in the Northern Region. Our neighbours have already collapsed. So that is why, if we get involved, there are many factors that we need to consider. Indeed, we will refine this for the long term. We also do not want Penang FC to follow the path of Bukit Tambun FC, too. We hope we can continue with good performance, lah. But that's it.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Padang Lalang, please.

Gooi Zi SenDAP · PHPadang LalangEN

Wait, wait, wait.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Sikit saja.

Gooi Zi SenDAP · PHPadang LalangEN

Let me finish first. Let me finish first, then I'll give way. So, indeed, regarding the proposal by the Honourable Bukit Tambun during the debate session the other day, that Penang FC be shut down completely, is a very serious decision that must be carefully examined by the State Government. This closure will not only result in the loss of the state team status that is the pride of the people of Penang. It may also lead to major implications. Including the possibility of heavy penalties being imposed by the Malaysian Football League (MFL), which is the organiser of the Super League. At the same time, it will affect the development of young talent, the state's football ecosystem and also the image of Penang sport as a whole. However, we do accept the views and proposals that have been put forward. But we are trying our utmost so that we still have a state team that can make all the people of the State of Penang proud. Please. Please, the Honourable Telok Ayer Tawar.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Okay. Thank you, Padang Lalang. (interruption)

H'ng Mooi LyeDAP · PHJawi

Goalkeeper, goalkeeper.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

What Tambun just said implies that elected representatives do not give support. (interruption) Just now they didn't give, give.

Gooi Zi SenDAP · PHPadang LalangEN

Never not given.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Never not given. Indeed we have given support. All elected representatives have bought tickets too, supporting. Given the old days of Shukor Salleh, Isa Bakar. Penang's football was legendary, including people who were famous in Penang. The best, if you mention Penang, it was the best. Today we see our collection receipts have dropped. Because of congestion, not because of a decline. The congestion of fans wanting to go to the stadium is too crowded, the traffic. We have a stadium at Batu Kawan.

Gooi Zi SenDAP · PHPadang LalangEN

There are no more people.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

It's not that there are no more people, it's because we don't do it. If we hold it at Batu Kawan, perhaps on the Seberang side, Seberang has even more people. Perhaps people from Kedah and Perak could attend. The border. Give support to Penang. Perhaps we could get a lot from the collection. Today at Batu Kawan Stadium, there are many import players. From China, just waiting, there are no players. Sorry, I'm sorry.

Gooi Zi SenDAP · PHPadang LalangEN

Alright, alright. I take note of what was proposed by Telok Ayer Tawar.

Speaker (Speaker)EN

Honourable Padang Lalang. So I hereby wish to cut the football allocation. Time allocation. Time allocation.

Gooi Zi SenDAP · PHPadang LalangEN

Okay, okay. Alright, alright, alright, Honourable Dato' Seri Speaker.

Speaker (Speaker)

Silalah ringkaskan.

Gooi Zi SenDAP · PHPadang LalangEN

Okay. Summarise, summarise.

Speaker (Speaker)EN

Many sports get it.

Gooi Zi SenDAP · PHPadang LalangEN

I want to answer.

Speaker (Speaker)EN

A good decision.

Gooi Zi SenDAP · PHPadang LalangEN

I want to answer.

Speaker (Speaker)EN

Without discussion, lah.

Gooi Zi SenDAP · PHPadang LalangEN

I want to answer regarding the other sports.

Speaker (Speaker)

Sila pendekkan.

Gooi Zi SenDAP · PHPadang LalangEN

Okay, okay. Alright. Honourable Dato' Seri Speaker, referring to the issue raised by the Honourable Bagan Dalam and also the Honourable Bagan Jermal regarding the recognition of the bodybuilding athlete who won the sports competition known as Mr. Penang on 6 September. And I am given to understand that he also won the Bantamweight category for Mr. Malaysia. That said, I am pleased to inform that the competition is a state-level contest, like other open competitions organised to nurture talent from the grassroots level.

Recognition of the athlete has already been given through the award of medals and also cash prizes during the competition. Where, for the information of this august House, the State Government has, where the Mr. Penang competition programme has actually received contributions from my office in terms of the organisation. And for information, for the participation of Mr Loganathan Chandran in the Mr. Malaysia level, it was also financed through a contribution under the Penang State Sports Council. We indeed acknowledge, give recognition and uplift the dignity of this athlete who has brought honour to the name of the State of Penang at the national level. Honourable Dato' Seri Speaker, I will move on to the next issue.

Kumaran KrishnanDAP · PHBagan DalamEN

Honourable EXCO, please. Thank you for the explanation just now, where the State Government has given support to this athlete. I thank you. Not only this athlete, any athlete who brings honour to the name of the state and country at state and also national level should be given support. But what I ask is recognition that we give after they bring honour to our state's name in the state or national arena. What will we do after that? A little appreciation so that it becomes a legacy for the athletes to come. A form of support and encouragement. Thank you.

Gooi Zi SenDAP · PHPadang LalangEN

Yes, Honourable Bagan Dalam, indeed under the SKIMAS incentive programme, our State Government does provide rewards and also recognition for athletes. But it has certain conditions. As I said just now, in fact for the organisation of Mr. Penang, it is only a competition involving the grassroots, grassroots development. However, under the SKIMAS reward system and so on, there are certain criteria: international sports event level, national level and so on, lah. Nevertheless, indeed our State Government is among the states that hold, where we give rewards and recognition sufficiently to our athletes, including deaf athletes. This too is under the State Government.

Honourable Dato' Seri Speaker, I would like to move on to the health issue…

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Before that, Honourable Member. I was interested in the issue brought up by Bagan, the Honourable Bagan. Dalam. No, Bagan Dalam. I, the question I want to ask is whether the State Government has initiatives to give recognition or remembrance to veterans of famous athletes in Penang. Because they have already fought a lot, contributing to the State of Penang. So and of course they also have historical stories from long ago that can motivate new athletes, young people today and so on. So, what are the programmes we carry out to recognize and to show our appreciation for their contribution to the state of Penang? Thank you.

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, Honourable Bukit Tengah, indeed there is a recognition programme. We often have programmes like recognition that we hold. Basically, usually we hold a programme like a Get Together (with permission) to gather legends from the sports sector who have brought honour not only to the name of the State of Penang but also to the name of Malaysia. For example, last year, to coincide with the victory of the Penang team in the FA Cup, marking the 50th anniversary, I too managed to hold a dinner, and succeeded in gathering all the Football Legends in the State of Penang, like the legends the Honourable Telok Ayer Tawar mentioned just now. We gathered them in an event to give them recognition, because these legends are always in our hearts.

Okay, Honourable, Honourable, Dato' Seri…

Chee Yeeh KeenDAP · PHBagan JermalEN

Honourable Member, excuse me for a moment, the Honourable EXCO wants to ask Padang Lalang. I am also interested in what Bukit Tengah and also Bagan Dalam said. So here, the reward does not mean only in terms of incentives, financial and so on. It means recognition, including if possible, giving them medals or nominations for sports personalities who have brought honour to the state. That's why I ask you to comment, please. (interruption, laughter)

Gooi Zi SenDAP · PHPadang LalangEN

Honourable Member, Honourable Bagan Jermal, that is not within my power. But, but, but we take note, we take note. Indeed, there is, indeed there are sports figures who have contributed greatly to our state receiving recognition, awards and so on. Indeed there are. This year alone, Honourable Dato' Seri Lee Chong Wei.

Chee Yeeh KeenDAP · PHBagan JermalEN

Yes, well, that's already...

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Atlet-atlet besar...

Chee Yeeh KeenDAP · PHBagan JermalEN

Like Dato' Nicole David...

Gooi Zi SenDAP · PHPadang LalangEN

Not that it means, it means there is.

Chee Yeeh KeenDAP · PHBagan JermalEN

Of course, but we are saying that sports that are not what people call mainstream should also be given.

Gooi Zi SenDAP · PHPadang LalangEN

We understand, we understand.

Chee Yeeh KeenDAP · PHBagan JermalEN

Attention and given. I don't want to use the word quota or anything like that, but a little space, lah.

Gooi Zi SenDAP · PHPadang LalangEN

I understand, I understand.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

I support, I support this neighbour of mine.

Chee Yeeh KeenDAP · PHBagan Jermal

Kali pertama.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

The Opposition's quota has never received anything. Take that and give it. (laughter)

Gooi Zi SenDAP · PHPadang LalangEN

Honourable Telok Ayer Tawar, he has...

Fahmi bin ZainolPKR · PHPantai JerejakEN

Looks angry, angry, angry.

Kumaran KrishnanDAP · PHBagan DalamEN

This year he gave, next year he asks for it for himself.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

We have never received it in two years.

Gooi Zi SenDAP · PHPadang LalangEN

I need to respond to this.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

If one elected representative has two or three quota collections, these 11 elected representatives take and give to the Penang athletes who have contributed.

Gooi Zi SenDAP · PHPadang LalangEN

Okay, okay, I want to move on to taking note, I take note. I want to move on to the health issue. There are many issues I want to touch on under this segment. Honourable Dato' Seri Yang di-Pertua, health issues remain a state priority, ensuring the well-being of the people and the sustainability of the national health service system. In facing complex health challenges, the State Government and also the Federal Government are taking a comprehensive approach by focusing on strengthening the delivery system, improving infrastructure and so on. All of this is to ensure that the people continue to receive the best health services.

Frequently, we hear of the issue of patient congestion at hospitals and health clinics in this state. This issue is not only unique to the State of Penang. In fact, it is an issue or challenge faced by the whole of Malaysia. However, I can say that there are various factors contributing to this issue. Nevertheless, I would like to present, among them, the measures that have already been taken, for example to speed up the discharge of patients from wards, carrying out a step-down process (with permission) for patients, distributing patients to smaller hospitals, and placing emergency and trauma medical specialists permanently at all hospitals so that referral cases to the main hospitals can be reduced.

Meanwhile, at health clinics, existing systems such as MySejahtera have greatly helped to overcome the problem of patient congestion by further strengthening the appointment system, the e-Medical Record system (with permission) that reduces human error (with permission), and also the implementation of the public health development master plan involving the upgrading and strategic construction of health clinics.

Honourable Dato' Seri Yang di-Pertua, I would like to thank the Honourable Bukit Tengah, whose debate, at length, touched on how we can see a, one could say, reform of the health system, particularly in this State of Penang. In this sitting, I also want to record my appreciation to the Honourable Members who have raised issues closely related to health.

In fact, the health issues and challenges we face, as I explained earlier, require a complex solution from various sectors. In terms of human resources, infrastructure development, promotion of healthy lifestyles and medical technology that is rapidly developing. In fact, at the State of Penang level, I do take note of the proposal put forward by the Honourable Bukit Tengah for us to develop a Health Facilities Master Plan. In fact, it already exists; we have a Health Facilities Master Plan developed under the State Health Department. Moreover, for the information of the Honourable Members, not only under the State Health Department of Penang do we have a master plan, but each main hospital in our state has also prepared a master plan for us to formulate the way forward.

Let me give an example. For example, for the hospital in the island cluster, for example Penang General Hospital, the direction is to make it a referral centre for a Stem Cell Center (with permission), Spine Deformity Center (with permission), Geriatric Spine Center, Cardiology and also a Regional Interventional Nephrology Center. It has a direction where, for example, Bukit Mertajam Hospital is a hospital with the direction of being a Medical Related Psychiatric Center and also an Ophthalmology Center. It has a framework based also on the existing population development statistics in this State of Penang.

However, the hospitals in this State of Penang, in fact, the patients or clients we receive are not only from Penang citizens, but also from neighbouring states such as Kedah, Perlis and also Perak; their patients are also referred to Penang General Hospital. This is what makes it a challenge to look at our health capacity.

However, I would also like to quote again what was raised by the Honourable Bukit Tengah. He quoted the ratio recommended by the World Health Organization, where for the State of Penang, we actually need about 5,000 beds, correct Honourable Member? However, under the public health sector, we currently only have about 2,000 beds. However, I would like to draw the attention of the Honourable Bukit Tengah, if we add the number of beds in the private health sector, Penang has in fact exceeded that 5,000-bed figure.

However, when we talk about how we want to reform the delivery of this health service system, there is in fact an important document that has been tabled, namely the Health White Paper (Kertas Putih Kesihatan) which was tabled in the Dewan Rakyat in June 2023. What I mentioned earlier is in fact an important issue. In fact, the number of beds and additional beds, in fact if we look at clinics, health clinics in our State of Penang, in our State of Penang we have more than 750 private clinics ready to become part of this health ecosystem to provide support to our people who need it. However, we need to emphasise one aspect that we often mention in the health reform of our Health White Paper, which is how we ensure that medical costs are not burdensome to our people, so that they can also enjoy the services offered by the private health sector as well.

However, the White Paper, after the White Paper was tabled in the Dewan Rakyat, in fact many efforts are now being taken under the Ministry of Health Malaysia (KKM) and also under the State Government through the State Health Department of Penang to try to make the health reform aspects succeed.

Let me give an example. Among the efforts we emphasise is outsourcing (with permission) services from health clinics and hospitals to private facilities. Throughout this year, in fact, the Ministry of Health Malaysia has implemented several outsourcing initiatives to increase the accessibility of health services in the State of Penang. First, basic radiology services have been outsourced to selected private clinics in several districts, involving expenditure of RM194,300.00. This means we do not implement this service in-house; we outsource it to private clinics to help us ease the burden faced by our public medicine.

At the same time, the Hospital Outsourcing Program (with permission), HSOP, operated by Protect Health Corporation Sdn Bhd, has been expanded starting April this year to channel patients from MOH hospitals to private hospitals for selected services. This programme aims to reduce congestion and speed up patient waiting times, with a total expenditure of RM10,665,680.00, lah. So there are indeed some initiatives we have implemented to further increase our capacity. Please proceed, Honourable Bukit Tengah.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Thank you, Honourable Member. Firstly, I want to stress once again that YB here is one of the hardest-working EXCO members in the Penang State EXCO. And it is not, it is not by accident that he shares the same surname with me, although we are, although we are not, (interjection) but we are related as brothers named Gooi. Daniel Gooi and Gooi Hsiao Leung. Cousins. But now I want to move on to, and I thank you for the explanation and the considerable help that has also been given to the Bukit Tengah State Assembly constituency in many aspects.

He has helped a lot, but on this health issue, I want to move on. It is not that, this issue is close to my heart. I thank you for hearing earlier that we have a master plan from the ministry. But the problem is, if there truly is a Health Master Plan, why, as I have said, Seberang Jaya Hospital, even with a new building, you know, patients are still sleeping outside the hospital corridors.

That means this master plan has failed the people of Penang, Dato' Seri. That is the first point. The second, I want to ask, this master plan, the ministry, the ministry that made it, not the State Government of Penang that made it, the State Government of Penang made it. I want to ask, we have raised many issues in terms of the workforce, doctors, nurses. We have raised the issue of an ageing society, right. So an ageing society means we need more specialised facilities for an ageing society and for treating NCDs, non-communicable diseases, and also long-term care, rehabilitation for these diseases. We need to solve the problem of insufficient beds. I want to ask, in the master plan mentioned earlier, what plans have been stated in the plan to address these matters over the long term. We do not want to hear that we only have a plan for stem cells for Penang Hospital. I mean that that is required, but that does not solve it; that is not an integrated master plan that addresses all the issues we need to tackle in the State of Penang. Thank you.

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, Honourable Bukit Tengah. Indeed, I would rather disagree, let us say the master plan has failed. The issue is that in terms of planning, what we have prepared is indeed based on the realities we face. However, there are various factors. First, let us say, in terms of financial resources. If we look, in fact our national expenditure on the health sector based on GDP has indeed not yet reached a sufficiently satisfactory level when compared with other countries. That is indeed an effort we are trying to increase, where recently we have also seen that the Ministry of Health Malaysia is the second highest ministry in terms of allocation received under the Federal Government. That is indeed something that we are working towards. It has indeed been highlighted in, (with permission) in the Health White Paper. However, what the Honourable Bukit Tengah said in terms of

planning the number of beds and so on. I can tell you here, indeed I have told you many times. If our people do not look after their health, do not look at aspects of health, and we ourselves do not practise a healthy lifestyle, I don't think so. However we plan, in terms of the number of beds, if we base it on the number of beds used for planning, it will definitely not be sufficient. Let me give one realistic example. The new building of Seberang Jaya Hospital, when it was opened that day, was already full on that day because the situation was different, where the situation is also closely related. And in fact there are many efforts we have also taken under the proposal of this Health Medical White Paper to see how we can curb it, do not always look only at adding beds, whereas the Ministry of Health, my portfolio is health, not medicine. We do not want to cure our people, we want our people to become healthier. Where in fact there are many programmes. For example, the free health screening programme, PeKa B40. We can see that private clinics also offer free health screening. And if there are cases we find from such screening, the government has indeed provided contributions for surgical equipment and so on up to RM20,000, and also travel fare, transport costs, and the cost for cancer treatment of RM1,000. The problem in the State of Penang is that, although it is free, free services, so far we have only 20% of people in the B40 category who have undergone this health screening. This is what I always emphasise, and I thank the Honourable Members. Many have organised health screening programmes, especially for perhaps women, senior citizens and so on. I indeed thank them, and this is indeed something we encourage because if we can detect early, when there are health issues we need to address, we can take action sooner. Do not wait until the patient reaches the Emergency Department before we rush about. That is what we actually want to try to cultivate. I think, I think, let me finish. Much more, much more, much more.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

The last one, and I will not bring up the health issue again. I strongly agree that prevention is better than cure and medicine and so on, and I recall that during the Chief Minister's budget presentation, it was mentioned that the MMK has been allocated RM83,000 for various awareness programmes, and I welcome this. However, if we look, earlier I heard that the Penang FC, the government's allocation is RM8 million, right. Meanwhile, the Health MMK, one very important Health MMK, receives only RM83,000. I hope that the State Government can consider increasing the allocation to the Health MMK for awareness programmes.

Second, regarding the beds at Seberang Jaya Hospital, I want to say here, if we do not look at WHO either. The population of Seberang Jaya now, Seberang Perai, Seberang Perai yes, is 1.1 million residents. According to the reply given by the State Government, Seberang Jaya Hospital now has 413 class 3 ward beds. This means, if we use a standard other than WHO, the Federal Government itself, two beds per 1,000 population. That means we are still currently at only 0.38, far behind the Federal Government's standard for the average set of beds at Penang Hospital. And not everything, and not everything can be outsourced to the private sector. We know now that private hospitals, their charges are too high for many to receive treatment, with insurance costs now, premiums that continue to increase, which have indeed been mentioned, causing many patients now to go to government hospitals for treatment.

Gooi Zi SenDAP · PHPadang LalangEN

Understood, Honourable Bukit Tengah, I, I indeed understand the issue.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

And there is one last thing. We say, we always hear.

Deputy Speaker of the HouseEN

Bukit Tengah has a lot, a lot already now.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

The allocations given to the Federal Government for the RMK and so on, I see the list of applications here. RMK 12 for Penang Hospital, to upgrade the Penang Hospital Fire Safety System.

The total is RM30 million. RMK 11 Rolling Plan 4 Years 2019, until today it cannot be approved. Penang Hospital Fire Safety, that hospital. So what, where is the implementation plan of the Federal Government's Health Master Plan.

Deputy Speaker of the HouseEN

Padang Lalang, continue.

Gooi Zi SenDAP · PHPadang LalangEN

No, Honourable Bukit Tengah, I think the Honourable Bukit Tengah has misunderstood. I said plan, do not, do not accuse, so that this plan, in fact, if this plan fails, we will not submit an application for that project either. However, as I mentioned earlier, the challenge may be in terms of the allocation that was successfully channelled, because do not forget, Honourable Member, the Ministry of Health Malaysia does not look after Penang State alone. There are many other states to which we need to give attention too. However, I take

Gooi Hsiao-LeungPKR · PHBukit Tengah

You don't really care about, Penang, kita yang, kita don't care about other states, yang kita risau

Gooi Zi SenDAP · PHPadang Lalang

I know. I know. Tak, tak, saya faham.

Zulkefli bin BakarBERSATU · PNPenantiEN

Permission to interject. Just two minutes, two minutes. One minute.

Gooi Zi SenDAP · PHPadang LalangEN

I will answer many more oral questions later. But I hope the Honourable Bukit Tengah, we also truly appreciate the planning done by the Penang State Health Department.

It is not that we just pluck the number from the air, with permission, it is not that we say, oh, today I stand up and think this wants to build so many beds, and that's that. Indeed it involves a lot of planning and many engagement sessions, and there are certainly other challenges in terms of funding and so on. We do acknowledge that, but this is indeed one of the issues we will constantly monitor to ensure the well-being of the people of Penang is always protected. Dato' Speaker, referring to the question from the Honourable Batu Lancang regarding unlicensed beauty centres and also IV Drip Vitamin treatment practices. I am pleased to inform that the Ministry of Health Malaysia (KKM), through the Private Practice Control Branch (CKAPS), is responsible for monitoring, controlling and regulating all private health care facilities and services in accordance with the provisions of the Private Health Facilities and Services Act 1998. Where, for this year alone, 2025, a total of three premises providing so-called beauty services in the State of Penang have been subject to enforcement action for operating without approval, involving a total fine of RM210,000. Indeed we have enforcement action, and we also carry out investigations into the complaints submitted, and usually these unlicensed services often promote themselves through social media and so on. This is indeed within the attention of the Ministry of Health Malaysia.

Abidin bin IsmailPAS · PNSungai BakapEN

Request to interject, Padang Lalang.

Gooi Zi SenDAP · PHPadang LalangEN

Bandar Tasek Mutiara. Never mind, I have already given the answer.

Abidin bin IsmailPAS · PNSungai BakapEN

There are also, there are also other things I need to say. I need to say them too because this is based on a complaint. Thank you, Dato' Deputy Speaker. Okay, regarding the sick project in Bandar Tasek Mutiara, which was supposed to be completed at the end of December 2023, due to the contractor problem it has been restarted.

Deputy Speaker of the HouseEN

Okay, understood. Padang Lalang, okay, answer directly.

Abidin bin IsmailPAS · PNSungai BakapEN

No, there's more, I want to.

Gooi Zi SenDAP · PHPadang LalangEN

Actually, the Honourable Member had not yet mentioned it earlier; I already know about Bandar Tasek Mutiara.

Deputy Speaker of the HouseEN

Have you got it or not?

Abidin bin IsmailPAS · PNSungai BakapEN

Yes. Okay, I just want to know a little information regarding the preparations, when it is expected to be completed. The second point is about the master plan earlier, I also support what the Honourable Bukit Tengah asked earlier. Yes, the master plan is there, but it has not achieved, its achievement is not what we hoped for. Okay, regarding the upgrading of Sungai Bakap Hospital. Recently, I submitted a written question regarding whether there would be a new hospital built in the area, in the district, in the district of SPS, but there is no plan to build a new hospital. I only want to ask about the upgrading of the hospital project which, in 2024, during the by-election (PRK), the Ministry of Health (KKM) came.

Gooi Zi SenDAP · PHPadang LalangEN

Understood, understood. I want to answer. I want to answer. I already understand. I understand the question.

Abidin bin IsmailPAS · PNSungai BakapEN

Still a lot to say.

Deputy Speaker of the HouseEN

Enough, enough. Enough. There is no more time. Sungai Bakap, sit down. Sungai Bakap, sit down.

Gooi Zi SenDAP · PHPadang LalangEN

I will answer. I will answer. Don't worry, Honourable Sungai Bakap, I will answer.

Abidin bin IsmailPAS · PNSungai BakapEN

Issue, just let me add a little, just a little.

Gooi Zi SenDAP · PHPadang LalangEN

Actually, what the Honourable Sungai Bakap raised had already been raised before, regarding the timeline for the Health Clinic, the development of the Bandar Tasek Mutiara Health Clinic. But as I answered the Honourable Member earlier regarding the timeline, indeed at present we are monitoring it and the contractor is indeed following the timeline that has been set. Regarding Sungai Bakap Hospital, it is indeed in the process of being resolved, there are land issues and so on. That is indeed our commitment to develop a new block to support the services available at Sungai Bakap Hospital.

Abidin bin IsmailPAS · PNSungai BakapEN

I want to say many thanks for the land acquisition process. We indeed want to achieved when our achievement in the land acquisition process, regarding the problem of increasing patients.

Deputy Speaker of the HouseEN

Sungai Bakap, sit down.

Gooi Zi SenDAP · PHPadang LalangEN

Never mind, never mind, earlier I actually already explained at length about the increase in patients. Indeed we will take that into account as a factor when we develop new facilities.

