Pulau Pinang · 20 November 2025

15th Assembly, 3rd session, 2nd meeting (Budget 2026) · 469 turns · 37,418 words · official PDF ↗

374 of 469 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.

Absent: Dato‘ Seri Reezal Merican bin Naina (Bertam), Kumaresan a/l Aramugam (Batu Uban), Lee Khai Loon (AHLI-AHLI YANG HADIR MENGIKUT BAHAGIAN I BAB 3 PERKARA 6A), Dato’ Seri Haji Zulkifli bin Long (Setiausaha Kerajaan Negeri), Dato’ Wan Nor Sakina binti Saad (Penasihat Undang–Undang Negeri), Dato’ Zabidah binti Safar (Pegawai Kewangan Negeri)

(Opening)

Secretary of the HouseEN

Honourable Members, Honourable Mr Speaker of the State Legislative Assembly (DUN). Recitation of prayer. Prayer. Oral questions.

Speaker (Speaker)EN

Good morning, Honourable Members. For this morning, we will begin with question 41. Since question 41 has already been answered together with question 26, we move on to question 42. Question 42 has also been answered, together with question 34. So, I would like to invite the Honourable Member for Permatang Berangan.

Mohd Sobri bin SalehPAS · PNPermatang BeranganEN

Assalamualaikum warahmatullahi wabarakatuh and Selamat Sejahtera. Dato' Seri Mr Speaker, my question is number 43.

No. 43 What is the actual status of the flood mitigation project in the Labuh Banting area, which is the confluence of Sungai Perai, Sungai Kulim, Sungai Jarak and Sungai Kereh?

(a) State the amount of allocation disbursed and the balance required for the flood mitigation project?

(b) When will full implementation begin, and when will it be fully completed to end the suffering of residents caused by floods?

Speaker (Speaker)

Terima kasih.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Seri Speaker, and Permatang Berangan. The Labuh Banting area, which is the confluence of Sungai Perai, Sungai Kulim, Sungai Jarak and Sungai Kereh, is included within the RTB (Flood Mitigation Plan) of Sungai Kulim and Sungai Perai. The proposal for this RTB project has already been submitted in the first Rolling Plan, RP1 of the Thirteenth Malaysia Plan (RMK-13).

However, approval of the allocation has still not been received for the implementation of this project. No allocation has yet been approved for the RTB Sungai Perai, and the implementation planning will be finalised after the allocation application is approved under RMK-13. So, we are still trying, Honourable Member.

Mohd Sobri bin SalehPAS · PNPermatang BeranganEN

Supplementary question, Dato' Seri Mr Speaker. Does the State Government have data on the losses borne by these flood victims, whether from major floods or flash floods?

Zairil Khir JohariDAP · PHTanjong BungaEN

That information is not within the purview of the Drainage and Irrigation Department (JPS), Honourable Dato' Speaker. However, if one wants to obtain that information, we need to discuss it, because it is outside the scope of authority. JPS only focuses on infrastructure, rivers and drainage. In other respects, it is perhaps more a matter of welfare. Thank you.

Speaker (Speaker)EN

Thank you. Please proceed.

Mohd Sobri bin SalehPAS · PNPermatang BeranganEN

Dato' Mr Speaker. As for my supplementary question earlier, the reason is that whenever a flood occurs, either the Government or the people will suffer losses, right? And there should be a study that determines the total losses we bear each time a flood occurs.

Zairil Khir JohariDAP · PHTanjong Bunga

Biasanya.

Mohd Sobri bin SalehPAS · PNPermatang BeranganEN

So that we can justify with applications.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes. Thank you.

Mohd Sobri bin SalehPAS · PNPermatang BeranganEN

The flood mitigation allocation just now.

Zairil Khir JohariDAP · PHTanjong BungaEN

Understood. Usually, if an allocation is approved and then consultants are appointed to do the design, usually in that design the consultant will also include elements such as the impact of the flood on residents, and sometimes it is also included, perhaps in terms of how many families are involved, and the economic losses, which sometimes are included, and sometimes depend on the scope given to the consultant.

But usually, if many residents are affected, that becomes the main factor. We want, we want the objective of flood mitigation projects to be to help as many families and houses as possible. That is the main objective.

Zulkefli Bin BakarBERSATU · PNPenantiEN

Supplementary question. YB, yesterday YB informed us that there is a Flood Action Plan by JPS. I just want to ask about that plan: is the issue of compensation included in the plan? As happened in my area, where paddy farmers' land was taken to build drains, but payment was not settled until they closed back the drains, and this caused the flood overflow water to be unable to go there. In Kampung Padang Tembusu, Kampung Padang Ibu and Kampung Gua Jering.

Zairil Khir JohariDAP · PHTanjong BungaEN

I need to check, but usually if there is privately owned land taken for any government project, there is certainly compensation. Except if it is not privately owned land. If the government reserve land has no compensation, Honourable Member.

Speaker (Speaker)EN

Thank you. I will now move on to question 44, from Bertam. Bertam is not here, he has applied for leave. So this question is passed over. Penanti, please.

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, Honourable Dato' Seri Mr Speaker. Thank you to the Honourable Member for Penanti, who asked about the maternity ward issue. For the information of this August House, the maternity wards referred to in the oral question posed by the Honourable Member for Penanti actually refer to the construction project of the Women and Children Block for Penang Hospital.

For the information of this August House, this new block will accommodate obstetric and gynaecological services as well as paediatric services, which are expected to add 164 beds for paediatrics and 165 beds for O&G purposes. So, the construction project of the Women and Children Block of Penang Hospital is expected to be fully completed on 19 January 2027, after taking into account the third Extension of Time (EOT) that has already been approved.

The approval of the EOT is due to the increase in gross floor area (GFA), resulting from the Room Data Interaction (with permission) session with the user side, to accommodate current operational requirements and compliance with the latest health standards.

However, construction works are now progressing smoothly according to schedule, and the implementing agency constantly monitors the progress of the project closely to ensure it can be completed by the date that has been set. Thank you.

Zulkefli bin BakarBERSATU · PNPenanti

Soalan tambahan.

Speaker (Speaker)

Sila.

Zulkefli bin BakarBERSATU · PNPenantiEN

YB, okay. Although YB has explained what will be done, is there any other plan for future improvements to reduce the congestion in the maternity ward? This is why, I feel, today many no longer go to the maternity hospital but go to private clinics. Because if we look at the statistics of expectant mothers giving birth at Penang Hospital, the figures for the maternity hospital have decreased. That means 2023 compared with 2024, 2023 is higher than 2024. So, I request, or is there anything else, such as free transport to the hospital or something? We also need to know if there is. YB, thank you.

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, I extend my thanks to the Honourable Member for Penanti. Earlier, in the Honourable Member's supplementary question, the Member mentioned two different factors. One is that it is indeed different from perhaps the medical treatment of other diseases, for example oncology and so on. Actually, the maternity ward, although I am not yet married, I don't have a wife yet, but I do know that the process of giving birth is not, it is not. I will wait, I will answer this question. I will answer this question.

Zulkefli bin BakarBERSATU · PNPenantiEN

Wait a moment, YB. I agree, YB.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

This is already an offer. This is already an offer.

Zulkefli bin BakarBERSATU · PNPenanti

Prevention is better than cure.

Gooi Zi SenDAP · PHPadang Lalang

Tak.

Zulkefli bin BakarBERSATU · PNPenantiEN

So prevention, Dato', (unclear). Prevention for pregnant women, how is that?

Gooi Zi SenDAP · PHPadang LalangEN

Wait a moment, I haven't yet got to the answer. Wait a moment. But it is different, different from other diseases. Actually, the process of giving birth, usually does not need to take a long period of time. It is not that pregnant women who need to give birth have to stay in the ward for three weeks, four weeks. No. The process is quick. So, the step-down process is also quick. That will actually be to look at the capacity of our maternity wards.

Secondly, actually, even if it is true that there is indeed a statistical reduction in the childbirth rate, there are several contributing factors. One is that there are indeed facilities at private hospitals that offer this childbirth service, perhaps because some have insurance coverage and so on, and they feel they want to take the service to give birth at private hospitals. That is one.

And the second is actually in terms of production, our population. That I cannot control, whether there is an increase or a decrease. We try to encourage, we try to encourage. But that is a decision made by families and so on.

There are several factors that will affect the total birth rate. However, as I said, at present in the State of Penang, we actually have a total of 174 maternity wards, namely 58 at Penang Hospital, 70 at Seberang Jaya Hospital, at Bukit Mertajam Hospital we have 20, Kepala Batas Hospital has 22, Sungai Bakap Hospital has 2, and Balik Pulau Hospital also has 2 maternity wards.

However, as I answered earlier, with the additional beds through this new Women and Children Block development project, we are expected to add 165 beds for O&G purposes. So, we hope that this can resolve the congestion issue referred to. Thank you.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Soalan tambahan.

Speaker (Speaker)EN

Want to call (unclear), this probably encourages EXCO to get married.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Dato' Seri Speaker, I was interested in Padang Lalang. They said that they have not yet. But you must learn from Bagan Dalam, just after. Okay.

Speaker (Speaker)

Soalan.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

The question is about Hospital BM, which is close to Padang Lalang. At Hospital BM, previously the maternity area was specifically for childbirth. Now, on the maternity side, some partition off the elderly and women. Will the ADUN for Padang Lalang take action, for the good, for the maternity area for mothers?

Mothers giving birth should not be mixed with female patients. Chronic patients are also there, and also next to the maternity area. That means they infect the disease, and the newborn babies have problems. That's all, thank you.

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, the Honourable Member for Telok Ayer Tawar. Indeed we take note, indeed the Honourable Member mentioned Hospital Bukit Mertajam as nearby. Actually, no. Hospital Bukit Mertajam is within the Padang Lalang state constituency. Indeed I took note, it is indeed in my heart. The hospital, which is now 135 years old, has actually developed. There are indeed plans for us to look at developing a new block. As we have raised in this August House, we have identified a plot of land suitable for us to continue the application with the Ministry of Health Malaysia (KKM) to develop the new block, to relocate some of the existing services within the existing block of Hospital Bukit Mertajam to the planned new block. The proposal has indeed obtained consent and approval from the Land Committee of the Ministry of Health Malaysia, and this is something we are indeed following up on. I too hope that not only as EXCO for Health, but as ADUN for Padang Lalang, that project can be realised within my term as well. That's all, thank you.

Speaker (Speaker)EN

Thank you, and Seberang Jaya, please.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

Dressed in smart batik, looking elegant, Armed with a firm resolve planted within,

Thank you, Speaker, so graceful, My question is number 46.

No. 46 What are the plans/actions of the State Government to redevelop the abandoned projects/landmarks in Seberang Jaya, namely the Expo Site, Bazar Perdana Bandar Perda and the Kampung Bagan Serai Housing Project?

(a) What is the current status and development obstacles of each of these projects?

(b) Has a recovery or takeover plan been drawn up?

(c) When is implementation expected to begin and be fully completed?

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Thank you, Seberang Jaya. Dato' Seri Mr Speaker. The State Government takes note of several projects and abandoned areas in Seberang Jaya, which involve various agencies and landowners.

The summary of the current status and the actions being taken is as follows:

(i) The Seberang Jaya Expo Site is under the maintenance of the Penang Development Corporation (PDC). PDC is currently planning to develop the land for the Seberang Jaya Expo Site with mixed development. PDC is currently in the process of refining the details of the sale and purchase agreement for the development of the said land, which also includes the entrepreneur development component in the overall proposal.

There is no recovery or takeover issue because the land is wholly owned by PDC. The expected implementation period for this project is seven (7) years, starting from the date the sale and purchase agreement is executed. The ownership of land or assets measuring 17.2519 acres on Lot 340 Tapak Ekspo Seberang Jaya Mukim 1, Daerah Seberang Perai Tengah was approved for transfer of ownership to PDC through the Penang State Government Land Committee Meeting on 16 March 2022 and was confirmed on 25 March 2022.

Bazar Perdana Bandar Perda. Bazar Perdana Bandar Perda is a strata development managed by the Joint Management Body (JMB) of Bazar Perdana. The current land status is a development obstacle. The current status and development obstacles of this project are subject to the internal management of the JMB, as this building operates under a joint ownership structure.

Among the challenges faced are issues of building violations and low occupancy rates. Until now, there is no official recovery or takeover plan by the State Government for Bazar Perdana, as it is not under the direct authority or ownership of the State Government. The redevelopment period has not yet been determined, because it is subject to the decision and capability of the building management party as well as the registered unit owners.

Kampung Bagan Serai housing project. Yesterday I already answered, but never mind, let's answer once again. The Kampung Bagan Serai housing project is located on private land owned by the developer JKP Sdn Bhd. Until now, no planning permission application has been submitted by the developer. This project will be developed through a joint venture between JKP as the landowner and Perda Ventures (PVISB), a wholly owned subsidiary of Perda. A feasibility study report on the development is currently being prepared and will be the basis for finalising the joint venture agreement. The original total number of units to be built will be determined once the development concept is fully endorsed.

Based on information provided by JKP, this site was originally occupied by at least 117 families or owners of illegal structures. All these families have vacated the site, and JKPSB currently bears the monthly rental costs for all these families until replacement units are built. A new recovery plan is being drawn up by JKPSB. After the earlier proposal from the joint venture partner failed, the process of finalising the joint venture agreement with PVISB is being carried out to enable development to continue. The new development concept is now at the final evaluation stage. Development works are expected to commence at the latest in 2026, possibly mid-year, and be fully completed by 2030. The State Government will, the State Government will continuously monitor the implementation of this project to ensure that the interests and welfare of the residents involved remain protected. Yesterday I contacted Perda, and indeed they are at the final stage and said Insya-Allah. They also take into account the 170, 117 families who will have a residential building constructed for them in the area. The last information I got is that, and Insya-Allah I will get further information today.

Speaker (Speaker)

Terima kasih.

Izhar Shah bin Datuk Arif ShahBERSATU · PNSeberang JayaEN

Honourable Dato' Speaker. Thank you, Honourable Member for Sungai Acheh, for the explanations on the abandoned projects or landmarks within the rapidly developing Seberang Jaya area. First, regarding the expo site, I understand, as explained by the Honourable Member for Sungai Acheh, I humbly ask that the proposal from representatives, not only myself but also previous representatives, regarding this expo site be considered, to consider making part of this expo site a logistics or mobility hub as an extension to Penang Sentral. In terms of connectivity, Penang Sentral can later be linked to the Seberang Jaya Expo Site, and a centralised parking site may also be developed there, which could solve several problems such as at Immigration and at the nearby Seberang Jaya Hospital. Secondly, regarding Bazar Perdana, as I mentioned, I hope we can together lead a committee to help these owners resolve their problems with whatever apparatus is available from the State Government.

Thirdly, until today I have still not actually received the chronology of why this Kampung Bagan Serai was delayed in development. From what I feel, it has been almost a decade, more than one decade has passed, 13 years to be exact, and this matter is still not understood by residents as to why it was delayed. So, I request that the State Government side be able to provide the chronology. Perhaps not today, but it may be given in writing later. That is my supplementary question, so that the chronology can be provided. Thank you.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Thank you, Seberang Jaya. Whatever proposals come from Seberang Jaya, we will bring them to discussion at the State Government level. Perhaps regarding the expo site, PDC and so on may decide, and regarding Bazar Perdana, I want to respond. Perhaps if given some power to be a negotiator, Insya-Allah I will go down and discuss together with the Honourable Member of the area and the strata owners to help with Perda and so on. I see, and I myself feel there needs to be a Special Committee to help. Insya-Allah we, the State Government side, will look at it and we will try to help as best we can. As for this chronology, I will get it in two or three days and I will inform the Honourable Member of the area. Yes, thank you.

Zulkefli bin BakarBERSATU · PNPenantiEN

Mr Speaker, regarding this Bazar Perdana, Honourable, I was previously Chairman of MPKK and Chairman of JKK for that area. So this Bazar Perdana has caused many problems in the area, where some of the people who bought the bazaar have gone bankrupt because they took bank loans to pay, but the building was not completed. So, I request that this matter be taken seriously by the EXCO in tackling this problem.

Dato’ Hj Rashidi bin ZinolUMNO · BNSungai AchehEN

Alright, thank you, Penanti. I will take note, and Insya-Allah we will try to find the best solution.

Speaker (Speaker)

Terima kasih.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Soalan tambahan.

Speaker (Speaker)EN

That's enough. It is already more than three.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Sikit. Sikit.

Speaker (Speaker)EN

Not even a little. Not even a little. The next question is from the constituency of Air Putih. Air Putih is not present, so the question is skipped, and I would like to invite Sungai Dua. Please.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Dato' Seri Speaker, my question is question number 48.

No. 48 How does the Government assess the effectiveness and fairness of the CAT Free Bus service?

(a) What percentage of users are citizens compared with non-citizens?

(b) To what extent is the Government considering a nominal charge for non-citizens?

(c) How is route coverage prioritising the B40, persons with disabilities (OKU) and rural areas?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Seri Speaker, and thank you to Sungai Dua. The State Government constantly assesses the effectiveness and fairness of the implementation of the CAT free bus service, whether the CAT Bridge service or the CAT George Town service, through monitoring of user data. The level of route coverage as well as the social and economic impact on local communities.

The total number of passengers will be submitted by the operator every week, and this figure will be monitored by the State Government to see whether it increases or decreases. The trends of increase and decrease will be studied by the State Government in order to improve the performance of the CAT free bus service. Through this passenger number data, the number of buses will also be determined and routes with greater potential can be examined more thoroughly.

At this time, Honourable Member, there is no official data that differentiates the percentage of citizen and non-citizen users of the CAT free bus service, given that the State Government intends to provide a free service to all residents of Penang. Nevertheless, based on Rapid Penang's records, 39.8% of the total passengers consist of Pas Mutiara users, and Pas Mutiara is only eligible for citizens. Taking into account cash payment usage and the use of other passes, the overall estimate of citizen users is between 55% and 60% for paid routes, including the CAT free bus.

The State Government has plans to impose a nominal charge on non-citizens for the CAT free bus service. However, since the State of Penang is a tourism-oriented state, a more tourist-friendly approach is a priority in order to maintain the state's image as an accessible and visitor-friendly destination. The State Government is still studying the feasibility of the proposal to impose this nominal charge, and a study on a tiered charging mechanism is still being carried out, taking into account the balance between social, economic and tourism appeal needs.

Route coverage networks are arranged by Rapid Penang with priority given to low-income B40 areas, the OKU community, students and rural areas. Areas with many low-cost housing are often given priority with an integrated and efficient bus network. For example, Padang Tembak, Paya Terubong, Farlim, Relau, Bayan Baru, Tanjung Tokong, Teluk Bahang and also Bukit Mertajam.

For rural areas with lower usage rates, a targeted frequency-based approach for bus services and also the Rapid On-Demand service has been implemented to ensure access to a more inclusive public transport network. Thank you, Honourable Member.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Supplementary question, Dato' Seri.

Speaker (Speaker)

Sila.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Tanjung Bungah. Does the Government study and also make an announcement on the Rapid bus routes to our people? Considering that I find our community has less information about these bus routes, so that our citizens can fully use these buses so that the congested roads we face now can, as people say, be reduced by reducing vehicles with the use of these buses. Then another matter, regarding whether the Government is studying the stations to be served by the feeder buses. That means these buses do not take other places, they pick up at certain stations to connect with Penang Sentral so that from Penang Sentral, the users can take the ferry and then go to the destinations they wish to reach. Especially the workers. We see that during the rainy season it is really terrible for users coming from Padang Serai through my area, Sungai Dua, as well as near Lahar Yooi, the roads are very, very congested. So if these feeder buses could, as people say, be set up and only pick up passengers at certain stations, perhaps this could, as they say, reduce it a little. Then the third is regarding park-and-ride stations, places to park vehicles, then they continue by taking these feeder buses. Is the Government studying to, that means, set up these park-and-ride facilities in the areas we see or congested areas. Areas that can ease the traffic congestion a little. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Sungai Dua. Regarding the bus timetables and also information about the bus services provided in the State of Penang, anyone can access this information through the Rapid Penang Facebook page. That is one, and also the Pulse application, Rapid Pulse, yes. It can be downloaded and used, and with that application you can check all the routes and also the bus times for each route. Apart from that, Google Maps can also be used in the State of Penang.

As for the feeder bus proposal, Honourable Member, that is a good proposal, especially as the LRT will be built at Penang Sentral. So, I think there should also be a feeder bus service. This we will look at and discuss. Apart from buses, there are also other options, Rapid On-Demand for example, e-hailing can be used and so on. Those become options for users too, but by setting up more park-and-ride facilities and also feeder services from certain stations to hubs such as Sungai Nibong or Penang Sentral, that is indeed a good proposal. Thank you, Honourable Member.

Speaker (Speaker)EN

Thank you. Bagan Dalam. Please.

Kumaran a/l KrishnanDAP · PHBagan DalamEN

Thank you, Dato' Seri Yang di-Pertua. My question is question number 49.

No. 49 What role has been implemented by the State Government of Penang in helping to resolve the issue of two Rumah MutiaraKu (RMKu) projects, namely the RMKu A Sri Bayu Project and the RMKu C3 Quinton Project, involving more than 600 owners whose projects have stalled in the Southwest District?

Thank you, Dato' Seri Speaker, and thank you, Honourable Bagan Dalam. Dato' Seri Speaker, for your information, Dato' Seri Speaker, I have already answered question 49 together with 52 during the winding-up session. As a summary for question 49, we have already identified a white night to carry out the project. The project is expected to start in the first quarter of next year and be completed within a period of one year, and for question number 52.

Speaker (Speaker)

52 nanti.

I did indeed ask the buyers to meet us. We let them understand the procedure. That concludes my reply, thank you.

Speaker (Speaker)EN

Thank you, Sungai Puyu, please.

Phee Syn TzeDAP · PHSungai PuyuEN

Thank you, Dato' Seri Speaker, my question is question 50.

No. 50 What preparedness measures are being implemented by the State Government to face natural disasters and unexpected events such as flash floods, storms, soil erosion and disease outbreaks?

(a) What is the total allocation that has been and is being spent for the purposes of risk mitigation, emergency action plans and assistance to affected citizens since 2020?

Lim Siew KhimDAP · PHSungai PinangEN

Thank you to Dato' Seri Speaker and to Sungai Puyu. The State Government is committed to implementing preparedness measures in line with NADMA Directive Number One through the State Disaster Management Committee (JPBN) and the District Disaster Management Committee (JPBD), which encompass agencies such as the Fire and Rescue Department (Bomba), the Royal Malaysia Police (PDRM), the Civil Defence Force (APM), the Malaysian Armed Forces (ATM), State Health, the Department of Social Welfare (JKM), the Drainage and Irrigation Department (JPS), the Malaysian Meteorological Department (MET Malaysia) and others. Among the measures taken are monitoring disaster risks and updating data on risk areas, developing human resource capacity and competency, raising awareness and understanding of disasters among the community, providing a complete logistics inventory, updating the disaster communication plan, and strengthening the disaster response coordination plan.

In addition, the main preparedness measures currently being implemented by the State Government of Penang to face natural disasters and unexpected events are as follows: One, flash floods and storms. The State Government has identified several flood hotspots across the state that have experienced flooding at least three (3) times within a period of three (3) years. One, implementing several flood mitigation projects in collaboration with the Drainage and Irrigation Department (JPS), including the construction of pump houses and flood retention ponds. Second, in facing phenomena such as La Niña, all technical agencies and rescue teams are mobilised. Drainage systems and rivers are updated, water pumps and pump house keys are ensured to be functional, and Temporary Relief Centres (PPS) are ready to be activated. For soil erosion, slopes and landslides, the State Government focuses on monitoring high-risk slopes throughout the rainy season. For example, the use of geotechnical sensors on slopes such as at Jalan Tun Sardon, Balik Pulau, to detect early slope failure.

Third, disease outbreaks. To face the possibility of disease outbreaks, the Ministry of Health Malaysia (KKM) will set up Fever Centres in hospitals to focus treatment on high-risk fever cases:

(i) Implementing separation of patient pathways for infectious and non-infectious diseases at the Emergency and Trauma Department to prevent transmission. (ii) In addition, the Hospital Disaster Plan is also activated when there is a surge in cases, with the provision of a Disaster Zone, addition of beds and internal mobilisation of health personnel. (iii) Measures to prevent internal transmission are also emphasised to avoid cross-infection to other patients who do not have infectious diseases. (iv) Cases detected in hospitals are reported through the Surveillance Severe Acute Respiratory Infection system, namely SARI, to the District Health Office for early preventive action. (v) At the same time, monitoring of oxygen supplies, medicines and medical equipment is constantly carried out to ensure sufficient resources if there is an unexpected increase in cases.

Fourth, the State Government provides financial assistance to disaster management agencies and also to disaster victims, namely:

(i) Financial assistance to disaster victims through the Penang State Disaster Fund, previously known as the Penang TYT Fund. The State Government allocates financial assistance payments of 10% of the actual value of destruction or damage or a maximum value of RM5,000.00 or a minimum of RM200.00 to each head of household of disaster victims. (ii) The State Government also provides the State Crisis Trust Account Special Imprest Fund to finance expenditure for the purpose of carrying out crisis-management operations for survivors at district level. Each district is given a Special Crisis Imprest Fund amounting to RM10,000.00 for each District and Land Office.

The State Government, in cooperation with NADMA, provides allocations for the management of the Northeast Monsoon operations. Purchase of engine boats and safety jackets. Allocation for repair and upgrading works of Temporary Relief Centres as well as provision of disaster assistance to disaster victims. All these allocations have been distributed to each District and Land Office for the purpose of

emergency and disaster works throughout the years 2019 and 2020 to 2023 and 2024 as in Appendix A, which will be placed on the table of the Honourable Member after the Oral Question session. Thank you.

Speaker (Speaker)

Terima kasih.

Phee Syn TzeDAP · PHSungai PuyuEN

Thank you. Supplementary question. We often hear that large allocations have been spent on implementing flood mitigation projects. But floods still occur in the same areas. So, does the State Government carry out technical audits of projects that may fail to function properly? Thank you.

Lim Siew KhimDAP · PHSungai PinangEN

Supplementary question from Sungai Puyu, it seems to be more on flood mitigation. So I, JPS certainly, JPS certainly does conduct audits for all projects carried out as well as studies. This is one of the measures to ensure the effectiveness and improvement of future projects.

Speaker (Speaker)

Terima kasih.

Zulkefli bin BakarBERSATU · PNPenantiEN

My supplementary question. Honourable, recently there was a mudflood disaster in one of the places in my area, Taman Penanti, Taman Guar Perahu. So, what is the term we use for a disaster for which assistance can be obtained, is it that the Disaster Fund assistance can be obtained by them?