Abidin bin IsmailPAS · PNSungai Bakap

Okey takpa.

Deputy Speaker of the HouseEN

Okay, Padang Lalang. Other issues.

Gooi Zi SenDAP · PHPadang LalangEN

Okay, good. Thank you. I want to finish now, there is still a lot. Okay, I move on to the question from the Honourable Teluk Bahang, but the Honourable Teluk Bahang is not here, so I skip it. In response to the issues raised by Honourable Members regarding health screening for women and also families. Indeed we have programmes such as the following, namely providing the Health Status Screening Form (BSSK) for adult women. The achievement in 2024 was 5.38%, which is 58,918 out of 537,900 as targeted. And actually, for this issue, as I mentioned earlier. Indeed there are many free health screening programmes. Actually this month we have just held a collaboration with Boston Scientific Group to organise a men's health carnival held at Design Village Mall. There are many screening programmes and we hope all Honourable Members can encourage the people in the constituencies to undergo these screenings. You can go to the nearest health clinic or check under PeKa B40, the website for the B40 group to obtain screening. That is what I usually encourage. And for the information of Dato' Deputy Speaker, I would like to take this opportunity to say thank you to the Honourable Air Itam who raised the issue of mental health. This issue is close to my heart because after I took over the responsibility as Exco, one of the earliest committees I set up was the Mental Health Committee in this State of Penang. Nevertheless, we will continue our efforts, because for the Federal Budget this year too, we also received good news in that there is additional allocation specifically to see how we can address issues closely related to mental health. We will move together with the committee at state level and, I will now answer the Honourable Berapit.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Honourable, I want to interject a little on the issue raised by the Honourable Padang Lalang. Indeed suicide cases, suicide, have become a hot issue now. Most of them occur at designated hotspots. For example, at the Penang Bridge. So, are there any proposals from the State Government or the Federal Government to improve safety on the Penang Bridge. Because for example, in the countries of the world, many countries have installed safety nets to prevent these issues. Thank you.

Gooi Zi SenDAP · PHPadang LalangEN

Honourable, actually I have explained this issue many times, there have been questions from media friends. Let me give one example, there was actually a case in our country where a safety net, or (with permission) safety net, was installed on a tall building to curb suicide attempts. But what happened was that the victim, he indeed had the intention already. Although he was successfully rescued by the safety net, he just flipped over. It did not actually bring a truly effective impact in curbing the issue.

Actually this issue has many aspects if we look at it, especially suicide cases and so on. Yesterday, when I answered media friends on the same issue, I was regretful to see that some media portals and mass media clearly showed the face of the suicide victim on social media. Actually there are guidelines under the media council, The Media Council which was just established.

Nevertheless, this is among the factors. If we look at it, for example the hotspot mentioned by the Honourable Air Itam, after the incident occurred, there were reports on social media and so on. Not long after, there was another case that happened. Indeed this is also among the factors where safe reporting needs to be emphasised. If not, this problem will never be solved forever. But this year, with the collaboration of Befrienders, we have held an engagement session with media friends to further foster how we can emphasise safe reporting to curb such incidents.

I want to answer the issue raised by the Honourable, the Honourable Berapit regarding the proposal to extend the operating hours of Health Clinics in this state. For the information of the Honourable Member, at present, we have two Health Clinics in Penang that implement extended operating hours, namely the Seberang Jaya Health Clinic in Seberang Perai Tengah and also the Bayan Baru Health Clinic in the South West District. For both these clinics, they operate from Monday to Friday, 8 am to 9 pm. With extended hours, namely from 5 pm to 9 pm. On Saturdays too, these clinics provide extended hours services, from 9 am to 1 pm.

Apart from that, we have two clinics under the Urban Transformation Centre (UTC), namely the UTC in the KOMTAR area in the North East. The UTC Penang operates from Monday to Friday, 8 am to 9 pm. Meanwhile on Saturdays and Sundays, this clinic is open from 8 am to 5 pm. Meanwhile the newest KK UTC at UTC Seberang Perai, SPU, provides services every day from 8 am to 9 pm. But we take note of the proposal raised by the Honourable Berapit. Because if we want to implement extended hours, (with permission) it involves human resources too. Because I have to run shifts and so on. This will also bring a burden to frontline staff.

Deputy Speaker of the State Legislative AssemblyEN

Okay landing, landing time.

Gooi Zi SenDAP · PHPadang LalangEN

Just a moment. Landing already, landing already. Okay. As for the issue raised by the Honourable Seri Delima, I will skip it. Okay, closing. Dato' Deputy Speaker, all the initiatives and projects presented today clearly show the commitment of the State Government in ensuring that the development of youth, sports and health proceeds in a balanced and comprehensive manner. From the addition of sports facilities, strengthening the performance of state teams, development of health infrastructure, right up to youth programmes that directly benefit society, all of them aim to improve the quality of life of the people and produce a generation that is healthy, active and competitive. I am confident that with the cooperation of all parties,

Bukhori bin GhazaliPAS · PNPinang TunggalEN

YB EXCO, you have not answered the question yet. Regarding the status of the Health Clinic in Pinang Tunggal.

Gooi Zi SenDAP · PHPadang Lalang

Status?

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Health Clinic in Pinang Tunggal.

Gooi Zi SenDAP · PHPadang LalangEN

I have actually already answered this in the written question. Indeed at present, the plan is for us to develop one Health Clinic,

Deputy Speaker of the State Legislative Assembly

Okay, EXCO.

Gooi Zi SenDAP · PHPadang LalangEN

But with the IK, the KKM Training Institute, in that area. But I do take note of what the Honourable has suggested. We will look at it again. There are still many requests from here and there. But we will indeed follow up on what the Honourable has raised.

Okay, I am confident that with the cooperation of all parties, these efforts will continue to bring positive results for the well-being of the state and the people.

To the paddy field to plant rice, stopping a while at the riverbank. Sport held high, youth standing on their own feet, health preserved, the state in harmony too.

With those words, Padang Lalang moves to support.

Deputy Speaker of the State Legislative AssemblyEN

Thank you, Padang Lalang. We have actually given Padang Lalang more than an hour, one hour and 10 minutes. So for the next winding-up, I request that matters already touched on in oral questions and so on need not be raised again. I invite Jawi to speak.

H'ng Mooi LyeDAP · PHJawiEN

Thank you, Honourable Dato’ Deputy Speaker. Honourable Members of the State Executive Council, Honourable Members of the State Legislative Assembly, and all distinguished guests. Good afternoon, peace and greetings, Salam Malaysia MADANI, Salam Penang2030. First, I wish to record my highest appreciation, thanks and congratulations to the Most Honourable Chief Minister of Penang for his noble, steadfast and brilliant leadership, which has guided this state with resolve, far-sighted vision and a noble conscience. The leadership of the Most Honourable Chief Minister is a full-moon lamp illuminating dark lanes, guiding every step of the people and upholding the dignity of Penang as a precious gem of the archipelago and a sovereign state. Thus, the Penang State Budget for 2026 has been produced as a complete and magnificent budget.

With a heart woven with gratitude, I stand before this August House to deliver the winding-up speech with dignity and in an orderly manner. I appreciate all the questions, comments and sound views from Honourable Members who represent the voice of the people, as all of these help to strengthen state policy. This House is not merely a place for debate, but the arena in which we step into the future of Penang through a range of views and suggestions that show our shared concern for the state we love. Without further ado, I would like to address the concerns of the Honourable Member for Telok Ayer Tawar. He has already left the House. Telok Ayer Tawar raised the absence of a public market. I need to answer this because he was worried that there is no public market. In the Telok Ayer Tawar area, he asked about the State Government's plans to provide a new public market in the area. For the information of the Honourable Member for Teluk Air Tawar, there is in fact a public market in the Telok Ayer Tawar area, namely Pasar Awam Bayu Aman, which was completed in 25 June 2015 and began operating on 1 July 2015. This public market has a capacity of 67 business lots. However, the public market was vacated from 23 March 2016 because it received little response from local residents and was categorised as an inactive complex.

Following that, the Seberang Perai City Council (MBSP) approved the leasing of the entire public market to a private company from 1 January 2021 until 1 July 2025. Subsequently, MBSP advertised the leasing of the building from 1 October 2025 until 31 October 2025. However, no applications have yet been received. Therefore, MBSP is now examining the best alternative methods to reactivate the public market. Nevertheless, Honourable Member, do not worry for long. This is because there are two public markets operating within a radius of 5 to 6 kilometres, namely Pasar Awam Bagan Ajam and Pasar Awam Penaga, both of which can meet the needs of local residents.

The Honourable Member for Sungai Puyu and also the Honourable Member for Telok Ayer Tawar raised the issue of tree maintenance. I am pleased to inform the House that the State Government, through MBSP, has initiated efforts to preserve arboriculture in a planned and scheduled manner to ensure the safety of road use and the orderliness of public landscapes remain protected. A total of 17 tree maintenance works have been carried out internally and through the appointment of the MARRIS contractor along Jalan Telok Ayer Tawar, Bagan, leading to Kepala Batas via Jalan Telok Ayer Tawar. Meanwhile, a total of 14 tree maintenance works have been carried out in the Sungai Puyu area. Details of the arboriculture or tree preservation works that have been carried out will be submitted to the Honourable Members after the winding-up session.

Having considered the proposal of the Honourable Member for Permatang Berangan regarding the establishment of a committee to study the drainage system in Taman Desa Ara Permai. I would like to state here that development in Taman Desa Ara Permai is still under the responsibility of the developer. Accordingly, MBSP has requested that the developer study the entire drainage system in the area. The proposals and the results of the study will be tabled at MBSP's technical meeting for further action.

Taking up the sound proposal of the Honourable Member for Pengkalan Kota regarding the integration of smart elements at new or existing bus stops. I am pleased to inform the House that the State Government is currently examining several technical proposal papers from qualified companies. Each proposal is being screened through the lens of real-time functionality, long-term maintainability, city data integration and cost efficiency, before a smart bus stop model that is truly practical and highly impactful is determined as a state standard for the benefit of users. The determination of this proposal will also take into account the total cost involved in developing a smart bus stop.

The Honourable Member for Pengkalan Kota also put forward a suggestion that a mechanical car park (TLK) be developed as a high-technology solution to address the shortage of parking space in the area. This proposal is seen as a progressive step in line with the needs of dense cities and more strategic use of land. For the information of the Honourable Member, MBPP is now taking action to provide additional parking spaces at Jalan Khidmat Gat Lebuh Macallum for the use of local residents, which is expected to be completed by mid-December 2025. In line with the sound views of the Honourable Member, MBPP welcomes the proposal to implement mechanical TLKs as a progressive initiative, particularly in such a densely populated city. Therefore, a comprehensive feasibility study will follow once MBPP has identified the total construction cost, suitable locations and operating methods of the TLK system, so that the TLK can ensure effectiveness, safety and long-term sustainability. This step will ensure that every implementation is not merely physical but aligned with the aspirations of a smart city and provides optimum benefit to residents and users. There is more noise about getting TLKs. It will be ready by December.

Wong Yuee HarngDAP · PHPengkalan Kota

Terima kasih.

H'ng Mooi LyeDAP · PHJawiEN

Ready by December.

Wong Yuee HarngDAP · PHPengkalan KotaEN

Yes. Thank you, Honourable Member for Jawi. I welcome the positive reply for the benefit of the local community at Gat Lebuh Macallum. As stated in my debate, I am willing to share the ideas or voices of the local community regarding the mechanical multi-storey car park. I hope we can realise it after the several years we have been waiting for. Thank you.

H'ng Mooi LyeDAP · PHJawiEN

I thank my friend, Pengkalan Kota. Regarding mechanical car parks, for the time being there are indeed many private projects, especially in multi-storey buildings. There are indeed some projects that have used mechanical parking. As for the proposal to the Penang Island City Council (MBPP) to examine the suitability of establishing mechanical car parks, there may be several areas, apart from the Honourable Member's area, that we can study. I will ask MBPP to examine the feasibility of mechanical car parks in those areas.

On the concern raised by the Honourable Member for Air Hitam about the financial position of local authorities, allow me to state that the financial statements of MBPP are prepared based on the Malaysian Public Sector Accounting Standards (MPSAS) with the application of the accrual basis, reflecting the precision, transparency and financial integrity that are the lifeblood of MBPP's governance. This means that non-cash expenditure such as depreciation allowances and losses on disposal of land arising from land surrendered to the State Government are recorded as expenses in the financial statements. In this regard, the Financial Statements of MBPP also contain a statement of comparison of budget and actual amounts for the year ending on that statement, which shows the Council's revenue and expenditure on a cash basis.

The statement of comparison of budget and actual amounts for 2022, 2023 and 2024 is as follows:

Year 2022: total revenue RM380.83 million, total expenditure RM329.41 million, surplus RM51.42 million.

Year 2023: revenue RM431.04 million, expenditure RM365.05 million, surplus RM65.99 million.

Year 2024: revenue RM447.46 million, total expenditure RM371.95 million, surplus is RM75.51 million.

Without taking into account the accrual basis of the expenditure, depreciation expenses and losses on disposal of land arising from the surrender of land to the State Government, which are non-cash expenditure, it shows that MBPP has had a surplus over the past three years and reflects a healthy cash position. As for the Seberang Perai Municipal Council (MBSP), I briefly note that there is no record of deficit for three consecutive years, namely:

Year 2022, surplus of RM4.91 million

Year 2023, RM17.49 million

Year 2024, RM26.79 million. This one, Air Itam has none, I will skip it from now on.

The Honourable Member for Penanti. I feel I should raise in this august House, and also propose that local authorities review the procedure for applying for business licences, to ensure that foreign nationals do not abuse marriage to Malaysian citizens to obtain licences, particularly under the local authorities.

The State Government, through both local authorities, namely MBBP / MBSP, has established comprehensive guidelines that incorporate the conditions of the Immigration Department of Malaysia. Both of these guidelines aim to control the involvement of foreign nationals in the business sector and ensure that only individuals who are eligible and comply with the law are permitted to work or assist in business. In addition, the policies established in these guidelines are also adopted as licensing conditions for business premises.

The local authorities always take a proactive approach to review and update existing guidelines according to current needs to ensure more effective enforcement and to reduce the involvement of foreign nationals in business activities in Penang. The guidelines used by the local authorities are as follows, namely the Garis Panduan Kawalan Aktiviti Perniagaan Untuk Pengusaha Warga Asing MBPP Tahun 2017 (MBPP Guidelines on Control of Business Activities for Foreign Operators 2017), and the Garis Panduan Keterlibatan Pekerja ataupun Pembantu di Pusat Penjaja MBSP, Premis Perniagaan, dan Penjaja Tahun 2020 (MBSP Guidelines on the Involvement of Workers or Assistants at Hawker Centres, Business Premises, and Hawkers 2020). MBPP has stipulated through an SOP that every business licence application must be submitted by a local citizen and is subject to registration with the Companies Commission of Malaysia (SSM).

MBPP also continuously conducts monitoring to ensure business licences are not leased to foreign nationals, and always inspects business premises to ensure frontline workers such as cashiers are local citizens as stipulated in the licence conditions. These measures are taken to ensure that business activities in Penang remain properly regulated and are not exploited by foreign nationals through marriage with local citizens.

As for MBSP, the action taken is to fully prohibit the involvement of non-citizen workers or assistants, including foreign spouses, in grocery shop activities. For other types of business, MBSP permits non-citizen spouses to assist or operate the business on behalf of the local citizen spouse. However, subject to the licensing condition that the number of non-citizen workers or assistants, including spouses, must not exceed 70% of the total number of workers. If any breach of this condition is found, MBSP has the right and will take firm enforcement action such as issuing notices, compounds or revoking the business licence.

Regarding the proposal of the Honourable Member for Batu Lancang on the establishment of a special committee (task force) to address this issue. I wish to inform that MBSP has already established the said special committee, whose members consist of the Companies Commission of Malaysia (SSM), the Royal Malaysia Police (PDRM) and also the Immigration Department of Malaysia. This committee is responsible for discussing and examining policies relating to the involvement of foreign nationals in the business sector on a regular and integrated basis. MBPP will also follow up on the establishment of the committee, subject to the suitability of its implementation at MBPP level.

Turning to the Honourable Member for Seberang Jaya. A young personality who is very eloquent. The Honourable Member has expressed deep concern that the State Government should give serious attention to hawker complexes, pavilions and food courts, especially those that are dilapidated and require renewal, far from meeting current standards in terms of safety, comfort and cleanliness. I strongly agree with the Honourable Member that strategic upgrading is a necessity. Weaving each step with the principles of empowerment, safety and community comfort. Every public space built is not merely for its physical use but also weaves the soul of society. Make complexes and food courts the economic lifeblood of the locality and express the aspiration of a glorious, sustainable and civilised state.

For the information of the Honourable Member. MBSP indeed has a specific annual allocation for the maintenance of hawker complexes, pavilions and food courts. MBSP has examined the conditions at the locations concerned and will carry out repair and maintenance work in phases according to priority, taking into account safety aspects, current physical conditions and the capacity of the allocation. As of 18 November 2025, MBSP has carried out routine maintenance and repair work at forty-eight (48) hawker complexes, pavilions and food courts, as well as at 18 public markets, with total maintenance costs of RM2.5 million.

As good news for the Honourable Member. For 2026, MBSP has re-listed the Lengkok Tenggiri food complex in the Seberang Jaya State Constituency as one of the food complexes to be upgraded, subject to the consent or approval to be obtained by MBSP to use part of the land around the Lengkok Tenggiri area as a temporary hawker site for carrying out the upgrading project. However, for minor repair works, MBSP will always carry out such works from time to time based on needs, especially regarding the scope of work involving the safety of hawkers and the public at hawker complexes, pavilions, or food courts, as well as public markets owned by MBSP.

The Honourable Member for Seberang Jaya also suggested upgrading the facilities at Uptown Bandar Perda so that they are more orderly, modern and safe from the risks of weather or storms. I take note of the need to upgrade the facilities at Uptown Bandar Perda for the comfort of visitors and small entrepreneurs. The Uptown location is a public car park, that is, a parking area under the supervision of MBSP, which is permitted for use after 6 p.m. by the organisers. For the time being, MBSP has no plans to carry out infrastructure improvements there because the area has been gazetted as a Public Car Park. A complete infrastructure build would involve financial allocation and require a detailed study from technical, safety and site suitability aspects.

I also wish to touch on the issue of residents' safety in the Bandar Perda area due to lack of lighting, as raised by the Honourable Member for Seberang Jaya. For the information of the Honourable Member, the results of MBSP's checks are as follows:

1. For street lighting from Pangsapuri Permata Block AN to Block OT, within the Kondominium Mutiara area, this falls under the jurisdiction of the management or the JMB (Joint Management Body). 2. For lighting on roads in the Taman Perumahan Perda Timur area, the installation of public street lights or lighting falls under the jurisdiction of MBSP. Any application for the installation of street lights must be submitted using the complete MBSP Public Street Light Installation Application Form together with a location plan and support from the relevant authorities for consideration by MBSP. Given that the existing street lights in this area were installed according to the specifications current at the time of construction. 3. For road lighting in the Mercu Pintu Gerbang area. It falls under the jurisdiction of the Public Works Department (JKR). Therefore, the installation of street lights must be carried out by JKR.

Still on the Honourable Member for Seberang Jaya, the issue of difficulties in management and maintenance in old flats or apartments, especially those more than 30 years old, due to the absence of a Joint Management Body (JMB) or Management Committee (MC), which was also raised by the Honourable Member.

For the information of the Honourable Member, in accordance with the legal provisions under the Strata Management Act 2013 (Act 757). Responsibility for the management of strata schemes lies entirely with the JMB, MC or the management agent or the developer. The Act does not provide for the establishment of any additional body other than the entities stated. However, the Building Commissioner's Department (COB) under the local authority has the power to appoint any owner or purchaser for the purpose of holding an Extraordinary General Meeting (EGM) for the appointment of members of the JMB or MC Committee. In addition, COB also has the right to appoint a management agent for schemes with no management, or where management fails to function, or where management does not exist. Through this process, the establishment of a JMB or MC can be pursued to facilitate the management and maintenance of the strata scheme concerned.

The Honourable Member for Seberang Jaya also requested proposed solutions to the traffic congestion issue in the Seberang Jaya Hospital area. For the information of the Honourable Member, with the additional development of a new building of nine storeys. The Seberang Jaya Hospital has provided a total of 490 parking bays to accommodate the parking needs of staff and the public. The Rapid on Demand (ROD) service is also provided as one of the alternative transport modes to address the issue of insufficient parking spaces. For vehicles that are still parked along the roadside, enforcement action falls under the jurisdiction of PDRM.

Furthermore, in considering the proposal from the Honourable Member for Pulau Betong, my friend, that local authorities and the Penang Islamic Religious Council establish a specific time period to enable traders and hawkers to perform prayers, especially at Maghrib time, which is short. For the time being, local authorities do not stipulate any specific time period for performing prayers as a condition for licence applications for traders or hawkers. In the context of a plural society, this policy helps ensure that all parties have fair access and are not burdened by strict time conditions.

I also wish to allay the nonsa asobiah misgivings regarding the issue of Malay-owned stalls in Taman Sri Indah being demolished, as expressed by the Honourable Member for Pulau Betong. This is not a matter of race or religion. MBPP's review found that these business activities were carried out along the main road, which is not permitted under MBPP's guidelines because it causes traffic congestion and endangers public safety. MBPP is conducting comprehensive monitoring in the area, and action will be taken against new businesses operated without a licence, as well as stalls located on the main road to the extent that they cause traffic congestion and disrupt public safety.

I suggest to the Honourable Member for Pulau Betong that if Pulau Betong has any proposal to place, designate or provide any suggestion, if there is any, a suitable place for hawkers without licences along the roadside to be relocated to a safer and more suitable area, you may come and meet me or contact me to propose such locations, and we will ask MBPP to study them so that we can help hawkers obtain a more suitable place, as proposed by Dato' Deputy Speaker. Indeed, in Bayan Lepas too we are working to look at suitable areas so that they can be made into temporary hawker sites.

As for the Honourable Member for Sungai Puyu, who has asked...

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Dato' Deputy Speaker, just a little, I want to ask a little. Because the Malay people there feel dissatisfied that all the Malay stalls were ordered to be vacated, but what is sad is that at the end of the same place, near the bend, also on the roadside, the Kim Kim shop that sells liquor was not ordered to close or to be vacated at all. So the Malays are puzzled why proper action has not been taken fairly.

H'ng Mooi LyeDAP · PHJawiEN

Okay, thank you, Honourable Member for Pulau Betong. I had to look back earlier at what I had raised, where MBPP indeed, first we will look at it from the aspect of safety, from the aspect of the suitability of the site, and also for all newly emerging hawkers. For newly emerging hawkers, MBPP will not compromise and will not...

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

This has been going on for a long time. The Kim Kim shop has been there a long time, indeed the longest of all.

H'ng Mooi LyeDAP · PHJawiEN

Earlier you said Malay shops.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

No, no. This is the one I was talking about.

H'ng Mooi LyeDAP · PHJawiEN

No, the Kim Kim shop has been there a long time but, but the Honourable Member said the shops that were requested or subject to action by MBPP. Have those shops existed for a long time?

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Quite a long time too.

H'ng Mooi LyeDAP · PHJawiEN

How long? Since when?

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Already, up to 10 years?

H'ng Mooi LyeDAP · PHJawi

Kedai-kedai...

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Many Malay stalls have been there for up to 10 years.

H'ng Mooi LyeDAP · PHJawiEN

The point, the point I am making here is that whenever local authorities take action, racial issues always arise. But we must remember, we are protecting safety, we are protecting cleanliness, we are protecting public peace. When enforcement action is taken in Chinese areas, people say, "Oh, they don't dare to take action in Malay areas." When, as the Honourable Member said, action is taken in the Honourable Member's area, the Honourable Member says, "Why are action always taken in Malay areas?" Do not bring up race, do not about... When enforcement action is taken, do not say it is because of this person, he will be opposed, against to any races.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

No, not race.

H'ng Mooi LyeDAP · PHJawiEN

Just now, the Honourable Member said...

Deputy Speaker of the HouseEN

Pulau Betong sit down, Jawi also sit down.

H'ng Mooi LyeDAP · PHJawiEN

Earlier the Honourable Member said (unclear).

Mohamad Shukor bin ZakariahPAS · PNPulau Betong

Masalahnya,

H'ng Mooi LyeDAP · PHJawiEN

I know, I understand. Listen to me first.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Malay stalls were taken action against, but non-Malay stalls were not taken action against. That was not fair just now. Double standard. This is a double standard attitude.

Deputy Speaker of the House

Duduk, duduk.

H'ng Mooi LyeDAP · PHJawiEN

This, this Pulau Betong must remember, do an investigation first before making wild accusations. Okay?

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

That is true, isn't it?

H'ng Mooi LyeDAP · PHJawiEN

If, if MBPP carries out enforcement, it must follow the SOPs that have been established.

Deputy Speaker of the HouseEN

Okay, Pulau Betong sit down. Jawi also sit down. Jawi, Jawi (unclear).

H'ng Mooi LyeDAP · PHJawiEN

I can do a check… I can do a check on what has been raised.

Deputy Speaker of the HouseEN

Speaker asks you to sit a moment. Okay, now, Jawi is trying to harmonise the situation. That is why Jawi earlier asked that Pulau Betong find a place, just like what happened in my place too. We find a place that we can allocate, which technically and so on we can approve. Whether it is a Chinese or Malay issue, actually both must be held accountable if wrong. Right. But in this case...

Chow Kon YeowDAP · PHChief Minister · Padang Kota

Boleh saya.

Deputy Speaker of the HouseEN

Okay, in this case, what is it, the CM's office, the CM's office then. What is it, YB EXCO will check again.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Former EXCO KT can help.

Deputy Speaker of the House

Boleh, boleh.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

We need to scrutinise at one point when dealing with so many unlicensed stalls, BKT, MBPP, MBSP have set a date for amnesty. And there is tagging given that they already existed on that date. After that date, we do not compromise. Those that newly emerged must be taken action against. So for the issue raised it is simple, just check whether the stall has tagging or not. Perhaps they have already received tagging, allowed temporarily while waiting for placement. If that is the case, they indeed did not violate the SOP that has been established. Perhaps towards this, do a check whether they have tagging, meaning they are not double standard, right? Because they were allowed to trade there while waiting for placement.

Deputy Speaker of the HouseEN

Okay, Pulau Betong.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

We will check, check again.

Deputy Speaker of the HouseEN

Okay, it's fine…

H'ng Mooi LyeDAP · PHJawiEN

I take note.

Mohamad Shukor bin ZakariahPAS · PNPulau Betong

Pastikan.

H'ng Mooi LyeDAP · PHJawiEN

And I also, usually when enforcement action is taken, there are indeed ADUN who contact me. For example, Seberang Jaya Jaya has come out, and I have also helped Seberang Jaya. It is not that we really like taking action, but when complaints come in for road safety, we have to follow the existing laws under the Akta Kerajaan Tempatan. And I have advised the Honourable Member to look at more suitable sites. When there are any, you can propose them to me. And let us look at methods to help the hawkers at the roadside to be placed in an area that is safer and more suitable for everyone.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

One more thing, I want to check again in terms of governance. If you want to demolish, inform the local YB. This suddenly collapsed straight away. It should have been informed at least a day, one day before to...

H'ng Mooi LyeDAP · PHJawiEN

I think every, every hawker enforcement, they will receive a notice before, before the enforcement activity is carried out. Apart from hawkers without tagging, the hawkers who directly set up at the edge of the junction, then MBPP will proceed to carry out enforcement.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

But we received information…

H'ng Mooi LyeDAP · PHJawiEN

I think the Honourable Member also agrees with me. Honourable Member, if there are buyers at the roadside, should a road accident occur, the Honourable Member will be blamed because the Honourable Member agreed to give a hawker site in an unsafe condition.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Okay, now. I received information, MPKK received a letter.

Deputy Speaker of the HouseEN

Pulau Betong, don't play with perceptions like that. Okay now, okay Pulau Betong. Okay, sit down.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

So we are not satisfied. It should have been informed. At the very least, we should have received information.

H'ng Mooi LyeDAP · PHJawiEN

There, there is, the KADUN Coordinator.

Deputy Speaker of the HouseEN

There is a PPK. Okay, now, what Pulau Betong wishes to convey, the Honourable EXCO has taken note. Any shortcomings or whatever will be subject to a review action, right. The issue we have now, I understand. I am also a people's representative, and we want to defend the traders; we do not want anyone to be wronged. And I am confident the Honourable EXCO Jawi is indeed very caring about the welfare of the people; he will review what has happened. Continue.

H'ng Mooi LyeDAP · PHJawiEN

Thank you. Next, the Honourable Sungai…

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Wait, I have not interrupted yet.

H'ng Mooi LyeDAP · PHJawiEN

Not yet arrived yet.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Ask, I apologise. Because just now the Honourable EXCO mentioned it was because there is a KADUN Coordinator. That is not correct. The ADUN should also have been informed.

H'ng Mooi LyeDAP · PHJawiEN

Come over here. PH.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Not like that. No, no.

H'ng Mooi LyeDAP · PHJawiEN

Government of Unity. Come, let us join Perpaduan. Sit first. (disturbance)

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

One more, there is still, still, still not answered. Still not answered.

H'ng Mooi LyeDAP · PHJawiEN

Answer what else?

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

I ask that the Pasar Tani be resurfaced again. Not yet answered.

Deputy Speaker of the HouseEN

Probably has not arrived yet. Never mind.

H'ng Mooi LyeDAP · PHJawiEN

We take note, I take note. I will ask MBPP (disturbance).

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Pasar Tani. It has been too long, far too long since it was last resurfaced.

H'ng Mooi LyeDAP · PHJawiEN

The Pasar Tani is under the maintenance of the Majlis or the Pejabat Daerah.

Mohamad Shukor bin ZakariahPAS · PNPulau Betong

Terlalu suram.

H'ng Mooi LyeDAP · PHJawiEN

Thank you. I take note. Thank you.

Mohamad Shukor bin ZakariahPAS · PNPulau Betong

Okey.

H'ng Mooi LyeDAP · PHJawiEN

Thank you. The Honourable Member for Sungai Puyu has asked about the status of the Phase 1 and Phase 2 flood mitigation project at Taman Bunga Raya. The Phase 1 project was successfully completed on 5 February 2024. As for the Phase 2 project, it is currently still at the detailed design preparation stage because it involves a comprehensive design change by the consultant. Next, the tender for this project is expected to be opened in June 2026, that is next year, with a total estimated cost of RM2.8 million. The implementation period for the works is estimated to take 24 months after the contractor appointment process is finalised.

As for the proposal from Sungai Bakap, the proposal of the Honourable Member for Sungai Bakap that the State Government examine the prohibition on the open display of alcoholic products at business premises, and study the practice of Thailand, which enforces the regulation by banning the sale of alcohol. I would advise the Honourable Member for Sungai Bakap to take note of the latest developments on this issue, where the Thai government has decided to lift the restriction with effect from December 2024, with a six (6) month trial period to assess the effectiveness of the policy.

I think I will skip Sungai Bakap. Permatang Pasir, I thank you. The Honourable Member for Permatang Pasir has raised a question regarding the action taken by MBSP on the mudslide incident caused by the construction of a new park at Taman Guar Perahu. For the Honourable Member's information, among the actions taken by MBSP is imposing a penalty composition for the related offences under Seksyen 71 Akta Jalan, Parit dan Bangunan 1974 (Akta 133) on the developer, Tetuan Kencana Buana Sendirian Berhad, on 15 May 2025 with a total composition of RM125,000. MBSP also issued an immediate stop-work notice to the developer with effect from 21 April 2025 until the flood mitigation works are completed. In addition, MBSP is also in the process of issuing a second composition of RM250,000 following the mudslide incident that occurred on 16 September 2025. The developer and consultant are also required to submit a proposed flood mitigation plan to MBSP for the new drainage so that it does not pass through the affected area. Any questions?

Firstly I want to ask. Has the developer paid the fine? Secondly. Has the developer paid the fine? Secondly. The residents, what, are worried that they are being flooded, but it is MBSP that profits. Why, because the compensation is only RM500 but…

H'ng Mooi LyeDAP · PHJawiEN

I ask you to withdraw that, please. You cannot say MBSP profits. This composition is an offence committed by the developer. This is under the law. Withdraw it. Permatang Pasir, do not say MBSP profits. (disturbance)

I, I quote back. I quote back what the residents said. The residents said that. So please, please explain, right? Please explain, the residents said that. I just want to back up. Only MBSP should answer back, why? The residents said that.

H'ng Mooi LyeDAP · PHJawiEN

Why? Why does MBSP profit?

Those, those who are flooded are the residents, it is MBSP that profits. The residents say so.

H'ng Mooi LyeDAP · PHJawiEN

Permatang Pasir, does Permatang Pasir think that MBSP wants to give developers everywhere a chance to make the area, make it result in flooding?

Not like this, I ask…

H'Ng Mooi LyeDAP · PHJawiEN

If MBSP gives favour to the developer, MBSP will not impose a composition or summons, or stop-work order on the developer.

Amir Hamzah B Abdul Hashim @ Md. HashimPAS · PNPermatang PasirEN

Yes, well but.

H'Ng Mooi LyeDAP · PHJawiEN

These summonses are for offences under the law.

Ya, lah.

H'Ng Mooi LyeDAP · PHJawiEN

For that reason, we hope that developers, or consultants, follow what has been stipulated in the Planning Permission Plan or their IND Plan or Mitigation Plan, to take care of the construction site and take care of the surrounding area of the construction site. I understand, perhaps Permatang Pasir wants to ask the developer to compensate the, the victims. Right?

Ya. Dak.

H'Ng Mooi LyeDAP · PHJawiEN

I think Permatang Pasir also knows the developer, right, you can discuss it.

Amir Hamzah B Abdul Hashim Md. HashimPAS · PNPermatang PasirEN

Dak, this, this.

H'Ng Mooi LyeDAP · PHJawiEN

See whether the ex-gratia they can give.

Amir Hamzah B Abdul Hashim @ Md. HashimPAS · PNPermatang PasirEN

Dato' Speaker, I am only expressing the residents' feelings.

H'Ng Mooi LyeDAP · PHJawi

Saya tau.

Amir Hamzah B Abdul Hashim @ Md. HashimPAS · PNPermatang PasirEN

The residents say so. Those who were affected are us. Those who get the money are MBSP. The residents say so. What I say, what I want to say to the residents.

H'Ng Mooi LyeDAP · PHJawiEN

Okay. I think I suggest.

Ya. Ya.

H'Ng Mooi LyeDAP · PHJawiEN

Permatang Pasir Honourable Member, you may arrange an internal discussion with the developer. I believe the Honourable Member for Permatang Pasir has also met the developer, right, perhaps you can give a suggestion so that some solatium, a certain amount of solatium, can be channelled from the developer to the victims. Can, Honourable Member? Cannot.

Boleh.

H'Ng Mooi LyeDAP · PHJawiEN

Okay. Thank you. Sit down.

Deputy Speaker of the State Legislative Assembly

Okey, teruskan.

H'Ng Mooi LyeDAP · PHJawiEN

Touching on the concerns of the Honourable Member for Pinang Tunggal, Pinang Tunggal has already come out and looked.

Deputy Speaker of the State Legislative AssemblyEN

Road, road, skip it.

H'Ng Mooi LyeDAP · PHJawiEN

This. These areas, these areas. I think I need to stand up. Because this concerns the issue of illegal factories. Every time there is someone who raises it, Permatang Pasir did not raise it this time. I do not wish to deny that the resolution of this issue takes a long time because it involves complicated processes and requires approvals at several levels, especially in terms of zoning approval, namely zoning, before it can be finalised. Nevertheless, MBSP has taken the initiative by implementing a new factory whitening programme in 2025 and bringing the zoning approval to the State Planning Committee on behalf of the factories included in the whitening list.

This effort is a solution implemented by MBSP to facilitate the process and accelerate the whitening programme. In addition, MBSP has also taken the initiative of issuing premises licences and advertisements on a staggered basis to unlicensed factories and business activities across Seberang Perai, in stages according to area. At present, MBSP is completing the issuance of licences in the areas of Kampung Tok Sani, Pantai Bersih, Kampung Dock di Juru, Juru Estate Mukim 12, and the businesses that are on the factory whitening list. MBSP will also identify unlicensed business premises in Kampung Selamat, as an effort to license these businesses.

Chickens in the coop can certainly be controlled. But goats let loose to roam are difficult for us to control. Likewise with foreign workers who do not, who do not work in the industrial projects at Taman Teknologi Pulau Pinang, Kepala Batas, it is impossible for the State Government to control their movements. Therefore, if the Honourable Member has information regarding the presence of these foreign workers, you may report directly to the Immigration Department of Malaysia or you may contact me to help resolve this issue.

In response to the Honourable Member for Pulau Tikus regarding the proposal to increase the number of CCTV closed-circuit cameras, MBPP does indeed have plans to add closed-circuit cameras on the island, Pulau Pinang, in 2026. The Pulau Tikus State Assembly area is also included among the focus areas being considered by MBPP. Accordingly, a detailed study will be carried out together with PDRM to identify suitable locations for the installation of the new CCTV units, in order to strengthen the security and monitoring aspects in the area.

In an effort to tighten building construction standards in Pulau Pinang, developers are required to comply with the technical conditions stipulated under the regulatory purview of the relevant technical departments. Among the basic conditions that must be complied with by developers are compliance with the development site setback, control of density or plot ratio of the proposed development, building setbacks, calculation of site entry and exit roads, community facilities, parking spaces, felling or planting of trees, calculation of refuse depots, and so on. Compliance with technical requirements must be adhered to by the project developer. In addition, approval of the Traffic Impact Assessment (TIA) is required before a planning permission application is considered, to avoid traffic congestion in the areas surrounding the development project. Furthermore, the traffic study element is one of the important components that must be taken into account in the preparation of the Local Plan Reports of both Local Authorities.

The Honourable Member for Kebun Bunga, meanwhile, requested clarification regarding the proliferation of derelict vehicles in private housing areas. For the Honourable Member's information, MBPP is intensifying efforts to promote and create awareness of the disposal of end-of-life vehicles through the Programme Strata Bebas Kenderaan Usang, expanding the awareness campaign to community leaders, all MPKK, associations, and community management down to the grassroots. MBPP also provides regular briefings, digital information kits, promotional materials, as well as engagement sessions with all stakeholders to ensure that every area on the island can clearly understand how to dispose of end-of-life vehicles independently through the online system, namely e-Deregistration. This method is very easy and the process takes only about five minutes, and does not require vehicle owners to attend the Jabatan Pengangkutan Jalan, namely JPJ, the cost is not burdensome and it is much more user-friendly.

In addition, vehicle owners can enjoy incentives and rewards when handing over their vehicles to licensed operators of Authorised Automotive Treatment Facilities, namely AATF, thereby encouraging lawful disposal and able to reduce the accumulation of derelict vehicles in residential areas. MBPP is committed to playing a more active role in promoting this initiative so that the public truly understands, is confident, and is motivated to dispose of their vehicles lawfully and responsibly.

For the information of Honourable Members, where I have asked Encik Azri, namely the Director of Enforcement under MBPP, to arrange a briefing for all ADUN, including the ADUN on that side, for a briefing on the method of e-Deregistration. Actually I, the briefing was to be held before the Dewan sitting, but due to time constraints I was informed it will be arranged either after the Dewan sitting, or in January, so that the Honourable Members understand the methods for disposing of derelict vehicles.

Dewan sitting that I honour all, concluding this discourse, every policy, plan, and development project is the result of the work of intellectuals who are not only heroes on the physical field, but guardians of values, weavers of hope, and protectors of the state. We build a city not merely physically. A city must be built together with a humane spirit, like flowing water that nourishes the life of every individual. All these efforts require harmonious unity. Together we ride the skies of aspiration, examine every vehicle of innovation, write every step with the letters of dedication and walk every stage of development with full wisdom.

Therefore, allow me to express my highest and most proud appreciation to the Local Government Division, Majlis Bandaraya Pulau Pinang, Majlis Bandaraya Seberang Perai, and the State of Pulau Pinang Town and Country Planning Department. They are the intellectuals of the state, the soldiers of development, the loyal warriors who work without end.

Deputy Speaker of the State Legislative AssemblyEN

I myself also find it hard to catch what the YB says.

H'Ng Mooi LyeDAP · PHJawiEN

To ensure this, I will explain later. To ensure this, these are the machinery, our heroes, ensuring every policy can be implemented perfectly. You step forward, step by step, weaving the trust of the people and acting tirelessly, only so that together with me we make the State of Pulau Pinang sparkle like stars and glitter like gems. Thank you, O soldiers and intellectuals of the city, glorious champions of the state.

And before I close this page of discourse, allow me also to state a matter that is the firm foundation of this state: that Pulau Pinang stands as a sovereign, self-owned and firmly established state, its position fixed in the Federal Constitution and the laws binding the nation. Its sovereignty cannot be disparaged, cannot be eroded and cannot be threatened by any party that attempts to distort the facts of history and the provisions of law. Pulau Pinang stands on a valid legal foundation and cannot be twisted by claims of songsong, songsang, or any reckless demands.

Deputy Speaker of the State Legislative AssemblyEN

This is an old transcript.

H'Ng Mooi LyeDAP · PHJawiEN

Should there be hands that try to drag this state into the legal arena, know that the State Government will stand firm, dignified and anchored on strong legal documents. We will argue with all the might of knowledge and constitutional evidence, defending Pulau Pinang as steadfast as a reef battered by a storm. This is our promise to the homeland, this pearl of the east, that this land will not be allowed to slip from its dignity, and its sovereignty will be defended without fear. Pulau Pinang remains the property of the people of Pulau Pinang, sound, noble, and cannot be claimed by any lackeys whatsoever.

Fireflies fly freely, Lighting the dark night, The 2026 Budget has been debated, Sincerely, Jawi, supports it.

That is all, thank you.

Deputy Speaker of the State Legislative AssemblyEN

Thank you, Jawi. Language at another level. I am afraid it includes the language of other countries. Because even I, a Malay, find it hard to understand. So be it. Next, we invite Sungai Pinang. Please.

Lim Siew KhimDAP · PHSungai PinangEN

Thank you to the Honourable Deputy Speaker of the Penang State Legislative Assembly, the Most Honourable Chief Minister of Penang, the Honourable Members of the State Executive Council and the Members of the State Legislative Assembly, and the ladies and gentlemen present.

Good afternoon, greetings of hope, greetings of Penang2030 and greetings of Malaysia MADANI. Thank you for the opportunity to present the winding-up speech for the portfolio of Social Development, Welfare and Non-Islamic Affairs.

Dato' Speaker, the portfolio I carry is one of the greatest responsibilities in the State Government because it is closely tied to the daily lives of the people of Penang from every level of age, background and need. Every decision made affects the wider social ecosystem. For example, when we invest in the empowerment of women, we can strengthen the family institution. When we expand age-friendly infrastructure, we can improve the health of the community as a whole. When we manage the issues of the poor with dignity, we uphold social justice, and when we respect all religious institutions, we are able to strengthen the harmony of Penang's multiracial community. Ever since before I became a Member of the State Executive Council, I have truly believed in the approach of going down to the ground, seeing the real situation for ourselves, understanding the realities of people's lives, and only after that can we draft accurate solutions, not merely relying on reports alone but guided by the voices, faces and true stories of the people we meet in the field.

From every ground visit I make, there is one sentence that I often say to myself: we need to do something (with permission), we must act. This sentence may seem simple but it carries a very great meaning. It is a call and a conviction that we must take steps to bring change to the people. We need to do something (with permission) also serves as a reminder to me that, as a government that bears the people's mandate, we cannot become a NATO government, that is, No Action, Talk Only (with permission). We need to do something becomes the moral compass that guides the entire approach of this portfolio. It reminds me and the entire machinery of government that social issues cannot be viewed in isolation or wait for official reports alone. It demands that we go down ourselves to see the realities on the ground, act early before problems become bigger, coordinate agencies more efficiently, and ensure that every initiative launched is not merely look good on paper (with permission), but truly benefits the people.

Hence, this entire winding-up speech is built upon that spirit, to provide a comprehensive picture of how policies, programmes and community movements are driven simultaneously to uphold dignity, improve well-being and preserve the harmony of the people of Penang. The Penang Social Development Framework. In a rapidly developing state like Penang, social challenges not only are not decreasing, but are becoming increasingly complex. They can no longer be addressed separately or in silos. Instead, they require a comprehensive framework that combines data analysis, demographic understanding, coordination among agencies and continuous monitoring to ensure more effective and efficient solutions.

Accordingly, the State Government through the Penang Women's Development Corporation (PWDC), with the cooperation of the Penang Institute, is developing the Penang Social Development Framework as a strategic guide to set the direction of the state's social development. If we look at it generally, social development covers various issues, and indeed almost every aspect of community life can be considered part of social development. However, this is where the important role of this framework lies. It functions to elaborate, focus and prioritise the issues and the actual gaps faced by the community. This framework will also help the State Government formulate more responsive policies, strengthen community engagement, ensure that target groups and vulnerable groups are always given attention, and provide access to the support needed. This framework is expected to be completed in the first quarter of 2026.

Secondly, the Gender Inclusivity Policy and GRPB. The State Government continues to strengthen gender inclusivity efforts through the Gender Inclusivity Policy (DKG), which is now in the second phase of its implementation with a focus on institutionalising gender inclusivity practices at all levels of government. Briefly, the Gender Inclusivity Policy is the State Government's commitment to ensure that every policy, programme and service takes into account the needs of women and men equitably. Meanwhile, the implementation of Gender Responsive and Participatory Budgeting (with permission) GRPB is a method used to ensure that the state budget is distributed fairly to those in need through engagement sessions with local communities that enable them to voice their actual needs.

In answer to the question of the Honourable Member for Sungai Dua regarding the impact of the Gender Inclusivity Policy and GRPB, one of the successes of this policy is the concept of DKG that has been integrated into the core work of departments, and it can be seen through the implementation of GRPB that has been institutionalised at the level of the Local Authorities (PBT), namely MBPP and MBSP. Both of these local authorities not only implement the policy as an administrative requirement, but truly practise it in terms of, namely, first, urban planning and safety such as the design of pedestrian lanes, cycling paths, and family and community rest facilities.

Secondly, the context of service delivery, such as encouraging gender-balanced participation in community engagement sessions and ensuring that decisions take into account groups with different needs. To give a picture of how GRPB is used, especially in the Island area under MBPP, the GRPB approach is applied in the provision of services and the implementation of problem-solving measures, such as tackling the issue of limited parking at Hospital Pulau Pinang.

Open and targeted online surveys that take into account the views of men, women, senior citizens and persons with disabilities (OKU) were conducted with the cooperation of PWDC before the budget was allocated to launch the new CAT Bus route, namely CAT Hospital. On the Seberang side, gender lens awareness by MBSP is clearly seen through projects such as Ops Cross MBSP, which is not merely a crow-shooting operation, and which also encourages women to participate as shooters in this operation, which was previously more dominated by men.

In line with this, the State Government through PWDC, together with MBPP and MBSP, organised the National Nexus GRPB Conference 2025 on 27 and 28 October this year, bringing together 350 participants from nine states including Penang. This conference proves that Penang's GRPB approach is increasingly recognised as a national reference model. More proudly, the Honourable Dato' Seri Town Planner, Dr. Maimunah Mohd Sharif, who is a former Mayor of Kuala Lumpur, in her keynote address at Nexus, announced the commitment of Kuala Lumpur City Hall (DBKL) to adapt the Penang GRPB module into their new module, namely Committee Inclusive and Participatory Budgeting. This is a clear recognition of the effectiveness of the GRPB approach developed in Penang.

To ensure the continuity and coordination of the implementation of this policy, the State Government will establish the Gender Inclusivity Policy Steering Committee, namely the Policy Steering Committee (with permission), to monitor, coordinate and measure the effectiveness of the implementation of the Gender Inclusivity Policy as a whole, thereby accelerating the integration of this policy in all government departments and agencies.

Thank you also to the Honourable Member for Sungai Dua for emphasising the aspect of women's needs in terms of safety, mobility and welfare, particularly for women who work night shifts. The State Government will look into the cooperation that...

Goh Choon AikPKR · PHBukit TambunEN

Excuse me, Sungai Pinang.

Deputy Speaker of the House

Laju LRT.

Goh Choon AikPKR · PHBukit TambunEN

He's very fast, it's hard to stop him.

Deputy Speaker of the House

Silakan.

Goh Choon AikPKR · PHBukit TambunEN

Dato' Deputy Speaker, and the Honourable Member for Sungai Pinang earlier, Sungai Pinang touched on the GRPB module being used as a reference by agencies and local authorities from other states, including DBKL. Is this GRPB module given to them free of charge, or can the module be sold to generate income for PWDC?