Lim Siew KhimDAP · PHSungai PinangEN

Thank you, Penanti. Indeed, the Disaster Fund that has been set up is intended for things such as fires and accidents, how do you say that natural disaster. But floods can happen, they can often happen, right? So it is not, it is difficult to assess. Therefore it is not, it is not listed in this Disaster Fund. Yes, thank you.

Teh Lai HengDAP · PHKomtarEN

Supplementary question. Good morning, Dato' Yang di-Pertua. I would like to ask about preparedness measures for facing earthquakes. So, although earthquakes such as those mentioned in my debate speech are heard to be far away, in Malaysia too there have been several earthquakes in Johor and in Sabah. So if tremors occur in Sumatra, there will also be tremors in Penang. So, what measures will the State Government take to face this problem?

Lim Siew KhimDAP · PHSungai PinangEN

Yes, as I meant earlier, earthquakes do seem to be very far away but they may happen, maybe I don't know, right. So indeed, below, there is indeed preparedness. I think under the directive of NADMA Directive Number One through it there is indeed a Disaster Management Committee, under which there are committees for agencies such as Bomba, there is APM, ATM, all of these. I, it indeed has this committee under it. I see that they indeed exist, because this is not within my authority, but I try to provide, the Disaster Committee will be active at any time. Operations room. There indeed is this committee for disasters and earthquakes is indeed a very insightful question and we need to be prepared before something happens. Thank you.

Teh Lai HengDAP · PHKomtarEN

Perhaps the public may not, may not know what they need to do during an earthquake. Run, is it? Stay still, is it? Wait, is it? So perhaps there should be some awareness, there should be some awareness for the public.

Speaker (Speaker)EN

YB, answer it, look it up in AI. AI tells everything. Thank you. I would like to invite Penaga.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Thank you, Dato' Seri Yang di-Pertua. Penaga question number 51.

No. 51 What is the number of fishing licence applications rejected in Penang since 2023?

(a) What is the temporary state fuel assistance programme for fishermen without an active licence?

(b) How does the State Government assist in licence eligibility so that fishermen become eligible again for Federal subsidies?

Fahmi bin ZainolPKR · PHPantai JerejakEN

Dato' Seri Speaker, for the information of the Honourable Member for Penaga, for the Special Boat Licence (LSK) matter, it will be issued by the Department of Fisheries (DOF). For the record, and it will only be given to eligible fishermen. And they must also attend the interview and vessel screening for sea-worthy vessels by passing the documentation check. For the record only, on 12 November 2024, a total of 504 fishermen had their licences cancelled because they did not renew their licences for three (3) consecutive years. For the record for 2024, a total of 76 applications were successfully issued to eligible fishermen. Meanwhile, in 2025, a total of 174 applications were received for phase one and eight (8) were rejected. For phase two of 2025, a total of 50 applications have been processed for the issuance of this LSK licence, with 296 persons eligible and also 319 persons not eligible. We are still open, the Department of Fisheries is still opening a quota of 154 for these fishermen to apply, with them following the stipulated conditions. For diesel and fuel subsidy assistance, it will be managed by the Malaysian Fisheries Development Authority (LKIM). Only eligible fishermen may receive diesel and petrol subsidies. And also fishermen must apply for a vessel licence to the DOF in order to enjoy assistance under the diesel and petrol subsidised scheme. Thank you.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Thank you, Dato' Seri Yang di-Pertua, and thank you to the Honourable Pantai Jerejak for the answer given regarding fishermen and fishing licences. For the information of the Honourable Pantai Jerejak, there are five (5) fishermen's units in Penaga, and the fishermen's unit with the largest membership is the Unit Nelayan Kuala Muda. In the near term, I have also received many complaints from these fishermen's units. One is the issue of young people who apply for these licences, because it is passed down from one generation to the next. Their grandfather did it before, then the father, and now the grandchildren. Many are still waiting because they have not yet received licences to go out and fish or to look for whatever the sea yields, fish and the like. And sometimes when the Maritime Enforcement, you see, catches them, and some have their boats seized and they have to pay fines, that is the problem that was raised. So, I ask the Honourable EXCO member to look into this and, as mentioned earlier, I think there may be an amnesty. Licences of fishermen who have not renewed their licences should be cancelled, and perhaps the quota could be given to these young fishermen.

And one more issue raised is my supplementary question. Now that we have the BUDI oil subsidy, fishermen who do not have licences cannot get it, they cannot, and they are not eligible to receive the diesel or petrol subsidy. This is also a problem. Because in a situation where they have nothing, they have to buy diesel or fuel to go to sea without any subsidy, costs rise higher and this places a burden on them. Please give attention.

Fahmi bin ZainolPKR · PHPantai JerejakEN

Thank you. We would like to inform that 154 quotas are still available. Insya-Allah, if the facts given by Penaga are correct, where many young people have applied and are waiting, Insya-Allah I will try to discuss with the Director-General of the Department of Fisheries to consider, because it is not easy for us to obtain young fishermen, you see, so as to give them priority. And Insya-Allah, we will also see that, so far, we only give to fishermen who have active licences and valid licences only. We ask them to apply for these licences. We still have 154 quotas. Insya-Allah I will help Penaga and also help young fishermen in the Seberang Perai Utara constituency. Thank you.

Speaker (Speaker)EN

Thank you. Question 52 has already been answered by the EXCO member during the winding-up, unless there is a supplementary question or additional information. If there is none, I would like to request that this question be deferred. Question 53, the question from Bukit Tengah. It has been answered as well, unless there is a supplementary question or additional information to be conveyed. Please.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

I think the Honourable EXCO member has already answered much. Only I

Speaker (Speaker)EN

Still not satisfied.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

No. I hope that the Honourable EXCO member can still consider the state producing or drafting its own master plan outside what has already been outlined by the ministry, and I also hope, I also request that the Honourable Member can give me one written copy of the master plan report that has already been prepared by the existing ministry and has been completed. That is all. Thank you, Honourable Dato' Seri.

Daniel Gooi Zi SenDAP · PHPadang LalangEN

Honourable Dato' Seri Yang di-Pertua, I thank my colleague from Bukit Tengah for the question regarding oral question number 53. It is indeed true. As far as that master plan is concerned, it was actually prepared by the Penang State Health Department. In fact, under the State Government at present, we indeed have a mechanism for looking at how we can expand, especially in terms of health infrastructure development. In fact, through the MMK Health Committee, this matter was indeed discussed. However, I take what was suggested by the Honourable Bukit Tengah, for us to look at how, holistically, we can look at how, in terms of statistics and also

planning, we can move towards a much better future direction. But I would like to emphasise further on this issue, as I raised yesterday, where if we look at the actual situation in Penang State. That's right. Under public health, we now have approximately 2,000 beds, but we must also not forget that the beds physically available in Penang State are actually more than what is recommended under the WHO. However, as I emphasised, the health reform that is stressed in the Health White Paper. We just need to see how we can address the financing part so that the people, regardless of whether they are in the B40 category, can also enjoy the services and facilities offered in the private health sector. But I would like to take this opportunity to answer part B of the question by the Honourable Bukit Tengah. For the Penang Health Infrastructure Master Plan, the development project planning for the 13th Malaysia Plan (RMK-13), from 2026 to 2030, for the Public Health Division, is to upgrade and build several new projects as follows.

First, the Kubang Semang Health Complex, which is a replacement clinic. Jalan Perak Health Complex. This is often asked by my colleague from Batu Lancang. That too is a replacement clinic. Butterworth Health Clinic, this is close to the hearts of Bagan Jermal and Bagan Dalam. Bukit Panchor Health Complex. And Batu Maung Type 2 Health Clinic. That is a new clinic, as well as Machang Bubok Health Clinic. That too is a replacement clinic. That is all, Honourable Dato' Seri Yang di-Pertua.

Speaker (Speaker)EN

Thank you, and I would like to request Bukit Tambun.

Goh Choon AikPKR · PHBukit TambunEN

Dato' Seri Speaker, my question is question number 54.

No. 54 Describe the manufacturing investment in Penang for the years 2024 and 2025.

(a) Describe the value of exports through the Penang Port and LTAPP

for the years 2024 and 2025.

(b) Describe the allocations received from the Federal Government

for the years 2024 and 2025.

(c) What is the development of the 20% claim on the tax revenue collected from Penang?

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you to the Honourable Bukit Tambun for asking about investment and related issues. For the information of this august House, based on sources from the Malaysian Investment Development Authority (MIDA), the total investment in the manufacturing sector in Penang for the year 2024 was recorded at RM17.3 billion. Next, for the period up to September 2025, which was recently announced by the Minister last Friday, the investment value of the same sector for the period up to September has reached RM15.78 billion for the State of Penang.

According to sources from the Department of Statistics Malaysia (DOSM) for the year 2024, the value of exports through the Penang Port was recorded at RM60.8 billion. Meanwhile, the Penang International Airport recorded an export value of RM411.1 billion. For the period January to August 2025, the value of exports through the Penang Port was recorded at RM37 billion. Meanwhile, through the International Airport, it was RM310.9 billion. So, we only have figures up to August. It is still behind compared with 2024. Because 2024 covers a full one-year period. The Federal Government has allocated RM50 million for a period of 5 years to the State Government for the implementation of the Invest Penang initiative, namely Penang Silicon Design 5KM+. This allocation was announced by the Honourable Prime Minister on 7 September 2024 during the launch of this initiative. Therefore, the Federal Government, through the Ministry of Economy, has disbursed RM3.6 million on 11 December 2024 and RM8 million on 19 March 2025 to the State Government to ensure the smooth implementation of this initiative. The disbursement of this allocation is in accordance with the progress of the project concerned. So, the maximum is the figure mentioned earlier for the 5-year period.

With regard to the tax revenue collected from Penang by the Federal Government, I myself have raised this many times, whether through questions and debates in the Dewan Rakyat and also through media statements issued from time to time. When answering my question in the Dewan Rakyat on 25 August 2025, the Deputy Minister of Finance stated that the ministry would bring a motion on this for review under the Federal Constitution, following the proposal raised by me that it is a necessity for the Federal Government to review and improve the existing federal-state revenue sharing model and apply it to all states. This is an important agenda for the Select Committee chaired by the Honourable Bukit Tengah.

In addition, during the debate on the 2026 Federal Budget dated 15 October in the Dewan Rakyat, I once again emphasised that the time has come for a transparent and fair agreement between the Federation and the States to be sealed regarding the sharing of state tax revenue or the return of revenue to each state. Also emphasised in that debate was that at the Meeting of Menteri Besar and Chief Ministers No. 147 dated 7 October 2025, the memorandum proposing a review of the federal-state revenue sharing model through the establishment of a Federal-State Grant Commission, prepared by the State Government, was also not accepted to be tabled at the said meeting. Accordingly, Penang proposes that a special commission be established to study this proposal, not only for Penang but also for all States in Malaysia. Thank you.

Speaker (Speaker)

Sila.

Goh Choon AikPKR · PHBukit TambunEN

Thank you for the explanation from the Honourable Padang Kota. We are indeed aware, especially the Honourable Bukit Tengah has always raised that the Federal Government collects about 7 to 8 billion from Penang and the return we receive is around 100 million. But recently, all states have moved forward, such as Johor, which is claiming 30%. We are claiming 20%. Sabah, meanwhile, under the Constitution, is 40%, and Sarawak has actually already received quite a lot from the Federal Government. As

Chief Minister and an experienced politician, does the 20% to 40% claim by these states, including Penang, weaken the unity of Malaysia as a federal nation? That is the first question.

Second, in the proposal of the Honourable Bukit Tengah, we are demanding the devolution of powers from certain ministries or these are areas of authority. Especially for me, is it more realistic if we demand the devolution of power to manage the port and also the airport, considering that both are part of the investment and industrial ecosystem of the State of Penang? Because both these elements generate income for the state and also for the country. That is my question. Thank you.

Speaker (Speaker)

Sila.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you, Honourable Bukit Tambun, for raising supplementary questions that test the experience of an experienced politician. I think the strength of the Federation comes from the strength of the states. Because the Federation is made up of the states. So if the states are strong, the Federation is strong. If the states are weak, the Federation is weak. So, what has been raised by several states regarding revenue sharing is to achieve a balance in revenue generation from the states, and to share some of the revenue contributed by the States to the Federation. So, if we look at it from this perspective, these demands in fact do not weaken the Federation but allow the states a freedom to use revenue sharing to boost development in their respective states. We cannot deny that we need the support of the Federation for most of the projects we have discussed earlier, which cannot be implemented because of a lack of approval from the Federation. Therefore, the Federal-State relationship cannot be severed. However, there must be efforts to mutually strengthen each other, that is our agenda. So, we welcome the fact that under the leadership of the current Prime Minister, a more open attitude has been adopted compared to before. The MA63 Agreement, many matters have been realised under the current leadership, not the leadership before that. With this spirit,

if the MA63 can be realised by the current government, then for other issues, I believe the current Federal leadership adopts an open attitude to consider and examine, and what is happening with Sabah is also a good direction, because it is enshrined in the Constitution. If other states cannot get revenue sharing because it is not in the Constitution, our argument here, I am speaking in Parliament, is that the Constitution can be reviewed to include elements of revenue sharing between the Federation and the States.

And there are certain mechanisms. I read on social media that the people of Sabah say, yes, 40% must be given. But do not reduce development allocations. That is one view. But in negotiations, it can be harmonised. So, perhaps as proposed, some areas of authority can be devolved or the state can submit a wishlist. And approval given with payment from the revenue sharing is also a mechanism we can explore. So we must not give up. We, the current government, if we do not do it, who will do it. This is the speech of an experienced politician. Rhetoric, yes. Thank you.

Speaker (Speaker)EN

Thank you. So I would like to invite the Honourable Kebun Bunga, please proceed.

Lee Boon HengPKR · PHKebun BungaEN

Thank you, Dato' Seri Yang di-Pertua. Moving on to Seri Delima, Kebun Bunga question number 55.

No. 55 What are the efforts and strategies of the State Government to significantly increase state revenue in the future?

Speaker (Speaker)

PWCC pergi.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you to the Honourable Kebun Bunga for the question on state revenue. At present, the State Government is focusing on nine (9) main strategies for increasing state revenue that were presented earlier as the main framework towards strengthening the state's financial position. These strategies place emphasis on aspects of revenue policy coordination, consolidation of collection mechanisms and efficiency of financial management, as in Appendix A which will be placed on the Honourable Member's table and which I will argue during the winding-up.

Apart from that, the State Government is also implementing various continuous improvement efforts such as strengthening the revenue collection monitoring system through digitalisation and integration of state financial data. Recently, there is already a dashboard at the State Finance Department. At any moment, we can follow the developments of revenue collection and also expenditure. So, at the press of a button, we know our financial position real time. I will not announce it now, later in the winding-up session I will provide the latest information regarding revenue and expenditure for this year, 2025.

B. We will enhance the arrears collection process. Arrears are also a major problem, how we can provide incentives to collect these arrears. There was news reporting a written reply that since 2020, the state has seized lands that did not pay land tax. That is among other things a last resort, last resort. I have always disliked giving approval to the State Finance Department to, to, to, what, write off those arrears. But since those lands have already been seized, we need to write off those arrears. We want to know why people do not pay land tax to the point that their land rights are revoked. But this involves many types of land. Perhaps some of them are vacant land that has not been transferred in ownership, developers also do not know and so on. There are several reasons. This does not show that the State Government is cruel in seizing people's land, this is the last resort.

Item C, we optimise state-owned assets to generate additional returns. D, explore new sources of revenue. Several Honourable Members have already given some suggestions on how we can generate new revenue. And this effort

is being carried out in phases to ensure the growth of state revenue can be achieved sustainably and without burdening the people. Thank you.

Lee Boon HengPKR · PHKebun BungaEN

Supplementary question. Thank you, Honourable. I just want to know as well, how will the government balance between, because we know the government's tax collection, the State Government's, the State Government's revenue collection is largely from land tax collection. And how will the government balance it with welfare expenditure, especially i-Sejahtera expenditure which will continue to rise. And for this 15-year period I believe the government has spent RM700 million on i-Sejahtera.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you to the Honourable Kebun Bunga and the Honourable Members who are concerned about the State's financial position. I have often said that the budget contains two (2) major parts: revenue and expenditure. Usually, when we focus on expenditure, we feel worried, for example that the allocation for i-Sejahtera will increase every year, given that the number of senior citizens registered will grow with an aging society. That is an important aspect, I do not deny it. But if we look at it more positively, we also need to look at revenue generation in order to achieve a balance. So, many measures have been taken. I thank all agencies for their cooperation in the efforts carried out by the State Finance Department to control expenditure while also generating revenue. And it seems that this year, after we have tightened and monitored closely since 2024, 2025, we can see a little hope at the end of the tunnel. Although tunnels do not like to be mentioned. The light at the end of the tunnel for 2026, perhaps 2027, we can improve the State's financial position, and I still hold to my promise. When I end my service, I must ensure that RM1 billion is in which account? Consolidated revenue. That is the consolidated fund, there is still RM1 billion. Thank you.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Supplementary question. Supplementary question. Thank you, Dato' Seri.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Don't ask about allocations.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

First, I want to ask whether the State Government intends to set up a company that focuses solely on economic generation activities. And it shouldn't happen in Penang, right? Like we see in Selangor, Kumpulan Perangsang. (interruption) Yes.

Speaker (Speaker)EN

No, different, different, different.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Every state has its strengths. So, meaning the economy isn't, isn't, we aren't, we aren't. Penang only, right. Meaning around Malaysia, sorry.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you for the suggestion, Honourable Member. Actually, we already have quite a number of GLCs in the State that can play such a function. We have the Penang Development Corporation and it has subsidiaries. We have Invest Penang, which leads investment and expands the manufacturing sector and the services sector. Now it has moved into IC Design and so on. We have CMI, whose role is not big but is important in managing the State's assets to convert immovable assets into cash and so on.

Indeed, the proposals of the Penang bank by the Honourable Pulau Tikus and others, we will study carefully, so that we can always ensure we are in a comfortable financial position to focus our attention on State development issues and not always be shackled by figures. This theme this time has been widely quoted from what was stated by the late Tun Abdullah Badawi

in my introduction. It is not merely about figures but a trust or an opportunity for us to use existing resources to bring well-being to the people when we are able to develop our State. That is all, thank you.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Dato' Seri Speaker. The third one.

Speaker (Speaker)

Ada lagi.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

One, two, three, okay. But for the information of the Honourable Padang Kota, in the answer to my question about these GLCs, it was stated that most - most of these GLCs are all non-profit oriented. That is why I asked earlier, and the last thing I want to know is, if the CM ends his term without being able to gather that RM1 billion, then what will happen.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

I will, (interruption) okay. Actually I want to answer. (interruption) Actually I want to answer, I will stop. Because I cannot achieve it, I need to stop. But there is a suggestion that I continue, I will take that into account too.

Speaker (Speaker)EN

This, this, this Pinang Tunggal.

Bukhori bin GhazaliPAS · PNPinang Tunggal

Ya.

Speaker (Speaker)EN

Bring a motion to amend the Constitution. Thank you, just joking. What's the name, Pengkalan Kota. Please.

Wong Yuee HarngDAP · PHPengkalan KotaEN

Thank you, Dato' Seri Yang di-Pertua. Question on SUKMA 2026. My question is 56.

No. 56 What are the latest developments in the preparations of the Penang contingent for

facing SUKMA Selangor 2026, given that only one year remains before the games take place?

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, Honourable Dato' Seri Yang di-Pertua. Thank you to my colleague from Pengkalan Kota who asked about the preparations of the Penang State contingent for us to face the SUKMA sports games which will take place next year in the State of Selangor. So, for the information of this august House, in this period of less than 300 days, every day is extremely valuable. This short time must be utilised with more careful planning, more focused training and a scientific approach. Regular discussions with the State Sports Association and coaches through the High Performance Committee Meeting are seen to help assess the latest performance of the athletes of the SUKMA training squad.

Our main focus is not only to build strength and skills, but also to prevent injuries and ensure athletes are at the highest level of performance during the championship. This meeting is also a medium for us to assess the current performance of athletes training in the training squad before they are taken to take part in SUKMA later.

Injury is the main enemy of performance. Where a small injury can change the entire course of training and jeopardise the chance of success. Therefore, we need to emphasise injury prevention through monitoring of training load, correct warm-up and cool-down techniques, as well as consistent physiotherapy and recovery support.

So, the Penang State Sports Council is also committed to integrating sports science into every aspect of athlete preparation. We will ensure athletes have access to expertise in sports nutrition, performance psychology, training physiology and also biomechanical analysis. Training now is not just simply for us to improve physical fitness, but involves continuous monitoring using technology such as video analysis, GPS and laboratory tests to assess athletes' progress and workload objectively. With this approach we can optimise athlete performance safely, improve energy efficiency, improve technique and reduce the risk of injury from excessive training.

And in the eagerness to pursue victory, we also must not overlook the importance of balance and physical recovery. Adequate rest, quality sleep and balanced nutrition are part of training and also our preparation to face the upcoming SUKMA. Athletes must follow the recovery routine recommended by the Sports Science Officer so that the body is always in optimum condition.

So, performance monitoring through the KPI system, fitness tests and regular health checks will continue to be carried out to ensure that no athlete experiences symptoms of chronic fatigue or mental stress that could affect performance. So, coaches are also one of the main pillars for us to make the preparations for this SUKMA a success. Therefore, coaches must practise open communication with the Sports Science and Medical Officers to coordinate training loads more effectively. We want every training decision to be based on data and scientific observation, not merely on intuition or experience alone. So the support team including physiotherapists, nutritionists and sports psychologists will continue to play an important role in ensuring each athlete is prepared thoroughly in terms of physical, mental and emotional aspects. And the most important thing is that, besides physical training, we also need to build a champion culture. A culture that demands discipline, perseverance, determination and teamwork. We want every athlete not merely to train to take part, but to train to win with dignity. Every drop of sweat today is an investment towards the glorious moment tomorrow.

So, mental, as I mentioned earlier, is indeed one aspect that we emphasise in the preparation for the Malaysian sports games next year, where the Penang State Sports Council together with the companies Global Edge Consultancy and Global Edge Pharma will organise a mental resilience conference themed "Malaysia's First Mental Fitness Sports Conference" on 21 and 22 November this year at Bayview Hotel George Town. So, this conference aims to emphasise the importance of mental health as a main component in athlete development and community well-being.

So, in realising efforts to achieve excellence at SUKMA 2026, the allocation of subsidies from the State Sports Council has also begun to be focused on targeted sports that are able to contribute more gold medals, without neglecting other sports which are also assisted comprehensively. So we will, we have already prepared funding according to tiers based on the total medal tally that was successfully achieved at the previous SUKMA in 2024. So, we will also focus on events which, first, offer more medals to be contested. Second, we have potential and we have athletes who can succeed in winning even more victories and achievements than that.

So, in addition, through the IMPACT Programme Funding Committee which was started earlier this year, although as some Honourable Members have asked, perhaps the allocation channelled to the Penang State Sports Council is insufficient. Nevertheless, we are taking the initiative through the IMPACT Committee that I mentioned earlier, we are also drafting and planning appropriate strategies to encourage private sector involvement in channelling financial assistance to the Penang State Sports Council. So, as of 10 November 2025, this Committee has succeeded in obtaining a total of RM180,000.00 to be channelled to development and welfare programmes for State athletes and certain sports. So, in conclusion, I want to stress, in this period of less than 300 days, is the time to focus, discipline and unite the energy of the entire Penang State sports contingent. So, with the hope of strategic planning, effective injury control and comprehensive use of sports science, I am confident our athletes can achieve excellent performance and bring success that will make our State proud. So, Penang is determined to produce a victory of 60 gold medals in responding to the call and challenge inspired by the Most Honourable Padang Kota.

The victory of 41 gold medals at the previous SUKMA Sarawak 2024 will be surpassed as best we can. So, let us work together as one team, and I also invite the Honourable Members to give full support to the State Sports Association and to the athletes so that we can accomplish the mission of the Penang State contingent towards SUKMA 2026. Thank you.

Wong Yuee HarngDAP · PHPengkalan KotaEN

Thank you for the supplementary question, Dato' Seri Yang di-Pertua. We have heard the efforts and also the disciplined training including the soft approach, including, what is it, sleeping soundly and so on, or sufficient rest. And now we want to know about that 60-medal target. So, what are the challenges that may become obstacles to achieving that, namely the target of 60 gold medals at SUKMA? Thank you.

Gooi Zi SenDAP · PHPadang LalangEN

Thank you, Honourable Pengkalan Kota, indeed that is a target that we have set. There are indeed challenges and certain issues that we also need to prepare for, of which, compared with the organisation of SUKMA in 2024, in terms of the sports events offered and to be contested, actually at the upcoming SUKMA in Selangor in 2026, the sports events are there, but perhaps small events within one type of sport will be reduced compared with what was already contested at the SUKMA games in 2024. So, when we take up the call of the Most Honourable Chief Minister to convert the silver medals that we have successfully collected, perhaps one of the challenges we anticipate is that the number of events to be contested later will not be as many as in SUKMA 2024. Nevertheless, we will still continue efforts to ensure this target is achieved. Another is that many things are happening, especially at us at the Penang State Sports Council, we often try to ensure that our State athletes are not poached by other states. That is also one very important aspect. We hope that those who are now training together with us and so on will continue to represent Penang State and not other states when competing at SUKMA 2026. Sometimes this is among the challenges that we need to look at to ensure the athlete remains with Penang State. And also, there are our athletes who may now be training in other states, we hope they will

return to represent Penang State when competing at SUKMA 2026 later. These are among the challenges, but indeed from a strategic point of view and there is actually a recipe, which I cannot, I cannot share here because other State Sports Councils may eavesdrop on our recipe for success. But we guarantee that indeed under the Penang State Sports Council together with the State sports associations, we are working to make our challenge at SUKMA 2026 a success. Thank you.

Goh Choon AikPKR · PHBukit Tambun

Soalan tambahan.

Gooi Zi SenDAP · PHPadang LalangEN

Don't ask about the recipe.

Goh Choon AikPKR · PHBukit TambunEN

There is no recipe. Because SUKMA 2026 has 30 core events and 7 additional events. So, can we put forward one sport, one ADUN adopts it? Yes, become the adoptive father of the sport. (unclear) (laughter)

Gooi Zi SenDAP · PHPadang LalangEN

Thank you. Thank you. Actually I strongly agree with what was proposed by the Honourable Bukit Tambun. Don't just be an adoptive father in name only. Including the allocation too. (laughter) Help, if possible, help to channel it to the relevant sports association, and I hope with that hope we can all work together to make the Penang State sports contingent for SUKMA 2026 a success. I will give the form later, thank you.

Speaker (Speaker)EN

Thank you. KOMTAR, please.