Lim Siew KhimDAP · PHSungai PinangEN

Thank you to the Honourable Bukit Tambun. Indeed, this is a sound proposal. We are in discussions to develop it into a module that we can market. Yes, thank you. So, the State Government will look at closer collaboration with the Labour Department (JTK), given that the Labour Department has guidelines based on the Employment Act 1955 (Amendment 2022), including provisions relating to working hours, employee welfare,

the prohibition of sexual harassment (Section 81), and the employer's obligation to establish an anti-sexual harassment policy as stipulated through the amendment to the Act.

At the same time, the aspect of workplace safety is also protected under the Occupational Safety and Health Act 1994, specifically Section 15, which requires employers to ensure a safe working environment for all employees, including those who work at night. Apart from the Labour Department, the State Government will also work with the Royal Malaysia Police (PDRM) to look at effective measures to ensure the safety of female employees' travel when going to and returning from work at night. From the welfare aspect, PERKESO is an important partner in ensuring social security protection for female employees should any unfortunate incident occur. The State Government will also consider the use of the Gender Responsive and Participatory Budgeting (GRPB) methodology to improve existing guidelines through engagement sessions with stakeholder agencies so that it can add value to efforts under the Gender Inclusivity Policy and become more responsive to the actual needs of women who work the night shift.

Third, Empowering Women and Families, Bridging the Gender Gap. Efforts to strengthen the state's social ecosystem will not be complete without giving special attention to women as leaders, economic contributors and community movers. Women make up a large part of the frontline workforce in families, society and the employment sector. Therefore, when women are empowered economically, socially and politically, this will have a positive impact on households, communities and the overall development of the state. Through the efforts of PWDC, a diverse programme ecosystem has been established to strengthen women's leadership, skills, financial management competence and their influence in the community.

One initiative that has made an impact is the Penang Women Entrepreneurs Mentoring Programme (Pen Mentor). Since its implementation in 2020, the programme has helped 435 micro women entrepreneurs increase their average income by up to 30%. For 2025, a total of 92 women entrepreneurs have joined an intensive programme covering digital marketing, business strategy and product branding with guidance from industry mentors. The success of Pen Mentor shows that when we support women to

grow their businesses, we are not merely providing assistance, but opening opportunities for them to be self-reliant and improve their families' future.

Moving forward, the State Government intends to extend Pen Mentor to more rural areas, strengthen market access for village entrepreneurs and enhance digital skills training so that women entrepreneurs remain competitive in today's digital economy. At the community level, the Women and Family Development Committee (JPWK) remains an active grassroots machinery in driving the state's social development agenda. Throughout 2025, the State Government through PWDC has implemented the Jelajah JPWK programme, which gave me the opportunity to visit JPWK members in every district, obtain a true picture of community needs and discuss solutions to issues together. To ensure JPWK continues to function effectively, PWDC will strengthen the capacity of this machinery through project management training so that every programme and initiative at the community level becomes more structured, targeted and truly meets local needs.

In line with strengthening the grassroots, Penang also places focus on long-term women's leadership development through the Penang Women's Sitting (Sidang Wanita Pulau Pinang), which is now entering the sixth year of implementation. The programme has produced more than 240 women leaders through leadership training and exposure to the public policy process. Many alumni now hold important roles in NGOs, community organisations and policy initiatives. The success of Sidang Wanita proves that women are not only ready to participate, but are also confident to lead in shaping the future of the state.

To complement these efforts and ensure the continuity of women's political leadership, the State Government through PWDC, together with the Penang Literacy Community Association (Peniti), will introduce the Elite Women's Leadership in Politics programme, namely Wilit. This programme is led by the Honourable Puan Connie Tan, ADUN Seri Delima, and is designed to build a cohort of future women political leaders with a strong foundation in governance, public communication, evidence-based policy formulation and community organising. Perhaps some may wonder, if there is already Sidang Wanita, why is there a need for Wilit? For that, allow me to explain. Sidang Wanita gives women experience in understanding the proceedings of the State Legislative Assembly and the role of an ADUN in the context of policy formulation. Wilit, on the other hand, emphasises women's ability to work in the field, drive programmes, build grassroots networks and collaborate with the ADUN in their respective constituencies. When these two aspects are combined, we not only produce women leaders who are understanding, who understand policy and who are capable of leading the community, but we also build a group of women who can become agents of change in strengthening the institution of the family.

Apart from the economic and leadership aspects, I would also like to remind that the empowerment of women will not be complete if we do not give attention to their health, because Health is Wealth, with permission. Therefore, looking after health is important not only for themselves but also for the well-being of families and communities. Accordingly, I would like to touch on the aspect of women's health as raised by the Honourable Sungai Dua. For the information of this Honourable House, the National Population and Family Development Board (LPPKN) provides several specific health services for women in Penang. Among them is the mammogram subsidy programme, which is free breast cancer screening for women aged 40 to 70 years with a household income of less than RM10,000. These examinations are carried out at private panel hospitals and are fully borne by LPPKN. LPPKN also provides the HPV DNA test programme as free cervical cancer screening for married women or women who have been sexually active, aged 30 to 65 years. To facilitate access, LPPKN also organises mobile clinic services for the implementation of this test.

In addition, LPPKN also offers the Fertility Treatment and Infertility Evocation Assistance Programme (BUAI), which provides incentives of up to RM2,000 for each treatment cycle. This programme is open to Malaysian citizen married couples with a household income below RM10,000 and women aged 35 years and below who face fertility problems. For any Honourable Member who is interested in bringing these services to their respective constituencies, they may directly contact and invite LPPKN to collaborate.

Fourth, Early Childhood Development. Another important foundation in social development is how we invest in the early development of children. Today, children grow up in an environment that places too much emphasis on early academic achievement, to the point of neglecting natural curiosity, social interaction and emotional stability. Working parents who work full-time often face difficulties in providing holistic development. Meanwhile, early education operators feel pressured to prioritise homework and academic assessment to the point of killing the interest to explore and play.

In response to this challenge, the State Government has supported the organising of the Unstructured Play Conference, with permission, which was recently held by the White House Education Group. This conference, the conference brought together more than 350 participants from Malaysia, China, Singapore and Thailand, consisting of educators, early education practitioners, child development experts and parents to dialogue and redefine how we understand learning through play, or with permission, Learning Through Play. This concept emphasises how play can stimulate the senses, enhance social interaction, hone skills, solve problems and build learning spaces that value imagination and curiosity. This conference sparked the commitment of attendees to highlight the importance of building and accepting a culture and concept of play as a meaningful form of learning.

Taking this momentum forward, the State Government will introduce the MAIN campaign, namely (Membesarkan Anak, Insan Negara), next year as the next phase in early childhood development initiatives. This campaign will become a state-wide movement that looks at the comprehensive needs of children's development, including building emotional resilience, creativity and giving priority to play as a basic developmental right for our young generation. Through the MAIN campaign, we can ensure that our children grow up in an environment that stimulates the mind and also supports their overall well-being.

Fifth, Strengthening the Care Ecosystem and Ease of Access. At the same time, we need to realise that efforts to strengthen the institution of the family can only be achieved through a comprehensive care ecosystem. Early childhood care, preschool education, support for persons with disabilities (OKU) and elderly care centres are now no longer optional extras, but have become a social necessity of modern society in Penang. Social change also shows that more and more working parents depend on care services that are safe and affordable so that they

can work with confidence. Quality taska and tadika help parents to work. Elderly care centres ensure ageing parents are well monitored. Meanwhile, OKU support centres provide peace of mind to caregivers.

Therefore, the State Government views the care sector as an important component of the state's social infrastructure. Hence, in responding to the question from the Honourable ADUN Sungai Puyu, Air Itam and Teluk Air Tawar, who raised the issue of care centres and what efforts we are making. As a start to strengthen the entire care ecosystem, the State Government has established the Task Force Taska Tadika and Care Centre Committee (TTPJ), involving all relevant agencies. This Task Force is responsible for coordinating special case issues and finding ways to facilitate cross-agency licensing processes so that they are clearer and more consistent. Two town hall sessions have also been organised involving approximately 300 operators of taska, tadika and care centres that are not yet registered.

Through these sessions, we identified two main constraints hindering the registration process that are frequently raised, namely the high infrastructure charges of the local authorities (PBT) and the lack of clarity in guidelines. To address these issues, inter-agency workshops have been carried out to restructure the guidelines so that they are simpler, easier to understand and no longer cause operators to depend on runners. These new guidelines will be incorporated into the Taska Tadika Pusat Jagaan Registration Kit, which will cover the complete process flow, checklists and reference officer information together with the roles of the agencies involved to help operators go through the registration process more systematically.

At the same time, this kit ensures that all agencies provide uniform and non-conflicting guidance. To assist operators who bear high costs, the MMK for Social Development has requested the Local Government Division to re-examine the proposal to reduce infrastructure charges. Following that, the Local Government Division has presented a proposal for a 50% discount at the Task Force Taska Tadika Pusat Jagaan Meeting. However, there is no final decision so far, although the final decision is subject to the MMK for Local Government, and this step shows the commitment of the MMK for Social Development to ease the financial burden of operators.

As a sign of commitment to assist operators, I have also temporarily suspended enforcement relating to premises licensing. However, firm action will still be taken should there be any incident involving the safety, negligence or neglect of children and senior citizens. This approach is to ensure that safety is never compromised. As an added value in supporting the entire care ecosystem, the State Government through PWDC, PEGIS and the Penang State Social Welfare Department (JKM) has also developed Taska @ Penang, which is an interactive portal displaying complete information on registered taska in Penang. This effort makes it easier for parents to make the right choices, increases transparency and encourages more operators to register lawfully. This initiative also strengthens women's participation in the workforce because they now have access to safe care.

The State Government is also considering extending this platform to care centres and tadika. With a more structured care ecosystem and easier access to support services, we are not only helping families function well, but we are also building a safer domestic environment. Where women, children, senior citizens and OKU are not exposed to exploitation or violence.

Sixth, Safe Families and Prevention of Gender-Based Violence (with permission). The State Government remains committed to ensuring Penang becomes a safe state for all families through the implementation of the Safe Family Policy, which affirms that every individual has the right to live free from fear and violence. Under this policy, the State Government has established First Support Point as community support to ensure victims of violence can receive early assistance quickly and safely. So far, a total of 536 community members and agency officers have been trained as First Support Point across the state, and since 2020, a total of 261 domestic violence cases have also been referred through the First Support Point network. PWDC together with WCC continues regular training to ensure First Support Point is always ready to provide assistance. The next step is to implement full training for grassroots leaders, including the Village and Community Management Council (MPKK), because they are the group closest to the community and have the potential to become the first rescuers in emergency situations.

As a complement to these efforts, the State Government has also introduced the Penang Stops Violence Application, developed by PEGIS and PWDC. This application helps users identify the nearest First Support Point easily and safely. Penang Stops Violence has also received international recognition through the World Summit on the Information Society (WSIS) Prizes 2025 in Geneva, Switzerland, making it among the nation's most high-impact social digital innovations.

However, to improve access and safety for victims, the State Government has decided to adapt Penang Stops Violence from an application to a website. Accessing a website is safer for victims because it does not require downloading an application. Given the risk of phones being checked by perpetrators of violence, the website is also easy to update by PEGIS and more cost-effective to maintain. This approach ensures help is always at their fingertips regardless of the victim's circumstances. For the time being, PEGIS is still in the process of setting up the website.

With the support infrastructure increasingly strengthened through First Support Point and Penang Stops Violence, it is time for us to mobilise the community more widely through educational and preventive campaigns. This is where the role of the annual Penang Goes Orange (PGO) campaign continues, as one of the longest-running anti-violence campaigns organised by a State Government in Malaysia. Entering its 12th year in 2025, this year's Penang Goes Orange campaign carries the theme "Jangan Dok Diam (Break the Silence)", which urges the public to become active observers or upstanders, not merely passive witnesses.

Goh Choon AikPKR · PHBukit TambunEN

Sungai Pinang, please give way.

Lim Siew KhimDAP · PHSungai PinangEN

Oh, yes, yes.

Goh Choon AikPKR · PHBukit Tambun

Rehat dulu.

Deputy Speaker of the HouseEN

You may have your drink first.

Goh Choon AikPKR · PHBukit TambunEN

Baik, Dato' Deputy Speaker, a short while ago the Honourable Sungai Pinang touched on the Penang Stops Violence Application, which also received the George Business World Excellence 2023 award and The World Summit on the Information Society Prize 2025. My question is the same. Will PWDC and also PEGIS explore this application for commercialisation? That is all.

Lim Siew KhimDAP · PHSungai PinangEN

Ya. Thank you to the Honourable Bukit Tambun. Yes, indeed, because we are now moving towards a point where we need to find more, more income, right, for maintenance or whatever. So this is also under discussion within PWDC so that it can be turned into a form, a model or a thing that we can make into a commercial. Something that is commercial, that can bring income to us. Thank you. And inspired by the approach of the international organisation Right to Be, PGO 2025 is not only an awareness campaign, but also introduces 5D Bystander Intervention training (with permission). That is five simple and safe steps for intervening when witnessing violence taking place. We must acknowledge that the authorities are not always present at the scene.

Therefore, it is the community that must play a role in helping, protecting and speaking up for those who are threatened. The "Jangan Duk Diam" culture must be nurtured in public spaces, workplaces, neighbourhoods and also at home. The launch of PGO 2025 will be held on 13 December at Padang Kota Lama and I welcome the presence of all Honourable Members as a sign of solidarity in opposing violence. Members of the House are also encouraged to implement programmes related to Penang Goes Orange in their respective areas to enhance community preparedness. Regarding the question from the Honourable Berapit on the issue of bullying, I believe the issue referred to is the "Penang Against Bullying" campaign that was launched in February 2018. The campaign began with the Walk As One awareness programme, which was officiated by the Most Honourable Air Putih as Chief Minister at that time. It was also a sign of solidarity with the family of the late T. Nhaveen, a student who became a victim of bullying at school until it claimed his life in Penang. The survey that the Honourable Member mentioned was in fact one of the action plans under that campaign.

However, unfortunately, the project could not be continued for certain reasons at that time. Nevertheless, the awareness element on the issue of bullying has been integrated into the implementation of Penang Goes Orange by recognising it as one form of violence. Since then, Penang has continued this commitment through Penang Goes Orange, which involves school students, colleges, universities, the general public and various strategic partners. This makes efforts to prevent violence and bullying more integrated and sustained. For the information of all, regarding the issue of bullying in schools as already explained by the Honourable Deputy Chief Minister 1 just now, this matter falls under his purview. For my part, I view bullying as a form of violence, which is why I also bring the awareness element through the Penang Goes Orange campaign, which focuses on the prevention of violence. With this explanation, I hope that in the next DUN sitting, all questions can be raised more clearly according to what you wish to know. The Honourable KOMTAR also asked about (interjection).

Heng Lee LeeDAP · PHBerapitEN

Excuse me, Honourable Sungai Pinang. I congratulate the success of Penang Goes Orange, which has been organised by PWDC and the Penang State Government so consistently over several years. The action committee just now was mentioned as Penang Against Bullying alongside Penang Stop Bully in the news, which I understand was in a statement. However, I would like to know, because at that time, the programme had cooperation with PDRM, with also a very good initiative. Because the State Welfare Department led the project and also PDRM went into schools to provide guidance or joint prevention at school hotspots, 30 schools' hotspots.

So I would like to know, with cross-department cooperation between the various EXCO portfolios and departments, what is actually the role of PWDC or of the Welfare Department, can this effort be continued? So that bullying in schools, which is a complicated matter, we can help better even though this falls under the Federal Government. But when it comes to education, it is too complicated if we rely only on the Government, the Ministry of Education. Thank you.

Lim Siew KhimDAP · PHSungai PinangEN

Thank you to the Honourable Berapit, who is concerned about the issue of bullying. But the Oral Question that I received, that all of us received, is not about Penang Goes Orange. You read out that the development of the Stop the Bully campaign launched in 2018 (interjection).

Heng Lee LeeDAP · PHBerapitEN

I did not mention that. Just now I only asked about Penang Goes Orange.

Lim Siew KhimDAP · PHSungai PinangEN

That's why this is your original question. So this one falls under the purview of our TKM 1. And after that, only then I answer about Penang Goes Orange.

Deputy Speaker of the HouseEN

Okay. Just touch on it briefly.

Lim Siew KhimDAP · PHSungai PinangEN

Yes, so here is where I am bringing up the issue of Penang Goes Orange. Because as I read out earlier, with the awareness element on the issue of bullying, we have integrated it into the implementation of Penang Goes Orange. The Honourable Berapit has also been for two years. You understand, Penang Goes Orange, all this time we have also gone into schools. There are, there are many activities throughout the year, especially in December when the month of Penang Goes Orange is the month for us to act against bullying. Not stop bullying lah, against bullying.

Heng Lee LeeDAP · PHBerapit

Minta laluan.

Lim Siew KhimDAP · PHSungai PinangEN

And so, I think that is enough.

Deputy Speaker of the House

Sudah cukup.

Heng Lee LeeDAP · PHBerapitEN

Because just now you touched on Penang Against Bullying. I only want to go back to the questions on Penang Against Bullying but in the year... (interjection)

Lim Siew KhimDAP · PHSungai PinangEN

Okay, I think when you want to ask, do it more clearly. The question should be clear, we have already had two terms, I think it is easier for all of us, yes.

Deputy Speaker of the HouseEN

This issue is already settled. Okay, I ask Berapit (interjection).

Heng Lee LeeDAP · PHBerapitEN

Mr Speaker, I think if this committee, which the Honourable Sungai Pinang just now touched on, the survey that was stopped for certain reasons. And can we know, with such a good initiative, why it was stopped? And after it was stopped, were there any other proposals? That is on top of the action of Penang Against Bullying that the Honourable Sungai Pinang just raised. It has nothing to do with Penang Goes Orange.

Lim Siew KhimDAP · PHSungai PinangEN

Okay lah, I I think it's okay lah, same lah.

Deputy Speaker of the House

Dua portfolio.

Lim Siew KhimDAP · PHSungai PinangEN

The Honourable Berapit is also a Board of Director in PWDC. If she will understand what has happened. Anyway, it's okay, we, I thank her for her concern on this issue... (interjection)

Heng Lee LeeDAP · PHBerapitEN

Deputy Speaker, if in this august House every time I am involved in every Board or MMK, I am given such an answer, it is unfair to all the Honourable Members in this House.

Deputy Speaker of the HouseEN

The earlier question, TKM has already answered (interjection).

Lim Siew KhimDAP · PHSungai PinangEN

The original question, the original question, the Deputy Chief Minister, eh, Deputy Chief Minister again, the original question confused everyone by not being sufficiently (interjection).

Deputy Speaker of the HouseEN

So now Sungai Pinang, Sungai Pinang please help a little.

Lim Siew KhimDAP · PHSungai PinangEN

Yes, that's why I read it out, I read it out, I read it out. Yes, and the year given was also wrong, if you must do your homework before that. However (interjection).

Deputy Speaker of the HouseEN

Don't poke people, Sungai Pinang.

Lim Siew KhimDAP · PHSungai PinangEN

Yes, yes, yes.

Deputy Speaker of the House

You, jalan terus.

Lim Siew KhimDAP · PHSungai PinangEN

Of course. Go straight, go straight, I go straight. However, that is why I also bring the awareness element through the Penang Goes Orange campaign, which focuses on the prevention of violence. So the Honourable KOMTAR also asked about the statistics of bullying cases that have been resolved. I will give this answer to the Honourable Member in writing after I receive the details from the relevant department. Penang as an Age-Friendly State and Empowerment of the Elderly.

Deputy Mr Speaker, in a rapidly ageing community, efforts to build an age-friendly state are no longer an option. Rather, they have become an important necessity for the safety and well-being of the people. Penang's commitment to becoming an age-friendly state reflects not only demographic reality but also our moral responsibility. As society grows older, we must create an ecosystem that enables the elderly to live with dignity, independence and continue to have a meaningful role.

Old is gold (with permission), the elderly are not a burden but they are part of the society that builds the identity of this state. Therefore, policies and planning must ensure that they continue to be valued, cherished and protected. In line with Visi Penang 2030, particularly under Strategy C2, namely increasing the participation of youth, women and the elderly in community life. Efforts to provide this environment are also guided by the Active Ageing Roadmap Plan, which was launched in 2022. The plan serves as a strategic guide in strengthening the role of the elderly as an asset to the state's development. One of the main goals in this plan is to obtain recognition as an Age-Friendly City (AFC). This initiative is actively being implemented in the Island and has now also been expanded to Seberang Perai through cooperation between PWDC and MBSP, thereby ensuring the benefits of the Age-Friendly Agenda can be enjoyed throughout the state.

For information, the formal application for membership of the WHO Global Network for Age-Friendly Cities and Communities by MBSP was submitted on 14 November 2025. This step has the potential to make Penang the first state in Malaysia to have two cities recognised under the WHO AFC network. Our efforts also focus on social well-being through lifelong learning programmes, community involvement and employment opportunities suitable for the elderly. Apart from creating a supportive physical environment, the State Government through the Social Development Exco Portfolio also strengthens the social participation of the elderly through the Warga Emas Celik campaign in collaboration with JKM and the Elderly Activity Centres (PAWE). The elderly are given easily accessible learning opportunities covering digital skills, health knowledge, awareness of online fraud and financial protection. The commitment of the State Government is clear, namely to ensure every elderly person enjoys a safe, respected life and continues to be given space to contribute to the community they have built throughout their lives. Therefore, to answer the question raised by the Honourable Seberang Jaya regarding the GLC that... is not there or I skip straight to it, can I?

Deputy Speaker of the HouseEN

Just answer, answer a little.

Lim Siew KhimDAP · PHSungai PinangEN

Answer, yes. Those who record losses, I want to explain that GLCs like PWDC were not established to make profits... (interjection)

Lee Boon HengPKR · PHKebun BungaEN

Sungai Pinang, Sungai Pinang. May I ask a question? I am interested in Active Ageing, especially the involvement of government agencies. But I want to know, what initiatives does the State Government have so that these elderly can also be absorbed as workers in State Government agencies? For example, MBPP, MBSP as cleaning workers. Because I see that local people, local citizens who work as cleaners are more diligent than foreign workers. And in addition they will also get income to sustain their lives. So, will the State Government through the Honourable Member's MMK propose that there be government agencies where we set a quota to employ elderly people in Penang to work? And apart from them getting income, they can also remain active in their old age.

Lim Siew KhimDAP · PHSungai PinangEN

Thank you to the Honourable Kebun Bunga. Kebun Bunga, the Kebun Bunga area has many elderly, especially in Padang Tembak. There already are initiatives and thanks to the Local Authorities, especially MBPP as I said this morning, that have employed elderly people who have retired such as teachers, engineers and worked at MBPP. So far I know eight elderly people have been employed. And also for public toilets, MBPP has also, which need maintenance, we have employed elderly people to be cleaners at MBPP public toilets. And we will study whether a quota needs to be set for agencies within the government. And we will consider that proposal from the Honourable Kebun Bunga.

Deputy Speaker of the HouseEN

There is still a lot more.

Lim Siew KhimDAP · PHSungai PinangEN

Yes, yes. Okay. That GLCs such as PWDC are not established to make a profit. They are established specifically to fill a gap in roles that cannot be fulfilled by other agencies. That is why it is important for the State Government to have GLCs such as PWDC, PYDC and Penang Tech Centre, because the nature of their operations focuses on social needs that cannot be resolved by money alone and require a human touch. To date, PWDC has carried out its operations and programmes in accordance with the allocations given. In fact, they are also making efforts to obtain new grants and partners to reduce costs without burdening the State Government. I also agree that the giving of bonuses is a form of appreciation and encouragement to all staff. However, it is still given according to capacity and the budget limits that have been set.

Eighthly, the Issue of Homelessness and Integrated State Government Intervention. With the same spirit of commitment, allow me to draw the attention of this Honourable House to another important social issue that requires serious and integrated action, namely the issue of homelessness. This is a complex challenge of modern cities and requires comprehensive, humane intervention based on human dignity. From January to October 2025, the Social Welfare Department (JKM) Penang has carried out a total of 40 scheduled operations, 7 integrated operations and 162 ad hoc actions across the state, thereby rescuing 180 individuals who were experiencing homelessness.