Teh Lai HengDAP · PHKomtarEN

Good morning, Dato' Seri. My question is question 57.

No. 57 Nowadays, electric vehicles have become increasingly widespread in use in the market. What are the latest developments in the infrastructure of electric vehicle charging stations (EVCB) in the State of Penang?

(a) What is the utilisation rate of these electric car charging stations?

H'ng Mooi LyeDAP · PHJawiEN

Thank you, Dato' Seri Yang di-Pertua. Thank you to KOMTAR for asking about electric vehicle charging in the State of Penang. Developments in Electrical Vehicle Charging Bays, namely EVCB, in the State of Penang continue to show progress in line with the State Government's efforts to strengthen the green mobility ecosystem. A total of 264 EVCB units have been installed by the private sector in the administrative area of MBPP so far. In addition, MBPP is currently implementing an RFP involving the installation of 158 additional EVCB units, and 62 EVCB units have been installed and are in operation. The remaining EVCB units are expected to be fully installed by the end of 2025. As for the administrative area of MBSP, a total of 134 EVCB units have been installed by the private sector so far. In addition, the operator appointed by MBSP is carrying out installation work for 74 additional EVCB units.

The utilisation rate of EVCBs in the State of Penang shows variation according to administrative area and current implementation stage. For the administrative area of MBPP, the average utilisation rate of EVCBs is between 1% and 13%, depending on location and the level of use by the public. Meanwhile, for the administrative area of MBSP, the utilisation rate of EVCBs has not yet been able to be recorded since the facilities are still in the installation process by the operator appointed by MBSP and are not yet fully operational. As for the private sector, usage data is indeed beyond the control of the local authorities (PBT). Thank you.

Teh Lai HengDAP · PHKomtarEN

Supplementary question. I think I heard just now, the utilisation rate is only 1% to 13%. Is that correct?

H'ng Mooi LyeDAP · PHJawiEN

Yes, that is indeed correct.

Teh Lai HengDAP · PHKomtarEN

Why is that rate rather low? First question. And to support this initiative, what efforts have been carried out by both City Councils in Penang in showing a good example towards the use of this green technology?

H'ng Mooi LyeDAP · PHJawiEN

Thank you, KOMTAR. For the rates shown, 1% to 13%, I believe many EV car users will charge at their own residences. And for your information, in every apartment or high-rise, with permission, most management committees or management corporations have taken their own initiative to deploy EVCBs in the area, even in strata areas. As for the question asked about KOMTAR, it reflects the aspiration of the Penang State Government towards the use of green technology. I think for MBPP, we have already moved towards using more EV vehicles. For example, I give an example: the Enforcement Department of MBPP has acquired 30 units of electric scooters for use while carrying out duties. And for the Municipal Services Department, 10 units of electric scooters are also being used by the Municipal Department. Apart from the electric motorcycles used by the Enforcement Department, MBPP also has two (2) BYD electric vehicles equipped with an ANPR (Automatic Number Plate Recognition) system for the purpose of checking parking charge payments. The enforcement officers use ANPR with these BYD electric cars to conduct checks: if anyone parks without payment, we can detect it through this ANPR and we will issue a summons. This initiative as a whole not only helps to reduce carbon emissions and noise pollution, but also improves operational efficiency and the green image of the city of Penang.

Wong Yuee HarngDAP · PHPengkalan KotaEN

Okay, supplementary question. Because I have a written question.

Speaker (Speaker)EN

Okay lah, last one.

Wong Yuee HarngDAP · PHPengkalan KotaEN

Thank you. Thank you, Dato' Seri Speaker. I refer to the written reply, which is also the question concerning vehicle charging. A total of 147 units at Penang Island City Council (MBPP) for parking bays and 100 parking bays in the Seberang Perai Municipal Council (MBSP) area have been released for these vehicle charging stations. My question is, what cost-benefit analysis, or cost-benefit, has been carried out by the State Government before approving the installation of these EV stations? Particularly regarding the taking up of public parking space and the sacrifice of this parking space, is it truly worthwhile, taking into account the rate of usage by EV owners in this state and the impact on ordinary vehicle users. Thank you.

H'ng Mooi LyeDAP · PHJawiEN

Thank you to Pengkalan Kota, not Padang Kota. Okay, thank you Pengkalan Kota. I just want to ask, does Pengkalan Kota support the initiative to establish EVCBs in the State of Penang? Under the direction of the Ministry of Housing and Local Government (KPKT), there is a target in every state, namely 600 units, 600 EVCB bays, or 600 in the State of Penang. 300 on the Island and 300 in Seberang Perai. Earlier, Pengkalan Kota said that there should be an assessment to replace existing parking spaces with EVCBs? Indeed we also take into account the losses when we convert existing bays into EVCBs. However, in order to show proactiveness

Winding-Up of Supply Bill 2026 and Motion on Development Estimates YearBill

H'ng Mooi LyeDAP · PHJawiEN

we, we indeed have to look at the feasibility of replacing existing parking spaces with EVCBs.

Because this is an initiative, I have met with many companies that sell EV cars. They ask whether there is an initiative from the State Government to establish more of these EVCBs. Because this is related to the chicken-and-egg problem. Which comes first? For EV cars sold in the market, do they have the infrastructure for their customers who own these EV cars to charge? Therefore, we have to look at replacing existing parking spaces with EVCBs, and in new developments, indeed in commercial areas, we have imposed a condition that 1% must provide parking bays as EVCBs.

Speaker (Speaker)EN

Thank you, Jawi. The 1 hour 30 minutes for oral questions has now ended in accordance with sub-rule 26(7), Peraturan-Peraturan Majlis Mesyuarat Dewan Undangan Negeri.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Dato' Seri Speaker, the answers to the oral questions that were answered just now will be placed on the tables of the Members who asked them and will be included in the official record.

Speaker (Speaker)EN

Thank you. We are now in the winding-up session on the Rang Undang-Undang Perbekalan Tahun 2026 and the Usul Anggaran Pembangunan Tahun 2026. And I would like to invite the Honourable Dato' Keramat, please.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok KeramatEN

Good morning and greetings, Dato' Seri Mr Speaker. To all who are present, my colleagues the Most Honourable Chief Minister and all the other Honourable Members who are also present, ladies and gentlemen. Greetings, Penang2030 greetings and Malaysia MADANI greetings.

I am pleased to take part in the winding-up this morning, which I will try to keep short. Under my portfolio there are several important issues that I need to present for the information of all present. If I may state them and go straight to the position of our State of Penang as a state that is so rapidly advancing in industry, science and technology, we have already been branded the Silicon Valley of the East. With permission, Dato' Speaker, Dato' Deputy Speaker.

And we will continue to commit to investment in the global Electrical and Electronics (E&E) and semiconductor industries, which we have been doing since the 70s. In fact, I have said this before, but I want to repeat it, the main Free Trade Zone in Penang, namely in Bayan Lepas, is now 55 years old. And we have several other areas that we have identified to develop as Industrial Parks as well, namely, as I have already mentioned, Batu Kawan has three (3) phases, and we also have Bertam on the mainland. Dato' Seri Speaker, the latest data shows the very dominant contribution of the State of Penang to the semiconductor industry at the national and global levels. Malaysia, and in particular we in Penang, play a critical role in the global semiconductor supply chain. In fact, although we are the second smallest state in Malaysia, not only in Malaysia, not only in the Southeast Asian region, but across the whole world, the semiconductor products that we supply are 7% at the moment, 7%. But I am sure that with industry developments, it can reach 10%. That is worldwide, Dato' Seri Deputy Speaker. So, we are not only a production centre, but also involved in chip packaging and testing. Now that is extremely important, and in short the semiconductor industry is the lifeblood of the digital and modern economy, and not only drives economic growth through exports and investment, but also enables us to enjoy technological facilities in our daily lives.

Now, Dato' Seri Deputy Speaker, according to the Silicon Vision report issued by the Ministry of Economy and a study by the Institute of Strategic and International Studies (ISIS) Malaysia, Malaysia has captured about 13% of the global market for Assembly, Testing and Packaging services, with permission, which is an important section in the semiconductor value chain.

This proud figure is directly contributed by the rapidly growing manufacturing industry, as I have said, in Penang, which recorded 58% of the total E&E exports of Malaysia, and we will continue with this achievement through the results of strategic planning, consistent government policy support and skilled human capital that we have nurtured for a long time. That is also important, Dato' Seri Deputy Speaker, skilled human capital and the talent that industry needs, we will ensure that there is a supply of them. Now, what is the direction of human capital development? Dato' Seri, Dato' Deputy Speaker, the technology world that is developing at a very rapid pace now, we need to look at new digital technologies and Artificial Intelligence (AI), Dato' Seri Speaker. As we know, Dato' Deputy Speaker, the National Semiconductor Strategy (NSS) was launched in May 2024. And in an effort to realise, to realise that goal, we are not exempt from challenges. Now, Dato' Deputy Speaker, regional competition is increasingly fierce in balancing the readiness of skilled workers and talent and job opportunities, as well as building strategies to face the uncertainty of global trade policy. We can see what is happening globally.

However, I always state one thing, Dato' Deputy Speaker, we in Penang, we see that there is a trade war between China and America that is heated now. We can see that. But we are in the centre of it all, and we are a neutral state, I would say, which will become the choice of the world to come here and invest. That is the beauty of Penang, Dato' Deputy Speaker. So, we are still confident of where we are, and we will continue with that. Coming back to human capital development, Dato' Deputy Speaker, from the industrial position we have, there are nearly 500 MNCs (Multinational Companies) and more than 7,000 SMEs. Now, the need for talent and skills is so, the demand is so great. Because technology in Penang now is not just high tech. We talk about science and talk about technology, we usually talk about high tech, but actually the world has gone one step further and I want to repeat and say, it is now called deep tech. That is where we are, it has gone one step further. And in Penang, when we talk about industry, science and tech, that is where we are, and why am I saying this, because it comes back to how we, you know, get how can we embrace the challenge, if I can say with permission, with high skills and talent. And we come back to human capital, now that is important.

Now for your information Dato' Deputy Speaker, our target earlier this year, from industry, the demand from industry for talent and skills, yes, that means high-skilled workforce, with permission, was 60,000. But now the numbers that I am getting, our office has been notified, it has gone beyond double that. We are looking at a need of nearly 150,000. Now, how do we, how do we even be able to achieve that? How can we achieve 150,000? We have 1 university in Penang, the State of Penang, Universiti Sains Malaysia. Yes, we have many colleges. Yes. Now these are the educational institutions that will produce such talent and skills. But if you want to reach 150,000 by 2030, Dato' Deputy Speaker, it is not possible. So, what we have to do is we need collaboration with all parties. Of course, we as the State Government, we will make the necessary policies. And we cooperate with educational institutions. Yes. But that is not enough, as I said, so what do we do? Now, come back to Bayan Lepas as an example, Dato' Deputy Speaker. 55 years. If it is 55 years, surely we do not have experienced workers there? Right? And when industry always comes to my office, Jagdeep, where is the skilled talent? Because they want high-skilled technicians, high-skilled engineers. Then I tell them, if you want that, you must cooperate with us. You can use your experienced workers to train those who want to enter that industry. Very simple. And they have agreed. Now, that is the first achievement, the important one. In fact, Dato' Deputy Speaker, there is a company in Penang, which of course has a very large site. It has a college university within the company, in Seberang Perai. And then they are training, in such and such a way, very aggressively to get that talent and those skills. That is what is happening. And of course, there are many other giant companies in Penang from all corners of the world that have already set up here and they have also agreed in principle. And what is important, Dato' Deputy Speaker, is this. You see, when you go and take your degree, if we have a degree or diploma, at the end when we finish the training or education, what will we get. We will get a certificate, degree or diploma or whatever, a certificate to show that we have gone through that course. Now, the problem is, when I talk to industry, okay they can help in training those who need to be given that talent and skills. One question they will ask is, but we cannot give accreditation. They cannot give that accreditation to the students they train. So, I also, as the second step, discussed with the Ministry of Education, where the minister has agreed to give a certificate to those who have been trained. Now, that is very important in this whole plan that we have.

Dato' Deputy Speaker, and we hope that with that collaboration with all parties, we can achieve the target of nearly 150,000 now in terms of that talent and those skills.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Datok Keramat may interject.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok KeramatEN

Please, of course. Go ahead.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Thank you, Dato' Deputy Speaker. We are talking about talent, and Datok Keramat mentioned earlier that the industry in Penang has been around for 55 years. I see that most international companies in Penang, from the US or Europe, have long been appointing locals as Managing Directors, Pengarah Urusan. But these Japanese companies still have Japanese people. Is it because they do not believe in the capability of locals?

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok Keramat

Now, I think that's a very important question, soalan yang penting kerana apabila saya pun melawat pada semua industry ya, kita lihat kita selalu menyatakan pada mereka bahawa tumpuan mesti diberikan pada masyarakat kita. Either Penangite first, of course, priority or Malaysians. So, I think even majority company sudah pun sekarang have a policy of fully having local talent. Maybe the top tier sahaja mereka perlu daripada luar untuk pastikan dapat ada they can train the ones below. But majority, more than 90% of all the industry that I've been, majority of the workers are all local. That is important, including the ones from Japan. So you must understand that, that is the position now. That is nombor satu. Nombor dua, one more thing, saya selalu apabila saya melawat industri, I am also very concerned about keterangkuman gender. That means mesti ada keseimbangan kerana wanita pun mesti diberi peluang. And I'm so happy to tell Dato' Timbalan Speaker, ada banyak yang sudah pun lepas 50% adalah wanita. Sehingga saya pun pergi satu company baru-baru ini, I think it was 90% wanita. So, saya saya macam outnumbered lah. Saya was

looking around mana mana kita punya lelaki-lelaki semua. But that is how it is. So, yes, I agree with you fully Pinang Tunggal that priority must and will be given, dengan izin Dato' Timbalan Speaker, kepada kalangan warga kita, Pulau Pinang of course, keutamaan and then of course warga Malaysia kita. That is definitely happening at the moment as I speak. So, you have asked the right question, and I'm happy to share with you what is happening here in Penang. Terima kasih.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Datok Keramat, please.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok KeramatEN

Yes. Please, please.

Azmi bin AlangBERSATU · PNTelok Ayer Tawar

Datok Keramat, this time for Dewan, I look your face, ah. Oh, now you've changed. You've changed, ah.

Deputy Speaker of the HouseEN

What is the Honourable Member for Telok Ayer Tawar going to jet about now?

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Change your look, your face. Like a Hindustan hero. Ah, I mean, more handsome. Datok Keramat said earlier that about 150,000 people who take courses get certificates and diplomas. How many of those who have taken courses and obtained certificates, obtained certificates from the party Datok Keramat mentioned earlier, how many of them have we brought into the industrial sphere as engineers or technicians all this time. At the last meeting too, Datok Keramat said this large amount. I remember it with me. But I request that Datok Keramat explain these 150 people.

Deputy Speaker of the HouseEN

That 150,000 is for the year 2030.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

So how many of them have entered? 150,000, of these 150,000 people, how many has the State Government monitored who have entered this industry. Thank you, Datok Keramat.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok Keramat

The last time I think I mentioned 60,000. Now, dari masa itu sampai sekarang, permintaan dia sudah naik sehingga 150,000 lah, 150,000. So kepada that is the keperluanlah industri sekarang, ya. Then of course kepada soalan Dato' Telok Ayer Tawar, definitely I agree. I don't have the exact number because remember I just now apa yang saya nyatakan, ini latihan dan kursus di dalam industri. That means daripada syarikat-syarikat ini semua, baru-baru ini sahaja, dalam saya ingat dua bulan sahaja, Menteri setuju untuk keluarkan certificate ini. So dalam pada itu, training-training ini, just like a degree or diploma, bukan enam bulan. Dia akan ambil masa setahun atau dua tahun, you know, and then they can say, okay, you are certified technician or certified engineer. And then they will get the certificate. So, at the moment, the certificate question, that part is happening. So, we have to wait for that time to pass for the new trainees. Tapi yang sudah pun what they call dilatih tersebut, ya, yang bakat dan kemahiran yang diperlukan oleh industri, sememangnya telah pun diserap ke dalam industri. Exact number, I can't tell you, but like I said, if I said the last time 60,000 keperluan that was pada waktu yang sebelum ni, and then now ya sudah meningkat kepada 150,000. Secara positif, saya boleh nyatakan at least half of the 60,000 sudah pun diserap, because they they started their training much much earlier. But the process continues, you see, this is what we are trying to do. Dan kita hendak jadikan proses itu dapat diselaraskan dari segi permulaan di mana mereka dilatih oleh siapa mereka dilatih dan akhir latihan itu mendapat satu sijil, that is the whole ecosystem that we are working on. Thank you for the question. So, Dato' Seri Speaker, Dato' Seri Timbalan, Dato’

Chee Yeeh KeenDAP · PHBagan JermalEN

Datok Keramat may interject briefly.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok KeramatEN

Come, come, sure.

Chee Yeeh KeenDAP · PHBagan JermalEN

Yes. I think high skills are indeed the preparation for us to drive our AI industry and also our digital economy forward. And we already have a, what is it, Digital Economy Master Plan, DEMP 2025. And here, may I ask, does the State Government indeed plan to combine both the Digital Economy Master Plan and AI technology to make it into an economic council or a digital economy and AI task force for Penang to drive and coordinate, for example, AI, 5G, and digital investment under one strategic umbrella, and also to accelerate AI development through collaboration with local universities, and to make areas like Perai or the Bayan Lepas Zone into 5G industrial zones for automation industries and smart manufacturing, and also, as we are doing now, we already have startups like SkyChip and Ace Silicon that have achieved success. But what will we do to accelerate this process? So, this is the question I want to ask the Honourable Datok Keramat. Thank you.

Deputy Speaker of the HouseEN

The question was long and the answer will be even longer. Long question.

Lee Boon HengPKR · PHKebun BungaEN

Datok Keramat. Datok, okay. Related question. Related question. Recently, Johor has set up an AI Council in Johor related to Bagan Jermal. So, does the State Government also intend to set up an AI Council or AI Committee so that we can coordinate industries that want to invest in Malaysia related to AI.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok KeramatEN

Yes, Dato' Deputy Speaker, and to my colleague from Kebun Bunga and also from Bagan.

Deputy Speaker of the House

Bagan Jermal.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok Keramat

Bagan Jermal, thank you very much for your question. Yes, I think generally apa yang sedang berlaku, of course, kita sudah pun, as you as I've said, you know, when we talk about Bayan Lepas, you talk about Perai, these are the matured industrial areas in Penang. We are coming up Batu Kawan, we are coming up with Bertam, many other places also. One day down the line apabila Penang South Island siap, that will become even more industrial. But like I said, we are not high-tech only, we are deep-tech now. We are at that level. And what is that. What does that mean. It means kita perlu ceburi dan cekupi AI, because that is the way it is. But you know what, Dato' Timbalan Speaker and to all my friends here, AI one day will become obsolete. It'll be taken over. I always say this, today's technology is redundant tomorrow, dengan izin. Saya selalu menyatakan itu. Then that's the reason why I fully support and agree that we must have, we have many many industry players already who are working on this. That's why we say we are the highest, one of the, this, the smallest state, second smallest state tapi 7% product semicon di dunia and this semicon products are all AI based for it to be produced in the first place. That's the reason why we come back to it very closely connected, science and technology, perlulah bakat supaya ini dapat kita pastikan dapat dicapai. Dan oleh yang demikian, kita baru-baru ada Penang International Science Fair. Lebih daripada 60,000 peserta, Dato' Timbalan Speaker. Baru-baru. And in that science fair there was the suggestion that yes, we must have a council to look specifically into the needs of this deep technology that we are moving towards. I agree with you. And now at the moment, of course, it is a loose sort of combination. Yes, there's a digital blueprint that we have, of course, but all that is part and parcel of maybe a bigger committee that we should have, and I fully agree that, that task force will be formed dengan secepat mungkin, dengan izin Dato' Timbalan Speaker. So, I support what you have said. Thank you very much. Saya teruskan.

Deputy Speaker of the House

Sila. Sila.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDeputy Chief Minister II · Datok Keramat

Tak banyak lagi. Now, saya balik pada pembangunan ekosistem industri berteknologi tinggi, which is exactly what we are talking about. Now, kita akan teruskan pembinaan ekosistem industri yang jitu yang sepenuhnya menyokong pembangunan bakat dalam konteks penyediaan fasiliti, infrastruktur, pembiayaan dan kerjasama strategik pihak industri serta latihan yang berkesan sepertimana saya telah nyatakan supaya kita dapat melahirkan pelapis baru yang kompeten dan berkemahiran tinggi. Now, Dato' Timbalan Speaker, berdasarkan data terkini daripada Perangkaan Malaysia, Jabatan Perangkaan Malaysia, DOSM pada 2024, jumlah tenaga buruh berpendidikan tinggi di Pulau Pinang adalah seramai 380,000 orang. In fact, to answer Telok Ayer, Telok Ayer Tawar tadi, that is the perangkaan yang kita ada. Sebanyak 93.9% daripada jumlah tersebut bekerja dalam kategori pekerjaan berkemahiran tinggi. That is 93.9% which is the dalam kategori pekerjaan berkemahiran tinggi. Now, Dato’ Timbalan Speaker, ini menunjukkan para graduan kita bekerja mengikut bidang dan kemahiran, mengikut kelayakan. Masih terdapat baki 6.1% yang bekerja di bawah tahap kelayakan, or therefore, the job mismatch is 6.1%. Walau bagaimanapun, i would, i would like to inform everyone, although it is 6.1% a mismatch, that is much better than the national mismatch, which is 15.8%. So, Penang has the least compared to the entire country. Now, ini membuktikan, Dato’ Timbalan Speaker, bahawasanya strategi pembangunan ekosistem industri berteknologi tinggi yang mampan oleh Kerajaan Negeri selama ini berhasil.

Di samping itu, Dato’ Timbalan Speaker, kejayaan syarikat tempatan yang telah pun membangunkan, for an example, cip (HBM3E) High Bandwidth Memory 3rd Generation Extended pertama di Malaysia, yang just now, I think the, if I'm not mistaken, Bagan Jermal mentioned by SkyeChip in July of this year, menunjukkan, Dato’ Timbalan Speaker, kemajuan ekosistem digital dan teknologi tinggi di negeri Pulau Pinang. Selari dengan inisiatif besar kita, I think my Chief Minister has mentioned the PSD at 5 kilometer, which is the Penang Silicon Design, telah pun kita adakan, di mana ia menyediakan satu pusat penyelidikan dan reka bentuk cip serta pembungkusan yang termaju di Pulau Pinang, bertujuan membangunkan kapasiti modal insan tempatan dalam penyelidikan dan

pembangunan serta inovasi teknologi cip elektronik, which is akan menyokong dan mendokong apa kita hendak buat dari segi dan sudut teknologi AI yang akan membangunkan bakat tempatan yang mahir dan berbakat dalam reka bentuk cip dan pembungkusan termaju.

Salah satu lokasi yang telah dilancarkan ialah Silicon Research and Incubation Space (SRIS) di Taman Perindustrian Bayan Lepas yang berfungsi sebagai pusat sehenti untuk syarikat permulaan dan syarikat reka bentuk IC tempatan. Dato’ Timbalan Speaker, selain daripada pusat penyediaan penyelidikan tersebut, kita juga telah pun membina pusat pemantapan kemahiran melalui Penang Skills Development Centre (PSDC), iaitu program IC - Integrated Circuit Design Mastery yang dilaksanakan di bawah Penang Chip Design Academy (PCDA), which is part of the PSD at 5 kilometer program and strategy.

Dato’ Timbalan Speaker, saya ingin juga nyatakan bahawasanya kita akan teruskan dalam usaha-usaha kita dalam pendidikan STEM dan TVET, which is extremely important for our industry, dengan kita sudah pun sekarang memohon dan ada perbincangan. Kebanyakan I would say aduan, or the cabaran terbesar adalah ramai murid-murid tidak ceburi diri mereka dalam bidang sains dan teknologi. And the problem is, we have identified, they are taught about science and technology mungkin tingkatan tiga. Last time was Tingkatan 3 to tingkatan onwards, and then they decide, okay, maybe they want to go into industry. Now, we have decided that it should start at least in Form One. Now, ini Jabatan Pendidikan Negeri telah pun setuju, dan ada perbincangan sekarang dengan Kementerian Pendidikan, where I facilitated that meeting. So at least in Form One, but the we are going even further. There is a, there is a discussion now, Dato’ Timbalan Speaker, untuk kita mulai di sekolah rendah. That means we try and get, you know, memupuk kesedaran tentang sains dan teknologi dan sebagainya kepada murid-murid di sekolah rendah pun. That is in the discussion at the moment. But at least I can say that to start that means to put it in the syllabus from Form One is going to happen. And we are talking about things like STEM education, of course TVET. And we have GLC in Penang, ada beberapa GLC seperti Tech Dome, kita ada Penang Science Cluster, Penang Math Platform, dan Penang STEM yang merupakan tunjang utama untuk usaha kita dalam menjadikan ini satu hakikat pada waktu yang tidak lama lagi.

For information, Dato’ Timbalan Speaker, sebagai bukti kepada impak positif daripada inisiatif yang kita jalankan itu, PSDC telah pun melahirkan 243 graduan pada 2024

dan 2025. Dan daripada mereka, 93% telah pun mendapat penempatan pekerjaan dan melanjutkan pengajian ataupun melanjutkan pengajian mereka di sini di Pulau Pinang. That is a proof of the work that we are doing.

Daripada itu, Dato’ Speaker, Dato’ Timbalan Speaker, ingin saya nyatakan apabila kita lihat lebih jauh ke hadapan untuk 2026, 2026, ada beberapa inisiatif baru yang kita telah rancang seperti penganjuran Pertandingan Robotik Antarabangsa bersama Pusat Sains di rantau, semua di negeri, di negara di rantau ASEAN, Experiential Robotics, National AI Challenge, AI Wiz Kids, AI On Wheels, Experience AI, Project Ignite the Coolest Projects in Malaysia, First Tech Challenge, Computer Science Core Schools, Advanced Maker Lab Tracks, AI Data Science, dan pembelajaran kemahiran teknikal, matematik dan sebagainya.

Dato’ Seri Speaker, Dato’ Seri Timbalan Speaker, saya ingin nyatakan bahawa sejak tahun 2023 juga, untuk pendidikan STEM, 17 buah syarikat teknologi tempatan telah terlibat secara aktif dalam dalam menyokong pelaksanaan program STEM dan inisiatif-inisiatif pendidikan digital. And we are, we are continuing to engage with more. We have 184 buah sekolah yang telah pun menerima melalui inisiatif pembelajaran digital ini, yang dilaksanakan oleh Penang Tech Centre, dan 297 buah sekolah melalui anjuran Penang STEM, dan juga Penang Science Cluster untuk pelbagai aktiviti seperti bengkel digital dan STEM, pertandingan, kem dan sebagainya.