However, rescue operations alone are not sufficient, recognising that the complexity of homelessness cases is increasing, including cases involving addiction, mental health problems and the absence of identification documents. The State Government has organised an engagement session on the issue of homelessness with stakeholder agencies at USM Penang to streamline rescue SOPs and identify room for improvement through collective discussion among JKM, the Royal Malaysia Police (PDRM), local authorities (PBT), the Ministry of Health Malaysia, the National Anti-Drugs Agency and other agencies.

This approach ensures that each agency plays its role in a coordinated manner, particularly for high-need cases. Moreover, this effort is also closely linked to the agenda of eradicating urban poverty, because homeless people often find themselves in a cycle of economic vulnerability that is difficult to break without organised support. By providing a clear pathway of recovery from protection, health and social rehabilitation to employment opportunities. We are not only helping them get off the streets, but also out of the poverty trap that is inherited and recurring.

Allow me to extend condolences to the family of the late Puan Wanis, Manager of the Homeless Transit Centre, who passed away on 30 September this year. I personally had a very close working relationship with the late since the first day the Homeless Transit Centre began operations. Almost every stage of the development of this centre, from initial planning and implementation to daily operations. The late was always by my side, providing tireless commitment. The late took on the responsibility of finding donors one by one with great sincerity until she was able to provide 10,000 food packs every month, and every surplus of food was channelled directly to B40 families in the surrounding area. Moreover, the late played a major role in helping more than 369 destitute people start a new life.

We have all lost a person of great kindness, who worked wholeheartedly without expecting any return. I hope the whole House can join together in praying that the late Puan Wanis be placed among those who do good deeds, and that every good deed she performed become a reward that flows without end.

Ninth, Poverty Dynamics and Targeted Assistance, hardcore poor, with permission. In response to the questions of the Honourable Member for Pinang Tunggal and the Honourable Member for Permatang Berangan regarding the figure of zero for records of hardcore poor. According to the latest records of the Penang State Development Office (ICU), the number of Household Heads (KIR) in the hardcore poor category has consistently decreased since February 2025 and finally reached zero starting September 2025. The zero figure is the result of a process of data cleansing from field records, and the ICU only displays cases registered in the eKasih system after the cleansing. A zero figure does not necessarily mean there are no poor people. It may mean there are no registered records and that a person has been confirmed as hardcore poor on the date of the report.

Allow me to take this opportunity to clarify the process of identifying the hardcore poor, because I see that many still do not understand this matter. The data on the hardcore poor received by the state government comes from the ICU Department, Prime Minister's Department. The ICU goes to the field to carry out enumeration, then conducts a cleansing process, and only after that is the list of hardcore poor confirmed. The criterion for hardcore poor is set at household per capita income of less than RM315.00.

So for the information of all Honourable Members, the State Government through BAIS, our BAIS Programme has raised household per capita income to 322. So with the addition, the addition of assistance from BAIS, the family will be lifted out of the hardcore poor category. Once a family has been identified and confirmed as hardcore poor through the process of income assessment and data verification by the relevant agencies, a coordination meeting will be held involving all the departments and agencies concerned. This meeting aims to identify the interventions and assistance that can be channelled by each agency. This includes JKM, Penang Zakat Management Centre, Northern Corridor Economic Region (NCER), District Office, Social Security Organisation (PERKESO) and others. ICU plays the role of main coordinator in ensuring that every follow-up action is implemented in an orderly and comprehensive manner.

At the same time, we need to understand that the figure of hardcore poor is dynamic. Today a person may have stable employment and income, but tomorrow he may lose his job, lose his source of income and suddenly fall into the poor category, and even hardcore poor. It is not something we can predict or control. Every family has different challenges and anyone can be affected when sudden changes occur in their lives. What we as a government can do is ensure there is a strong support system so that when a person falls into poverty or falls into the hardcore poor category, assistance can reach them quickly, accurately and effectively.

Therefore, Honourable Members all, I would like to remind once again that JKM is only one agency involved in tackling the issue of hardcore poor. JKM is not the agency that stores or manages the entire data on hardcore poor. Therefore, if Honourable Members see any individuals or families who are in poverty and in need of assistance, please help them to register under the eKasih programme by contacting the District Office or directly the Penang State Development Office, and the team from the ICU Department will contact them as soon as possible to conduct screening and ensure the family receives the support needed, and JKM will also provide assistance. However, I also wish to emphasise here that economic assistance alone will not be able to break the cycle of poverty. To move forward, agencies still need to step up efforts so that those in need can be identified immediately.

Tenthly, Sukarelawan Mutiara. I would also like to take this opportunity to share about one of the field programmes under MMK Kebajikan, namely Sukarelawan Mutiara, an initiative that arose from the close collaboration of JKM Penang with the Tzu Chi Buddhist Association and the firm support of the People's Representative Service Centre. This programme has strengthened the house-to-house assistance approach, especially for senior citizens who live alone, persons with disabilities (OKU) and families without strong support. Since its implementation on 7 March until 1 November, a total of 217 volunteers have registered and the majority have been placed according to their respective State Legislative Assembly areas.

Throughout this period, a total of 68 home visits have been carried out and some of them have been referred to the relevant agencies for additional assistance. More importantly, it is these volunteers who help the State Government identify cases that are not listed in the eKasih system or any official database. These groups are often marginalised from the radar of assistance and without community networks, they may simply never be found. The Sukarelawan Mutiara approach enables the State Government to close intervention gaps and ensure that no one is left out of the support system. The State Government greatly appreciates the cooperation of the People's Service Centres in Bukit Mertajam, Bayan Baru, Balik Pulau, Kebun Bunga, KOMTAR, Paya Terubong, Pengkalan Kota, Perai, Seri Delima, Berapit, Sungai Puyu and Sungai Pinang, which have implemented this programme in their respective areas.

Dato’ Speaker, this effort cannot stop here. We need more volunteers, more community networks and more frequent field visits so that safety risks can be detected at an early stage. Taking into account the suggestion of the Honourable Member for Air Itam, I also intend to expand the Sukarelawan Mutiara programme through the participation of PAWE members. The daily "Apa Khabar" routine among them can be used as a platform to nurture the role of volunteers who not only benefit the community, but also help reduce the loneliness of senior citizens.

Therefore, I call on MPKK, JPWK, KRT, the Structure, Strata and Local Community Management Bodies to jointly collect and update data on senior citizens and at-risk families in their respective areas. With accurate data, our actions will become more effective and more lives can be saved. Throughout 2025, the State Government has conducted a series of engagement sessions with the People's Representative Service Centres of the Unity Government as well as the officers and KADUN coordinating officers to assess the effectiveness and suitability of existing allocations for the iSejahtera programme, and the State Government received many constructive proposals from this engagement, and after consideration was made, a unanimous decision was taken to continue the iSejahtera programme as a sign of the State Government's continued concern for senior citizens, OKU, single mothers, housewives and infants who are the main beneficiaries of this scheme.

Next, I would like to touch on the Non-Islamic Affairs Portfolio in an effort to strengthen religious harmony and community relations in Penang. Referring to statistics as of November 2025, the database in the e-RIBI system totals 1,239 RIBI. However, at present only a total of 1,145 RIBI information has been verified while 94 RIBI information is still under data cleansing. Towards the Unity Manifesto Agenda 41, the State Government also emphasises the importance of increasing discussion sessions and engagement regarding the implementation of the e-RIBI system. Therefore, the Penang Harmony Corporation (Harmonico) adopts an open door approach where all RIBI management parties are welcome to visit or contact its officers for any consultation and assistance. To date, almost 100 monitoring sessions and site visits have been carried out by Harmonico across all districts in Penang as an effort for outreach sessions with RIBI management.

The Penang Government is committed to continuing to demonstrate strong commitment in realising and fulfilling the Unity Manifesto, namely Agenda 40, by allocating RM10 million to meet the needs of Non-Islamic Places of Worship until the year 2028, and apart from the injection of funds, this allocation will be channelled annually at RM2.5 million into the Non-Islamic Affairs allocation account under the Honourable Chief Minister of Penang to guarantee the rights and welfare of RIBI management in this state.

And apart from this injection of funds, the local authorities, namely MBPP and MBSP, also play an important role through the collection of contributions from developers who are unable to provide a RIBI site in new housing development projects. All these contributions are channelled into the Non-Islamic Places of Worship Trust Fund (TARIBI) account which is also used for the development and maintenance of RIBI. The State Government is confident that the combination of these allocations will certainly provide multiplied benefits to RIBI management.

So, in leading this initiative, applications for financial assistance from the Trust Fund and the special allocation for Non-Islamic Places of Worship of the Penang State have now been implemented 100% online through the e-RIBI system in line with efforts towards modernising and digitalising services. In addition, in leading the religious tourism initiative, the State Government through Harmonico has introduced Streets of Harmony as a tourism product that promotes…

Deputy Speaker of the HouseEN

Summarise Sungai Pinang.

Lim Siew KhimDAP · PHSungai PinangEN

Yes, I have already jumped. Promoting harmony between races, religions and cultures. So now there are four Street of Harmony routes in Penang, namely Street of Harmony George Town, Seberang Jaya, Bukit Mertajam and Bayan Baru. Each of these routes highlights the places of worship of various religions that exist nearby and live in harmony within one area.

Deputy Speaker of the State Legislative Assembly

Okey.

Lim Siew KhimDAP · PHSungai PinangEN

Okay, can. Deputy Speaker.

Deputy Speaker of the State Legislative Assembly

Okey.

Lim Siew KhimDAP · PHSungai PinangEN

For the first time, Penang has been selected as the host for the International Conference on Mazu Culture and Heritage 2025, namely the global contribution and impact of Mazu in the Asia Pacific region. The conference, organised by the State Government through Harmonico, was held from 4 to 6 October 2025 and gathered 30 researchers from the United States, China, Japan, Singapore, Thailand, Vietnam and Malaysia, as well as more than 100 cultural practitioners, RIBI management and civil society, local civil society.

This conference is an important platform to strengthen efforts to protect and preserve the Mazu Heritage, as a cultural heritage of humanity that is intangible and was recognised by UNESCO in 2009. It became a space for scholarly discussion to integrate traditional knowledge and cultural heritage, as well as to strengthen research collaboration networks, particularly in aspects of heritage preservation for the sustainability of cultural identity and regional historical values.

Deputy Speaker of the State Legislative Assembly

Akhirnya.

Lim Siew KhimDAP · PHSungai PinangEN

Yes, when we assess all the progress achieved in this portfolio, one fact becomes clear. Social development is not a single programme and nor is it the work of one department alone. It is an interconnected, mutually reinforcing and constantly evolving ecosystem. Every initiative mentioned earlier contributes to the well-being of the people as a whole. This is the spirit that sparked the phrase we need to do something in my CV. It reflects what I want to be known as, part of this government. Every time I face a family in need, elderly people living alone or children who need protection, I cannot turn my face away.

We must not remain silent and must choose to act to help. As Penang moves forward, the State Government remains committed to ensuring that development is not driven by infrastructure alone but is also built with human values. Our goal is to build a Penang where every individual, regardless of age, gender, ability or background, has the opportunity to progress. I also want to take this opportunity to express my highest appreciation to all parties involved in conducting investigations into the case of the previous DUN question paper leak. Thank you for those efforts. Our system has now been improved and strengthened.

Penang, a blessed land, The people united, building hope, This is the state we hold high with pride, None left behind, everyone included.

I beg to support. Thank you.

Deputy Speaker of the State Legislative AssemblyEN

Thank you, Sungai Pinang, for the lengthy and energetic debate. Can you share with us what supplement the YB took. And next we invite the YB EXCO who answered many oral questions, YB Paya Terubong, and I think the winding-up may not be very long.

Wong Hon WaiDAP · PHPaya TerubongEN

Yes, yes. Thank you, Dato' Deputy Speaker. I rise to deliver the winding-up speech for the Tourism and Creative Economy Portfolio. As the Deputy Speaker mentioned, many oral questions and many written questions have already been answered today. So, I will not repeat those answers, and I will respond to the new matters raised by the Honourable Member. It is only 15 pages, thin. Several Honourable Members raised the Visit Malaysia Year 2026. The State Government has worked hard to open a new chapter in Penang's aviation sector. Two (2) years ago, Penang was connected to only 12 international cities, namely Bangkok, Hong Kong, Medan, Singapore, Jakarta, Surabaya, Bandar Aceh, Phuket, Guangzhou, Taipei, Dongguan, Ho Chi Minh City. In these two years we have added eight (8) more cities, namely Xiamen, Shanghai, Shenzhen, Chengdu, Dubai, Chennai, Yangon and Doha.

In addition, there are several charter flights to several cities such as Kunming, Haikou, Xi'an and Chongqing. This is the State Government's continuous effort to boost the tourism sector. 2026 is the Visit Malaysia Year and also the Malaysia Medical Tourism Year. We did not start work in 2026, but we started work in the past two years, launching various initiatives and various direct flights within the past two years. In the fourth quarter, namely from October to December this year, there are several new flight lists or additional frequencies, namely Sichuan Airlines adding frequency from Chengdu to Penang. Hong Kong Express increased its frequency from daily flights to two (2) times daily from Hong Kong to Penang.

TransNusa Airline will melen, launch its maiden flight next Monday from Jakarta to Penang on 24 November. Batik Air will introduce maiden flights from Medan-Penang and Singapore-Penang in December. Scoot will add frequency for Singapore-Penang. 9 Air began a chartered flight yesterday from Haikou, China to Penang. So, the data shows encouraging growth for Penang's tourism sector, because many direct flights will bring many tourists to Penang. I refer to the speeches of the Honourable Member for Telok Ayer Tawar and the Honourable Member for Telok Bahang, neither of whom is in this House. The two contradicted each other. One said there are so many tourists in George Town, over tourism. Another said there are few tourists in George Town. Therefore I do not need to answer. In fact, Telok Ayer Tawar has already answered Telok Bahang. So, already answered.

To address the view that there are too many tourists in George Town, the government's strategy is to develop the tourism sector outside George Town. At Balik Pulau, at Telok Bahang, at SPU, SPT, and SPS, as well as the eco-tourism sector that I mentioned yesterday. To answer the questions of the Honourable Member for Permatang Berangan and the Honourable Member for Telok Ayer Tawar: I have invited Think City with promotional materials on Seberang Perai to hold an exhibition in the corridor of the State Legislative Assembly (DUN) compound today, with stories about Seberang Perai on that side of the State Legislative Assembly corridor. And we will also open a booth at the Butterworth Fringe Festival on 22 to 23 November this year, which is this weekend, in Butterworth in conjunction with the Butterworth Fringe Festival.

To answer the question of the Honourable Member for Permatang Berangan regarding eco-tourism at Kampung Labuh Banting: the installation of a landmark by the Seberang Perai City Council (MBSP) is being carried out and is expected to be completed in January 2026. In an effort to strengthen Lebuh Banting as one of Seberang Perai's eco-tourism products, MBSP has created a plot in the tourism product inventory, which is in the final verification process, and an engagement session with stakeholders will be held on 26 November 2025. Regarding Kebaya Day, Pengkalan Kota proposed the proposal to set Kebaya Day. The State Government does not intend to set 5 December as a holiday for Kebaya Day. We do not want too many holidays.

For now, the State Government has set 7 July as a state public holiday, namely George Town Heritage Day. The State Government's strategy is to promote the kebaya during suitable events or platforms, and not only on that day. That is to say, all year round, if there are suitable events, every day can be kebaya day. If there are suitable days and events. For example, the kebaya was showcased during Chap Goh Mei 2025, during the Chingay 2024 parade, during the State-level National Day celebration of Penang 2025, and during Penang Week at Osaka World Expo 2025.

For the Honourable Member's information. The date of 5 December, that sacred date, is also the date when Malaysian breakfast was listed as a UNESCO Intangible Cultural Heritage. So, that day is sacred. Two days. So on that day we must eat Malaysian breakfast, because that day is also that date, and the State Government also takes a joint decision in this matter, namely that we will continue to uphold our intangible heritage on suitable platforms. The Honourable Member for Air Hitam.

Wong Yuee HarngDAP · PHPengkalan Kota

Yang Berhormat.

Wong Hon WaiDAP · PHPaya TerubongEN

And the Honourable Member for Telok Bahang has raised a point, yes, please go ahead.

Wong Yuee HarngDAP · PHPengkalan KotaEN

Thank you, the Honourable Member for Paya Terubong. I thank the State Government for its efforts to promote the kebaya as a garment at all State Government events all this time, and I mentioned or proposed in regard to 5 December as Malaysian Kebaya Day not for the purpose of a holiday, but as a memory or a token of appreciation so that the public, especially the children of Penang, recognise that the kebaya is an intangible heritage and, as some people say, a product of Penang.

If we follow the historical development of the kebaya all this time, Penang is a hub for the kebaya. Even foreigners, other neighbouring countries, Indonesians, have once come to Penang to measure and sew their own kebaya. So I hope that if we can declare 5 December as a Malaysian Kebaya Day, then we can promote Penang's products to an even higher level, namely internationally. Thank you.

Wong Hon WaiDAP · PHPaya TerubongEN

Yes. The Honourable Member can raise this proposal to a higher level, because now the Honourable Member is proposing Malaysian Kebaya Day. So perhaps the relevant ministers can study the Honourable Member's proposal. But on the 5th of the month we should post a Facebook post. On the anniversary, we get Kebaya Day to remember, because there are many dates we must remember. 7 July. Another date we must remember, with no holiday, 15 September. Why 15 September? The day Penang Hill was listed as a UNESCO Biosphere Reserve. So, there are many dates now because there are many, we have many heritages. Pantun also has a date, silat also has a date. You know, there are many heritage items. We can, we can mark it in our calendars, post it on Facebook.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

We must also remember 19 November, Men's Day today.

Wong Hon WaiDAP · PHPaya Terubong

Kenapa.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Hari Lelaki.

Wong Hon WaiDAP · PHPaya TerubongEN

Is that so? Isn't it every day, Men's Day?

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Yes, today is Men's Day. We must remember it too.

Wong Hon WaiDAP · PHPaya TerubongEN

Oh okay, okay. Every day is Men's Day, okay. The Honourable Member for Air Itam and Telok Bahang raised the issue of heritage village nominations. Plan Malaysia has carried out a study of the Heritage Villages Master Plan in Penang and prepared a conservation and preservation management plan for heritage villages to ensure that the heritage villages in the State of Penang remain protected. So far, only one nomination, Kampung Melayu Lama, Air Itam, will be submitted to the relevant authority.

The Honourable Member for Telok Bahang asked about the Penang Festival. The Penang Festival falls under the State Finance Department of Penang. I am answering on behalf of JKN (Jabatan Kewangan Negeri, the State Finance Department). To provide feedback, the Penang Festival this year will still be held from 6 December 2025 to 10 January 2026. The Government has decided that this year's festival will be a special one, and it will be the last for this year. We will give way to the LRT project until the LRT project is completed, which is scheduled for 2031. So, at the same time, the State Government is in the process of careful planning towards handing over the project site to the LRT company, MRT, on 1 April 2026.

Therefore, the tradition of organising the Penang Festival, which has been around for so long, and because we need to give way to the LRT. So this year we will, we will be the last. After that, we will see how we continue, continue at other places and continue at the same place after the LRT project is completed. After its completion, we will make plans later. The human resource management relating to the festival will be followed up after the organisation of the 2025 Festival.

And the Honourable Member for Bagan Jermal raised the matter of an improvement portal for digital platforms and so on. For the information of the Honourable Member, the State Government will study the suitability based on the development cost of that feature if it is to be implemented in the future. However, the reach of tourism social media is not only to Facebook. We, through the YouTube, Facebook, TikTok, WeChat, Weibo and Red Book platforms, continue to show very encouraging performance, with views reaching millions. On Red Book alone, content related to Penang has garnered more than 800 million views with 3.9 million discussions. Meanwhile, on the Douyin platform, the Chinese version of TikTok, videos about Penang have received more than 550 million views. Accordingly, promotional focus will continue to be given to digital social media that is more in line with current trends and demands, to ensure that the reach and effectiveness of tourism promotion are at a good level.

The official Penang tourism portal, mypenang.gov.my, is now undergoing a comprehensive improvement process to make it a more comprehensive, interactive and globally impactful digital tourism platform. This effort is being carried out by Penang Global Tourism (PGT) as part of the digital transformation efforts, and the new version of this portal is expected to be fully completed in December 2025 with a modern and user-friendly interface design. The portal will feature content

in multiple languages to facilitate access for international and domestic tourists, thereby expanding the reach of Penang's promotion at the global level.

This new portal will provide complete and well-organised information according to attractions, current events, public transport guides, travel itineraries and so on. This improvement will also enable PGT to make use of visitor data analytics to assess tourism trends and the effectiveness of the digital platform.

Honourable Member, the Honourable Member for Berapit raised the issue of Dewan Sri Pinang, and in fact we have supplied a written reply to the Honourable Member for Seri Delima. However, I will briefly read out that reply. The Ministry of Economy has approved an allocation of RM50 million under the Thirteenth Malaysia Plan for the implementation of this project, with the Penang Development Corporation (PDC) as the implementing agency for this project. Preliminary work involving topographic survey and utility mapping has been carried out by JKR (Jabatan Kerja Raya, the Public Works Department), and the scope of work includes, among others, upgrading of the shared-use space, upgrading of the performing arts space and auditorium, construction of the TYT Gallery, installation of lifts, upgrading of the mechanical system, enlargement of the dining area, landscape upgrading and so on, so the estimated cost is RM52 million. Planning is still being carried out and Dewan Sri has not yet been closed, and the implementation period has not yet been finalised because PDC has only just taken over from JKR on project planning and so on. Regarding the question from Berapit, she also asked about the performance by Vincent Ong, if Dewan Sri cannot be used, where will it be held? In fact, the proposal from the music group from RondoFest is to hold a solo recital, a solo performance, at Stonyhurst International School in Tanjung Tokong.

Murals in George Town. On the issue of mural paintings at the Heritage Site, which was again raised by the Honourable Member for Berapit, artists are advised to submit applications for mural paintings in the George Town Heritage area for approval by the Public Area Review Panel. In fact, if we look back at history, looking back to around 2012, when I was serving as EXCO Kesenian (State Executive Councillor for the Arts) in my first term. During my first term as EXCO Kesenian, at that time we commissioned the George Town Festival, and in 2012 we invited Encik Ernest Zacharevic to paint six murals. Six murals. At that time there was not a single mural, and he painted six. Although at that time there were no mural guidelines, and after that, his success in raising the mural with the siblings on bicycles and so on, those six murals

were introduced, and then murals grew like mushrooms everywhere in George Town.

Thus, the State Government, through MBPP (Majlis Bandaraya Pulau Pinang, the Penang Island City Council), introduced mural guidelines, and the Government did not want to see every corner of George Town filled with murals, because beautiful paintings we call murals. If the paintings are ugly, we call them graffiti. That is why control mechanisms are needed so that it does not become, if in language, I think it's a French word, cliché, that is, graffiti everywhere. Without control, it becomes graffiti everywhere in every corner of George Town. Therefore, a mural guideline has been approved, which must meet the Universal Outstanding Value of George Town. The State Government also introduced, besides that, the State Government also because murals, although we say they are great now, are actually an art product of the past decade. I say from 2012 until now is 2025, that is 13 years. So, an art product of the decade before. We are no longer in the new trend; we no longer do murals. Now the newest trend is not murals but installation art, digital art, interaction installation. Just as what we did during the George Town Festival, Projek Terang, when project mapping was done on the wall of City Hall, which was very beautiful digital art, and MBPP's latest effort at Padang Kota also uses projection mapping. That is the latest trend, and that is my answer.

The Honourable Member for KOMTAR, Cruise Ship, Cruise Ship, two pages. For Penang, the cruise ship is a very ideal destination for sunset cruise experiences, and sailing tourism offers a combination of natural beauty, calm waters and premium hospitality. Visitors can enjoy panoramic views along the George Town heritage waterfront, the colourful sunset that is mesmerising over the Selat Melaka, and clear views of iconic landmarks such as Jambatan Pulau Pinang, Pulau Jerejak and Teluk Kumbar. These attractions are further strengthened by water conditions suitable for sailing.

Besides natural beauty, Penang also stands out with unique onboard experiences. Many cruise packages offer food and beverage menus featuring the authentic taste of Penang, and among the popular operators supporting this segment are Penang Island Cruise, Tropical Charters, Queeny Cruises and Penang Blue Whale, with options that include shared cruises with

dinner to luxurious events on private sailing yachts. The Sailing Tourism segment in Penang also meets various needs through private boat charters for about 20 to 30 people, luxury catamarans for corporate events, photography and videography cruises, and fishing trips and island tours. This experience is further enhanced by the atmosphere of sunset cruising and the refreshing sea breeze. Depending on the operator, guests can also enjoy water activities, paddle boarding, paddle board or kayaking, with the opportunity to see dolphins in certain seasons. That is a good experience. If you are wealthy, or want luxury, you can go on a cruise ship.