I mentioned just now about the (PISF), Penang International Science Fair, yang telah berlangsung pada 8 dan 9 November yang mendapat sambutan yang begitu menggalakkan sekali, more than 60,000, Dato’ Timbalan Speaker, dengan participation daripada 73 buah syarikat untuk menjayakan program itu. Dan ia akan kita teruskan juga pada tahun yang akan datang. But on top of that, that is just one or two example, contoh yang saya berikan. For this year alone, kita sudah pun anjurkan lebih daripada 50 program yang melihat dan menitikberatkan STEM, TVET, Sains, dan sebagainya, more than 50 just this year alone.

Saya tidak mahu ambil terlalu banyak masa, Dato’ Speaker, Dato’ Timbalan Speaker. But when we talk about sektor perindustrian, I just want to end by saying that we are also having very close contacts with the rest of the world, because the rest of the world is here. That's why I always say, saya selalu nyatakan kita di Pulau Pinang, actually kita world class. So, we cannot, we cannot take lightly the, the need for that collaboration with the world. And that is the reason why we have many a meeting with them. Most of them they come here

because they are already based here, and they want to expand. Mereka hendak expand dengan izin, perluaskan industri mereka, ataupun yang tidak datang, hendak datang. So kita perlu pastikan ada ruanglah untuk mereka, and that is happening. Just, I think, yesterday or day before, I was, I met up with a whole contingent from Germany. They are already here, the big companies that are here, you know, from, from Germany. They, they want to expand, first of all. And then on top of that, there are some from Germany that want to come and open up. So itu penting.

Of course, my Chief Minister, Ketua Menteri saya, sudah pun bincang dengan pihak negara yang besar-besar seperti China, dan mereka akan datang juga dengan nombor-nombor yang lagi besar. Itu adalah berkenaan pelaburan. Of course, my Chief Minister, he will elaborate on the numbers, he already has just now. And we are talking about so many other countries, not just Germany from Europe, tapi banyak negara lain. Then of course, India is the biggest player, one of the biggest, and they are already showing more interest on top of what they already have here in Penang, they are showing more interest to come here. So, it is extremely important to understand that in this ecosystem of being a, the top industrialised state in Malaysia, we have to work together and we are working together with the rest of the world, because the world is already here.

So, Dato’ Timbalan Speaker, saya ingin sudahi dengan menyatakan kita akan teruskan dengan usaha kita untuk memperkasakan lagi industri kita di Pulau Pinang. Dan of course sains dan teknologi and the most important way to do that is to ensure ada bakat dan kemahiran, and therefore modal insan itu begitu penting. Sekian, terima kasih. Saya mohon menyokong. Thank you very much.

Deputy Speaker of the HouseEN

Thank you, Datok Keramat. Before we move on to the winding-up by Batu Maung, I would like to inform the House that we will break for lunch as soon as Batu Maung has finished the winding-up session, and the sitting will resume at 2.30 p.m. Batu Maung, do not go over time until 2.00 already. Otherwise we will have only half an hour for lunch. Ah, and I also take this opportunity this morning to welcome the presence of the JPWK of the Bayan Lepas State Assembly seat, please stand. And also the MADANI community who are here this morning to witness the sitting of our State Legislative Assembly. Thank you. And now, I invite Batu Maung.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Greetings of peace, greetings of Penang2030, and greetings of Malaysia MADANI. All praise is due to Allah, Lord of the worlds. May blessings and peace be upon the most noble of the prophets and messengers, and upon his family and all his companions.

Thank you, Yang Berhormat Dato' Yang di-Pertua, Deputy Speaker of the State Legislative Assembly, Yang Amat Berhormat Chief Minister, Honourable Members of the State Executive Council and Members of the State Legislative Assembly, heads of departments, and ladies and gentlemen whom I respect.

First, I would like to thank Yang Amat Berhormat the Chief Minister of Penang for tabling the Supply Bill and Development Estimates Motion 2026 during the Second Meeting of the Third Session of the Fifteenth State Legislative Assembly on 14 November, which was drawn up based on the Penang2030 vision of making Penang a smart and green state, anchored on inspirational families of the nation, which is also in line with the aspirations of Malaysia MADANI as stated in the 2026 budget speech by Yang Amat Berhormat Datuk Seri Utama Anwar bin Ibrahim, Prime Minister of Malaysia. This is also in tandem with the Penang Islamic Religious Development Agenda 2030 (APAI 2030).

I would also like to record my congratulations to the Honourable Members who took part in the debate during this Second Meeting of the Third Session of the Fifteenth State Legislative Assembly.

On this occasion, I would also like to wish good luck to the students of the Sijil Pelajaran Malaysia (SPM) in Penang who are sitting the Sijil Pelajaran Malaysia examination from 3 November 2025 until 23 December 2025, involving a total of 20,056 SPM candidates across the whole State of Penang. In addition, I would also like to wish good luck to the students of the Ujian Penilaian Kelas Kafa (UPKK) who are sitting the examination starting on 17 November, which was last Monday, until 20 November 2025, which is today.

Dato' Deputy Speaker and Honourable Members, through the Islamic Religious Development portfolio, the Penang State Government continues to strengthen the policies and implementation of programmes related to Islam comprehensively through the Penang Islamic Religious Development Agenda 2030, which encompasses five (5) pillars, 14 strategies and 70 action plans. This agenda has been rebranded as a continuation of the concept of Khairul Ummah so that it is more in line with the direction of state development under the Vision 2030 of a Smart and Green State anchored on Inspirational Families of the Nation.

APAI 2030 focuses on empowering the propagation of Islam, strengthening the governance of religious institutions, and safeguarding the Maqasid Syariah in the form of a society that is prosperous, progressive and resilient. Through this framework, the development of Islamic religious affairs in the state is driven in a more systematic, inclusive and phased manner, covering the pillars of socio-economic development, education development, family development, youth development, and development of da'wah and tarbiah, which are the main pillars of ummah development in Penang.

Last Friday, the 2026 Budget Speech by Yang Amat Berhormat the Chief Minister also emphasised the continuation of the APAI 2030 Agenda, particularly under the pillar of education development and the pillar of da'wah and tarbiah development. The State Government's support is demonstrated through a clear commitment to the development and renovation of mosques and surau throughout the State of Penang from 2023 until this year, 2025. Penang remains a state that allocates 30% of the total cost for the construction of new mosques in order to uphold the dignity of the mosque institution as a centre of knowledge, unity and sustainable community development.

Dato' Deputy Speaker and Honourable Members, allow me to debate and wind up on matters relating to socio-economic development. Under the first pillar, the socio-economic development of the ummah is driven through the APAI 2030 strategy, which gives attention to the ownership and development of ummah property managed by the Penang Islamic Religious Council. Among the projects to be implemented on waqf land are the development of apartments and commercial units in Bayan Lepas, the development of medium-cost housing and apartments at Permatang Damar Laut, at Permatang Tok Kandu, as well as mixed development at Bagan Lalang, through the Bumiputera Trust Account which has already been approved by the State Government Executive Council meeting with a total fund of Ringgit Malaysia 145 million.

In addition, zakat collection in the State of Penang also shows very encouraging development. This is the result of the continuous efforts and commitment of the Zakat of the Penang Islamic Religious Council. Up until October this year, collections have reached a total of RM134,145,481.56 compared with RM120,087,255.00 for the same period last year. This significant increase proves the confidence of Muslims in the state's zakat management and the effectiveness of distribution and ummah development programmes by the Penang Islamic Religious Council. Therefore, based on current projections, Penang is on the right track, Insya-Allah, to achieve the target set for this year of RM200 million for 2025. The overall implementation of this action plan proves that waqf and zakat are instruments for empowering the pillar of socio-economic development that can become the driver towards realising the aspirations and objectives of APAI 2030.

Dato' Deputy Speaker and Honourable Members, the education development pillar continues to be driven through emphasis on digitalisation, artificial intelligence, and empowering a conducive learning ecosystem that uses the concept of Integration of Knowledge, with your permission, namely Knowledge Integration, in order to meet the needs of the current increasingly dynamic environment. The Penang Islamic Religious Council implements high-impact programmes such as sponsoring tablet devices to ensure that students have equal access to digital learning. A total of 8,740 tablet units have been distributed to 263 schools throughout the State of Penang, involving a total cost of RM6,511,300.00. These devices are used as access to digital textbooks of the Ministry of Education Malaysia, particularly for primary school students from B40 families who fall under the categories of asnaf fakir, miskin, and also Asnaf Fisabilillah.

The State Government also welcomes smart collaboration with various parties with an interest in education. The Spectacles Assistance Programme, for example, which is implemented through Yayasan Sahabat Bina Negara and Etiqa General Takaful, involves a total cost of RM500,000.00, consisting of RM475,000.00 from Etiqa General Takaful and RM25,000.00 from Yayasan Sahabat Bina Negara. This initiative involves a fund of RM100,000.00 in every district, benefiting a total of 500 students. This means that a total of 2,500 primary school students have received benefits from this assistance. This initiative not only brings a new light to students who need it, but it also supports the basic learning process through the provision of effective visual aids implemented by the Penang Islamic Religious Council together with the Office of the Deputy Chief Minister I in collaboration with corporate partners.

Efforts to digitalise education are also strengthened through close cooperation between the Penang State Education Department, the Penang State Government, the Penang Islamic Religious Council, and corporate companies in identifying schools that need digital facilities support. This step is in line with the aspiration of the Federal Government to equip all schools with MakerLab by 2030. Up until now, through the efforts carried out, 136 out of 396 schools have been equipped with MakerLab facilities, while the rest are being planned for upgrading in phases, Insya-Allah, so that they keep pace with the learning needs of the 21st century.

Penang continues to strengthen the education digitalisation agenda through the handover of more than 100 SmartBoard units to national schools, national secondary schools, national religious secondary schools, and government-aided religious schools under the Aspirasi Pemimpin Programme to enhance technology-based learning facilities. Last April, the Minister of Education also announced that Penang had become the first state in Malaysia to achieve 100% availability of at least one SmartBoard for national secondary schools of the Ministry of Education Malaysia, thereby strengthening the position of this state as a leader in the nation's digital education.

This effort was reinforced at the EduTech Carnival 2025, when the Penang Islamic Religious Council Waqf handed over the distribution of benefits of the Education Waqf totalling RM75,789.00 to selected schools for the purchase of SmartBoards, installation of air-conditioners, and upgrading of meeting rooms. In line with the digitalisation strategy of APAI 2030, the State Government, through cooperation with corporate companies, Wakalah Zakat will also distribute another 85 SmartBoard units with our collaboration in December, including KAFA schools and several selected national schools, so that national educational institutions and Islamic educational institutions can also enjoy modern learning facilities.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Batu Maung interjected. The allocation that Batu Maung mentioned just now, where did the allocation come from?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

That is what I mentioned just now, cooperation with corporate companies. These corporate companies pay zakat and receive tax exemption/deduction for corporate tax. So when they make zakat payments to the Islamic Religious Council through this zakat, we return 50% of the total zakat paid by the corporations back to them, and we work with them again to distribute it, for example what I mentioned just now, smartboards.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

So, Batu Maung, that is zakat money?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Ya, korporat.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

From zakat, is it? So these programmes are funded from zakat money?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Corporate zakat. Penang continues to strengthen the Learning Materials Assistance Programme, which is also prioritised, as I mentioned just now, through this initiative together with corporates so that it is returned to the State of Penang, namely through Wakalah Zakat and strategic cooperation between the Penang Islamic Religious Council, Etiqa General Takaful, and Penerbit Mahir. This year too, assistance in the form of exercise books for B40 students is being implemented to strengthen the foundation of learning in schools. Through this Wakalah Buku initiative, a total of 4,261 sets of SPM trial examination question books have been donated by Etiqa General Takaful, valued at RM382,231.25, while additional sets of books were also donated by Penerbit Mahir to ensure that the provision of learning materials is more inclusive, involving other races and religions as well. The early distribution of these book sets before the August trial examination enabled SPM candidates to make optimal use of these materials as preparation for the SPM examination more effectively. This is a form of strategic cooperation that has a positive impact between the Penang State Government, the Penang Islamic Religious Council and corporate companies towards the development of holistic education in the State of Penang.

In ensuring that the higher Islamic education ecosystem continues to receive attention, the Penang Islamic Religious Council, through its Islamic Higher Education Institution, namely KITAB Penang, has become the State Government's Islamic higher education institution that provides opportunities and benefits, particularly to the children of Penang to pursue further studies at higher levels. Recently, the new KITAB hostel with a capacity of 300 students has begun to be occupied since July 2025 to ensure that the comfort and welfare of students at KITAB are on par with other higher education institutions. The construction of this hostel began through the approval of the Penang Islamic Religious Council Meeting Number 2/2020, namely on 23 June 2020. This project was implemented with the Penang Development Corporation (PDC) acting as the Project Management Consultant. This five-storey hostel demonstrates the serious commitment of the Penang Islamic Religious Council to providing a conducive and comfortable learning facility for students in line with the education development pillar contained in APAI 2030.

To complement this higher education commitment, MAINPP has also increased the distribution of higher education scholarships with an allocation of RM20 million in 2025, namely an additional RM500,000 compared with the previous year. The restructuring of the Academic and Education Division under MAINPP last year enabled this aid scheme to be expanded, including aid for polytechnic diploma students as well as one-off aid for Form 6 students, which were previously not given to polytechnic students.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Batu Maung interjected. Dato' Deputy Speaker. So the scholarship that Dato' mentioned just now, who receives this benefit? Because I found that there are students in Egypt, there are also students in Egypt who say that some of them did not get any benefit or advantage from the what-do-you-call-it scholarship that was mentioned by Batu Maung.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Alright. This scholarship involves the whole of what I mentioned just now.

Deputy Speaker of the House

On button.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

The RM20 million includes students in the Middle East, namely Egypt, Jordan, including places in the Middle East. So if there are those who say that some students did not get it, I need that information, because scholarships for students at Al-Azhar University are also included in this scholarship.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

This is Batu Maung. Apart from that, students from Yemen and also students from other universities, I think they need to be looked at, because people say they too, what should I say, their benefit, they also receive, people say they receive what has been offered to other students.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

The country, that is, Yemen, and...

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Yemen, Syria. We still have other students of ours studying there. Perhaps the Islamic Religious Council can look at our students who study in the Middle East, in Yemen, in Syria and also in other countries, so that they too can receive this benefit.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Yes, just now when I mentioned Egypt, Egypt is included. That is why I said that our need to increase zakat funds, which previously there was no fund that we gave to diploma students at polytechnics. That is why when we see the need for us to increase the allocation of these funds, we give it to diploma students in order to increase the participation of these Bumiputera Muslim students in STEM fields. As proposed by Sungai Dua concerning other Middle Eastern countries, including Syria, Yemen, Maghribi, that is Morocco as well, we will review it to increase the scholarship fund.

In line with the state's long-term education aspirations, various strategic initiatives have also been driven, among them KITAB's internationalisation efforts, the development of the smart campus KITAB Bandar Cassia at Batu Kawan, the upgrading of the Zakat Training Centre, namely PULAZA, at Pantai Acheh to the Penang Islamic Training Institute as an initial step towards the establishment of the Penang Islamic University, as well as a commitment of an endowment of RM5 million for the Al-Azhar Chair and RM5 million for the strengthening of (ILIPP), namely the Institution, namely the Penang Islamic Training Institute. In addition, the launch of the Penang State Education Waqf Fund and the increase in allowances for teachers at Government-Aided Religious Schools, Rakyat Religious Secondary Schools, Rakyat Religious Primary Schools, Quran and Fardu Ain Classes (KAFA) and Islamic Kindergartens (TADIS) also strengthen the more sustainable Islamic education ecosystem of this state. The State Government greatly welcomes the participation of more corporate bodies to join together in supporting the asnaf through the payment of zakat in this state.

In addition, in efforts to strengthen the foundation of Islamic education in this state, attention is also given to the development of Rakyat Religious Schools. The entire construction cost of two Rakyat Religious Schools is fully borne by the State Government, namely Madrasah Al-Ittihadiyah Al-Wataniah at Cherok Tok Kun, Central Seberang Perai District, valued at RM3.85 million, and the Rakyat Religious School of Masjid Teluk Air Tawar, North Seberang Perai District, valued at RM4.01 million. In addition, three (3) Rakyat Religious School projects are in the construction phase, involving Madrasah An-Najah at Kampung Selamat, North Seberang Perai District, the Rakyat Religious School Nurul Falah at Taman Berjaya, Nibong Tebal, South Seberang Perai District, and the Rakyat Religious School of Masjid Bandar Baru Air Itam, North East District, involving a total development allocation from the State Government of RM15.07 million.

In addition, Penang has also achieved significant development through the implementation of a STEM learning module within the Quran known as STEM-Q. The Penang Islamic Religious Council has approved RM2.5 million for the implementation of this module in state Islamic educational institutions. The STEM-Q module, which integrates tadabbur of the Quran with STEM learning, is implemented in 28 SABK and SMAR schools, namely Government-Aided Religious Schools and Rakyat Religious Secondary Schools, involving 1,650 students from Form 1 to Form 3. A total of 151 teachers have attended training on implementing this module throughout 2025 to increase the interest of these Malay Muslim students to specialise in STEM fields when they choose their streams in Form 4. The complete Mufiq Quran set with QR codes for STEM, reference books and STEM-Q activity books have also been distributed to ensure that the learning process is implemented systematically and effectively. The full implementation of this module in all the schools involved is expected to be carried out in 2026 through control and supervision by the Penang State Department of Islamic Religious Affairs.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Yes, Batu Maung, I do not want to be left behind in the matter of education. In the earlier Khairul Ummah Agenda, which was championed by the Deputy Chief Minister in the previous session, the KAFA Menengah was established. But we have heard that the KAFA Menengah has not been heard of for a long time. Is the KAFA Menengah still being given attention by the current government? We see the KAFA Menengah as one of the matters that needs to be expanded, to give opportunities to students who may not follow religious education, shall we say, directly in the mainstream, to enable them to continue this religious education at the KAFA Menengah level.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Alright. Under the Khairul Ummah Agenda, which involves the pillars and summary, Hebat, has been rebranded under APAI, namely Hebat, namely hikmah under under the education pillar, and one of these is the KAFA Menengah, and it was placed in the manifesto, actually the Pakatan Harapan manifesto, namely Perpaduan. That became the basis, namely the promise, for us to strengthen the KAFA, not only at the KAFA Rendah level but also the KAFA Menengah. However, in the context of the KAFA Menengah, we are currently conducting a review together with JAKIM because it involves facilities that need to be upgraded. The, the, the good response to the KAFA Menengah has caused several mosques to complain about the facilities provided for the KAFA Menengah. That is why the review is being discussed between the Penang Islamic Religious Council (MAINPP) and the Department of Islamic Development Malaysia (JAKIM) so that we can hold additional programmes for this KAFA Menengah in the form of MyInsaniah offered by JAKIM. So my response to the Honourable Member for Sungai Dua is that the KAFA Menengah will continue, Insya-Allah, with improvements.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Let me interject briefly, the Honourable Member for Batu Maung, regarding this KAFA Menengah that I raised during the debate the other day. As I have received information, there has been no intake of new students for the KAFA Menengah for two consecutive years, and even the intake for next year has not yet been made. As has been explained just now, I strongly agree and request that the KAFA Menengah be strengthened.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

It also involves a fairly high cost, because at present it involves a cost of RM800,000. That is why we are conducting a review of the demand, and it may be increased from time to time. We will then develop a curriculum between the KAFA Menengah proposed by the State Government, adopting the curriculum from Selangor, with the MyInsaniah programme or project offered by JAKIM, Insya-Allah.

Alright, the government answers the question of the Honourable Member for Air Itam regarding special training on students' mental health and other useful skills for teachers to identify, at an early stage, signs of bullying among students before undesirable incidents occur. The State Government, through the JPN, namely the Penang State Education Department, has organised a programme to empower Healthy Mind Management training for all guidance and counselling teachers through the Minda Sihat PRISMA intervention module since 2023. Every year, workshops are held on Healthy Mind Management. In addition, the state department, the Penang State Education Department, always collaborates with the Penang State Health Department to provide training to all guidance and counselling teachers, such as the First Aid Psychology Workshop and Management of Prevention, Recovery and Crisis Programmes. In matters of bullying, findings from the Personality Trait Inventory are used as a measuring tool to identify deviant behaviour of a student. Likewise, the role of psychometric findings in managing students' positive behaviour.

Dato’ Deputy Speaker and Honourable Members, allow me to continue the winding-up on matters relating to family development. In line with the holistic and dynamic family development strategy, the State Government gives serious attention to the state's preparedness in facing the phenomenon of an ageing nation. Penang is now among the states with the highest ratio of senior citizens in Malaysia, and this situation shows that long-term planning must be more structured, integrated and have a major impact on family well-being and the social structure of the state. In this regard, the announcement by the Right Honourable Prime Minister in the 2025 Budget was taken up by the Penang State Government through the Penang Islamic Religious Council (MAINPP) for the Retirement Fund (Incorporated) (KWAP) to work with the states in the context of the State Islamic Religious Councils developing waqf land and also Baitulmal land in connection with the issue of, or in connection with, the Independent Senior Citizens' Home. Thus, the Penang Islamic Religious Council took the first step as a pioneer in holding discussions with the Retirement Fund, to the extent that the announcement by the Right Honourable Prime Minister in the 2026 Budget regarding an allocation of RM35 million out of the total RM300 million through the Retirement Fund (KWAP) to pioneer the Independent Senior Citizens' Home project in Penang, to raise the state's efforts to a more solid level in developing a more structured and sustainable model of elderly care.

The selection of MAINPP Baitulmal land in Pongsu Seribu as the pilot site shows confidence in the state's ability to provide a comprehensive support ecosystem covering health, welfare, social and spiritual aspects for senior citizens in need of protection. Permatang Berangan is interested in a senior citizens' home right next to Permatang Berangan, yes. In Pongsu Seribu, we now have Darul Hanan and the strategic collaboration between MAINPP and KWAP through a subsidiary company (KWEST), Kumpulan Wang Amanah Pencen Estate Management, which also complements the state's aspiration to strengthen the Darul Hanan module, which for a long time has been an example of senior citizen welfare management based on a balanced approach of physical, psychosocial and spiritual aspects, where Darul Hanan was developed through collaboration between the Islamic Religious Council and Yayasan Al-Bukhari and was completed in 2012. The construction of this Independent Senior Citizens' Care Centre is expected to provide more systematic long-term care facilities, especially for senior citizens who are asnaf, at risk, and those who need institutional protection. This development also has the potential to stimulate silver economy growth through new employment opportunities in care, health, therapy and other support services, while opening space for the younger generation to venture into this growing sector. And the Penang Islamic Religious Council has also signed an MoU with KWAP, witnessed by the Right Honourable Prime Minister on 8 November at the MADANI Mosque Launching Ceremony in Permatang Pauh.

The State Government, through the Islamic Religious Affairs Department, continues to focus on building a holistic, stable and dynamic Muslim family by emphasising aspects of household management, emotional well-being, family law literacy and the provision of more structured support services to the community. So, in relation to the service of streamlining marriage and household services, the e-Munakahat Penang system continues to be strengthened as a platform for systematic registration of marriage, divorce and reconciliation. And this effort is implemented in collaboration with the Information Technology Division of the Office of the State Secretary, the District Religious Offices, and the Penang Islamic Religious Affairs Department (JAIPP).

Family development programmes are also enriched and strengthened through three (3) specific series of programmes related to the Special Child Care Programme involving 150 parents in collaboration with NGOs such as IKRAM. The Positive Parenting Programme involves 200 participants with the support of the Department of Social Welfare (JKM), as well as the Healthy Family Chat Programme

Keluarga Hebat involving 200 qariah members with the participation of four (4) mosques and the Penang State Health Department. All three programmes place emphasis on parenting knowledge, mental well-being, family health and community support. In addition, the MADANI Prayer Bestari Camp 2025 gathered 300 students from Sekolah Kebangsaan Sungai Kecil, Nibong Tebal, as well as international participants from Indonesia, Cambodia, Brunei and Thailand through online participation. This organisation strengthens the basic education of worship, discipline, and the formation of personality among students. Many more programmes were carried out, among them the Legal Literacy Programme in two series with 30 registrars' officers participating. Meanwhile, the Tafaqquh Munakahat programme, six series in total, was attended by all assistant registrars of Muslim marriages, divorces and reconciliations. The Professional Marriage Officiant Course was also implemented to enhance the competence of 30 assistant registrars of Muslim marriages, divorces and reconciliations. The procedures for the management of nikah solemnisation were also continuously monitored, involving 22 assistant registrars of Muslim marriages, divorces and reconciliations across the state, to ensure compliance with syariah procedures.

The State-Level Bahagia Family Symposium, held together with the launch of Baiti Jannati Care. This gathered various agencies including the Islamic Family Law Division of MAINPP and JAIPP as a platform to build a framework of cooperation on family issues in the state.

Under the advisory service component of Baiti Jannati, a total of eight (8) BJC centres, namely Baiti Jannati Care, equipped with 16 registered counsellors and 22 assistant registrars of Muslim marriages, divorces and reconciliations, are operating across the country. A Counselling Skills Course was held for 30 officers to improve the competence of providing guidance to the community. The BJC outreach programme with the theme "Empathetic Family, Harmonious Living" was implemented in three (3) series covering various locations, with the participation of 200 participants, providing exposure to empathetic approaches in managing family conflict.

All the programmes that I have mentioned, as examples, show our commitment to strengthening the family institution through advisory support, family education, munakahat services, and broader community involvement. The implementation of this family development pillar ensures that every

family in Penang gets access to guidance, support and organised intervention to build a more prosperous, harmonious and competitive household life.

Dato’ Deputy Speaker and Honourable Members, allow me to continue with the youth development pillar in this Islamic religious development agenda. The State Government focuses on building a young Islamic generation that is competitive, disciplined, and has a strong identity. This development is implemented through a comprehensive approach covering personality, leadership, social skills, and awareness, a sense of responsibility towards society.

The programmes organised this year aim to open opportunities for teenagers and youth to hone their potential, showcase their talents, and increase their self-confidence. At the same time, this enhancement also instils the values of respect, compassion, the spirit of volunteerism, and a sense of belonging among youth from various backgrounds.

Throughout 2025, we are strengthening the network of cooperation between the District Religious Offices, District Mosques, government agencies, the State Youth and Sports Department, the Youth Council, and NGOs. This cooperation is very important in providing more comprehensive social support and ensuring that the state's youth are guided through orderly and impactful channels. Among them, the development we have implemented, the Madani Merdeka Youth Programme, gathered 250 participants aged between 18 and 30 years at the South West District Mosque. This programme focuses on character building, as I mentioned earlier. Leadership development programmes were also strengthened through Next Gen Mukmin Mantop, involving 250 youths from North Seberang Perai. The Next Gen Mukmin Programme is for SMAR teenagers and mosque congregation children aged between 14 and 16 years. This programme places emphasis on leadership building, mental resilience, self-discipline, and character formation through spiritual activities and outdoor activities planned systematically. Also organised was the Jiwa Sakinah Teen Camp involving 80 SMAR students in a two-day, one-night module at Batu Kurau. This camp focuses on strengthening morals, emotional management, character building, teamwork, and enhancing leadership capacity through an orderly learning environment.

The State Government is confident that the young generation of Penang will be shaped into people who are competitive, virtuous, disciplined, and ready to play an important role in community development and the future of the state through carefully planned and well-organised efforts, Insya-Allah.

Dato’ Deputy Speaker, dakwah and tarbiah development is the fifth pillar. Focusing on dakwah and tarbiah development as the foundation for building an Islamic society that is knowledgeable, virtuous, and resilient in facing current challenges. Emphasis is given to strengthening the mosque institution, coordinating Islamic education, developing knowledge materials, collaboration with stakeholders, as well as the adaptation of digital technology and AI, namely Artificial Intelligence, in the delivery of dakwah.

In line with the Ummatik Mosque concept, the State Government and MAINPP continue to strengthen the role of the mosque institution as a centre of Muslim community development. Among the major commitments are the construction and renovation of mosques and surau throughout Penang. This year, five (5) mosques have been completed, namely Masjid Papan, Masjid Taman Sungai Dua Utama, Masjid Bandar Cassia, Masjid Sungai Kecil Nibong Tebal, and Masjid Mengkuang Titi, with a State Government commitment of RM9.8 million. Another mosque, namely Masjid Bandar Putra Bertam, is expected to be completed this year with an additional allocation of RM2 million. Three (3) more mosques are under construction, namely Masjid Lama Sungai Bakap, RM6 million in Sungai Bakap, Masjid Cerok Tok Kun Bawah, and Masjid Permatang Tinggi. The construction of the Penang City Mosque at the Smart City Campus KITAB site, Bandar Cassia, is also being implemented through land investigation work and design preparation by the State Public Works Department (JKR Negeri).

To complete the dakwah development ecosystem, MAINPP also strengthens cooperation with NGOs, educational institutions, mosques, government departments, as well as other stakeholders. Continuing...

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Batu Maung. Allow me to interject on this matter of dakwah development. We see today, on Friday, many people do not perform the Friday prayers. People who do not perform the Friday prayers are today sitting at coffee shops. The sermon is almost over, and they are still sitting at coffee shops, loitering everywhere. This is the situation that exists in, in our state.

So what steps have been taken by MAINPP, firstly from the enforcement aspect. Secondly from the education aspect. Education for the community who abandon the Friday prayers. We see it has become a trend, where now people are ignoring the Friday prayers.

If it were the regular prayers, perhaps he would say they do it in other places. But this is the Friday prayer, the mosque congregation is already in the sermon and nearly finished, yet we see those just loitering everywhere today in great numbers. They do not perform the Friday prayers. What steps have been taken by MAINPP in the situation that is affecting our state?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Alright. I will respond to that, because this is in the winding-up and was also raised by Sungai Dua in the debate. So that the flow looks nice, I will get to that matter.

Completing the dakwah development ecosystem, MAINPP also strengthens cooperation with NGOs, educational institutions, mosques, government departments and stakeholders. In line with present-day technological developments, digital strategies and AI are also applied in the state's dakwah ecosystem. MAINPP introduces the use of digital platforms, the development of electronic Islamic content, mosque information systems, and training for imams, takmir teachers and mosque officers to improve the effectiveness of dakwah delivery. This approach ensures that dakwah messages are more interactive, easily accessible, and can be adapted to various segments of society, especially the younger generation.

The development and printing initiative of the Penang Al-Quran Mushaf reinforces the state's commitment to upholding the tradition of Al-Quran scholarship through strategic collaboration between MAINPP, Yayasan Restu, and related agencies. This initiative covers the preparation of manuscripts, calligraphy art, the verification process, and research related to Al-Quran studies. In addition, Penang also made an important achievement in coordinating Islamic schools through the official appointment of School Management Councils (JPS) for all Islamic schools in this state.

For the first time ever, all chairmen and secretaries of the JPS were gathered in one official ceremony at the end of June 2025, and Insya-Allah it will be held from time to time to strengthen ties between the Islamic Religious Council and the Islamic Religious Department, as the management provided by the Islamic Religious Council with these JPS.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Batu Maung, gathering them is a good thing. But, do not interfere, lah. This is us. We want to attend. I want to attend the school, I build it myself. There are schools that we built ourselves, we cannot attend. What is this? We hope there will be no interference like this. We must, must be positive in this. Do not, people say, interfere, look at it through political colours. Political colours, all of us have our own political colours.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Baik. Baik.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Let us be positive, professional in, in, in management. Do not interfere with us. This one interferes, that person cannot, this person cannot. This is something that should not have happened. I hope, meaning, in this matter there should be no interference.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

And I, I think I have already answered this matter in the previous session, concerning this interference and intervention. This is because, in terms of the management carried out by this JPS in respect of the Sekolah Menengah Agama Rakyat and Sekolah Agama Rakyat, it is managed by JPS. And this JPS is appointed by the Registrar. So, in terms of the matters involving the gatherings and istimak held here, these are managed by the Penang Islamic Religious Department through the Registrar, namely the Director of the Penang Islamic Religious Department. So, I think there was no school excluded from the invitations. However, if there is any school that was excluded, they may refer to the Director of the Penang Islamic Religious Department as the Registrar, and

Insya-Allah, we will invite them. If there is such a case, you may inform us directly.

This is because I observed that there were also political leaders who were not directly involved and did not attend the programme we held on that day. If anyone was missed out, you may inform me yourself, it is alright, Sungai Dua.

Next, where was I? The successful organisation of the Penang State Level KAFA Ihtifal 2025 is proof of the State Government's commitment to building the identity and character of KAFA children. Apart from encouraging the mastery of religious knowledge through healthy competition, the programme also gives students exposure to the wider pathways of Islamic education. The State Government remains committed to uplifting the dignity of KAFA teachers through the Penang Islamic Religious Council (MAINPP), by increasing KAFA allowances as we are well aware and as was announced, including in the State Legislative Assembly (DUN), in the, in the previous session.

The overall implementation of the strategies and action plans under the core of dakwah and tarbiah development is our sincere intention to strengthen the position of the mosque as a centre of knowledge and unity. Ensuring quality Islamic education, invigorating the culture of Al-Quran knowledge, and strengthening the state's dakwah network in line with the great aspirations of APAI 2030, which must be driven together to form a progressive, knowledgeable and united Penang Muslim community. In reply to the question of the Honourable Sungai Dua and Sungai Bakap concerning the request that the State Government review and re-issue guidelines to companies in the State of Penang on requiring Muslim employees to perform Friday prayers, as well as enforcement against Muslims who do not perform Friday prayers.

The State Government accepts this proposal and, for the information of all, the State Government constantly carries out periodic monitoring through the Female Religious Enforcement Officers of the Penang Islamic Religious Department (JAIPP). Men cannot, because of Friday. According to district and location of complaints. This monitoring is more of advocacy, advising men to perform Friday prayers. However, arrests and prosecutions cannot be proven because, under Section 14 of the Penang State Syariah Criminal Offences Enactment 1996, a person will be convicted of an offence under this section only if the offence is committed three times consecutively, the year 1996 when it was implemented.

So, we are just counting three times. So yes, perhaps we can discuss it again. If this motion is brought again, we request that the Honourable Member be able to support the amendment motion of three consecutive times. However, the Enforcement Division of JAIPP always takes note of complaints and continuous monitoring, for offences under Section 14 of the Penang State Syariah Criminal Offences Enactment 1996 this.

Furthermore, the State Government is of the view that the existing guidelines are already sufficient. However, every employer, company and factory in Penang must be considerate towards Muslim employees who do not perform Friday prayers, and report immediately to the Enforcement Division of the Penang Islamic Religious Department (JAIPP) for further action.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Dato' Batu Maung, a quick interjection. Earlier it was said that according to the enactment, we can only convict if he does not come, he does not attend prayers, he does not attend (selawat).

Deputy Speaker of the State Legislative Assembly

Jumaat.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Friday, three times consecutively. So, if you look at it, it has been almost 30 years.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Four times already.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Why have we left this enactment like that all this time?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Good. Insya-Allah, we will discuss, study, and eventually it will be raised to the Legal Adviser for review, and finally brought to this Assembly.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

One more thing, like fasting, right? If he does not fast, we can charge him under disrespect, right? Can we not charge those who do not perform Friday prayers as disrespect?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Bincang.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Dato' Yang di-Pertua. Dato' Deputy Speaker. I want to obtain some clarification from Dato' Batu Maung regarding the proposal from Pulau Betong, namely the syariah criminal offence of not performing the five daily prayers.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

The reason for this will come in detail.

Deputy Speaker of the State Legislative Assembly

Perbahasan.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Perbahasan.

Mohamad Shukor bin ZakariahPAS · PNPulau Betong

Okay.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Good. Where were we just now? The Employment Act 1955 requires employers to give Muslim employees sufficient time to perform Friday prayers. It stipulates at least one hour and 30 minutes for Friday prayers. Meanwhile, other prayer times require at least 20 minutes for each prayer time. For exemption for Friday prayers, Section 60A (1) of the Employment Act 1955 provides that employers shall give Muslim employees exemption for Friday prayers for at least 1 hour 30 minutes. Meanwhile, exemption for prayer times is provided for at least 20 minutes for each prayer time. Yes, please, Sungai Bakap.

Abidin bin IsmailPAS · PNSungai BakapEN

Excuse me, Batu Maung. Thank you very much. First, I would like to say many thanks for the information given just now. The enactment needs to be reviewed, almost 30 years, because the issue of prayer is very important. We indeed are responsible for this matter. Regarding Friday prayers, if possible, let us do our best for the ummah. If this is the best, Insya-Allah, we will get a good Muslim, Insya-Allah. Thank you.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Insya-Allah. Thank you for that view, Sungai Bakap. Therefore, it is so.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Dato' Batu Maung. One more addition.

Deputy Speaker of the State Legislative AssemblyEN

I think, that is enough about Friday prayers, I suppose.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

This. This. Important. This is important.

Deputy Speaker of the State Legislative AssemblyEN

Still long, this.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Just a little, yes, yes. This is important. Because this issue of Friday prayers.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Semua penting.

Bukhori bin GhazaliPAS · PNPinang TunggalEN

Because the issue of Friday prayers is not only about disrespect, it also gives a bad image to non-Muslims towards us. That is why I say, this matter is important.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Yes. Yes, that is right. Everyone agrees on this matter.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

This, Friday prayer enforcement.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Already said from earlier.

Muhammad Fauzi bin YusoffPAS · PNSungai Dua

Kelmarin, ya.

Deputy Speaker of the State Legislative AssemblyEN

Just now, Batu Maung has answered everything.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

My own, my own issue, when it comes to my turn I also want to respond so that this enforcement is carried out. We can involve women, women who do not perform Friday prayers.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Already answered. Already answered. I have already answered earlier, that it involves female enforcement officers.

Muhammad Fauzi bin YusoffPAS · PNSungai Dua

Ia pendidikan.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Only, I want to file a complaint because it is related to the enactment that we will study and review since 1996.

Muhammad Fauzi bin YusoffPAS · PNSungai Dua

Sebab ni.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Yes, yes, already answered.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Cases concerning prayers are included in the demands of Allah the Almighty, you know.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Betul.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Reciting a verse from the Quran.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Saya teruskan.

Deputy Speaker of the State Legislative Assembly

Batu Maung.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

"Those whom We give authority in the land, then they must establish prayer." That means the government must, must focus on this matter.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Yes. That is the one.

Deputy Speaker of the State Legislative Assembly

Okay.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Discussed, after I informed you earlier. Therefore, it is the responsibility of employees not to take advantage of the permitted rest period by deliberately delaying prayers, and its effect will affect the productivity of the duties entrusted to them. However, if there are complaints, the Penang Islamic Religious Department (JAIPP) will take the following steps: conduct a preliminary investigation and take appropriate action, whether through advice, religious counselling, or referral to relevant authorities such as the Labour Department (JTK), if it involves an employer who prevents Muslim employees from fulfilling their obligation of prayer.

In addition, the Honourable Sungai Dua and Penaga have conveyed to the State Government the request to reprint the Hijri Calendar for the Muslim community in Penang, especially for the elderly who often rely on the use of the Hijri calendar. For the information of the Honourable Member, the State Government, through the Mufti Department, is the one that prints the Hijri calendar, namely the Penang State Mufti Department. So, we will obtain this information again from the Mufti Department, the calendar has been printed, I also looked, very little, 1,000. 1,000 copies involving a cost of RM6,500.00. I say 500 suraus, plus 200, 45 mosques including ghairu jamek, one mosque only 10, I think. So I say it is alright, we need to review the printing aspect because it involves budget cuts to departments. But, I say for the calendar we must increase it again, and for printing because there are those who need it. Although in terms of promotion we promote digitally, but as Sungai Dua mentioned, and not only older people say so, young people also want to see it. But it is alright, we will review it again for printing.

Good. Nevertheless, the State Government always takes note, yes, and the Mufti Department will increase the number of prints for the calendar publication in the following year, so that the need is met better without affecting the digital efforts being driven.

Next, in reply to the question of the Honourable Sungai Dua, Telok Bahang, and Penaga regarding the issue of the selection of the Mosque Kariah Committee and the request for a review of the Guidelines for the Selection of Mosque Kariah Committee Members in the State of Penang. For the information of the House, the Penang Islamic Religious Council (MAINPP) has always, to me, stressed this repeatedly, that there is no political interference at all in the selection of the Kariah Committee. And the process is carried out transparently and democratically. Kariah members are given full rights to nominate 20 candidates to be submitted for consideration by the District Level Nomination Committee, which is established at district level through a 4-1 method. This relates to the enactment, I do not want to repeat it, if I mention the enactment, the Honourable Member may say I will mention the enactment again. But, this nomination is made by the kariah children. The kariah children who function for and are submitted to the District Level Nomination Committee, namely JAPEK. JAPEK, chaired by the District Religious Administration Officer (PTA), to examine the complete list of kariah member nominations and recommend 15 candidates to the Mosque Management Division. From this JAPEK, which is chaired by the PTA, there is a penghulu, there is a representative of the District Office, a police representative, a representative of the Religious Council, who is not even a Religious Council member, the representative is officers of the Religious Council involving the Baitulmal Manager, what is it, the Training Unit, N41 officers and also 44. So the list of candidate names approved in JAPEK will be submitted to the Penang Islamic Religious Department, and then presented at the Islamic Religious Council Meeting to be submitted to the Yang di-Pertuan Agong. And as I recall, this Meeting took place in the 10th month, in the 10th month last. I think within less than 30 minutes, perhaps, such a thick file was submitted by the Penang Islamic Religious Department, and we immediately approved it and submitted it to His Majesty, and it has been consented to.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Batu Maung. The 15 persons referred to by Batu Maung are the list selected by the kariah children without any additions from others. If it means the list is from the selection of the Islamic Religious Council, from the kariah itself without involving other persons who were brought in, then 15 is okay, right? But if there are still other persons brought in, brought in by people who do not know the kariah children themselves, this is a matter that should not be.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Good. Because that matter has not yet been circulated. If there is, make a complaint later and we will see. Right? So, it has not yet been released, that is more about rumours and also perceptions raised, because this was indeed selected democratically by the kariah children and sent to

JAPEK. I too only just learned about JAPEK. JAPEK, the term JAPEK, namely the District Selection Committee. Wait, let me finish this one, then Pinang Tunggal can raise his view later. This method was formulated to maintain the prerogative of the Islamic Religious Council, to ensure that those appointed are truly capable of shouldering responsibilities and are in line with the state's religious development policy, especially to guarantee uniformity of religious activities and the unity of the Muslim community in Penang. This method aims to limit, to limit the rights of the kariah, but as one, not limiting the rights of the kariah. But, as a step to ensure that selection is carried out prudently, orderly, and based on the interests of the mosque community across the state. That is why, if the Honourable Member is aware that the restructuring of district mosque management, which was previously chaired by the District Officer, and restructured starting in the 1st month by placing the right on the District Religious Administration Officer (PTA) who chairs the District Mosque Management Committee. Because we consider the PTA to be more knowledgeable in the field of management, it was agreed by the State Secretary, the Honourable State Secretary, including the Penang State Mosque which was previously chaired by the Honourable State Secretary, and now is chaired by the Director of the Penang Islamic Religious Department himself, in strengthening the governance and management of district mosques and state mosque.

For the 2026 to 2028 kariah appointment session involving 208 mosques, meaning district mosques are excluded, state mosque is excluded. And the nomination process has been carried out starting from 18 July 2025 until 14 September 2025, through the Kariah Nomination General Meeting and then the District Level Nomination Committee, namely JAPEK. And all candidates have been certified and approved by the Penang Islamic Religious Council Meeting, 10th meeting, 272nd, on 27 October 2025 and submitted to His Majesty Seri Paduka Baginda Yang di-Pertuan Agong for consent. And this process, we will follow it, and the appointment will begin to be made Insya-Allah at the latest early in the 12th month, at the latest it will be issued. The membership of JAPEK that I mentioned earlier includes various neutral parties such as the Royal Malaysia Police, the Area Penghulu, the MAINPP representatives I mentioned, namely N41 officers, the former grade, and also 44 and 48. The administrative coordinator of the District Mosque, namely a JAKIM appointee, and the kariah supervisor as Secretary of the Committee cum JAIPP representative of grade N19, chaired by the District Religious Administration Officer (PTA), to ensure transparency and balance in the selection of candidates.

The method stipulates a complete list of seven (7) candidates proposed by the kariah and eight (8) additional candidates by JAPEK to complete the list of 15, drawn from the 20 candidates proposed by the kariah. To ensure transparency and public understanding, several actions have been taken, among them the nomination procedures have been explained thoroughly through three official briefing sessions, to all chairpersons and kariah secretaries for each district, on 27th day of the fifth (5) month (May), Southwest District Mosque, 28th day of the fifth (5) month (May), Darul Hidayah Complex, 4th day of the sixth (6) month (June) 2025 at the Central Seberang Perai District Mosque, attended by the chairpersons and kariah secretaries of Southwest District and Northeast District, Kepala Batas District, and also Butterworth and Central Seberang Perai District, and South Seberang Perai.

These procedures were also displayed on the notice boards of all mosques and suraus, all have been displayed. Disseminated through social media, to ensure the kariah children can understand the entire process before the Nomination Meeting is held. These procedures were also formulated taking into account past experience, as well as comparison with other states so as to be in line with best practice in Malaysia. With the dissemination actions, the Honourable Member, there is still a lot, you know.

Deputy Speaker of the State Legislative Assembly

Kita langkau.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Good. Furthermore, the State Government accepts the proposal put forward by the Honourable Sungai Dua, on the proposal to table the Annual Report of the Penang Islamic Religious Council to the Penang State Public Accounts Committee. As in the previous session, there is no problem for the Islamic Religious Council to supply to the PAC through the State Legislative Assembly (DUN) if there is a request. But, until today there has been no official request, in writing, as the National Audit Department (JAN) requested the Audited Financial Statements to be delivered, sent to them through a written application, and it has indeed been sent by the National Audit Department. So, there is no obstacle to that matter.

However, all this time since the start of the session since the State Legislative Assembly existed, the Financial Statement Report has not been supplied to the State Legislative Assembly because this is based on the enactment. For comparison, there are Statutory Bodies such as PDC, which is why there is a Financial Report of PDC, the Penang State Museum Board, which indeed has special provisions in their respective enactments requiring the annual report and their accounts to be submitted to the House. But in the context of MAINPP, the Islamic Religious Administration Enactment does not provide for an obligation to table. However, if there is a request, it will not be an obstacle for the Islamic Religious Council to supply the said report.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Let us request that it be supplied to these State Assemblymen (ADUN).

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Yes. Next, in response to the question raised by the Honourable Member for Telok Bahang regarding the allegation of automatic transfer of congregation members, to put it briefly, when Telok Bahang raised this, I was rather surprised because it was the Kariah Chairman who approved it, not the Islamic Religious Council. It is stated here that the procedure for transferring congregation members is carried out openly and transparently and must go through a process approved by the Kariah Chairman himself.

Next, in response to the further question from the Honourable Member for Telok Bahang regarding the construction of mosques, it must take into account the needs of the congregation. Yes, there is indeed a procedure for building a new mosque. There are roughly seven (7) processes to be considered before mosques are established in certain areas and districts. Therefore, MAINPP is always attentive and sensitive to the needs of the Muslim community, especially in developing comfortable places of worship. MAINPP will take immediate action whenever there is a need to provide places of worship for Muslims in this state. In addition, the State Government appreciates the concern of the Honourable Member for Pulau Betong regarding the five daily prayers and enforcement action. For the information of the House, at present there is no provision in the state's syariah criminal law that prescribes punishment for the offence of neglecting obligatory prayers. However, the State Government's approach through JHEAIPP towards the issue of obligatory prayers is based on education and awareness and not on enforcement of the law. Regarding the issue of traders and Muslim visitors at night markets not performing the Maghrib prayer, there is currently no specific programme targeting prayer campaigns in night market areas. However, JHEAIPP's approach is comprehensive, placing emphasis on general public awareness of the obligation to perform the five daily prayers, not only the Maghrib prayer. Among the efforts being implemented and continuously carried out are raising public awareness through advice, guidance, periodic reminders, cooperation with the kariah community, dakwah dissemination through mosque social media, conveying messages about prayer through existing platforms such as khutbah, kuliah, public talks, and mosque programmes. Mosques throughout the state also consistently publicise the importance of prayer, including encouragement to perform congregational prayers at the mosque. In response to that, there is no provision in the enactment for taking action.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

So, that is what we can ask of MAINPP, right?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

We will review it.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

Negotiate with the local authority (PBT) so that it is 15 minutes, which is not long at all. It won't cause their businesses any loss.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Ya, ya.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

It is even more blessed. Yes, that is why we will save them. So if people know that at prayer time, at 7 Maghrib, automatically all the buyers will not go to the night market because they know, and they have already set in their minds at 7 pm, "we will not go." Why? Because that is prayer time. Now it is free. People are calling the azan and still shopping. We hope... (interruption).

Deputy Speaker of the HouseEN

Okay, continue, Batu Maung, we do not have enough time.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

That is why in the past the elders proposed night markets next to mosques and considered why people should stop praying at the mosque. But never mind, on that matter we will discuss, review, and hold workshops for the next steps.

Mohamad Shukor bin ZakariahPAS · PNPulau BetongEN

The same goes for the afternoon prayer, too. If possible, we ask MAINPP to gazette the enactment.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Ah, that one, that is what I mentioned earlier, bringing the discussion forward. In response to the matter raised by the Honourable Member for Permatang Pasir regarding where the congregation members will be taken in relation to Masjid Madani. For the information of the Honourable Member, the establishment of Masjid Madani here in Taman Arowana, as stated by the Prime Minister, is an initiative of the Honourable Dato' Seri Utama Anwar Ibrahim involving an allocation of RM75 million from individuals, corporate figures and foreign leaders, who did not take a single sen, as announced by the Honourable Government, the Honourable Prime Minister. However, the Honourable Prime Minister expressed his thanks to the State Government that

succeeded in providing this site and carrying out the land acquisition, land acquisition for the purpose of developing Masjid Madani.

The justification for building this Masjid Madani takes into account the following matters: the increase in the number of congregation members following the housing project constructed by JKP at Kampung Bagan Serai and the Seetee Aisah 2 Project, which has 2 blocks and 572 housing units. Establishing a congregation with a mosque in Penang located along the North-South Expressway will become a landmark of Islam on the Penang mainland. The strategic location of the mosque makes it easier for road users travelling from north to south to perform their worship. This is because previously there was no mosque in Penang located beside the north-south highway, which made it difficult for road users to perform their worship and they had to pray at surau or petrol stations.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Here in Batu Maung, does this mean it involves splitting the congregation, because this mosque must have its own congregation members. Has the congregation split actually happened? Has the Mufti Department already gazetted the split of the congregation, because this mosque is being established within the congregation area? If there are no Friday worshippers, where will the Friday worshippers come from? Surely we cannot just go wandering everywhere like that.

Deputy Speaker of the HouseEN

Okay, Batu Maung, please go ahead.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

The congregation split has been completed. If not, a mosque cannot be built; the congregation must be split. That process must be carried out first, and only then can the mosque be built. As I said earlier, that is the answer to Teluk Bahang. The State Government's plan to ensure administrative involvement of the mosque and congregation members is that the mosque will be managed by MAINPP and JHEAIPP. MAINPP will set up a MAINPP branch office in Seberang Perai that will handle all matters related to Islamic religious affairs at Masjid Madani. All activities, programmes for mosque prosperity and welfare will

be carried out as at other mosques in this state, involving the participation of the congregation members within the mosque's congregation. In response to the question from the Honourable Member for Matang Pasir regarding whether the government plans to place the Seberang Perai Tengah District Religious Office and a school in the area of the Masjid Madani to be developed. For the information of the House, the State Government has no plans to place the SPT District Religious Office and religious school in the Masjid Madani area. Only from an administrative perspective, the Islamic Religious Council in Seberang Perai will have its branch there. This is because at present the construction of the new building for the SPT District Religious Office is in the pre-implementation phase and will be built on part of Lot 2763 Mukim 10, Seberang Perai District. In response to the question from the Honourable Member for Matang Pasir, how much allocation has been and will be provided to NGOs. There is no specific allocation to NGOs; applications are considered case by case, but allocations have been given to NGO coalitions, for example Hidayah Centre Foundation Pulau Pinang and the Islamic Propagation Society International, involving an allocation of RM50,000.00. However, if any NGO applies, it will be approved on a case-by-case basis.

Furthermore, in response to the question from the Honourable Member for Matang Pasir, there are also many in Permatang Pasir concerned about the measures taken by the State Government in tackling the issue of Islamophobia. There are many programmes implemented by JHEAIPP. Dakwah programmes through speech and deeds, expanding cooperation with the non-Muslim community, the State Government's togetherness at official gatherings, cross-racial and cross-religious participation in agency programmes, messages of unity and well-being in khutbah, kuliah, and dakwah media, and cooperation between government agencies. JHEAIPP is ready to cooperate with JPNPP, the EXCO Office, PDRM, JPENIN (National Unity and Integration Department) and other agencies within the context mentioned here.