But also this week, I think there needs to be a correction in the speech text: 28 to 30 November. The Penang International Dragon Boat Festival will take place from 28 to 30 November 2025 at Straits Quay Marina. Everyone is invited. It is an international competition for dragon boats, and along Straits Quay Marina, more than 50 teams will compete. That too will attract many tourists to come to Penang.

The Honourable Member for KOMTAR also raised bringing the George Town Festival to the international stage. At the moment, there are no such plans, because of foreign currency value, the exchange rate of foreign currency that is not very encouraging, and the cost of bringing artist groups abroad, which requires flights, accommodation and so on, is a very high cost. However, the State Government has brought a Chingay group to the Chingay parade in Singapore in 2025, and this year we have also been invited to take part in the Chingay parade in Singapore, because of the very impressive performance we had in Singapore.

In addition, the State Government also collaborated with the Quanzhou College of Technology from Fujian, China, to train their Wushu instructors in Chingay performance. This training was brought back to Fujian as an effort to introduce and promote Penang's Chingay heritage at the international level. This initiative started on a small scale but has the potential to expand the art of Chingay and make it a cultural bridge between Penang and foreign countries. Likewise, Penang Global Tourism has collaborated with industry players to

hold a Penang Food Festival in Bangkok, with Char Kuey Teow and everything, we have Roti Canai too, held in Bangkok.

The State Government also sent representatives to the Osaka World Expo with a kebaya showcase and an intangible heritage exhibition. We also participated in an intangible heritage exhibition in Chengdu, China. Besides that, GTF also supports regional arts networks by showcasing local arts practitioners on overseas stages. Among them, Ombak POTEHI, which performed POTEHI at the Singapore Night Festival in Singapore. Culture Shock, which was showcased at Park Thai Design Week, Songkhla, organised by the Creative Economy Agency of Thailand, presenting local music based on Penang stories. What I mean is, we do not take the George Town Festival, a whole festival, abroad, but we take certain segments such as Chingay, such as Ombak POTEHI, kebaya and heritage exhibitions. We bring small groups overseas so that we appear on the international stage.

And the State Government also welcomes the announcement by the Ministry of Transport to implement the upgrading project of KTM Butterworth Station with an allocation totalling RM30 million, which will strengthen the role of Butterworth and Penang Sentral as the main transport hub in the north of the Peninsular Malaysia. This upgrade will cover improvements to passenger facilities, provision of more OKU-friendly access, enhancement of the integrated ticketing system and better integration. I think this will, will increase tourist attraction, not only from Kuala Lumpur going up to Penang but also from Bangkok, from Southern Thailand, arriving in Penang by train.

In conclusion, I wish to state that the State Government is always committed to making Penang the premier tourism destination in the region. Paya Terubong requests to support.

Deputy Speaker of the HouseEN

Thank you, Paya Terubong. I now invite Tanjong Bunga to speak.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you to Dato' Speaker. Thank you to all the Honourable Members. Between the breeze of the Straits of Malacca and the pulse of the heritage city of Penang, we continue to move forward, weaving the future with threads of progress that we stitch together with determination, discipline and hope.

2025 has tested us, and the results prove that Penang is not merely a small island in the north, but is the economic lifeline of the nation, whose infrastructure is increasingly strong, whose transport is increasingly planned and whose digital agenda is increasingly bright. The roads we build are not only to shorten distances but to connect lives. The transport we plan is not only a system but the pulse of people's mobility. The digitalisation we drive is not only technology but the language of the future that we must master.

So, as we turn the page to 2026, we do not begin with nothing. We begin with the conviction that every project, every policy and every innovation is a small step leading towards a state that is not only developed but becomes an inspiration. Towards 2026, the State Government will move into a more aggressive and focused implementation phase by focusing on strengthening strategic infrastructure networks, including the continuation of mobility and flood mitigation projects, transforming transport towards a more efficient, sustainable and integrated system, as well as empowering the digital agenda, which covers talent development, digital security, smart city innovation and SME development.

I believe that through careful planning, the spirit of cooperation between all parties and the support of this August House, we can ensure that every initiative undertaken not only meets today's needs but also prepares the state for future challenges.

Mr Speaker, in general, thank you for all the views, criticisms and suggestions raised throughout the debate regarding transport, congestion and also the future of mobility in the State of Penang. Allow me to make the winding-up on the issue of the Penang Transport Master Plan (PTMP).

Mr Speaker, Penang's economic growth is progressing rapidly. At the same time, on average the number of registered vehicles increases by more than 4% every year. Although not all vehicles registered in Penang mean they will be used in Penang, it is still true that without large-scale intervention, our state will face critical congestion that will affect productivity, logistics costs and the well-being of the people. The State Government also takes a firm stance that building roads alone is not a long-term solution. Every developed country proves that the number of users will always increase and new roads will become congested again within a few years. Therefore, PTMP is designed as a comprehensive, thorough and holistic 50-year plan, not a merely ad-hoc project. PTMP combines strategic components such as the rail system, for example LRT, commuter and also ETS, the Bus Rapid Transit system, strategic bypass road networks, water transport, and integrates the concept of Transit Oriented Development (TOD).

The LRT Laluan Mutiara is the most important component of PTMP because it becomes the backbone of the public transport system of the State of Penang. This line is expected to accommodate more than 200,000 passengers a day by 30 years of operation, namely the Ultimate Design Year, which will reduce dependence on cars and motorcycles.

Although urban rail transport is the priority, several strategic road components as traffic decongestion projects are still needed to address current congestion, especially in the City of George Town, in Air Itam, from Tanjung Bunga to Batu Ferringhi, and Sungai Ara to Bayan Lepas. Therefore, traffic decongestion projects such as the Jalan Pintasan Air Itam-Tun Dr. Lim Chong Eu Project, the North Coastal Paired Road (NCPR) Project, Pan-Island Link 1, Pan-Island Link 2 and Pan-Island Link 2A, and also the Juru-Sungai Dua Traffic Decongestion Project are complementary networks to the urban rail transport system that will make public transport more practical. Without this decongestion, the effectiveness of rail transport will also be affected.

PTMP is not merely a transport project; it is a mobility project, an economic project and also a project for the future of the State of Penang. Without PTMP, congestion will worsen and investment will begin to shift to other states or other countries. The difficulties

we face during the construction of the LRT and any mega project are temporary in nature, Honourable Member.

Mr Speaker, in answer to the question of the Honourable Member for Sungai Dua regarding the LRT, the alignment crosses six of the 13 parliamentary constituencies, not just four, namely including the Balik Pulau, Bayan Baru, Bukit Gelugor, Jelutong, Tanjong and also Bagan parliamentary constituencies. That is six. The connection to Penang Sentral is important because it connects the LRT system with the ETS system and also the Northern Commuter, thus giving benefit to residents in areas such as Tasek Gelugor, Bukit Mertajam, Batu Kawan and Nibong Tebal. In fact, residents living in Sungai Petani, Alor Star and Padang Besar can take the Northern Commuter as far as Butterworth, and then use the LRT.

Deputy Speaker of the State Legislative AssemblyEN

Don't forget Pematang Pauh.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, I haven't forgotten.

Deputy Speaker of the State Legislative Assembly

Tak sebut.

Zairil Khir JohariDAP · PHTanjong BungaEN

It was also included in the speech. This project is designed to minimise land acquisition and to ensure the alignment passes through high-impact areas, supported by feeder bus networks within a 3-kilometer radius of each station to ensure comprehensive access. With an expected capacity of up to 37,000 passengers a day in the opening year, and connections to major hubs such as KOMTAR, Sungai Nibong, the Bayan Lepas Free Industrial Zone and the Penang International Airport, this LRT serves almost the entire state, not just certain areas. In terms of traffic congestion, I would like to stress once again that the LRT is the backbone of the public transport system and is able to reduce dependence on private vehicles, particularly on the main routes I mentioned earlier. So, regarding the land acquisition issue, MRT Corporation has informed that, so far, a total of 81 lots of land have been gazetted under Section 8 of the Land Acquisition Act, including 15 lots belonging to State Government agencies and 66 lots of private land, of which 61 of the 66 private lots have already been paid compensation after four rounds of investigation sessions.

As for the land of State Government agencies, the investigation sessions will be carried out shortly. Regarding the Social Impact Assessment (SIA), for the information of the Honourable Member, the SIA for the PSR-A to KOMTAR alignment was approved in 2020. Meanwhile, the SIA for the Macallum to Penang Sentral alignment is expected to be approved in January 2026. Referring to the labour and flood issues raised by the Honourable Sungai Dua, who has just joined us, as of October 2025, the Laluan Mutiara LRT project involves 339 workers, including 234 foreign workers. Foreign workers are currently housed at AA Dormitory, Sungai Pinang, which provides facilities such as a cafeteria, a surau and recreational areas. All foreign workers will be placed in Centralised Labour Quarters (CLQ) that are fully equipped with facilities under one roof, ensuring they have comfortable accommodation and comply with labour laws. The total labour force is expected to increase in line with the progress of the project.

For the information of the Honourable Member, the MRT Corp has already designed the piers and pile caps by taking into account hydraulic discharge, free water flow requirements, and the risk of water flow and flooding during the construction period. Water management and mitigation plans during construction have also been prepared as follows:

• maintaining the existing drainage flow by constructing temporary drains, additional culverts and bypass drains at potential locations; • implementing erosion and sediment control measures such as silt traps, silt fences, sediment basins and regular cleaning; • avoiding any obstruction to the main drains or rivers, including ensuring that pile and pier works do not disrupt flow capacity; • close coordination with MBPP, JPS and related agencies to ensure that any temporary amendments to the drainage system obtain approval and do not affect the surrounding areas.

Finally, continuous monitoring at hotspots before and after heavy rain and immediate action in the event of overflow.

Dato' Speaker, I will move on to the other public transport modes as raised by the Honourable Members. For the information of the Honourable Members, the Rapid On Demand (ROD) service is a new mobility service by Rapid Penang, operating using vans or small vehicles, based on the concept of Demand Responsive Transit, known as DRT. It does not operate on fixed routes like regular buses but moves based on passenger demand through an application. The ROD system uses an algorithm to combine passengers with nearly identical destinations in order to optimise the journey.

For the information of the Honourable Member, at present the ROD Bukit Mertajam covers the Bukit Mertajam Hospital area. Likewise, the ROD Seberang Jaya also covers Seberang Jaya Hospital. Meanwhile, the ROD Bertam not only covers Kepala Batas Hospital, but also covers the USM Bertam Medical Centre. The proposal by the Honourable Bukit Tengah for ROD to be expanded to Kampung Bagan Nyior, Kampung Sekolah, Kampung Bukit Kecil and Kampung Kuala Juru will be conveyed to Rapid Penang. And as the Honourable Member is well aware, passenger volume plays an important role in the success of a new route, and a comprehensive route plan should be carefully studied.

Dato' Speaker, the Honourable Telok Bahang touched on water transport services as a two-pronged approach, namely as an attraction for the tourism sector and also as one of the ways to ease traffic congestion. I support the Honourable Member's elaboration and Penang Port Sdn Bhd itself has announced that more than 5 million ferry passengers have been recorded within 17 months since the new ferry service began in October 2023 until the second quarter of 2025. This passenger record clearly shows that the ferry service is one of the transport alternatives of choice for residents and tourists in this state. For the information of the Honourable Member, the State Government, with the cooperation of related agencies such as the Marine Department under the Ministry of Transport, is now studying the proposal for water ferries or water taxis. At present, a feasibility study is being carried out by the private sector to identify the most suitable model for the implementation of water taxis in this state.

Next, I thank the Honourable Pulau Tikus, who raised the issue of the new free bus route that will start on 1 January 2026, namely the CAT Hospital route. The CAT Hospital bus service will pass through three hospital buildings, one government health clinic and school areas, with a route length of 8-kilometer involving three buses with an interval of 20 to 30 minutes between them. I also take this opportunity to record my thanks to the Ministry of Transport and congratulate Prasarana and Rapid Penang on the launch of 310 diesel buses for the last batch of the 2025 bus replacement programme, where Penang will also receive several new buses. I have also been informed that in the second quarter of 2026, electric buses or EV buses will begin operating in Penang. The operation of electric buses by Rapid Penang will support the State Government's efforts towards a Low Carbon State and will contribute somewhat to increasing the use of public transport and reducing traffic congestion in this state.

Dato' Speaker, I now turn to the Penang Silicon Island Project as raised by the Honourable Sungai Dua. For the information of the Honourable Member, the implementation of Silicon Island does not only take into account physical development aspects but also gives priority to long-term ecological conservation. I think during the winding-up of the previous meeting sessions I also gave details on the conditions of the Department of Environment that will be complied with, as well as the protection of marine habitats, control of coastal bund management and so on. So I will not repeat all those arguments. To answer the question of the Honourable Pulau Betong, the Silicon Island Master Plan has no plan for the construction of permanent foreign worker dormitories. The main focus of development is high-technology industry, modern utilities, public facilities and an innovation ecosystem to support the digital and green economy of the State of Penang.

However, for the needs of the construction phase, a temporary CLQ will be provided for project workers. It will be built within the Silicon Island area to ensure safe and orderly operations without affecting the communities on the main island.

Construction of the temporary CLQ is scheduled to begin in June 2026 with a capacity of 1,200 workers, and is expected to be completed by September 2026, operating until 2030. This CLQ is enclosed and controlled with a security system, internal facilities, and cleanliness and orderliness standards that are fully complied with. This approach is in line with the Federal Government's guidelines to ensure the project runs in an orderly manner without putting pressure on the surrounding areas.

Regarding the flood issue at Kuala Sungai Pinang as stated by the Honourable Teluk Bahang, the EIA Report and Hydraulic Study carried out by a certified independent consultant states that the water levels in Sungai Gertak Sanggul, Sungai Gemuruh and the main drain of Bayan Lepas are expected to increase by only around 0.01-meter after the Silicon Island reclamation works are fully completed. This increase is very small and is within the tolerance range of the existing drainage system, and is not significant enough to trigger a change in flood patterns or affect the downstream or upstream areas of the rivers. Therefore, based on these technical findings, there is no evidence to show that this project poses a flood risk, particularly in the Kuala Sungai Pinang area.

Honourable Member, Mr Speaker, I take this opportunity to record my appreciation to the Federal Government for approving the Traffic Decongestion Project between the Juru Toll Plaza and the Sungai Dua Toll Plaza, Penang on the North-South Expressway and surrounding areas. This is our project, named PTJSD, the Juru-Sungai Dua Traffic Decongestion Project. The Groundbreaking Ceremony was officiated by the Right Honourable Prime Minister on 8 November 2025, and package one of the project, which involves upgrading the roundabout and building a new flyover on Jalan Tun Hussein Onn, has commenced and is scheduled for completion within 24 months.

I take note of the concerns of the Honourable Seberang Jaya and the other Honourable Members regarding the traffic conditions during the construction of this project. The PLUS route between the Juru Toll Plaza and the Sungai Dua Toll Plaza is among the busiest alignments in the north of the country. Therefore, effective traffic management throughout the construction period is the main focus of the development of this upgrading project.

At present, the Traffic Management Plan (TMP) has not yet been submitted to MBSP and JKR. However, once the TMP application is received, the proposed TMP will be studied appropriately. In addition, the State Government will work closely with KKR (Ministry of Works) with LLM (Malaysian Highway Authority) and also PLUS Malaysia Berhad to ensure that traffic conditions are kept under control.

Among the measures that have been identified are the following:

• Limiting lane closures, where lane closures will be carried out minimally and only outside peak hours. • Providing temporary diversion routes that are comfortable, clear and equipped with adequate signboards. • Installing warning signboards and additional guidance, including electronic information boards to provide real-time information on traffic conditions. • Continuous monitoring and traffic personnel on site, and modern construction methods that are faster and safer, using a modular construction approach and precast components to accelerate the construction process and minimise heavy work on active roads.

Dato' Speaker, comprehensive socio-economic development is closely linked to the provision of quality and sustainable infrastructure, including a systematic road network. In this regard, the State Government is committed to continuing to provide good infrastructure so that it can be enjoyed by the people and at the same time attract investors to invest in the State of Penang.

In 2025, the State Government approved an allocation of RM20.8 million for road upgrading projects. Among the projects that have been and are being implemented on site is the construction of a 100-foot road behind Carrefour, Seberang Jaya. Road surface repair works for damaged roads by resurfacing and milling using a super fiber mix additive, as well as related works on parts of Jalan Perusahaan Perai and roads around Seberang Perai Tengah, and the road widening and upgrading project from one lane to two lanes from Jalan Perusahaan to the Tok Kangar traffic light junction. This one we call phase three, the upgrading of Jalan Tok Kangar.

In addition, the JKR Penang will also implement the proposed project to build entry and exit slip roads to the Penang International Airport on Jalan Sultan Azlan Shah. This construction is carried out to reduce traffic congestion in the area, and this project is currently at the stage of preparing the detailed design plan and tender documents. It is expected to be implemented on site beginning in June 2026.

Dato' Speaker, I now refer to the flyover upgrading project on Jalan Perusahaan Valdor as raised by Bukit Tambun. For the information of the Honourable Member, JKR has already carried out survey works in 2024 for the project, and the estimated construction cost for this project is RM124 million, excluding the cost of land acquisition compensation. The application for an allocation for the design works will be submitted by JKR Penang.

Regarding the road widening project at Pokok Machang and Pokok Sena, for the information of the Honourable Permatang Berangan, the notice issued by JKR is intended to give early notification to the owners of structures that the area is state road reserve land and is now included in the plans for road widening by the developer. This widening is one of the development conditions imposed on developers to reduce the impact of traffic congestion arising from the increase in the number of houses and business lots to be built by the developer in the area. The State Government through JKR will arrange engagement sessions with stakeholders to resolve any issues arising to ensure this project can proceed, Honourable Member.

In answering the question of the Honourable Telok Ayer Tawar regarding the potholed road in the Bagan area towards Sungai Puyu, the maintenance concessionaire for the Federal Road, namely THB Maintenance Sdn. Bhd., conducts routine inspections at least twice a week along the Federal Roads including on Jalan Telok Ayer Tawar. Members of the public may also channel complaints regarding potholed roads to KKR through the MyJalan application. The concessionaire is required to patch potholes within 24 hours after the pothole is identified or a complaint is received. This means the KPI of the concession company is 24 hours, Honourable Member. If complaints occur and no action is taken, they may also be reported to the State Government, and we will raise the matter with JKR.

Dato' Speaker, the State Government takes note of Jalan Kampung Masjid Timah as raised by the Honourable Seberang Jaya. The upgrading of Jalan Kampung Masjid Timah is part of the scope of package one of the 100-Foot Road construction project behind Carrefour Seberang Jaya, which has already commenced on site on 11 September 2025. This project is expected to be completed on 8 September 2027, Honourable Member, two years to complete.

Referring to the bridge design at Sungai Derhaka, for the information of the Honourable Member, the replacement of the bridge has already been approved in the First Rolling Plan of the Thirteenth Malaysia Plan (RP1 RMK-13). The State Government takes note of the Honourable Member's suggestion that pedestrian, bicycle and motorcycle paths be integrated into the design. Therefore, JKR will study and look at the design and road user safety aspects to ensure this project can be implemented within the allocation ceiling that has already been approved.

As for the issue of Jalan Kampung Besar, which has now become the main focus as a shortcut for users from Bukit Mertajam to Berapit, the infrastructure upgrading project on the road cannot be continued at present because the alignment of the road passes through land belonging to RAC or Perbadanan Aset Keretapi. So far, RAC still has not agreed to surrender the land required. Nevertheless, the State Government will follow up on this matter with RAC to find a solution. I call meeting lah Honourable Member.

Dato' Speaker, the State Government welcomes the suggestion made by the Honourable Sungai Puyu that the preventive maintenance approach be used rather than repair maintenance. For the information of the Honourable Member, JKR has indeed already implemented preventive maintenance, namely through a study using the Road Model software, which we call the Highway Development and Management Model (HDM-4), to carry out a technical assessment of the performance of road surfacing, recommend repair methods and the costs involved. However, repair works on site still need to be coordinated according to damage priorities and the availability of allocations. For road surface areas that are not included in the preventive maintenance priorities, pothole patching is still one of the road maintenance scopes that JKR is obliged to carry out as an immediate action.

Next, the Honourable Machang Bubok regarding the new road to connect Jalan Machang Bubok 1, Taman Sanctuary and Jalan Seladang. For the information of the Honourable Member, the State Government indeed has plans in that area to improve the existing road network and enhance connectivity between the surrounding areas. The application for an allocation for the new road is expected to be made in 2027 by JKR.

Dato' Speaker, the Honourable Bukit Tengah raised the matter of serious traffic congestion in the Bukit Tengah Industrial Area, Jalan Perusahaan and Jalan Bukit Tengah. For the information of the Honourable Member, PDC is carrying out road widening works from the Auto City junction towards Jalan Tok Kangar. This project is expected to increase the capacity of the junction and ease the flow of traffic in the area. Meanwhile, for the Jalan Bukit Tengah area towards Bukit Minyak, the application for road widening works has already been submitted through the proposed road upgrading project from Permatang Tinggi to Sungai Juru on Federal Route FT001. The estimated total cost of this project is RM533 million, with the main scope as follows. Upgrading a single two-lane road to four lanes, widening three existing bridges, building a flyover across the Bukit Minyak Alma junction, and upgrading the drainage system along the project alignment. This project has received approval under the Twelfth Malaysia Plan for the implementation of preliminary works covering the preparation of detailed design, traffic impact studies, coordination with public utilities, and technical checks on site. Next, the issue of responsibility.

Goh Choon AikPKR · PHBukit Tambun

Minta laluan.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, please, Bukit Tambun.

Goh Choon AikPKR · PHBukit TambunEN

Dato' Deputy Speaker, thank you, Tanjong Bunga. Regarding FT001, does the Ministry of Works have a comprehensive master plan from the Perak border to the Kedah border for the upgrading works? Does it already have a complete master plan, or is each section only now carrying out planning or design?

Zairil Khir JohariDAP · PHTanjong BungaEN

Actually, Honourable Member, there is comprehensive planning, and it is being implemented in phases. I can ask for the information during the next State Executive Council (MMK) meeting. I can ask the Public Works Department (JKR) to provide that information, Honourable Member.

Next, regarding the issue of road maintenance responsibility between MBPP and JKR, as raised by Honourable Seri Delima. The State Government, through the State Executive Council (MMK) meeting on 9 April 2025, has already approved the proposal to realign the maintenance responsibility boundary, which will resolve the issue raised by the Honourable Member. Personally, I also agree with the Honourable Member's suggestion that implementation be brought forward to 2027. This is because my constituency, Tanjong Bunga, is also located outside the George Town City Limit. So I understand the complaints from the ADUN-ADUN in areas outside the City Limit, namely where housing estates are maintained by JKR and not by the local authority (PBT), as is common in Seberang Perai and in all states across Malaysia.

This causes many difficulties because JKR has various constraints on issues such as the installation of bollards, road humps and so on. At the same time, the standards for five-foot ways also differ from MBPP's standards. Therefore, the State Government considers that the time has come to harmonise this matter and hand over responsibility to the proper party, namely MBPP. However, at MBPP's request, the enforcement of this realignment has been postponed to 2028. Nevertheless, since many Honourable Members, including Seri Delima and myself, feel that 2028 may be too long, I will perhaps try to raise this matter for reconsideration by the State Government so that the enforcement date can be brought forward. Let us try.

Dato' Yang di-Pertua, the State Government welcomes the suggestion from Honourable Pinang Tunggal that the route from the Penang–Kedah border along the banks of the Sungai Muda to Jalan Bumbung Lima be upgraded to avoid congestion on Jalan Paya Keladi. The State Government, through JKR, will submit a proposal for this project to be considered in the Malaysia Plan.

Next, to answer the issue of the main road in Pekan Penaga being unable to accommodate existing traffic, JKR has submitted a paper proposing a new bridge project to connect the existing road between Jalan Penaga Bawah and Jalan Pasir Gebu to the Ministry of Rural and Regional Development (KKDW) under the Rural Roads Programme. If the construction of this road is approved, it will become an alternative route to reduce congestion on the main road in Pekan Penaga. This proposal paper is now at the final stage of evaluation and consideration by KKDW. Perhaps we can ask Honourable Sungai Acheh to also help obtain allocation for this road.