In response to the question from the Honourable Member for Penaga regarding the issue of housing assistance to an individual through a special approval to settle the outstanding housing loan given to an individual named Zamri bin Ahmad, who received special assistance under the housing scheme, monthly food, monthly financial assistance and other one-off assistance, and the total assistance received after his house was settled is RM187,868.60. Was the approval of assistance of this magnitude first brought to the Zakat Housing Committee of MAINPP before being decided by the Zakat Board of Directors of MAINPP? Why was assistance of this size only approved at the Board of Directors level? Why was

the approval of such a large amount for an individual? Why was this assistance disbursed directly to the account of the individual's wife?

For the information of the Honourable Member and all Members of the House, the individual in question is Encik Zamri bin Ahmad, who resided at Taman Seri Serdang, Kepala Batas, Seberang Perai Utara, and passed away on 15 November 2025. Previously, he served as a Public Assistant at the Veterinary Services Centre. However, life's trials came unexpectedly. He was diagnosed with heart failure and stroke, which directly affected his ability to continue his duties. Due to his deteriorating health, a report from the Medical Board established by the State Health Director of Penang on 19 July 2022 decided that he was no longer permanently able to carry out the responsibilities of his post. The termination of this service not only affected his career but also his daily livelihood and that of his family. The family's income came only from a pension of RM1,518.97 per month and they had to pay the monthly housing loan instalment of RM1,340.00 per month. The monthly expenses left only a balance of RM178.00. In view of these circumstances, the Zakat Majlis Agama Islam side conducted an investigation into the needs and situation faced, and so he was considered for assistance and became a recipient of the MAINPP Zakat Monthly Financial Scheme of RM500.00 per month and the Basic Needs Food Distribution Scheme of RM200.00 per month starting from August, with a review of the report carried out within a period of 3 months, 4 months before that August. His wife, Siti Fatimah binti Syarif, once ventured into the food business as an effort to supplement income and reduce the family's financial burden, such as selling, among others, ice cream. However, due to the health problems experienced, the business could not be continued. The couple Zamri bin Ahmad and Siti Fatimah binti Syarif were tested with health problems related to fertility.

However, to fulfil their natural affection for children, they adopted two children and registered them in 2014. The children are Nur Fatihah Najwa binti Abdul Malik and Muhammad Najwan bin Abdul Malik, who now are a delight and a source of strength and spirit in their daily lives. This noble action reflects the sincerity and resilience of this couple in building a harmonious family full of affection. The first child, Nur Fatihah Najwa binti Abdul Malik, has just received the results of the Sijil Pelajaran Malaysia recently,

she is a resilient and dedicated student, despite having gone through a serious health test when she experienced kidney failure. Now, she depends on only one kidney to continue her daily life. This condition requires continuous health attention and monitoring and has a major impact on her well-being and the family. As for the second child, Muhammad Najwan bin Abdul Malik, he is now in Form 2 and is pursuing education at secondary level. He is a diligent and enthusiastic student who shows effort in his studies despite facing the challenges of family life. Seeing the needs and hardships faced by Encik Zamri bin Ahmad, particularly relating to housing and shelter, his case was raised. And every month he applied for one-off assistance as an addition to the RM500 and RM200 assistance because it was insufficient due to the pressure of paying monthly to what is it, the bank.

Thus, the report was raised to the Zakat Housing and Facilities Committee Meeting of the Majlis Agama Islam Negeri Pulau Pinang, Number 2/2025. The Zakat Housing and Facilities Committee carefully studied the difficulties faced by Encik Zamri bin Ahmad and, with the limited allocation under the housing scheme, decided that if RM80,000.00 were settled, it would not solve the problems faced by the late Zamri. That means there was still a balance. Therefore, according to the cost of building a house, Zakat MAINPP, for the purpose of reducing the outstanding loan to be paid and the initial balance before settlement, was RM103,967.00, using the Gharimin asnaf allocation. However, after the final settlement was made, the reduced settlement balance was RM98,368.60. However, this approval and recommendation is subject to approval and endorsement to be passed by the Meeting of the Board of Directors of the Zakat Majlis Agama Islam Negeri Pulau Pinang, where the Gharimin allocation provided for the year 2025 is RM5,910,000.00. So, accordingly, MAINPP Zakat submitted the proposal paper and approval relating to the Board of Directors Meeting on 23 June after it was tabled at the Housing and Facilities Committee Meeting earlier.

The MAINPP Zakat Board of Directors carefully and thoroughly examined the matter and approved the proposal paper for the special distribution approval to Encik Zamri bin Ahmad as presented. The meeting also agreed that the house may not be sold (caveat) for a period of 10 years after settlement. The total of the approval, the overall payment amount is RM178,368.60 in two (2) stages of payment. The first, a payment of RM80,000.00 was made on 10 September 2025 directly into the housing financing account in the name of Siti Fatimah binti Syarif, his wife. Meanwhile, the balance payment of RM98,368.68 was made on 17 September 2025 directly into the housing financing account of Fatimah binti Syarif.

This is her receipt. It's just that I was rather surprised that I was in the House. When it was shown, the words "paid to personal account" are not correct. Because the recipient account number is indeed the same, namely 7000142885, the second payment was also to account 7000142885. It's just that when the payment details were written, perhaps the Honourable Member for Penaga saw that payment was made to his wife's account. But it was paid.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Just a little, just a little interjection. YB Batu Maung, the issue of settling what, the outstanding housing loan of this asnaf. Actually, I already raised it during the debate. The matter or the issue I raised is one of integrity, transparency, procedure or governance and financial administration at the Zakat level. Looking at asnaf, indeed we in Penang have many, and many issues like those detailed earlier by YB Batu Maung, there are many in Penaga I can bring. If that were given priority, there are many more asnaf who are really in need.

Settling the outstanding loan, I am not sure what house he bought, what type of house it was. But the outstanding loan alone totals RM178,368.00. This is one question, a big amount. I am not sure which Board approved it, whether at the Zakat Board level or the Islamic Religious Council level. And whether it was first referred to ask for the views of the Fatwa Committee. Because this uses zakat money, zakat money is not waqf funds and so on. With such a large amount, then deposited as mentioned earlier, that account is indeed in the name of Siti Fatimah, a personal account. I too bought a house and that account is indeed in my name. But if it goes into that account, the bank will not deduct it all at once. They will deduct it monthly. So I want to ensure that the total of the two payments made through asnaf miskin. The RM80,000.00 allocation and the gharimin asnaf of RM98,000.00 more than that, with a total of RM178,368.60, is it

now that the bank has taken everything and has settled it, or is there still a balance in that account. Deducted every month. This is the question I raised.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Yes, that is what I answered earlier, that the settlement of the housing account has been completed. So, what the Honourable Member for Penaga can do is check the account, it has been closed. It has been closed. That means the payment has been settled. Regarding the approval, it was made at the Housing Committee level and brought to the Board of Directors Meeting because the allocation for gharimin, which I mentioned, its allocation is RM5,910,000.00 until month six. So, that decision was made at the level of.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

YB, a brief interjection.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

That is what is being made clear now.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

In terms of this financial procedure, this financial governance. Can such a large amount be released without being direct, or not settled directly but put into a personal account? And was this procedure applied, or is this a first-time case, or have there been cases before with such a large amount, RM178,000.00, released to him?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Not a personal account. A housing account in the name of his wife.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Yes, one more thing. That name is also a problem. So, that house is not the house of asnaf Zamri, but was bought in the name of his wife. That too is a question that needs to be considered, or given attention by the Zakat side, because this asnaf is Zamri, not his wife. I was informed that his wife was working that day.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

No, she was not working.

Ini asnaf.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

This is what is being discussed, yes.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

So (interruption), we settle the outstanding debt to a non-asnaf because the name is his wife's name. This is also a question that many asnaf have raised, and they are dissatisfied. Why this issue?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

As I have already discussed, in the chronology of Zamri bin Ahmad's case, it was assessed in a period in 2023, and he was finally granted poor asnaf status, namely in August. Monthly assistance began for him. So, to resolve the problem faced by him, because the house payment was borne by Zamri from the account, from his pension fund of RM1,500.00, which was deducted by RM1,300.00 or more, as I mentioned earlier, leaving a balance of RM178.00. So he cannot live. So in the end he paid the house account funds

which were paid by this asnaf on the liability incurred by Zamri. Therefore it was raised in the Meeting.

Sedikit pencelahan.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Jawatankuasa.

Sedikit pencelahan.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Let me finish my answer first.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

A little, a little, a little interjection from Batu Maung. Alright, I want to, I want to resolve, or I want to make sure this issue is resolved, because it is a big issue as I have said. If the outstanding debt of RM178,000.00 is what I see, and many are of the view, and even outside there are those who are of the view, that it is better for this house to be sold. Settle the outstanding debt, sell the house, and give Zamri's asnaf an asnaf house valued at RM80,000.00. Provide a house worth RM80,000.00 for him to live with his family. So the house he bought at such a large amount is better sold and the debt settled. That is better. Not just settling the outstanding debt.

Deputy Speaker of the HouseEN

Okay, Penaga. Okay Batu Maung, go ahead.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

So, procedurally, it was eventually brought to the Committee and submitted to the Board of Directors, out of the allocation approved and discussed critically and comprehensively. And in cases involving large amounts, it is not only Zamri's case, in terms of the case. For information, for example, the younger sibling Khayla Adha Mirza binti Imran, born on 16 September 2016, aged 9, residing in Taman Pauh Jaya, Perai. She suffered a fracture, a broken bone.

Deputy Speaker of the HouseEN

This is his problem, we actually cannot quote individuals directly. We cannot.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Tapi kena.

Deputy Speaker of the HouseEN

But the problem is when it comes to giving the explanation.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

The approval made by the Board of Directors, amounting to RM180,000.00, and rental payments of RM1,100.00 per month from August 2025, to ensure the health of the younger sibling is not disrupted, so that she does not have to move to another rental house.

Deputy Speaker of the HouseEN

Okay, Batu Maung, please continue. I want to.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Batu Maung, Batu Maung. Before that, I also want to. So, this will become a case, will become a reference case. There are many troubled people there, many people in hardship like that. What is special about these cases. What is the connection. So that they receive this special treatment?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Including the younger sibling, including the younger sibling I mentioned earlier. That means in this case and for example.

Deputy Speaker of the HouseEN

Are there other cases?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

There are other cases, namely receiving assistance of RM125,741.00, and there are other cases receiving assistance of RM158,970.00. And today I requested information from Zakat: there are 542 people within this five (5) year period. Payments and an example that I can give to the Honourable Member for Penaga is RM193,389.00. These are isolated cases and cases raised from time to time. That is why, in certain cases as the Honourable Member for Penaga mentioned earlier, or the Honourable Member for Sungai Dua, may apply specifically and be considered by Zakat.

Deputy Speaker of the House

Okey.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Furthermore, in response to the Honourable Member for Penaga regarding the land purchased or identified by the Penang Islamic Religious Council, the land sold and extended

to MAINPP (Penang Islamic Religious Council). That relates to the question raised by the Honourable Member for Penaga and shows a letter dated 11 August, and up to today it has reached three (3) months. I asked them to check but they could not find it. If possible, the land measuring 204,000 square feet in Mukim 6 Pondok Upih, Daerah Barat Daya, can and will MAINPP consider buying that land at a value of RM11,251,000.00 or a joint venture, right. The State Government through the Islamic Religious Council, I asked them to check many times. They checked and did not receive the land sale offer through the letter mentioned, dated 11 August. So, what was raised.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Batu Maung. If that letter is with me, I will extend it.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Yes, thank you. However, based on the matter raised, we will examine it. MAINPP may consider the offer submitted, because that is indeed the purpose of the Penang Islamic Religious Council now, which is to increase ownership of land that can be developed or kept as a land bank in the future. In response to the question raised by the Honourable Member for Penaga regarding the issue of Takmir teachers playing their role: indeed, the Islamic Religious Department is always committed to strengthening the role of Takmir teachers in this state. Accordingly, many improvement measures have been and are being implemented by the Penang State Islamic Religious Affairs Department.

The review of improvements to the Takmir Teacher allowance rate is also considered from time to time by JAKIM, based on financial capacity and decisions at the Federal level, since the Takmir Teacher Allowance Scheme falls under JAKIM's jurisdiction. However, MAINPP always helps by providing additional gratuity payments to Takmir Teachers, paid twice (2) a year. In response to the Honourable Member for Penaga's question regarding the issue of land purchases as assets for the Penang Islamic Religious Council using zakat funds, namely the purchase of land in Sungai Bakap from 2023 to 2025. How many lots or areas of land were purchased by MAINPP using Zakat money. What is the procedure, if

true, why did MAINPP make the decision without taking into account the views of the Fatwa Committee, which clearly did not agree to buy that land.

For the information of the Honourable Member, according to the number of land lots purchased using Zakat tawaqquf funds from 2023 to 2025, there are three (3) lots, namely in Sungai Bakap. One lot, the Committee decided, is redemption, namely in Bagan Jermal. And one (1) more lot, acquisition, namely in Mengkuang Titi. So altogether it is five (5), right. If we say purchased, three (3). One (1) acquisition, one (1) is redemption, buy-back. And the procedure and method of purchase used are as follows. Receive the sale offer and record the seller's information, lot address, title number and proposed price. Preliminary investigation and site visit to assess potential use and identify technical issues. Application for official valuation to JPPH to determine the current market value. Legal and technical due diligence including checking title status. Restrictions, if any, including waqf, third-party ownership, taxes and environmental checks. Preparation of a complete working paper combining the site visit report, JPPH report, legal comments and financial analysis, and proposed purchase conditions. And presentation to the MAINPP Land and Asset Management Committee Meeting for endorsement.

Presentation to the MAINPP Meeting together with the endorsement of the MAINPP Land and Asset Management Committee for final approval and determination of conditions. Signing of the sale and purchase agreement and the signing of the sale and purchase agreement (SPA) and ownership transfer transactions through Form 14A after conditions are met and financial allocation is approved. The Penang State Fatwa Committee Meeting Number 1/2024, confirmed on 16 and 17 March 2024, and the Penang Fatwa Committee Meeting Number 4/2024 dated 15 October 2024, have summarised the proposal paper presented by the Secretary of MAINPP and the Head of the MAINPP Land Administration Unit, at the initial stage, deferred for more detailed and comprehensive discussion at MAINPP level on the use of the land purchased for the benefit of asnaf.

MAINPP Meeting Number 12/2024, the 260th time, dated 20 December 2024, has taken into account and noted the Fatwa's views decided in relation to comprehensive land use planning for the benefit of asnaf, and further discussed the purchase of land with emphasis on the aspects of maqasid syariah and

maslahah ammah (public interest). The Mufti, who is a Member of MAINPP, received views from MAINPP Members regarding the need to purchase these land lots during further discussion held in that MAINPP meeting.

However, there are certain cases in which MAINPP has deferred the implementation of Fatwa views or decisions on reasonable grounds such as management, financial and social aspects. For example, the decision of the Fatwa Committee Meeting Number 2 on 29 and 30 permitted Friday prayers at the Seberang Jaya Hospital Surau. But the MAINPP Meeting deferred the implementation decision in order to review the policy and approval process. This is one example where we deferred and did not implement a Fatwa decision.

The MAINPP Meeting saw a need to urgently purchase those land lots because there were other ownerships, other owners who intended to sell land without giving attention to matters of property ownership by Muslims. Moreover, the MAINPP Meeting took into account the recommendation made by the MAINPP Land and Asset Development Committee Meeting Number 1 dated 20 February 2024, chaired by the Deputy Speaker of MAINPP, when discussing the sale offer of these land lots. For information, the membership of the MAINPP Land and Asset Development Committee consists of MAINPP members themselves and representatives from various agencies such as the District and Land Offices from all districts, the Valuation and Property Services Department (JPPH), Penang Island City Council, Seberang Perai City Council, the State Economic Planning Unit, the Penang State Mufti Department, and the Penang State Islamic Religious Affairs Department.

There is no issue of conflict of interest because one of the owners of the land lots purchased by MAINPP declared an interest and left the meeting during the discussion on the sale offer of the land lots to MAINPP, both in the MAINPP Meeting and in the Fatwa Committee Meeting. He declared his interest and left the meeting. Referring to the answer prepared by the Penang State Mufti Department itself, just let me finish this one. The Penang State Fatwa Committee did not reject the purchase of that land, did not reject it, by issuing a ruling of impermissibility. It did not issue a ruling, it did not reject the purchase of that land. This was issued by the Mufti Department itself in terms of its commentary. Regarding MAINPP's intention to use tawaqquf money to buy land on lots 240, 264

and 265 Mukim 3 Seberang Perai Selatan. The decision of the Penang State Fatwa Committee through paper Number 6-6/4/2024 reads: disagree with the proposal by MAINPP to use tawaqquf money to buy that land because the estimated return is RM17,000 a year. This is what the Honourable Member mentioned about 100 years. Because the Fatwa Committee's consideration was based on that paper. The Fatwa will not make a decision beyond what is stated in the paper at that time. Therefore, this decision is based on the consideration of an inefficient return. That is a decision based on the paper. But that is not a ruling. And it is not an Irsyad Fatwa either. There is a difference. One is from the perspective of Irsyad Fatwa. The other concerns gazetted fatwa. Irsyad Fatwa is a fatwa issued concerning ruling. So now it is turning into a lecture.

Deputy Speaker of the House

Kuliah Zuhur.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Concerning ruling. But, but this is not an Irsyad Fatwa. This is the view of the Fatwa Committee itself, that it disagrees with the proposal based on the report in the proposal paper. And the Mufti Department states that this decision is based on the consideration mentioned about an inefficient return. And not based on the issue of permissibility or impermissibility. This is from the Mufti Department in accordance with syarak. That decision signals that the Penang Islamic Religious Council is still permitted to buy that land, if there is more appropriate (aslah) justification, namely it is better to proceed with the purchase.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

A little interjection from Dato' Batu Maung, a little interjection. I am satisfied with the explanation given earlier.

Deputy Speaker of the HouseEN

Satisfied, is it?

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Just want to confirm, want to confirm. The conflict of interest, indeed the individual was not in the meeting.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

No, yes, left.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

When the decision was made. That is confirmed.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Confirm.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Alright. The second. I also see that if the Fatwa Committee has stated in this letter that it certainly does not agree to the purchase of that land using

Deputy Speaker of the House

Bukan hukum.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Zakat funds, tawaqquf money, right. So, the Religious Council, can it, because the fatwa's view is that it is not necessary to buy that land with Zakat funds?

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

We accept. We accept because there is a guideline approved by the Committee on using Zakat tawaqquf funds to buy land for the purpose of asnaf development. And

the decision and guideline from the Fatwa Committee has reached this level that Zakat Tawaqquf Funds may be used. Not for the purpose of asnaf development.

Ya.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

And it is counted as a Qard, that is, a loan.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

To respect this view.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Ya.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

The Religious Council should use or buy that land not from Zakat Tawaqquf money, but perhaps from Waqf Funds.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Baik.

Mohd Yusni bin Mat PiahPAS · PNPenagaEN

Because the fatwa has considered based on the paper submitted. If it is wanted, then the second paper must be brought back in (inaudible).

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

That is why, that is why the Mufti Department asked for it to be discussed again. Resumed again in the MAINPP meeting for a decision. So in that there are, there are three. Dato' Mokhtar left. I mentioned the name. I apologise. I withdraw it. I also mentioned it yesterday.

Deputy Speaker of the HouseEN

Do not mention names.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

So I did mention names. There is a Palace Religious Officer who is also a member of the Fatwa Committee in that meeting. And there is the Mufti, the Sahibus Samahah, in the Religious Council meeting. The decision of the Fatwa Committee is not a fatwa decision. The decision of the Fatwa Committee does not mean rejection. Only disagreement. It was only brought back to the MAINPP meeting. Let's discuss.

Deputy Speaker of the HouseEN

Okay, Professor, we understand already.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Because from the legal perspective.

Deputy Speaker of the House

Ustaz, faham.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Because of his consideration. His consideration, Honourable Member for Penaga. I also say it here with permission.

Deputy Speaker of the House

Penaga, Penaga.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

The Seetee Aisah land, for example, which was endowed (waqf) by Siti Aisyah on 30 September 1901, 120 years ago, was not strategic, not efficient, located in the middle of paddy fields. Siti Aisyah did not even know that this land would be on the main road of the North-South Expressway. Endowed by Siti Aisyah. So we are discussing making it a land bank for the Islamic Religious Council for the development of the ummah. And at this stage we also propose, as we have developed at Tanah Ara Kuda, for agriculture, for asnaf development, not only for the poor and needy asnaf, but including Fisabilillah asnaf, including university students who can benefit from developing this land.

Deputy Speaker of the HouseEN

That's enough, that's enough.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Based on this consideration, it was discussed at length, taking into account the guideline ruled as permissible (harus) by the Fatwa Committee, that the use of this Zakat Tawaqquf fund may be applied for the purpose of asnaf development. If not for asnaf development, then it is counted as a loan to the Tawaqquf Fund. This is the decision of the Tawaqquf Fund guideline by the Fatwa Committee.

Deputy Speaker of the HouseEN

Okay Batu Maung, landing, landing.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Honourable... (inaudible). Thank you very much. Always, Honourable Member, Penaga, and…

Abidin bin IsmailPAS · PNSungai BakapEN

Honourable Member for Batu Maung.

Deputy Speaker of the HouseEN

Sungai Bakap is enough already.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Regarding allowances and also incentives for individuals who serve in the management of funerals and gravediggers, these will be considered, God willing, based on the financial capacity of the Penang Islamic Religious Council. In conclusion, Dato' Deputy Speaker and Honourable Members,

Abidin bin IsmailPAS · PNSungai BakapEN

Dato' Batu Maung, just now (inaudible).

Deputy Speaker of the House

Okey cukup.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

The uniformity of implementation under this Islamic religious development agenda, we will drive it, God willing.

Abidin bin IsmailPAS · PNSungai BakapEN

Just now, I was waiting just now.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

And the State Government is confident that

Deputy Speaker of the House

Duduk, duduk.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

All these efforts form a strong foundation for this state to produce a better, knowledgeable, competitive, responsible and noble-character society. In line with Penang's identity as an inclusive, progressive state grounded in family values that inspire the nation. As ADUN Batu Maung, I also took the opportunity to speak earlier as EXCO for Religious Affairs. Allow me to add that the State Government's commitment to local community development was also demonstrated through the completion of the Batu Maung State Assembly Multipurpose Hall, which was handed over last week. I thank the State Government for building the Batu Maung State Assembly Multipurpose Hall under my supervision, that is, as ADUN Batu Maung. And about two weeks after I took the oath as Deputy Chief Minister I, Alhamdulillah, this project was successfully completed earlier, on 27 October 2025, at a cost of RM 4,975,424.32, fully financed by the Penang State Government.

Deputy Speaker of the HouseEN

Batu Maung, Batu Maung.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Thus, I record my appreciation to

Deputy Speaker of the HouseEN

Speaker, you didn't even allow me to interject like this.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Dato' Seri Abdul Halim bin Hussain, former ADUN Batu Maung. I must give appreciation to the former ADUN Batu Maung.

Deputy Speaker of the HouseEN

Alright, with your permission.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Dato' Seri Abdul Halim bin Hussain, Public Works Department (JKR), and the contractor, on the completion of this project. It has now begun to receive applications for use from local residents. This facility is expected to become a catalyst in implementing the solid agenda of Batu Maung, covering the aspects of harmony, youth, fishermen, an academic park, and progressiveness. And next, we are going to develop housing on waqf land at Permatang Damar Laut, which has been approved by the State Government with an allocation of RM75 million from the Amanah Bumiputera account, as decided by the State Government Executive Council (EXCO) Meeting of Penang. Once again, the ADUN for Batu Maung, representing the people of Batu Maung, thanks the State Government.

Deputy Speaker of the HouseEN

Batu Maung, would you like to interject a little? Mr Speaker may interject. (laughter) Likewise, Bayan Lepas also hopes that the Bayan Lepas Mosque can be expedited. (laughter)

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

This includes a project related to the development of waqf land, Insya-Allah, under consideration by the EXCO Meeting, with an allocation of RM30 million to develop waqf land in Bayan Lepas that was endowed by the waqif in 1948.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

I would like to interject briefly. (laughter) We request that the cemetery issue at Sungai Dua be resolved. (disruption)

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

I thank the Penang Islamic Religious Affairs Department (JHEAINS), the Penang Islamic Religious Council (MAINPP), Zakat Pulau Pinang, and all the agencies involved in the Penang Islamic Religious Development Agenda 2030. In conclusion, as a state that is moving towards improving quality of life, founded on the Mission and Vision of Penang2030, the State Government is always committed, through integrated and collaborative efforts among all parties, to creating balance and economic and social stability, while upholding high moral values and ethics among the residents of this state. Accordingly, the State Government calls on all parties to respect and celebrate the diversity of religions and races in this state, so that the harmony and peace we enjoy will always be preserved and passed on to future generations. Thank you. Batu Maung requests to second the motion.

Deputy Speaker of the HouseEN

Thank you, Batu Maung. Honourable Members all. The winding-up is suspended and will resume at 2:30 pm this afternoon. Thank you.

The House was suspended at 1.26 p.m.

The House resumed at 2:30 pm.

Secretary of the HouseEN

Honourable Member, Honourable Member, Speaker of the State Legislative Assembly.

Speaker (Speaker)EN

Honourable Members, we are resuming, and we have reached the final winding-up session. Please, the Right Honourable Chief Minister.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Salam Sejahtera, Salam Malaysia Madani and Salam Penang 2030. The Honourable Dato' Seri Speaker of the State Legislative Assembly, the Honourable Leader of the Opposition, the Honourable Members of the State Government Executive Council, the Honourable Members of the State Legislative Assembly, Heads of Departments, media colleagues, and all the respected ladies and gentlemen.

With full spirit and confidence in the future of the state we love, allow me to begin today's winding-up by expressing my highest appreciation for all the incisive views, constructive criticisms, and visionary proposals put forward by the Honourable Members of the House during the debate on the Supply Bill and the Development Estimates Motion for the Year 2026. The debate that took place was not merely an exchange of views but a clear demonstration of our shared commitment to bringing Penang towards greater achievement.

Indeed, the Budget 2026 tabled here is one of the important cornerstones in our efforts to realise the Vision of Penang2030, a Smart and Green State founded on the family, a national inspiration which is also in line with the Aspirations of Malaysia MADANI, a vision that not only drives physical development but also uplifts the dignity of people's lives, strengthens the family institution, and builds a brighter future for the coming generations.

Therefore, this winding-up will clarify the strategic actions of the State Government, reinforce the commitment to the four pillars of the Vision of Penang2030, and outline how each proposal raised by the Honourable Members will be translated into tangible results for the people.

Dato' Seri Speaker. Based on the latest economic information, the Gross State Domestic Product (GDP) of Penang State for 2025 is estimated at RM121.5 billion, in line with a state economic growth rate of 4.8%. This figure reflects the solid performance of the high-technology manufacturing, electronics and electrical sectors, as well as external trade activities, which continue to be the main drivers of our state's economy.

Along with this, Penang's GDP per capita was recorded at RM76,033 for 2024, making Penang among the states with the highest per capita income in the country, surpassing the national record of RM56,734. This achievement reflects the state's economic competitiveness, the efficiency of its industrial structure, and Penang's ability to attract high-value investment.

Investment Scenario. The investment performance of Penang's manufacturing sector not only remains solid but also continues to position this state as the leading player in high-technology investment in Malaysia. Data from 2009 to the third quarter of 2025 clearly shows that Penang stands in a class of its own in attracting foreign direct investment. Referring to MIDA data, the total investment in the manufacturing sector for 2009 to 2018 was RM65.67 billion. Meanwhile, for 2019 to the third quarter of this year, total manufacturing investment has increased to RM217.42 billion. This more than threefold increase reflects the increased level of investor confidence in the State of Penang. This is no coincidence. This success results from consistent policy settings, careful planning, and the confidence of global investors in the stability and capability of this state.

At the same time, domestic investment continues to show strong commitment. The steady inflow of domestic direct investment reflects the trust of local companies in the economic direction of Penang. This situation reflects that the state's industrial growth does not depend solely on FDI but is also strengthened by the strength of local players. Until September this year, the state has recorded manufacturing investment reaching RM15.79 billion. This achievement proves the resilience of our economy even though the world is facing tariff issues, geopolitical uncertainty and global supply chain pressures. Penang remains firmly a safe choice for investors who value stability, competitiveness and future-oriented outlooks.

The State Government is committed to ensuring this momentum continues. We will continue to focus on high-quality investment, automation, digitalisation, research and development, and strategic technologies that can guarantee the state's competitiveness in the long term. We do not merely want to be the leader but the benchmark for the other states.

Penang Development Bank. Dato' Seri Speaker and Honourable Members. The State Government thanks the Honourable Member for Pulau Tikus for the proposal put forward regarding the establishment of the Penang Development Bank. The proposal is in line with the State Government's Aspiration to strengthen infrastructure development, the industrial sector, and support urban renewal and tourism initiatives. In fact, it is also highly relevant to the proposal to establish the Penang International Financial Centre (PIFC). The State Government wishes to inform that this proposal will be studied in detail to assess the effectiveness and suitability of the proposed financial management model with the framework and financial policies of the State Government. This assessment process includes a study of the management models of successful state-owned or government-linked development companies (GLCs) at the international level, and adaptation to the national laws and regulatory requirements.

On finance, as everyone is aware, the Supply Bill 2026 has been tabled by the State Government to implement an estimated expenditure of RM1.087 billion and a development expenditure estimate for 2026 of RM318,622,100.00. The estimated state revenue for 2026 is RM1.068 billion. In winding up, allow me to emphasise the very commendable fiscal achievement of the State Government. Based on the latest estimates, the deficit for 2026 is expected to be only RM19.92 million, while 2025 recorded RM33.63 million. This is a significant decrease compared with the deficits of previous years which cumulatively amounted to RM514 million over the last 10 years. This achievement clearly proves the effectiveness of the state's financial management policies and revenue improvement measures, prudent expenditure control and careful fiscal planning, which have enabled the state to record the lowest deficit in recent recorded history.

Consolidated Revenue Account. Dato' Seri Speaker and Honourable Members. I wish to inform that, as of 20 November, which is today, the State Government has recorded revenue collection of RM927.63 million. This collection has exceeded the 2025 target of RM906.59 million, thereby placing the State Government on the right track to increase the accumulated balance of the Consolidated Revenue Account. With recent developments, the deficit projected at the beginning of the year or during the presentation of the 2025 budget, which was RM33.63 million, is now only RM12.59 million. With the continued commitment of the State Civil Service members, the State Government is optimistic to achieve total revenue collection exceeding RM1 billion before the closing of the final accounts this year, as was last achieved in 2016 when we recorded revenue collection of RM1.029 billion. It has been many years since we were able to collect revenue exceeding RM1 billion. Perhaps this year we can achieve more than RM1 billion. No requests, yes.

Referring to the debate by the Honourable Leader of the Opposition, the State Government takes note and does not deny that the Consolidated Revenue Account (AHD) has recorded a decline every year from the balance as at 31 December 2019, which at that time amounted to RM1.15 billion, to RM155.94 million as at 31 December 2024. In this context, the State Government normally recorded a revenue surplus of RM80.21 million in 2019 before recording deficits from 2020 to 2024. This performance shows that government expenditure has exceeded revenue collection in the related five-year period, namely from 2020 to 2024. The cumulative deficit over these five years has reached RM998.88 million, close to RM1 billion.

In response to the Honourable Leader of the Opposition's claim that the money is lost, that someone used the money, just lost like that. I stress here that no loss occurred. On the contrary, the money was spent through various welfare programmes and incentives that directly benefited the people, especially during the COVID-19 pandemic or disease period.

Among the programmes implemented were i-Sejahtera, the Penang Against COVID-19 assistance, assistance to people's religious schools, Chinese schools, Tamil schools, incentives for taxi assistants and bus operators, subsidies for various free bus services, ferry fare subsidies, and so on. Including local flood development projects. The details of this expenditure are as I have previously tabled in the August House during the last sitting. We are selective, and that alone amounts to RM1 billion. Perhaps more than that, I have not listed them. So if that money was lost from the Consolidated Revenue Account, it actually reached the pockets of the common people through welfare programmes. The strategy to reach RM1 billion in state reserves. Dato' Seri Speaker and Honourable Members.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Padang Kota, may I before this. I am somewhat confused on item 21 in the name of this in the Budget Speech of Padang Kota. Mentioning the significant increase in other expenses, OA 50,000 for 2026, amounting to RM9.96 million. Yesterday, Padang, Padang Kota, and Tanjong Bunga in the winding-up mentioned that it is RM10 million. In this, it says the RM10 million is payment, repayment back, payment of loans to Perbadanan Bekalan Air Pulau Pinang (PBAPP). Tanjong Bunga mentioned that PBAPP itself pays. Not the government. I request an explanation.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

In my winding-up, Tanjong Bunga will talk about water. I will talk about finance. On the same issue. During the winding-up session of the last sitting of the House, I made a promise to hand over the leadership of this state in perfect condition with a strong financial position. Specifically, RM1 billion in the AHD. The latest position of the AHD balance as of today is RM397.71 million. Compared with the balance for 2025 or 2024, well, not 2025. The AHD was RM155.4 million. So, although this figure is not yet final, because there is still more than one month to account for expenditure and amendments to the Development Fund that are still being implemented until the closing of the final accounts for 2025. This performance proves that the State Government is working to increase the AHD balance again through strategies to increase state revenue, while also implementing fiscal expenditure in an ideal manner. That is, from the RM155 million balance at the end of 2024. Initially, we budgeted the balance to be only around RM50 million. But after the closing, the balance remained at RM155 million at the end of 2024. So far this amount has been raised to RM397 million. So if we follow the collection, revenue and expenditure, it is not impossible that this figure reaches a balance of RM400 million in the AHD. Thus, this shows that the efforts

in these two years have already shown results. I thank everyone for their sacrifice in not spending beyond what we can bear to achieve this situation.

The main contributor to the increase in reserves is from the increase in tax and non-tax revenue collection. Including land premium revenue, licence fees and dividends from investments. In addition, expenditure-saving measures and prudent financial management by the State Government also contribute to this increase in reserves. The State Government is implementing an action plan based on the principles of revenue efficiency, prudent management, and the strengthening of new state revenue sources. These efforts are focused on implementing nine (9) key strategies for increasing state revenue and several revenue improvement initiatives that are still being implemented in phases.

The tax revenue improvement initiative by the Land and Mines Office (PTG) covers strategies to increase land tax and assessment tax revenue over the next 5 years. This includes the collection of tax arrears and land forfeiture, the provision of guidelines for auctioning lands that have been forfeited due to tax arrears, land tax reviews, gazettement of urban areas covering the expansion of 10 existing towns and the establishment of 25 new towns. A review of transaction and non-transaction fees under the Penang Land Rules. This covers a review of temporary occupation licence (TOL) fees, grant of title premium rates, lease extension periods, and others as well. A review of Strata Assessment with a focus on new rates more in line with the Skim Strata Mewah, namely condominiums, serviced apartments and commercial complexes. Overall, this initiative is expected to contribute to an increase in land tax and assessment tax revenue from RM140 million to RM145 million which can be collected now, rising to RM300 million to RM350 million per year over the next 5 years. Meanwhile, non-tax revenue, namely premiums, transaction fees, permit fees, and so on, is expected to increase from RM300 million per year to RM400 to RM450 million per year over the same period. Meanwhile, the non-tax revenue improvement initiative involves initiatives to optimise revenue collection from various agencies. Among them, increases in poultry farm licensing fees, a review of service rental rates by the relevant departments, as well as a proposed increase in hotel fees. The State Government is optimistic that the implementation of this integrated approach will enable the RM1 billion target to be achieved by 2028.

To monitor progress towards this target, four key performance indicators (KPIs) have been set as follows:

(a) Growth of state revenue at a rate of at least 5%

to 7% per year.

(b) Actual collection exceeding 95% of the estimate;

(c) Prudent management of reserves in line with the current fiscal position; and

(d) Real-time monitoring of revenue to increase the effectiveness of planning. Therefore, these KPIs must be obtained before we can achieve the target of RM1 billion by 2028.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

Padang Kota requests to interject. Earlier I received a memorandum from the Penang Taxpayers Association. It has several matters regarding this tax increase. The tax increase may be the government's intention to add this. But at the same time, we see there are matters that may burden the lower-income groups, right. Here there are taxes listed. Perhaps this matter will reach the Chief Minister. This needs to be checked. If taxes reach the level of the people themselves, they are also severely burdened with a load that causes them to be affected. For example, paddy field tax, where when they plant to get 4 tonnes, they only get 2 tonnes. That example, they cannot get capital. They also have to pay, then there are other matters.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

This is part of my answer. Actually, the leaders of the Taxpayers Association made a statement when I announced the tax increase, the proposed increase. They did not object, but asked for it to be enforced next year or one or two years later, not now. They accept that we have not reviewed it for 30 years. How many more years do we have to wait. That's it. If not now,

Honourable Members

Bila.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

If not me,

Honourable Members

Siapa.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

The question is, do not jump, do not jump too high. People cannot reach.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Okay, I will continue. Next, regarding the sharing of proceeds from the sale of PDC land to the State Government, one hot issue was raised. PDC, together with the State Government, continues to play an important role in planning and driving Penang's socio-economic development. This cooperation focuses on attracting quality investment, developing strategic areas, and at the same time generating revenue for the state. The reclamation projects along the Queensbay coastline are a clear example of this synergy. They not only transform the landscape of the area, but also open up new economic opportunities and increase property values, with the benefits returning to the people through the State Government's share of interest. Based on current projections, the World City Project and the latest, the Penang Linear Waterfront Project, are expected to generate revenue of up to RM1.31 billion for the State Government. This will further strengthen the state's fiscal position and support more development programmes for the welfare of the people. However, this revenue will take several years to be realised.

Next, Mr Speaker and the Honourable Members, arrears of revenue. In reference to the question from the Honourable Leader of the Opposition regarding the factors contributing to the increase in the State Government's revenue arrears in 2024 compared with 2023. Based on the Treasury circular WP 10.6, Accounts Receivable Management or ABT. The definition of ABT is an amount that should have been received but has not yet been received by the government, arising from past events. Meanwhile, arrears are defined as ABT amounts not yet received that exceed the stipulated maturity period. In 2024, the State Government's ABT totalled RM315.8 million. This amount, yes, that is correct as the Leader of the Opposition said, increased by RM221.15 million, which is a 233% increase in accounts receivable arrears, compared with RM94.65 million in 2023. This is because, starting in 2024, ABT investments took into account land premium revenue. Most of this ABT comes from land assessment totalling RM71.58 million, land premiums totalling RM203.44 million, and rental and maintenance charges for housing under the supervision of the Housing Board totalling RM17.77 million. Thus, the ABT arrears for 2024 totalled RM274.8 million.

The increase in ABT in 2024 was due to land premium offers being included in ABT investments, based on discussions and mutual agreement with the National Audit Department, the State Finance Department, the Land and Mines Office, and all District and Land Offices. This land premium ABT accounts for 64% of the total ABT reported. However, the investment of land premiums as ABT has been reviewed, and the State Government has issued a policy on the point of recognition of land premium revenue. Land premium offers will not be reported as ABT because of the uncertainty over the value and timing of receipt, which is subject to appeals, exemptions, cancellations, forfeitures, and so on. Therefore, when this category is removed from ABT, the actual ABT for 2024 is RM122.35 million, and not RM274 million as previously stated. This is because when we approve the granting of ownership or sale, a premium is imposed and it is immediately recorded as revenue, even though it is still subject to the appeal process by the person granted ownership, the person to whom the land has been offered. That person can make an appeal, consider it, may request to pay in instalments over three years, or may say that he cannot afford it and does not accept the offer. But that revenue has already been recorded as received, as soon as approval is granted, he is taken into account. So, we have stated that this does not give a correct picture, and we have removed this portion from the arrears accounts. I hope this clarifies the situation.

The MARRIS allocation. In reference to the question by the Honourable Bagan Jermal, and perhaps other Honourable Members are also interested, regarding the MARRIS allocation from the Ministry of Finance (MOF). Based on the records of the State Finance Department, the total MARRIS receipts continue to increase every year. The State Government received a total of RM208.76 million in 2021, RM208.77 million in 2022, RM210.95 million in 2023, and for 2024 the receipts were RM221.72 million. For 2025, the amount received so far is RM207.3 million, which is approximately 93% of the estimated allocation to be received, namely RM223 million. For the information of this August House, the disbursement of MARRIS allocations by MOF to the State Government departments is made monthly. Every month he will release the money. Regarding the need for additional MARRIS allocation for MBSP, the State Finance Department is prepared to consider it, subject to the spending performance of the allocations that have been disbursed previously.

Next, new revenue. Dato' Seri Mr Speaker and the Honourable Members. In reference to the question raised by the Honourable Batu Lancang, the status of the assessment and management of non-radioactive rare earth element deposits in Penang remains as previously reported, namely based on the preliminary survey study conducted by the Minerals and Geoscience Department Malaysia (JMG). Based on that study, Penang has NRREE resources in several hill areas including Teluk Bahang, Balik Pulau, Bukit Mertajam, and Bukit Panchor. The total inferred resource in this state is estimated at around 1.7 million metric tonnes, with an estimated value of approximately US$21 billion, subject to verification through a detailed study. The potential of these resources can become one of the new economic drivers of the state, in line with the strategy to diversify the revenue base and ensure a more sustainable income model for the long term.

In line with these developments, the State Government is preparing the Penang State mineral regulations, as an important regulatory framework before any exploration or resource development activities are carried out. The State Government is also open to proposals from any party, whether local or international, that is interested in exploring the NRREE potential in Penang. Every proposal will certainly be evaluated professionally by the relevant Technical Departments.

Regarding the loan raised by the Honourable Leader of the Opposition, the justification for the commitment and the impact on the State Government's budget for the repayment of the PBAPP loan. This took place under the restructuring of water services with the Federal Government. I would like to state here that this repayment does not burden the State Government because the amount is PBAPP's own allocation that will be returned by the State Government. This follows from the 2011 water services industry framework restructuring agreement, under which the State Government found that a total of RM88.76 million was disbursed by PBA to the State Government to settle the loan involving water supply to the Federal Government. That amount must then be paid back to PBA after the lease agreement between PBA and Pengurusan Aset Air Berhad. In short, PBA pays twice. So the State Government will return what was paid in excess, and we will pay RM10 million every year for approximately 8 years.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

PBA has been paying for 40 years, you know.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

That is what PBA pays.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

So because it is in the 21 and in whatever, that is why I asked.

Chow Kon YeowDAP · PHChief Minister · Padang Kota

Ya.

Muhammad Fauzi bin YusoffPAS · PNSungai DuaEN

That means it is not government money, it means this money is PBA's money.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

PBA. Yes. We return what it actually paid twice. Regarding the advance of RM100 million from the Federal Government to the State Government raised by the Honourable Leader of the Opposition, it has actually been explained before. In return, MOF will make an offset. As the Honourable Member already knows, the offset is against four (4) types of grants to the State Government, namely the per capita grant, service payments, shared list, and tier grants, amounting to RM33 million each for 2027 and 2028, and RM34 million for 2029. This money is now in a trust account. We do not need to use that money. When we make an application, at that time we anticipate that a deficit may occur, but in the end, as I explained earlier, we estimate our balance, the consolidated revenue account left with RM50 million, but in fact RM155 million remains. So we did not use the advance money, and it was placed in a trust account. And when we reach 2027, the Centre will continue disbursing these funds, and they will deduct RM33 million in 2027, RM33 million in 2028, and RM34 million in 2029. So, they reduce it to recover the RM100 million they advanced to the state. At that time it will be recorded as revenue to be used.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Honourable Member, may I just get clarification for an explanation. The Honourable Member earlier mentioned tier grants too, tier payments. My question is, although every year we receive tier grants, does the Federal Government disclose or explain how this tier calculation is made, the formula calculated every year for the states including the State of Penang, and also the ecological fiscal transfer. Because, although we appreciate this money, until now we do not know how this calculation is made, considering that Penang contributes a great deal in terms of economic contribution to our country. Thank you.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Except for the per capita grant allocation. The per capita grant is based on the population of each state. There will be differences. If a state has a higher population, it receives more than a state like Perlis, which will receive slightly less. But the tier allocation and others do have a formula, but I cannot explain it. The difference between states is not significant. So I can conclude that it is not given based on the state's contribution to the Federation. It does not take that into account. The former Minister of Finance is here, perhaps he can help explain.

Regarding the question of the Honourable Bukit Tengah, the RM100 million loan given to PDC was to finance part of the cost of the GBS By The Sea project, which is valued at RM208 million. This project was developed to meet industry needs for office space with MSC Malaysia status and has now achieved MSC Malaysia Tier 1 status. It is also now fully rented out. At that time PDC felt that if this project used bank financing, it would increase the project cost, making it not very competitive in terms of rental rates. So they asked the State Government to contribute RM100 million so that they could reduce the financial cost of the project. And I believe we have still not fully disbursed it. Perhaps only RM70 million. Because at present PDC may not even need that disbursement. That can be renegotiated. But at that time the consideration was to ensure the project was viable, and if bank loans were used it would increase the financial cost of the project concerned.

The issue of overseas visits raised by the Honourable Leader of the Opposition. Throughout 2025, the State Executive Council Members carried out 22 overseas working visits. Not all at once, each had its own programmes. The total expenditure to carry out these visits was RM2.9 million. However, this includes RM1.4 million financed by PDC for the World Expo Osaka and RM0.22 million disbursed by MITI to support the programme in Osaka. These working visits aim, among other things, to expand regional cooperation and explore international market opportunities in the agriculture, technology, halal industry and tourism sectors, as well as attract foreign direct investment (FDI) to Penang as an effort to strengthen the state's economic growth. Among the main achievements of the working visits was the signing of three Memoranda of Understanding (MoU) between PDC and FedEx, DHL, as well as Synz International and Atlantic Blue, with a potential investment value totalling RM426 million. These MoUs were signed during the holding of Penang Week at the World Expo Osaka. Besides that, from the economic impact aspect, Penang Week also opened up space for strategic cooperation through 20 business matching sessions, involving companies from Japan, thereby expanding investment and trade ties for Penang.

The participation of the State Government's representatives in the Malaysia International Halal Showcase or MIHAS in Shanghai, China, recently witnessed the signing of two Memoranda of Understanding involving Penang companies, namely Nashmir Capsule Sdn Bhd and Hang Tuah Sdn Bhd with joint venture partners from China, with an agreement value of RM23 million. This cooperation not only expands Penang's halal market to China, but also strengthens the state's position in the global supply chain. The State Government has also successfully strengthened cooperation in the aviation sector to open and reconnect strategic international routes, and the EXCO for Tourism was involved in many visits because he wanted to negotiate direct flights to the State of Penang, and in the end we saw and witnessed the results, many new flights have been obtained. Among the cities that have direct flight connections with Penang are Xiamen, Shanghai, Shenzhen, Chengdu, Dubai, Chennai, Yangon, Doha, and several upcoming destinations, coming soon, landing soon.

Regarding the question of the Honourable Pinang Tunggal, following my visit to Kumamoto. Actually, I carried out an Investment Mission with Invest Penang to Kumamoto, and I knew about this matter and included it in our itinerary. To look at underground water sources. Kumamoto City uses underground water up to 95%. Its water supply comes 95% from underground water. So following that visit, the Water Regulatory Division, the Penang Water Regulatory Unit, submitted an application for allocation under RP 1 RMK for the purpose of mapping and developing underground water resources in Penang to JMG Malaysia. However, that application was not listed in the RP 1 RMK-13 approvals issued by the Ministry of Economy recently. Nevertheless, the State Government will continue to follow up and resubmit this application for consideration under the next RP, considering that the study and development of underground water resources is an important component of long-term planning to ensure the sustainability of the state's water resources.

Next, the project in South Seberang Perai raised by the Honourable Bukit Tambun. The State Government has never neglected South Seberang Perai, including Bukit Tambun. As I have stated before, the future of Penang is in Seberang Perai, the future of Seberang Perai is in Batu Kawan and Bukit Tambun. Bukit Tambun is within the Batu Kawan area. I am not partial, that is a natural cause. Under RP 1 RMK-13, a total of 30 extension projects are being implemented at a total cost of RM1.06 billion. Because there are many extension projects, perhaps the new ones were not approved. For continuity of implementation, RM125 million has been allocated for 2026, while the balance of RM506.4 million will be continued according to schedule and development priorities. Among the high-impact projects are the Sungai Jawi Flood Mitigation Plan, upgrading the Sungai Kerian Bridge, and building footbridges across the intersection of the Federal Road to Jalan Transkrian, and others. In addition, PDC acts as a catalyst for development in Batu Kawan through the implementation of major projects such as Cassia City School, Batu Kawan Public Market, GBS @ Bandar Cassia Entrepreneurs Plaza, Batu Kawan Bridge, Bandar Cassia Technology Park Phase 1, and the repair of Jalan Valdor, and others. PBA is also committed to increasing water supply capacity in SPS through eight (8) short and medium-term projects valued at RM532 million. Furthermore, the recent signing of the MoU for the Air Pulau Pinang Perak project has completed long-term planning to ensure sustainable water supply in South Seberang Perai.

Next, regarding the land reclamation projects at Bagan Ajam and Telok Ayer Tawar. For the information of this August House, the State Government signed a concession agreement with Rayston Consortium (Butterworth) Sdn Bhd on 16 June 1999. In the era of the Honourable Telok Ayer Tawar, 35 years ago, right, 25 years, 25 years ago, for the Butterworth Outer Ring Road project. Through the third supplementary agreement, namely on 23 May 2022, Rayston was granted the right to reclaim 582 hectares of land. It must be made known to the House that the original agreement had no expiry timeline. There was no date stating that if you do nothing, it still does not expire. There was no date in the agreement. So, by 2022, when we renegotiated with the company, we included a date for compliance to commence reclamation. Otherwise, it could be terminated. So, this is an achievement for the State Government, we set a timeline to start the project. Previously there was no timeline at all. Waiting until who knows when. So, as a result of several discussions.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Padang Kota, I request to interject about that project. During my time, in the last two sittings of the previous session, Padang Kota said the project was returned to the State Government. I have brought up that motion regarding that land. He said the project party did not carry out the project and it was returned to the State Government.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

If I may continue, and we will find out the final outcome. So, after some discussion, Rayston informed us that the reclamation project faces significant constraints, including high reclamation costs, a shift of the site to the north due to the expansion of the Penang port, and height restrictions relating to the operations of the RMAF (TUDM) Butterworth Base. So, those are the constraints this project will face. The State Government has decided not to extend the concession period, and the agreement was terminated after 31 May this year following Rayston's failure to demonstrate the viability of this project. The notice of termination was issued to the developer on 22 September this year. So the termination of this agreement was made before any implementation of the reclamation project began. Therefore, no post-mortem was carried out as proposed by the Honourable Machang Bubok. Taking all factors into account, this project requires far more complex effort and exceeds the developer's capacity. Therefore, termination of the agreement is the best step to ensure that the state's development planning remains realistic, sustainable and provides real benefits to the people. Looking ahead, the State Government remains open to receiving applications for planning from any company interested in the land reclamation projects at Bagan Ajam and Telok Air Tawar. That is, we cancel the concession, and the right returns to the state to appoint, if there are any. That is what he means: the right returns to the state to offer a new concession. However, we have still not received an appeal from Rayston; perhaps they will appeal.

Regarding Silicon Island, the development of Silicon Island is not merely a physical project but a long-term strategy to ensure that Penang remains a hub for high-technology industry and a centre of economic growth for the country. Silicon Island is being developed as an extension of the state's industrial ecosystem, which will continue to support the demand of international investors and the expansion of existing technology companies, particularly in the E&E sector and the global semiconductor supply chain. I think I can skip a few paragraphs here.

Regarding the results raised by the Leader of the Opposition. Initial studies show that Silicon Island is expected to trigger investment totalling RM74.7 billion, namely once the Green Tech Park begins to be sold, and to contribute up to RM1.1 trillion to Malaysia's GDP by 2050, with the potential to create more than 220,000 direct and indirect job opportunities. As for direct fiscal revenue, the State Government is expected to receive land premiums, excluding other payments, at the time of grant of rights, in addition to continuous annual land tax collection throughout the development and operation period. Apart from that, the State Government will also generate significant revenue through a land proceeds sharing arrangement with a ratio of 70:30 between Silicon Island Development and the State Government. On 24 July recently, the Ministry of Finance approved a tax incentive package for the development of Silicon Island. This approval was based on an assessment of the investment value made, the total number of job opportunities generated, the use of local supplies and services, the implementation of corporate social responsibility projects by the company, and industrial training opportunities for local students throughout the tax incentive period. Meanwhile, tax incentives for investors or industry players within the Silicon Island area will be considered by applying the existing tax incentives under MIDA, and will apply the assessment of the New Investment Incentive Framework, which will begin to be implemented in 2026. This means the company will receive incentives from the MOF during reclamation, and when this land is sold to investors, investors will receive incentives under MIDA as in other areas.