Honourable Member also raised the issue of large uncovered drains in Pekan Penaga that pose a danger, especially to motorcyclists. JKR SPU has carried out an on-site inspection and found that there are certain locations that require the installation of road barriers or guard rails. An allocation application has been submitted, and its implementation in 2026 is subject to approval of the allocation and suitability on site.

Regarding the roads in Guar Kepah and Lahar Kepah that require maintenance and repair, for the time being repairs are being carried out by patching potholes thoroughly, which we do in-house. Plans to carry out resurfacing maintenance will be included in the 2026 budget and will be implemented once the allocation application is approved.

Dato' Yang di-Pertua, regarding the frequent flooding in Gua Perahu, Gua Jering, Kampung Terus, Mengkuang, Kuala Mengkuang and Tanah Liat, which was raised by Honourable Penanti. For the information of the Honourable Member, the State Government, through the Drainage and Irrigation Department (JPS), takes the flooding that occurs in these areas seriously and is now taking proactive steps by placing a mobile pump with a capacity of 280-

litres per second in the Sungai Kubu channel area. The deployment of these mobile pumps will be determined based on current needs.

For the information of the Honourable Member as well, JPS has carried out several studies for long-term solutions in the area, namely a detailed design study for the proposed flood mitigation scheme at the upper section of Sungai Permatang Rawa, at Kampung Tanah Liat, and also a consultant service for the detailed design of the Mengkuang flood mitigation scheme in the SPT district. Regarding the flooding problem in Kampung Kolam and Tanjung Putus, JPS will include maintenance work on Jalan Ladang Sungai Prai to overcome the flooding problem in that area, using MARRIS contributions. Referring to the flooding issue in the Sungai Bakap, Bukit Tambun and Jawi areas: for the information of the Honourable Member, the State Government takes this matter seriously, and the whole flood hotspot area is undergoing long-term flood mitigation works with the implementation of the following flood mitigation schemes (RTB). Firstly, RTB Sungai Jawi; secondly, RTB Sungai Kecil; thirdly, RTB Sanglang; and also the upgrading of the Nibong Tebal pump house. All are in implementation. RTB Sungai Jawi has not yet reached the construction stage, but the others have started. At the same time, river maintenance works in other areas are carried out periodically based on the allocation received.

Dato' Yang di-Pertua, Sungai Puyu has raised the matter of flash floods in Kampung Manggis and Kampung Tok Sani. For the information of the Honourable Member, the State Government is aware of the need to carry out periodic maintenance works on all existing rivers and drainage systems to ensure smooth water flow and reduce the risk of flooding. For the Sungai Puyu area, thorough maintenance works and sediment removal in the river, including in Kampung Manggis and Kampung Tok Sani, are carried out according to current needs and based on the allocation received. For 2025, sediment removal works were carried out twice, namely in April and in October.

Next, regarding the flooding problem in the Kuala Sungai Pinang and Teluk Bahang areas due to the phenomenon of big high tides. JPS has appointed a consultant to carry out a detailed design study to upgrade the drainage system at Taman Nelayan Kuala Sungai Pinang in order to determine the method of solving the flooding problem in that area.

This study is still at the conceptual design report stage and is expected to be completed in July or June 2026.

Regarding the maintenance issue of Sungai Nipah. Sungai Nipah is a main river with an estimated length of about 1.3 kilometres, and it receives flow from several drains and drainage channels of JKR, the MPBP roadside drain, Parit Kampung Perlis and also Parit Pulau Betong before flowing to the estuary. Maintenance works such as dredging and clearing weeds in the river are carried out based on the allocation received each year. At present, JPS is in the process of obtaining additional allocation to carry out works for the remaining 800-metre stretch that has not yet been maintained.

Regarding the flooding problem in Kampung Kolam. The State Government, through JPS, this year carried out maintenance works on Sungai Jelutong, Sungai Anak Jelutong, Sungai Alor Anak Jelutong and Parit Anak Jelutong 1R. For future planning, the State Government will apply for allocation from the Federal Government in phases through the Thirteenth Malaysia Plan (RMK-13) to implement the Sungai Prai Phase 2 flood mitigation scheme project, which will also cover the catchment area of those rivers.

Next, to answer Honourable Bukit Tengah. Bukit Tengah is not here regarding the flood mitigation project applications under RMK-13. The list applied for is: first, the Sungai Juru Conservation Project, RM60 million, has already been approved. The river conservation project to reduce flood risk in Penang, RM25 million, has already been approved. The Penang Eco-Friendly Drainage Master Plan study for SPT, which has not yet been approved, and fourth, upgrading of mechanical and electrical infrastructure, RM3 million. This is at the Parit 5 pump house and has not yet been approved.

Dato' Yang di-Pertua, next I will go to the negotiations on the supply of treated water from the state of Perak to Penang, as raised by several Honourable Members. For information, this water supply issue has been a prolonged one between the Penang State Government and the Perak State Government for more than 10 years. Initially, Penang's request reached a deadlock until the Perak State Government finally agreed on the condition that we buy treated water and not raw water. As a result, the Perak State Government appointed the Perak State Development Corporation Consortium and Gamuda Berhad, which we call PKNPk-Gamuda, as their official representative to hold negotiations with the Penang State Government. These negotiations were carried out over several rounds with no element of threats or arm twisting from any party. The technical details under the memorandum of understanding that was signed the other day are as follows.

Firstly, the annual capacity charge is at a rate of RM210 million a year. The treated water supply charge is at a rate of RM1.70 per cubic metre. The minimum quantity of supply is 300 MLD. The agreement period is 40 years, with a rate review in the 21st year. This MOU that has been signed is a non-binding MOU and aims to explore the potential for long-term business cooperation involving the sale, provision and purchase of water from the State of Perak. This MOU will be followed by discussion and negotiation sessions before a formal agreement is signed. That formal agreement will in future require approval from various parties, including the board of directors, shareholders, financial institutions, authorities such as the National Water Services Commission (SPAN), Bursa Malaysia and others.

And here I want to explain the annual capacity charge of RM210 million a year. This will be borne by PBA and not the State Government, as part of the cost of purchasing water. In other words, it is part of the operating expenditure. That means it is part of the cost of purchasing the water. PBA buys water from Perak not for its own use. We buy water to sell to consumers, including non-domestic consumers such as in the Sungai Petani industrial area, which is developing rapidly. Therefore, there is no issue of subsidising that capacity charge. This capacity charge is imposed by the Perak State because all the costs of treated water infrastructure must be borne by them for the construction of a treatment plant with a capacity of 500 MLD that is built specifically for the use of the State of Penang.

Therefore, the question that Honourable Members should be asking is whether this RM210 million capacity charge is a reasonable charge or not. That is the question we really need to ask. So, for this matter, I can inform you that PBA has carried out due diligence by comparing the cost if we did it through BOT with, for example, the Water Assets Corporation Berhad (PAAB), which is a federal government agency. Right now, for everyone's information, PBA is implementing two projects with PAAB: the Sungai Muda Water Treatment Plant and also the Sungai Perai Water Treatment Plant. So we compared two models, one proposed by PKNPk-Gamuda and the other by PAAB, using the same formula, and we made the calculation. After carrying out due diligence, taking into account all costs, including the cost of building the water treatment plant, the cost of land acquisition, the piping system that must be connected from the WTP around Bukit Merah to Sungai Krian in Penang, financing costs including loan interest, maintenance costs and the cost of upgrading the water treatment plant over 40 years. All of this is their responsibility, not ours, because we only buy water. And also other costs, PBA found that the cost offered by PKNPk-Gamuda is a competitive cost. It is a competitive cost.

In other words, if the 500 MLD project together with these supporting infrastructures were done by PBA itself through the Build Operate Transfer model, as we did with PAAB, the cost would be roughly the same, and may even be higher, because the financing cost offered by PAAB is higher compared with what is offered by PKNPk-Gamuda, Honourable Member. So the only difference is that if it were implemented by PBA itself, the RM210 million cost would be included as CAPEX and not OPEX. That is the only difference, because we are not carrying out the construction project, and we have to pay as OPEX. But if we did it ourselves, we would not get the water treatment plant for free. We would still have to spend money. So we spend the same amount, but it becomes part of CAPEX. That is the only difference, Honourable Member.

So, I want to mention here that some Honourable Members have also proposed that the Federal Government finance this RM210 million capacity charge. Normally, for the information of all Honourable Members, the Federal Government only finances raw water infrastructure. For this water project from the Perak River, the Federal Government will indeed bear expenditure in the estimated amount of RM5 billion. I am not sure of the actual cost. I am not representing the Federal Government, but the information we have is more or less RM5 billion for the construction of source works, or the infrastructure for the abstraction and transfer of raw water from downstream of the Chenderoh Dam to Bukit Merah through a tunnel that penetrates the hill. This means that the Federal Government will spend RM5 billion as part of this project to build all the raw water infrastructure. But once the raw water reaches the water treatment plant, that is no longer the responsibility of the Federal Government. That is the responsibility of the state. So there, the Perak State Government through PKNPk-Gamuda will build the water treatment plant and will extend the water from Bukit Merah, far away Honourable Member, to Sungai Krian, Penang. So the cost of carrying that out is high. PBA is not doing it, so we do not need to spend a large CAPEX. They will do it, but we will pay in instalments over 40 years. Basically, that is their structure, Honourable Member. I hope you can understand. In conclusion.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Before concluding…

Zairil Khir JohariDAP · PHTanjong Bunga

Boleh.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Earlier, the Honourable Member mentioned a comparison if it were implemented by PAAB, implemented by PBA, or implemented by PKNPk-Gamuda. Can PBA do it at a possibly lower cost?

Zairil Khir JohariDAP · PHTanjong BungaEN

Even if the cost is lower, Honourable Member, the Most Honourable Member, PBA cannot do it.

Chow Kon YeowDAP · PHChief Minister · Padang Kota

Mengapa?

Zairil Khir JohariDAP · PHTanjong BungaEN

Because the river is not in the State of Penang. The most important point, Honourable Member, is that we must all understand this. This is the point the Most Honourable Chief Minister wished to raise, and that point is very important. The source of the water is not in the State of Penang. Whatever we do, we cannot do it. Only they can do it because the water is in their state. So we buy water from the State of Perak. Even if we wanted to build, even if we wanted to build 1,000 MLD, it is not that we cannot, we can, but to build…

Deputy Speaker of the State Legislative Assembly

Kat mana?

Zairil Khir JohariDAP · PHTanjong BungaEN

Where would we build it? Dato' Speaker. We could build it, but there is no water. So, yes, in conclusion on this matter.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Tanjong Bunga. Tanjong Bunga, may I have the floor?

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, please, please, please.

Bukhori bin GhazaliPAS · PNPinang Tunggal

Terima kasih.

Deputy Speaker of the State Legislative AssemblyEN

Is there a solution?

Bukhori bin GhazaliPAS · PNPinang TunggalEN

It's like this, I am still waiting for an answer to my question about Jalan Lebuh Bertam Perdana.

Deputy Speaker of the State Legislative AssemblyEN

That's the end now. Earlier, time had already run out.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

I thought I would land without answering yet. Oh, not landed yet, okay, okay, okay. Final remark on the water.

Deputy Speaker of the State Legislative Assembly

Air mengalir.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okey, okey, okey. Finally, on the water issue, Dato' Speaker. I want to stress that if we do not carry out the Sungai Perak water project now, if the opportunity to buy 500 MLD from Perak State is let go, then within a short time, perhaps in 10 years, all raw water sources in this state will have been maximised. If at that time the Federal Government and the Perak State Government are unwilling to cooperate, Penang will face a life-and-death situation, live and death situation, Honourable Member. So I want to put a question to this honourable House: can we put a price on water security? Can we put a value, a price, on water security? At that time, what can we do when all rivers in Penang have already been maximised for water abstraction and there is no new source of water other than desalination? It can be done, but at three times the cost, Honourable Member. If RM210 million is considered expensive, desalination costs three times more. Singapore does it too, but it does only a little, not much, because it is expensive, very expensive. So at that time, where will we find 500 mld? As the Honourable Chief Minister said just now, we can build a plant, but from where will the water come? Even saliva is not enough, Honourable Member. So at that time, where will we find 500 mld of water to meet the needs of the people of Penang? Therefore, to guarantee the water security of this state in future, the State Government will definitely proceed with this project. What did the Honourable Pinang Tunggal want to ask?

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Thank you, Dato' Deputy Speaker. I raised a matter concerning Jalan Lebuh Bertam Perdana, which has caused many deaths. I request the statistics on fatal accidents that have occurred since 2022, because this year alone, up to this month, there have been 3 deaths and people seriously injured. The data given to me says zero last year, zero the last two years, whereas there were deaths. As I said, I myself hold it, so my purpose is to ask for one justification why urgency is needed to carry out this improvement. Because there is a very sharp bend, and I propose that while waiting for the budget, whatever it is, perhaps we can place a barrier in the middle, just any steel barrier, because recently a fatal accident happened, the car jumped over to the other side, probably because it lost control. I am aware that driving methods are also important, but we want to look at preventive methods, and I asked about the need to lower the speed limit. The reply agreed with me, but actually it must show when it will be done, the expected timeline, because I feel the speed limit is not difficult to change, it only needs a faster study. That is all.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Pinang Tunggal, for the issue. Based on the account from the Honourable Member, it indeed sounds like a very dangerous bend. So I will discuss this matter immediately with the relevant agencies so that a solution can be found, and perhaps we will also contact the Honourable Member. Thank you, Honourable Member, for raising this matter.

Chee Yeeh KeenDAP · PHBagan JermalEN

Honourable Member, sorry ya. Here I refer to a report from Buletin Mutiara, which says The Penang State Government will require to pay RM210 million. I think that is what we sometimes want to ask more about, that alone, but I think the deal, I think I feel it is worthwhile. Because in my calculation, 6 sen per litre, after the OPEX and everything, that is what I want to clarify only. If it is 6 sen per litre, then when sold to industry, I think you can still earn a little profit, and for domestic use, I feel they will definitely not raise the water price, right? That is what I want to be assured of only. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. Yes, that's right. I understand that sometimes media reports are not very accurate when they say the State Government has to pay. In fact it is the Penang Water Supply Corporation (PBA) that pays; it is part of the OPEX that must be carried out. Okay, thank you, Honourable Member, for that explanation and support.

Dato' Deputy Speaker, the last issue before I end my speech today. We are approaching the end of the winding-up session, and before I withdraw I want to share a little with Honourable Members about the Green City Action Plan (GCAP) Project, which is a project…

Kumaran KrishnanDAP · PHBagan DalamEN

Honourable Member, may I interject before that? Thank you, Honourable Member. Only one matter I want to raise. I know that although it is not under the State Government, but under the concession of the highway company, the problems that occur there every day involve the public and road users, that is, ordinary people, and the first party they blame is the State Government, the state assemblyman for the area, the Member of Parliament for the area, and even as far as Telok Ayer Tawar, whoever is from Permatang Berangan, people ask for the toll to be abolished. So because of the flood and jam issue, they ask for the toll to be abolished, but it must be requested from the concession party, not the State Government. The question is what solution the State Government can take, or what reprimand we can give to the concession party, because congestion occurs in our state even though a concession has been granted, and the traffic jam problem is very severe, especially at peak times. I have also discussed with the Honourable Member the issue of rising water. We understand what the real issue there is and there is a short- and long-term plan, that I understand, I agree. Thank you for the follow-up, but the road congestion issue, and another thing, the congestion is caused by the failure of the concession party, the toll party, to operate their toll gates. At peak times many gates cannot function, so it causes a bottleneck there. So we have to look at this because the issue involves everyone. So I humbly request. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Bagan Dalam. One action we may be able to take is to bring this matter to the attention of the highway authority. That is, all highways in Malaysia, the concessions and so on, their regulator is the Malaysian Highway Authority (LLM). So perhaps we can escalate this matter to the attention of LLM so that the appropriate action can be taken. I agree with the Honourable Member, it should not happen, especially at peak times when toll booths are not open and so on, and this makes the congestion severe, and as the Honourable Member said, it is also our responsibility. Very much agreed, okay, and I will bring this matter up.

Okay, regarding GCAP. This is a project that we implement together with the Ministry of Economy and also the Asian Development Bank (ADB). For Penang, both city councils, namely Penang Island City Council (MBPP) and Seberang Perai City Council (MBSP), have already been selected in the statistics of the Green City Action Plan. The GCAP Penang 2025 has listed a total of 57 action plans estimated to have the potential to reduce greenhouse gas emissions in Penang by 27%. Climate vulnerability assessments were carried out according to climate change patterns and their impact on 10 urban systems, most of which are critical urban infrastructure such as utilities, transport, drainage systems and so on. Most projects under the Infrastructure, Transport and Digital Portfolio are based on the GCAP concept, which aims to reduce greenhouse gas emissions in the State of Penang.

Among the projects under this action plan is ITOD (Inclusive Transit Oriented Development) at Sungai Nibong, which is expected to become a transport hub covering a rail system and an integrated bus terminal. This project is also expected to improve mobility and accessibility, support the LRT network, reduce congestion and stimulate the local economy.

Dato' Speaker, in conclusion from me, allow me to stress once again that all the planning and implementation that we present today are not merely physical projects or numbers on paper, but a reflection of our determination to build, together, a state that is more connected, more competitive and more prosperous for all the people of Penang in facing modern challenges, from climate change, economic growth, rapid urbanisation to future digital needs. We must continue to move forward with courage, sincerity and efficiency. Every road alignment that is upgraded, every transport system that is streamlined, every flood mitigation project implemented and every digital innovation introduced is a step we entrust for the future of the children of this state.

Therefore I call on all parties to continue standing shoulder to shoulder, supporting the policies that have been drawn up, and to be partners in driving Penang towards the Penang 2030 Vision, a Smart, Green, Inclusive and Liveable State for all. May every effort we start today become a legacy of progress for the next generation. With humility I end this speech with thanks for all the views, criticism and support of this honourable House. Thank you. I move to support.

Deputy Speaker of the HouseEN

Thank you, Tanjong Bunga. Next, I invite Sungai Acheh to speak. There is a river, but no water, is that right, Sungai Acheh?

Dato' Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

In the name of Allah, the Most Gracious, the Most Merciful. All praise is due to Allah, Lord of the worlds, and may peace and blessings be upon the most noble of the prophets and messengers, and upon his family and all his companions. Dato' Deputy Speaker, first of all I wish to record my highest appreciation to all Honourable Members who have taken part in the budget debate. The debate session this time clearly shows our sincerity in placing the people at the centre, not only through budget figures but through human values, well-being and the future of the state we love. As emphasised by the Honourable Chief Minister, Penang must continue to advance as a progressive and inclusive state. However, that progress cannot rest on the shoulders of certain groups alone; it must flow to every corner, from the big cities to the village lanes, from commercial centres to flats and villages, from high-technology industries to the daily life of ordinary people. Therefore, I will wind up this debate for the Portfolio of Trade, Entrepreneur Development and Rural Development, which covers the various needs and support that we implement for communities across the whole state.

The cost of living remains the issue closest to the hearts of the people. Although Penang continues to record high investment, daily life remains challenging for many families, with unstable prices of goods, rising kitchen costs and daily expenses that must be managed carefully. The State Government fully understands this situation. We are aware that many parents have to plan their spending more carefully, choose the most important needs and look for ways to increase income for the well-being of their families.

Therefore, every programme and policy that we draw up always takes into account the realities being felt by the people on the ground. The State Government works closely with KPDN to ensure the supply and prices of basic goods are safeguarded. It is well known that KPDN implements the Rahmah Madani Sale Programme (PJRM) twice a month in every DUN as an initiative to help the B40 group and below. This programme will continue until December 2025 for now and is in plan for 2026. For everyone's information, PJRM is also implemented at educational institutions and selected public markets every month. KPDN's target for the implementation of PJRM throughout Penang in 2025 is 1,278 times. However, up to 31 October 2025, 1,677 have been implemented throughout the state, thus exceeding the target earlier than specified. This programme gives people the opportunity to obtain goods such as rice, cooking oil, chicken, eggs and vegetables at lower prices.

However, I also take note of the matter raised regarding the organising of rahmah sales to sundry shops, the impact on local sundry shops and the effect on sundry shop sales thereafter. However, the Government, in its efforts, provides space and opportunity for sundry shops to register with i-Sara, but these sundry shops must fulfil certain conditions, gentlemen. Sundry shops, as we know, may not have sufficient licences, but KPDN gives an opportunity if they meet the licence requirements and so on, and we can make a request to MOF and the i-Sara programme, but so far not many have succeeded. But Insya-Allah, nevertheless, a solution will continue to be pursued by KPDN.

I wish to explain that price assistance is not a long-term solution. What is more important is that we together build awareness among the people about the priority of spending wisely, so that they are not overly burdened by changing prices of goods. With this awareness, the people can make better choices for their families and be better prepared for daily challenges. Once consumers are guided and assisted, the next focus is the income of the people. Penang cannot progress if low-income families are not given the opportunity to build their own economic sources.

Mr Deputy Speaker, I wish to take this opportunity to record my highest appreciation to all parties who have been the backbone of the success of our programmes throughout this year. Thank you to the District Office as the main implementing agency, together with the District Officer, Penghulu and MPKK, who always ensure that every policy and assistance of the State Government can be implemented effectively at the grassroots level. I also appreciate the support of fellow EXCO members, such as state and federal agencies, including PWDC, PYDC, Digital Penang, Penang Halal International, PDC, Zakat Pulau Pinang and other implementing agencies, who have contributed directly and indirectly to strengthening the entrepreneurship ecosystem and rural development in Penang. The solid contributions of all parties are what form the basis of the strength of this portfolio, and I record my thanks for their continued commitment.

Mr Deputy Speaker, with the support of these many strategic partners, the State Government is not only able to implement comprehensive entrepreneur development programmes, but also extends the reach of policies down to the grassroots level. In this regard, one initiative that has had a major impact on local communities is the District-Level Entrepreneur Tour Programme (Program Jelajah Usahawan Peringkat Daerah). The district-level Entrepreneur Tour Programme is implemented to ensure that all levels of society, including villagers and rural areas, are not left behind in information and economic development opportunities. Through this tour, the District Office together with Penghulu, MPKK and implementing agencies go down to local sites to deliver briefings, assistance, training, advisory services and on-the-spot registration. This approach ensures that government information reaches the community directly without them having to come to the city or the main office.

The aim is clear: no small entrepreneur and no villager is left behind from the opportunities provided by the State Government. We have completed four series of the Entrepreneur Tour, namely in SPS, SPT, DBD and SPU. And it will be further implemented in DTL in 2026. The Penang Entrepreneur Tour complements efforts to reach the people at district level. The State Government also implements larger-scale initiatives, giving small and micro entrepreneurs the space to promote their products and expand their markets. In this regard, one programme that has had a clear impact on entrepreneurs is the Penang Tour Programme (Program Jelajah Pulau Pinang). This programme is a collaboration with the Bumiputera Coordination Division and the Implementation Unit of the Prime Minister's Department, and is implemented through FAMA Penang. This programme is not merely a sales space, but an opportunity for entrepreneurs to introduce their products outside Penang and penetrate new markets.

So far, this programme has been expanded to three locations. And these three locations have enabled Penang entrepreneurs not only to record good sales, but also to gain new exposure, including ways of pricing goods more competitively, improving packaging, understanding the tastes of outside customers and building new business networks. This programme proves that small and micro entrepreneurs can grow further when given appropriate opportunities and support. The Penang Tour Programme so far has involved the participation of 30 entrepreneurs at each tour location in Peninsular Malaysia, and succeeded in recording sales of nearly RM555,000 against minimum expenditure of around RM199,000. This achievement shows that the strategy of bringing entrepreneurs out of the state is a worthwhile and high-impact step. Going forward, this programme will be continued.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Sungai Acheh, may I interject. Sungai Acheh has said that the three entrepreneurs just now brought products. What kind of products are they, Honourable Member for Sungai Acheh?

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Dry and wet food products that we take outside the constituency. But in what form they represent Penang food, and some of what we take is dried, retorted and so on, local kuih. In Kelantan we were led by YB Bukit Tambun, who became Chairman there. Praise be to God. In Kelantan we sent YB Goh, YB Bukit Tambun went to Kelantan. Yes, can (inaudible). Okay, next, this programme will continue to Sarawak on 28 to 30 November 2025, involving 15 Penang entrepreneurs to explore market potential in Borneo. Next year, several more new locations will be explored so that the benefits of this programme can be enjoyed more thoroughly by small traders across the state. This programme continues to be an important platform in strengthening the entrepreneurial ecosystem and increasing the competitiveness of local products at a wider level.

Mr Speaker, Deputy Speaker, the Trend Marketplace programme began at Komtar as a platform to rebrand the trading space of local entrepreneurs. Since it was launched in June 2024, the programme has been held regularly every month at the Legar Level 3 area of Komtar, with about 30 entrepreneurs participating in each session. The response has been very encouraging, with average daily sales reaching RM25,000.00, demonstrating the great potential of this initiative in uplifting the products of Penang entrepreneurs. Based on the success at KOMTAR, the programme has been expanded to factories and major industrial zones, in areas of strategic cooperation and multinational companies (MNCs) in Batu Kawan, Perai, Bayan Lepas and Bukit Mertajam. Praise be to God, as of early November, nearly five MNCs and local factories have given approval and commitment to take part in Trend Marketplace. Among them are SanDisk, Keysight, Molex, Mattel, Flexus, Wet, Intel, Value, TF, AMD, Bosch and others.

The programme will continue regularly and, with the support of the industry, we have succeeded in organising Marketplace at four to five factories each month. Locations are determined based on the readiness of the factories, while the participation of entrepreneurs is arranged on a rotational basis through the state entrepreneur database to ensure opportunities are distributed fairly and inclusively. We are also discussing with PDC and the Public Works Department (JKR) to obtain suitable areas within industrial estates where we can place our entrepreneurs, who can open up new space and places. God willing, the markets at these factory areas will be more attractive. The State Government also welcomes proposals of names of entrepreneurs from all the Honourable Members to be included in the next round, so that the benefits of this programme can be enjoyed by all SME entrepreneurs, who are the backbone of the state's economy.

To ensure the sustainability of entrepreneurs and traders in this state, the State Government, through its agencies, has provided various business premises facilities in strategic locations. Through PDC, a total of 335 premises have been provided. Meanwhile, all District and Land Offices have also provided 254 premises to support business at the community level. In addition, the State Government is also strengthening the entrepreneurial ecosystem through close collaboration with Federal agencies such as PERDA, MARA, TEKUN and various central government agencies, for closer cooperation so that entrepreneurship programmes can be formed within a more organised ecosystem. At present, PERDA provides a total of 387 premises across various categories. Meanwhile, MARA offers 363 lots of business and industrial premises facilities throughout the State of Penang. These facilities not only provide opportunities for entrepreneurs to start and expand their operations, but also ensure that more organised and high-impact infrastructure support is delivered to eligible target groups.

In response to the question from YB Penanti, on the success of the NESP and SPH programmes. The NESP programme by NCER, which began at the end of 2023, aims to strengthen the capacity and competitiveness of local SMEs in line with the goals of NIM 2030. The programme helps SMEs improve skills, upgrade operations, obtain business matching, penetrate international markets and obtain important certifications. Making local companies more competitive and ready to compete at the global level. In Penang, this programme has created 232 new job opportunities, including 65% high-skilled jobs, with nearly 70% of the workforce receiving incomes between RM3,000.00 and RM10,000.00. Through business matching, several companies have also succeeded in penetrating the markets of Italy, India, Singapore and the UAE, besides opening new factories and obtaining Malaysia Digital and ISO 14001 accreditation. Among the success examples highlighted is Silicon Creation Sdn Bhd in Batu Kawan, which supports the state's semiconductor ecosystem. Through the NESP Programme, this company has undergone transformation to the point where it can become a pioneer in the repair of printed circuit boards (PCBs) for AI technology used by the company Global Advanced Micro Devices. A major achievement for a local company.

The Harapan Loan Scheme is a micro-financing scheme under the Penang Development Corporation (PDC). This scheme was created to help micro entrepreneurs and small traders obtain capital and more flexible terms compared to commercial loans. In 2025, SPH has helped a total of 196 entrepreneurs with an overall financing amount of RM3.499 million. The majority of recipients are Bumiputera micro entrepreneurs. Those who benefit from this financing also start new businesses, provide equipment and increase the operating capacity of their respective businesses. Likewise with MARA, according to the report I received, nearly RM24 million in allocations has been given as loans this year to entrepreneurs under MARA. So, based on the reports we have, the entrepreneurs at present are paying 90% on schedule. So if we look at the entrepreneurs today whom we have produced from Penang, praise be to God. Borrowing and repaying. In the past, entrepreneurs borrowed but had difficulty repaying, but today they borrow and repay.

Mr Deputy Speaker, rural development is not a secondary option. We do not want any village to feel left behind in the state's development momentum. Rural areas possess identity, family values and community strength that form part of the lifeblood of this state. For YB Penaga, oh, there isn't any. Good news for YB Penaga, and what YB Tanjong Bunga mentioned just now, as an early notice, I would like to share good news with YB Penaga and the local residents. Under the RMK-13 Rolling Plan 1, the Federal Government through KKDW has approved the road and bridge upgrading project for Penaga, under Pasir Gebu, with an allocation of RM11.6 million, including RM150,000.00 for preliminary work in 2026. Asked just now, though it was noisy, and immediately received today. That's the good thing. When he asks directly, we check directly, and get it immediately. In fact, there is already an approval. Coincidentally, it was indeed in my possession.

Congratulations to YB Penaga. And this approval also comes at the right time. Especially after YB Penaga raised the issue of traffic congestion due to the increase in visitors to the tourist area of Kampung Ah Gong. He must not say 'Agung', it's Ah Gong.

In addition, this allocation also addresses the problem of narrow roads in Permatang Bendahari and the Penaga lower roads that are cut off at Sungai Tembus. Right, Ah Gong, YB Permatang Pasir? With the construction of these new roads and bridge, residents will obtain a smoother and safer alternative route between Penaga and Pasir Gebu. It will reduce congestion, save travelling time and improve safety. This initiative can also be considered another bonus or addition beyond the 10 wishlist items mentioned by the Honourable Chief Minister, particularly for the benefit of Penaga residents.

Although this project is moderate in scale, its impact is great in resolving the daily issues of the people and improving the quality of life of the people. This approval proves that every need of the people receives due attention, regardless of where the location is. If it is important for the welfare of residents, the State Government will take the necessary action. Therefore, I would like to take this opportunity to also encourage YB-YB ADUNs to submit any proposals for projects under the RMK 13 Rolling Plan 2 for the year 2027. Because for the information of Honourable Members, Penang is among those that rarely request from KKDW. Other states always request in billions sometimes. We only ask for RM10 million, 20, 50. So I suggest that if YB-YBs describe problems, saying the areas are all congested, very congested, then ask. We will help convey it to the centre. If there is fortune, we have it.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

May I interject briefly? Just now YB Sungai Acheh mentioned about not requesting. Actually, what I understand is that they don't even have requests for street lights now. This is KKDW's allocation. Previously there were, but now there are none.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Okay. Is that all you wanted to ask?

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Tell me first.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Okay, for the lights we will request them immediately. God willing, when there is an allocation for lights, they will come with the lights. Ah, so we are the same. The problem that Pinang Tunggal is talking about here, Sungai Acheh, also goes down like that. The people of Sungai Acheh are like that. They requested lights and did not get them. Never mind, if they do not get them this year, perhaps they will get them next year. So for this road, I, I hope we, we together have constituencies, we look at what needs to be done through KKDW, we request, God willing. Hopefully there is at least hope in our lives. If we do not request at all, it will become a problem.

Bukhori bin GhazaliPAS · PNPinang Tunggal

Pengharapan.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Ha, there is hope. That is what is important. Rest during the day, and at night you will be granted sweet dreams.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Just now you said Penang is among those that rarely request.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Yes. We, we have to request, ah. Ha, God willing.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

No. We, it, we have to go through that channel.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

We have to go through the channel via JKR, then it will be brought to BPEN, and God willing we will bring it. Can? Anything else?

Bukhori bin GhazaliPAS · PNPinang TunggalEN

A little, a little more.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai Acheh

Ya.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Never mind, later I will ask YB EXCO for a copy of that request to help me expedite it. You said the budget is large. Just one more thing.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

The budget is not large.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

The allocations, the allocations are large. Okay, since I've already asked, I have one more question. I want to ask about GIATMARA because it is under KKDW. For the matter of new houses that need repair under GIATMARA, can we extend it to the PN ADUNs, ah. The opposition ADUNs.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Applications, they will go and look. I will also help. Yes.

Deputy Speaker of the HouseEN

YB EXCO. If I am not mistaken, all ADUNs are invited to the Focus Group. The Focus Group meeting can raise this matter. It doesn't matter which party. For the people. It can be included.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

If we enter through the District Office, they will, they will enter there.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Never mind, I will take note of what Dato' Deputy Speaker mentioned as one, one decision.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Therefore, I would like to take this opportunity to say what I said just now.

Deputy Speaker of the HouseEN

Battery's dead. Mic.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Not much left, not much. Short. I will be brief, yes. Okay, I would like to take this opportunity to respond to the matter raised by the YB DUN Seberang Jaya regarding the request for the State Government to examine the narrow road at Masjid Timah, which has now become the main shortcut route, causing congestion and safety issues for residents. For information, based on data from the District and Land Office of Central Seberang Perai, Jalan Kampung Masjid was upgraded in 2024 with an allocation of RM100,000. And in 2025 with an allocation of 189, RM189,000. Therefore, additional works will be considered according to needs and current complaints, subject to the allocation for the relevant year. I think the Masjid Timah area is in Permatang Pauh. If we request, God willing we will get it, right? Right? The Permatang Pauh area, up to today, whatever we request, we get. Right? Even those we did not request, we get. So YB, I think YB Seberang Jaya has no problem. Seberang Jaya, Permatang Pasir, Penanti, God willing there is no problem there. Just request. Right? Request from the DO, God willing, it will arrive. Without, without going through the State Government, it will arrive. Can? YB Seberang Jaya, can?

Okay, TABIKA KEMAS has, since long ago, played an important role in providing early education foundations to the generations of our society. Many children received the beginning of their education at TABIKA KEMAS and were shaped with values and a strong foundation of learning. The contribution of TABIKA KEMAS to

rural communities is indeed undeniable. However, among the main challenges identified is that many TABIKA KEMAS operate in State Government premises such as village halls, surau and community buildings that do not have official occupancy certification documents. This situation means KEMAS cannot submit applications for maintenance allocations to KKDW because they do not meet the basic requirements set.

Recognising the importance of this, I have taken the initiative and coordinated the matter by calling a special meeting on 22 October 2025 with all parties from the District and Land Offices, as well as the Penang Islamic Religious Council (MAINPP), to discuss the operational status of the 93 TABIKA KEMAS that use State Government premises and to examine the needs and suitable methods to be considered. This step is important to ensure that all TABIKA KEMAS are eligible to apply for maintenance allocations, and further ensures a safer, more conducive and quality early learning environment for children in rural areas.

The State Government allocates approximately RM6.8 million a year under P01 Item 64, Special Economic Project, to implement various rural community development initiatives, including building new houses, repairs, equipment assistance, stalls, village roads, drains, land filling, halls and the Modal Insan programme. Part of this total is channelled through the economic improvement and recovery programme for equipment assistance, which supports full-time small traders with low income below RM3,000. For 2024 and 2025, this programme has helped 77 small and micro traders with an allocation of RM280,550.80 to provide the equipment needed to expand their businesses. In addition, through the programme for repairs and building new houses for the poorest of the people, the State Government also adds low-income household dwellings through house repair assistance.

Lee Boon HengPKR · PHKebun BungaEN

Ha, Sungai Acheh, Sungai Acheh, YB Sungai Acheh.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai Acheh

Ya.

Lee Boon HengPKR · PHKebun BungaEN

May I interject briefly. I welcome the effort of equipment assistance. I know it is among the initiatives of the State Government. Only the maximum value of RM3,000 is too small, too low to buy equipment for hawkers. If possible, we ask to increase it to RM5,000 so that more equipment can be bought. Prices of goods have increased.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Okay YB, thank you. Coincidentally, coincidentally, next week we have a meeting and special discussion on equipment assistance together with the District Offices, and God willing we will discuss an increase from RM3,000 to RM5,000 as the maximum. And indeed we have long.

Deputy Speaker of the HouseEN

This information is leaked.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

And we will bring it to the EXCO for approval. Thank you. Yes, for houses earlier, from RM42,000 and new builds RM75,000, for 2024 and a total of RM2,179,000 has been channelled for the benefit of 71 houses. 71 house recipients. The overall effort reflects the continuing commitment of the State Government in strengthening the welfare of low-income families, improving basic infrastructure and supporting small traders in rural communities.

Gentlemen, it is not only today that we hear about allocations from the State Government; we also have allocations from KKDW, from MARA, and we may have additional allocations from PERDA, and we have a few more that we are increasing for KKDW. Because if we look at the rural areas, the position of villages and hamlets, I am someone who is close to the rural areas in the Sungai Acheh area. Perhaps it is different for Pinang Tunggal, Pinang Tunggal. Where when roads are congested, it is no longer rural. It has almost become urban. But in Sungai Acheh there are still rural areas, where one house is occupied by three families who have to cut the walls. On the sides there are still other families. Sometimes 1 metre of water is shared by up to 5 houses. One metre. And these issues we will also raise in this meeting, to provide space and opportunity for how the government can help. Perhaps today when we talk about squatters. Earlier I heard many speeches about squatters. Squatter matters are about people who live on other people's land. Is that right? Hey, listen until I finish speaking, do not ask again later.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Not, not afraid of forgetting. Because just now YB EXCO mentioned that in Sungai Acheh it is difficult.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Not everything is the same; it is not all difficult.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

There are 3, 4 families sharing one house. But hardcore poverty is zero in Penang. Hardcore poverty is zero in Penang. Okay, hardcore poverty is zero.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Okay, yes, he is not, he, he is different. "Miskin tegar" (hardcore poor) has a different meaning in a different context. When we look at 4 families, whether the house is big or small must be asked first. What I mean is we must look at it, we must be fair. When we are fair, it means there are families who need our help, Insya-Allah, and we will try to help. We will look for space, and the government will help. Perhaps from my perspective today, when we define squatters, we define squatters as those living on other people's land. Right? So when we look at the majority in these villages, many are living on land belonging to others, land that belongs to siblings, and eventually these people are waiting for the day they are relocated. That is where we, as the YB in the area, can see that we need a list or data that we can discuss. Sometimes we have many houses. We cannot wait, we can send people to other places.

I would like to thank the CM and the District Office because we were able to bring a settlement in Sungai Acheh. We obtained a new settlement approved on 7 acres for Sungai Acheh. But what I need to do is, we have 300 family houses waiting for the day to be relocated when the landlords' children take over, so surely those not included will be relocated. So we got 200. We still need more. But I will work on it. As the constituency YB, I will work on it. We must not blame many parties, but look for land that we can get to help add to and help our residents. Sometimes, if we want to look for faults in others, we cannot solve problems. So, as local leaders, each of us has a duty, we must look at our data, Insya-Allah. And if there is anything I need help with from the State Government EXCO that we can bring forward, please do. Thank you.

Mr Deputy Speaker, I want to finish, I want to land this now. Regarding the issue of Bazar Perdana in Bandar Perda that was asked by Seberang Jaya. I did not have the opportunity to answer this question orally. And allow me to give a comprehensive explanation that is not entirely comprehensive. For the information of the House, Bazar Perdana.

Deputy Speaker of the HouseEN

Too much cendol, my head is spinning.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Bazar Perdana is a building with strata titles that is managed by a joint management body. This means that all efforts at redevelopment and rejuvenation of the development are subject to the shared ownership structure and the internal decisions of the unit owners under the Joint Management Body (JMB). Among the main challenges currently faced is the issue of building maintenance that has been delayed for some time, and the low occupancy rate, which in turn affects the building's ability to be restored quickly. To date, the State Government has not drawn up any restoration plan or official acquisition for Bazar Perdana, as it is not under the direct jurisdiction or ownership of the State Government. The source of authority must also be found. Without a source of authority, nothing can be done. Therefore, the implementation timeline for redevelopment also cannot be determined until the JMB and the unit owners reach a mutual agreement. However, the State Government is always open to providing policy facilitation at the state level if needed, to help expedite the decision-making process on the part of the building management.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

Thank you, Honourable Sungai Acheh, for the comprehensive explanation, although not entirely comprehensive. We appreciate the answer given by Sungai Acheh. However, Seberang Jaya hopes that, because this building has been left abandoned for so long, and based on the answer from Honourable Sungai Acheh just now that indeed it falls under the jurisdiction of the owners concerned, Honourable Sungai Acheh could take somewhat more proactive steps representing the State Government, which Insya-Allah will be assisted by the State Assemblyman (ADUN) of the constituency, to lead with all the apparatus available under the authority of Honourable Sungai Acheh to help these owners resolve their problems, so that this building can be rejuvenated again. This is because the Bandar Perda area has not only various residential complexes or residences, but also government complexes, such as the MBSP Tower there, for example. Thank you, Honourable Sungai Acheh.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Thank you, Honourable Seberang Jaya. I accept the request to help, and Insya-Allah I will seek advice from the CM to be given the authority, to be given some power as a representative of the State Government, to come down and discuss with YB Seberang Jaya, and then we will look for a solution for, that bazaar. Because from the perspective, we can see that when it is left like that, it is quite a wasteful thing, when there are rights that we can help with. And Insya-Allah, I will discuss it with the government, in the meeting.

The issue of the Kampung Bagan housing has also drawn the attention of several Members of the House. For information, this project is located on a private lot owned by JKP, or the land ownership is PERDA. Ha, there are a lot of steps here. Up to now, it still does not have a planning permission application. Although at present this project is planned to be developed through a collaboration between JKPSB and Perda Venture Incorporated Sendirian Berhad, a wholly owned subsidiary of Perda. At this time, a feasibility study report is being prepared to finalise the joint venture framework. And the final number of housing units to be built will be determined once the complete development concept is approved.

Based on information from JKP, the site was originally occupied by at least 117 families or unauthorised structure owners. All these families have vacated the area, and to date JKPSB has been bearing the monthly rental costs for them until the replacement units are completed. A new restoration plan is also being drawn up, since the previous joint venture partner's proposal failed to be implemented, and now the process is being finalised with PVISB underway. The latest development concept is at the final evaluation stage, and development work is expected to commence by 2026 at the latest, with the target of full completion by 2030.

This is not an answer from the State Government, eh. This answer we requested from the department, from PERDA. Ha, this is the answer they gave. Ha, later, don't use this right, this is from the State Government.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang Jaya

Boleh mencelah?

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai Acheh

Boleh, silakan.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

Thank you, Honourable Sungai Acheh. I appreciate the answer given to Honourable Sungai Acheh by the firm of JKP Sendirian Berhad. If it is examined and traced, and if my debate is observed, I humbly request the fullest goodwill from the State Government to explain the complete chronology, from the beginning when residents occupied Kampung Bagan Serai until today. How many forms of cooperation are to be made by either JKPSB and several other parties, including how many times applications for planning permission have been submitted, which need to be clarified by the State Government. That is why I mentioned it, I request that the State Government explain the complete chronology of matters that fall under the jurisdiction of the State Government. For more than a decade, from me on the school bench, from my father in this seat, until I am now in this seat, and there are residents of Kampung Bagan Serai who were also in this seat behind me, it is still not resolved. So I request that Honourable Sungai Acheh, if you cannot give an answer from the State Government today, perhaps it can be given in writing later. I request this because it involves the well-being and fate of 117 families who once dearly dreamed of a new housing complex on the land they once occupied. Thank you.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Okay, thank you, Seberang Jaya. I will bring this question to PERDA. And I think part of the chronology, Seberang Jaya is already aware of. If this matter comes from a long struggle, and I only entered in 2023. That means its lineage started very early. But no, Insya-Allah, we will provide it, Insya-Allah. I will try to get it from Perda and JKP.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

So I request that it be given in writing, if the complete chronology cannot be explained, because the one who will face these 117 residents is the current representative of Seberang Jaya. Thank you.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Okay, thank you, I will try my best to obtain it, and we will inform Seberang Jaya.

Kumaran KrishnanDAP · PHBagan DalamEN

Honourable Sungai Acheh? Okay, a quick question. Just a small addition. I just want to ask about the Kampung Bagan Serai issue too. Like him, I also said, my mother used to live there. Many people I know now who live there, uncles and aunties, have all passed away, they are just waiting for housing. So, I want to see what immediate action and intervention can be taken by the State Government. If JKP Venture and PERDA are unable to carry out the housing project, which indeed charges rent of RM300, or RM300 a month. In these times, where can elderly people and poor B40 people find rental housing? Just, see what action or intervention can be carried out by the State Government, or including whether they can collaborate with the Penang State Housing Board to find a solution, because it has been, it has been nearly 13 years. So, I ask that you take seriously the handling of this matter.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

I will add a little, the hoarding board at this project has also been changed many times. It was mentioned along the highway. So I hope there will be a rise, there is a new ray of hope from the Pakatan Harapan and Barisan Nasional Government led by whoever is leading the State Government today. Thank you.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Coincidentally, coincidentally. Tomorrow there is a PERDA board meeting, I will inform them and request details for the report on what we are requesting today, and we, Insya-Allah. I see…

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Sungai Aceh, may I interject.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Eh, there's more? Please, please.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Has the State Government met with the 170 people who have to be relocated, to discuss what problems JKP, this JKP project that has not been resolved with PERDA, has? The State Government should have taken the initiative to meet the residents there and resolve the problems that have lasted nearly 13 years there. Up to today, we ask the State Government to meet with those residents and resolve their problems. That's all, thank you.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

I think Telok Ayer Tawar, perhaps they have met already. Because our YB, YB Bagan Dalam, is there, and YB Seberang Jaya is there.

Deputy Speaker of the HouseEN

Sungai Acheh, carry on?

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

We ask the Government to meet. The opposition YBs who meet can talk, lah.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

A little, Honourable Sungai Acheh. I understand that I happen to be meeting with PERDA. So coincidentally, I also want to request that the rental rate be increased from RM300-plus, perhaps doubled again to RM600-plus. Thank you.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Okay, we will take it to see tomorrow. If they approve, we will inform. Okay, the State Government will continue to closely monitor this project to ensure that the interests and welfare of all residents involved are always protected. This project not only involves the provision of new housing but also carries social and community well-being implications. Therefore, the commitment to assist and monitor its implementation will continue until completion.

Okay, landing. Dato' Deputy Speaker. Trade, Entrepreneurship and Rural Development are not three separate worlds, but one ecosystem that complements each other and determines the future of the people. Through this portfolio, we strive to help the people manage the cost of living, open opportunities for them to continue doing business and earning a livelihood, and ensure that villages are not marginalised from the development currently taking place. On behalf of Sungai Acheh, ha, I spoke earlier on behalf of the portfolio, this is also the State Assemblyman (ADUN) for Sungai Acheh. Many thanks to the State Government, and to the Right Honourable Chief Minister, because development in Sungai Acheh is proceeding in an orderly manner, from housing, we asked for stalls. But that is just my view, I hope we, friends, look at it without a negative perspective.

Although we know we have a hawker problem, when there is development, there are roads that are always busy, they will still set up stalls by the roadside, we need to look for a place like what YB Jawi mentioned earlier. We need to look at places, and I also in Sungai Acheh are looking for new areas to relocate the hawkers, who are involved in narrow areas that can cause accidents. Accidents that can happen at any time. So if this, we, as community leaders, do not look for a solution and then we blame, in my view that is unfair. And Insya-Allah we can develop together, and in my view, I open space and opportunity for friends, for YB over there, to come and discuss what we can mutually help with in a more prosperous community. Whatever the aspiration of Penang is, to ensure the people live, the people of Penang live and become more prosperous. And we want to land now, Penang must continue to move forward as a developed state. However, that progress will not be meaningful without a prosperous people.

From Balik Pulau to Seberang Perai,

from the village to the city,

our commitment is the same,

to ensure Penang remains a prosperous, stable, inclusive state where development can be felt by all levels of society without anyone being left behind.

I humbly support. Thank you.

House Suspended

Deputy Speaker of the HouseEN

Honourable Members, the winding-up of the Supply Bill 2026 and the Development Estimates Motion 2026 will continue tomorrow, 20 November, which is Thursday, at 9.30 am. With the permission of Allah, may success and guidance be granted, peace be upon you and the mercy and blessings of Allah.

The House was adjourned at 5.55 pm.