Pulau Andaman. This too is a long story, 35 years ago. On 4 October 1990, the State Government signed a concession agreement with KGN PDC, now taken over by Tanjung Pinang Development Sdn Bhd, for the reclamation of 1,131.72 acres of land at Tanjung Tokong, North East District. The entire development cost, including the provision of infrastructure, is borne by the developer. There are two phases of reclamation: Phase 1 was completed in 2005, covering 240 acres. Meanwhile, Phase 2, known as Pulau Andaman, is expected to complete reclamation in 2028, covering 760 acres. There are two bridges connecting the island and the mainland, namely the Andaman Bridge from Seri Tanjung Pinang and also the Gurney Bridge from Persiaran Gurney to Pulau Andaman. The GDV for the development is in the region of RM60 billion. And the revenue that the State Authority may obtain is through applications for land alienation, and the premium we can estimate is RM561 million. Some has been received, some has not yet been received.

For the tax calculation, based on the overall Master Plan, the estimated collection of land tax and assessment on the development of Pulau Andaman is approximately RM5.18 million a year.

Land Administration. Dato' Seri Mr Speaker and Honourable Members, the amendment of town and mukim boundaries throughout the State of Penang. The State Authority has gazetted amendments to the boundaries of existing towns and the establishment of new towns in accordance with Section 11(CA) and Section 11(D) of the Kanun Tanah Negara, and it was declared through the State Government Gazette on 4 September 2025. Through this amendment, we have expanded the boundaries of 10 existing towns and established 25 new towns. The amendment of town and mukim boundaries will involve more than 210,000 land titles and 180,000 strata titles throughout the state. This amendment will bring about changes to the land tax rates and assessment rates on respective titles starting from 2026. The state's decision is based on the need to realign the classification of land throughout the state so that it keeps pace with the rapid economic and social development and the current land use in the areas concerned.

Examples of areas that still have village land status until now are Bayan Baru. Its name is Bandar Baru Bayan Baru, but it is in the village category. Bukit Jambul, Seberang Jaya, Bandar Perda, Bandar Cassia, Simpang Ampat, Telok Air Tawar and Bertam. This amendment is also indeed very important in the State Government's efforts to increase the efficiency of land administration, prevent revenue leakage, and establish a land taxation system that is fairer and more equitable to all landowners in Penang. To reduce the burden on owners of strata units due to changes in strata assessment rates, the State Authority has agreed to defer changes to the strata assessment rates for more than 184,000 strata titles until 2027. This means that all strata unit owners in Penang, with a total of 300,000 strata titles, will continue to pay the existing assessment rate in 2026. That is, any changes will only take effect in 2027 for strata titles.

Goh Choon AikPKR · PHBukit TambunEN

Seeking clarification, Dato' Seri Mr Speaker. The Most Honourable Chief Minister. Based on the answer to my written question, up to the end of 2024, the outstanding balance of assessment arrears was RM13.9 million. We managed to recover RM2.4 million in the first 10 months. The balance up to October is still RM11.48 million. Why is the arrears rate for this assessment so high? Because land tax arrears are RM27.45 million, and assessment arrears are RM13.9 million. That is quite high in this respect.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

The Director of Land and Mines feels that this is due to a lack of awareness among lot owners. They thought they only paid the house assessment and that it did not involve land tax. Previously, land tax was paid by the MC or JMB before the title was issued. But once the strata title is issued, they actually have to pay the lot tax. So, because the level of awareness is still low, the payment of the lot tax is still in a state that has led to arrears of nearly RM10 million now. So we will further intensify awareness and publicity regarding the responsibilities of strata title holders so that they also know their responsibility to pay.

The increase in land tax rates after the review. In response to the question from the Honourable Leader of the Opposition, I am pleased to explain that the State Government has taken into account all relevant factors in determining the new land tax rates. This approach was designed so that the increase does not burden the public, while ensuring that the objectives of the tax review are achieved in a balanced way. Below are examples of simulations of the tax rates after the review was carried out.

Case one, let us say we use case one. Paddy land of 4.98 hectares in Mukim 4, Seberang Perai Utara. For example, the current land tax rate is RM50 a year per lot. Under the new rate, the total tax becomes RM75, an increase of 50%. Based on the rebate of 32.5% in 2026, the payment amount that this owner needs to settle is RM51. Now RM50, next year RM51 because there is a rebate. Without the rebate, RM75. So, I think what the Honourable Member said, its effect is not as we imagine.

Case two, for example, oil palm land of 7.66 hectares, that is more than ten acres. Earlier, not even 10 hectares of paddy land, only RM50 now. Case two, oil palm land (interruption) I am not hungry, yes (laughter) oil palm 7.66 hectares in Mukim B, Daerah Barat Daya, Balik Pulau. The current land tax rate is RM378 a year. More than ten acres already. RM378 a year, with the new rate RM792, an increase of 106%. After the rebate, he only needs to pay less than RM535. So his increase is just over RM100 for 7.66 hectares of oil palm land. That is his situation.

As for residential property affected by the tax rate review and urban re-classification.

For example, a residential lot of 195 square metres in Seberang Jaya. The current land tax rate is RM43. Under the new rate after urban re-classification, the tax becomes RM106. Because of two conditions, one is re-classification from rural to urban, one is the tax review. According to the total for this case it is RM137, an increase of 218%. After the rebate is given, the amount to be paid is RM93. From RM43 to RM93. In a typical residential situation, terrace, from RM43 to RM93.

For the information of this august House, before implementing the land tax increase, the State Government carried out an assessment involving the socio-economic impact on the agriculture, housing and small business sectors, such as a comparison of tax rates with other states. An analysis of payment capacity by assessing the impact on landowners according to land use category. Engagement sessions with stakeholders, where assessments were made by the Local Authority (PBT) and community representatives to obtain direct feedback, and an assessment of mitigation measures by proposing a rebate mechanism, exemptions and a minimum rate to protect the B40 group and small paddy farmers.

In general, the State Government is of the view that this land tax review needs to be implemented now, considering that these land tax rates have not been reviewed for 30 years. This has caused the State Government not to receive an increase in land tax revenue over a long period. That is why land tax arrears and leakage in land tax collection have also increased, because thorough data cleansing could not be carried out. It can be said that in these two years, the Land and Mines Office (PTG) and all District Offices have done work that I appreciate by cleaning all the data and refining the data to reflect the actual use on the ground.

Third, next, the provision of incentives to all owners. We know that any review will have an impact, and we have decided on a 32.5% rebate mechanism for the first year, followed by a 20% rebate in 2027 and 20% for 2028. This means that in 2029, the full effect of this review will take place, three years later. The land tax payment rebate will benefit all landowners in Penang regardless of land category and use. However, all landowners who enjoy the rebate must pay the existing land tax rate if the amount of land tax payment after the rebate is given is lower than the existing amount paid in 2025. Earlier I gave an example, he only pays because the rebate is only RM1.00 more than what he pays now. There are cases that are lower than what he pays now. RM50.00, perhaps he pays RM47. That cannot happen, right? So if these cases occur, he still pays RM50.00, because his rebate is lower than what he pays now.

Other incentives are a 100% exemption from late payment penalties on land tax and assessment arrears throughout 2026. So whoever has arrears can take the opportunity and get exemption from penalty payments. Also, there is a 50% discount on the premium rate for changing agricultural land category to building for residential purposes only. Because we found that many agricultural lands no longer carry out agricultural activities but instead have houses on them. But their tax is still agricultural. So they can take this opportunity to change the land category to building and surely that land will be valued as residential land and not agricultural. So, we will give a 50% discount on the premium. If they take this opportunity to change the use category.

The State Government hopes that with the proposed land tax review for 2026, the State Government's tax revenue will increase significantly and the State Government will be better able to provide more financial incentives and cost-of-living assistance to all the people of Penang over the long term.

Regarding the issue of compensation payments not yet settled to landowners at Jalan Gua Jering, Mukim 21, SPT, which was raised by the Honourable Leader of the Opposition. The State Government is coordinating an application for allocation in 2026 for the purpose of payment to the landowners concerned.

On the issue relating to the Chief Minister Incorporated or CMI that was raised, CMI has recruited key positions such as Accountants and Investment Officers and plans to establish a technical unit. This step aims to strengthen the capacity to monitor projects, implement projects under public-private partnership (PPP), attract investment and monitor the financial position of 18 GLCs under CMI and SSI, thereby increasing profits and reducing dependence on State Government grants. CMI always gives priority to control and monitoring of GLC financial performance through budget disbursement and quarterly review of financial statements, in addition to requiring every GLC to submit audited financial statements to SSM (Companies Commission of Malaysia) and the National Audit Department. To support revenue-generating efforts, the State Government has also agreed to amend the Memorandum and Article of Association (M&A) of several GLCs to allow companies to generate their own income. Amendments are being implemented involving the Penang Convention and Exhibition Bureau (PCEB), Digital Penang and PWDC and will be extended to other GLCs in stages. CMI has also appointed consultants from Universiti Sains Malaysia (USM) to conduct a study on the coordination and standardisation of GLCs to assess the scope of operations and revenue-generating capacity of each company. In addition, the CMI Consolidated Fund Account has been established and will be activated in January 2026 in line with the approval of the operating budget in the form of an annual grant starting from 2026. The management of CMI accounts will also be carried out professionally in accordance with the Standard Accounting System for Government Agencies (SAGA), with external company support for system provision and six months of training to ensure efficient, orderly financial governance that complies with current standards.

Next. Dato' Seri Yang di-Pertua and Honourable Members. The State Government welcomes the opening of the Seberang Perai Urban Transformation Centre (UTC), which was raised by the Honourable Bagan Dalam, and which was officiated by the Right Honourable Prime Minister recently. This initiative will certainly add value for the people and I would like to record my appreciation to all parties who have realised this project. In this regard, the allegations on the ground that I opposed the construction of the Seberang Perai UTC are baseless. From the very beginning, I have explained, including through written and oral answers in the State Assembly (DUN) sitting dated 24 May 2024, that the decision on the construction of the UTC is entirely under the jurisdiction of the Federal Government, particularly the Ministry of Finance (MOF). A UTC is not a small project. Based on Clause 4 of the Guidelines for the Establishment and Management of UTC, the MOF must bear the costs of modification, building upgrades, provision of agency equipment and facilities, as well as bearing rental costs, maintenance and various operating costs. Therefore there is indeed a need to examine the financial implications before the decision is finalised. On this basis, the State Government has taken a pragmatic approach, namely we give full cooperation, but at the same time respect the assessment process and decision of the Federal Government as the party fully responsible for the financing and operation of the UTC. I want to stress that the State Government has never obstructed but always supports any Federal initiative that brings direct benefit to the people of Penang. The opening of the Seberang Perai UTC is one example of this good cooperation and the State Government will continue to be committed to playing its role as a strategic partner in the development of the state. Earlier too, the State Government through PDC (Penang Development Corporation) has spent more than RM10 million to make the establishment of the UTC at Komtar a success.

Next, the legal status of Penang and payment to Kedah.

Kumaran KrishnanDAP · PHBagan DalamEN

Honourable Member, may I pass. Thank you, the Honourable Chief Minister, for the explanation on the UTC. I am not sure which party threw that accusation, but here I would like to record my highest appreciation to the Honourable Chief Minister and also a special appreciation to the Honourable Member of Parliament for Bagan for bringing the State Government's application to the attention of the Right Honourable Prime Minister, thereby enabling us to get the 24th UTC in Penang. What is important is that the people of Seberang Perai can now obtain services from nine (9) Government departments and this has received a good response from the people on that side. Thank you.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you. I propose to include the speech in my speech. For the information of this august House, the position of Penang as a state within the Federation is clear, and has never been disputed in terms of law. Repeat, it is clear! (House laughs). Repeat three times. It is clear! (House laughs) (interruption). I have also lost where (House laughs) Article 1(2) of the Federal Constitution clearly lists Penang as one of the states in Malaysia, equal in status with the other states. The issue regarding the claimed rent or payment to Kedah also does not arise at the level of the Penang State Government. Based on the 1869 Agreement between the British and Kedah and the provisions of Article 167(7) and Article 169(A) of the Federal Constitution, any annual payment commitment that existed during the British colonial administration has transferred to become the responsibility of the Federal Government, and not the Penang State Government.

Accordingly, from a legal perspective, Penang has no obligation whatsoever to pay any form of rent, compensation or payment to Kedah. And this position is in line with the constitutional evolution of the nation and the structure of the Federation of Malaysia. State boundaries have also been finally determined through the Kedah and Penang (Alteration of Boundaries) Act 1985 (Act 325) enacted in Parliament pursuant to the provisions of Article 2 of the Federal Constitution. However, the State Government strongly rejects any provocative narratives or messages of hatred propagated by irresponsible parties to the extent that they could threaten public harmony. In conclusion, Penang is a sovereign state within the Federation, and all historical financial commitments involving Kedah are a matter for the Federal Government. The State Government will continue to respect the constitutional position of the Federal Constitution and ensure that relations between states are preserved based on the principles of law.

Gunung Jerai stands proudly, Bukit Bendera gazes calmly, If a dispute arises between states, with the law we shall deliberate.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Honourable Padang Kota, before the winding-up I want to interject a little. That's all. Thank you, Padang Kota, for giving cooperation to civil servants with a bonus of 0.75. Earlier the Penang State Government collected such a soaring amount of State Government revenue and gave it to the Federation. The Federation returned it back with a little. Earlier Padang Kota said, if the states work hard, the Federation is strong. If the states are weak, the Federation is weak. Here I see the Penang State Government is so concerned, finding money by raising taxes, raising everything, to look for financial sources. But I see, in terms of football, Penang has fallen to the bottom. In terms of.

Daniel Gooi Zi SenDAP · PHPadang LalangEN

Withdraw it, a bad assumption. We are not at the bottom. Withdraw Telok Ayer Tawar. A bad assumption.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Not the very bottom.

Daniel Gooi Zi SenDAP · PHPadang LalangEN

Earlier the Honourable Member said, "tercorot" is not allowed.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

I did not say the very bottom, I said "corot bawah" (fallen to the bottom).

Gooi Zi SenDAP · PHPadang LalangEN

Check first (interruption). Withdraw, withdraw.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Number eight or five, also fallen. Number one is still above.

Daniel Gooi Zi SenDAP · PHPadang LalangEN

No, no, no. Withdraw.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Between the bottom and the middle. Today we look at it again, we give a lot of resources to the Federal Government. But the CM's salary has fallen to the very bottom, number 13. What are the Office Holders, the House Committee Members doing. What are the EXCOs doing.

Teh Lai HengDAP · PHKomtarEN

This is a correct fact, this is a correct fact.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Fallen to the bottom, number 13. Shameful. Looking for a lot of money for the Federal, the CM's salary is at the bottom. A small state, a small state. The CM says a small state, has more. Even more so, close to the CM. Revenue is not much for the Federal. The Desa Committee Members, the House Committee Members must study this. This matter

Gooi Zi SenDAP · PHPadang LalangEN

Telok Ayer Tawar, you can come and sit over here already, sit here (interruption).

Member for Pantai Jerejak (YB Fahmi Bin Zainol

Fill in the form, fill in the form, fill in the form, fill in the form

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Must study it (interruption). I am speaking not on the basis of the state assemblies, I am speaking about the CM only. I am speaking for the CM. I did not speak about the state assemblies (interruption). But think again (interruption). A little more, a little more. But if the opposition can already say that song, don't forget the allocations for us. That's all, thank you (interruption).

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

I am a very fortunate Chief Minister. There is an opposition that really loves me. They want my salary increased. Thank you. There is a group of backbenchers who.

Azmi bin AlangBERSATU · PNTelok Ayer TawarEN

Look, who is at the very bottom (interruption).

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Yes. Okay, okay. There are backbenchers who want me to continue my service. I am very fortunate today.

Speaker (Speaker)EN

Because the salary is low.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

So, whatever, whatever, I still have to give a closing. As a closing, Dato' Seri Yang di-Pertua and Honourable Members, I would like to stress that the 2026 Budget tabled is not merely figures on paper but a manifestation of the State Government's commitment to the well-being of the people, competitive economic growth, and wise financial management. With the lowest deficit estimate in recent history, we demonstrate that fiscal discipline and the courage to make strategic decisions enable us to channel resources more effectively to infrastructure development, education, health and socio-economic programmes that bring direct benefit to the people.

Therefore, I record my highest appreciation for the commitment and close relations between the Federal Government, the State Government, leaders, departments, agencies and GLCs who carry out the trust for our state. I close my speech with a pantun.

The Pinang tree stands upright,

Symbol of the state's own heritage,

Budget 2026 read strategically,

Vision Penang2030 becomes a glorious reality.

That's all. Dato' Seri Yang di-Pertua, I beg to move the motion of support.

Speaker (Speaker)EN

Thank you, the Honourable Chief Minister. What's it called, Telok Ayer Tawar, Telok Ayer Tawar, Telok Ayer Tawar. I think what was said as Telok Ayer Tawar, I as the Speaker of the House, we will study it in the House Committee later (interruption). Because there is indeed a rationale and I understand that. So, relax. We wait, we study and we send it to whatever level can decide.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

This will kill my career already. Raise taxes to raise salaries.

Tabling of BillBill

Gooi Zi SenDAP · PHPadang LalangEN

Danger, Telok Ayer Tawar. Danger (interruption).

Speaker (Speaker)EN

Actually, there is a basis for it. But we have to look at it. We have to look because of the chronology, why the CM's salary was not increased at that time, we can look back (interruption). What constitution, anytime can (interruption). That you all in the opposition are so fond of wanting to give. Okay, okay, okay.

H'ng Mooi LyeDAP · PHJawiEN

Love remains love. The allocation simply isn't there. Next time come and sit over this side.

Speaker (Speaker)EN

Okay, okay, okay, okay. Order, order, order, order. Honourable Members, the question before us now is that the Rang Undang-Undang Perbekalan Tahun 2026 be read a second time. Honourable Members who agree, say aye.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Those who disagree, say no. Everyone supports it. The ayes have it by a large majority.

Secretary of the HouseEN

A Bill intituled: An Enactment to authorise the use of a sum of money from the Consolidated Fund for services for the year 2026 and to appropriate that sum for services for that year.

Speaker (Speaker)EN

The Bill has accordingly been read a second time. The Bill will now be considered at the Committee stage.

Secretary of the House

Jadual.

Speaker (Speaker)EN

Head B.01. Office of the Chief Minister and Office of the State Secretary. RM188,432,328.00 only. That the sum of RM188,432,328.00 only. For Head B.01. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.02. Land and Mines Office. RM19,067,245.00 only. That the sum of RM19,067,245.00 only. For Head B.02. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.03. District and Land Office of North East District. RM9,053,156.00 only. That the sum of RM9,053,156.00 only. For Head B.03. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.04. District and Land Office of South West District. RM8,821,926.00 only. That the sum of RM8,821,926.00 only. For Head B.04. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.05. District and Land Office of North Seberang Perai District. RM11,028,612.00 only. That the sum of RM11,028,612.00 only. For Head B.05. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.06. District and Land Office of Central Seberang Perai District. RM11,289,972.00 only. That the sum of RM11,289,972.00 only. For Head B.06. Shall it stand part of the Schedule. Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.07. District and Land Office of South Seberang Perai District. RM8,913,438.00 only. That the sum of RM8,913,438.00 only. For Head B.07. Shall it form part thereof.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.08. Irrigation and Drainage Department. RM44,668,490.00 only. That the sum of RM44,668,490.00 only. For Head B.08. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.09. Forestry Department. RM4,754,044.00 only. That the sum of RM4,754,044.00 only. For Head B.09. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.10. Botanical Gardens Department. RM6,083,768.00 only. That the sum of RM6,083,768.00 only. For Head B.10. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.12. Public Works Department. RM50,000,972.00 only. That the sum of RM50,000,972.00 only. For Head B.12. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.13. Islamic Religious Affairs Department. RM27,084,588.00 only. That the sum of RM27,084,588.00 only. For Head B.13. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.14. Social Welfare Department. RM11,451,955.00 only. That the sum of RM11,451,955.00 only. For Head B.14. Shall it stand part of the Schedule. Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.15. Town and Rural Planning Department. RM5,938,135.00 only. That the sum of RM5,938,135.00 only. For Head B.15. Shall it stand part of the Schedule.

Honourable Members of the State Legislative Assembly:

Aye.

Speaker (Speaker)EN

Head B.16. State Finance Department. RM609,089,932.00 only. That the sum of RM609,089,932.00 only for Head B16. Shall it form part of the Schedule?

Honourable Members

Ya.

Speaker (Speaker)EN

Head B17, Veterinary Services Department, RM9,346,874.00 only. RM9,346,874.00 only for Head B17. Shall it form part of the Schedule?

Honourable Members

Ya.

Speaker (Speaker)EN

Head B18, Department of Agriculture, RM10,644,454.00 only. That the sum of RM10,644,454.00 only for Head B18. Shall it form part of the Schedule?

Honourable Members

Ya.

Speaker (Speaker)EN

Head B19, Mufti Department, RM3,032,575.00 only. That the sum of RM3,032,575.00 only for Head B19. Shall it form part of the Schedule?

Honourable Members

Ya.

Speaker (Speaker)EN

Head B20, Syariah Judiciary Department, RM10,139,188.00 only. That the sum of RM10,139,188.00 only for Head B20. Shall it form part of the Schedule?

Honourable Members

Ya.

Speaker (Speaker)EN

Last but not least, Head B21, Syariah Prosecution Department, RM2,034,032.00 only. That the sum of RM2,034,032.00 only for Head B21. Shall it form part of the Schedule?

Honourable Members

Ya.

Secretary of the House

Fasal 1.

Speaker (Speaker)EN

Shall Clause 1 form part of the Bill?

Honourable Members

Ya.

Secretary of the House

Fasal 2.

Speaker (Speaker)EN

Shall Clause 2 form part of the Bill?

Honourable Members

Ya.

Secretary of the HouseEN

The Bill intituled Suatu Enakmen bagi Menggunakan Sejumlah Wang daripada Kumpulan Wang Disatukan untuk Perkhidmatan bagi tahun 2026 dan bagi Memperuntukkan Jumlah Wang Itu untuk Perkhidmatan bagi Tahun Itu.

Speaker (Speaker)EN

Shall the long title and the enacting clause form part of the Bill?

Honourable Members

Ya.

Speaker (Speaker)EN

The House resumed.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Mr Speaker, I beg to report that the Rang Undang-Undang Perbekalan Tahun 2026 has been considered clause by clause in Committee and agreed to without amendment. I beg to move that this Bill now be read a third time and passed.

Speaker (Speaker)EN

Thank you. Honourable Members, the question before us now is that the Bill be read a third time and passed. Honourable Members who agree, say aye.

Honourable Members

Ya.

Speaker (Speaker)EN

Those who disagree, say no. The ayes have it.

Secretary of the HouseEN

Enakmen Perbekalan Tahun 2026. Enacted by the authority of the Penang State Legislative Assembly.

Speaker (Speaker)EN

Thank you. The Bill has accordingly been read a third time and passed (table thumping). Honourable Members, the question before us now is the motion moved by the Honourable Chief Minister, which reads:

That this House approves the expenditure of RM318,622,100.00 only as set out in the Development Estimates 2026 tabled as State Assembly Paper No. 4 of 2025, and resolves that the said sum shall be used for the purposes specified in the Development Estimates 2026. Honourable Members who agree, say aye.

Honourable Members

Ya.

Speaker (Speaker)EN

Those who disagree, say no. I think the ayes have it. The motion is agreed to.

Secretary of the HouseEN

Rang Undang-Undang Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, (Saraan) (Pindaan) 2025.

Speaker (Speaker)

Sila.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Dato’ Seri Mr Speaker, I beg to move that the Bill entitled Suatu Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri (Saraan) (Pindaan) 2025, to amend the Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, Saraan 1980, referred to as the "Enakmen Ibu", be read a first time.

Speaker (Speaker)

Boleh.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Dato’ Seri Mr Speaker of the State Legislative Assembly, I beg to second.

Speaker (Speaker)

Terima kasih.

Secretary of the HouseEN

The Bill entitled Suatu Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri (Saraan) (Pindaan) 2025, to amend the Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, Saraan 1980, referred to as "Enakmen Ibu", be read a first time.

Speaker (Speaker)EN

The Bill has accordingly been read a first time.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Mr Speaker, pursuant to Standing Order 59 of the Standing Orders of the Penang State Legislative Assembly, I propose that the second reading of this Bill proceed forthwith.

Speaker (Speaker)

Boleh.

Secretary of the HouseEN

Rang Undang-Undang Anggota Pentadbiran dan Ahli Dewan Undangan Negeri (Saraan) (Pindaan) 2025, second reading.

Speaker (Speaker)

Terima kasih.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Dato’ Seri Mr Speaker, I beg to move that the Bill entitled Suatu Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri (Saraan) (Pindaan) 2025, to amend the Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri (Saraan) 1980, referred to as "Enakmen Ibu", be read a second time.

Speaker (Speaker)EN

I beg to second. Speech first.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu Maung

Sorry.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Dato’ Seri Mr Speaker and Honourable Members, thank you for the opportunity given to me to table the Bill entitled Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri (Saraan) (Pindaan) 2025 in this august House. As Dato’ Seri Mr Speaker and Honourable Members are aware, we lost a State Assemblyman, the former Honourable Member for Sungai Bakap, the late Nor Zamri, on 24 May 2024. This is also the first time since 2018 that we have lost a State Assemblyman while he was still serving.

Upon examination of the Enakmen Anggota Pentadbiran Ahli Dewan Undangan Negeri (Saraan) 1980, Subsection 9(1) of the Enactment briefly states that a survivor's pension or survivor's gratuity may be paid to the heirs or family members of an Executive Member or State Assemblyman who are eligible to receive it. However, the First Schedule of the Enactment does not provide for the manner of apportioning the shares of survivor's pension and survivor's gratuity.

Whereas there is a need to improve the calculation of the apportionment of shares of survivor's pension and survivor's gratuity for Executive Members and State Assemblymen, this August House sat on 19 May 2025 and approved the Statutory Paper on Pension and Survivor's Gratuity and Privileges for Executive Members and State Assemblymen, in which it was proposed that:

(A) Apportionment of Shares of Survivor's Pension:

(1) The widow or widower of an Executive Member or State Assemblyman is entitled to receive two parts or shares; and

(2) The child of an Executive Member or State Assemblyman is entitled to receive one part or share. And.

(B) Apportionment of Shares of Survivor's Gratuity:

(1) The widow, widower or child of an Executive Member and State Assemblyman is entitled to receive nine out of ten parts or shares. If the Executive Member or State Assemblyman no longer has surviving parents, his or her widow, widower or child is entitled to receive the gratuity in full; and

(2) If the Executive Member or State Assemblyman still has surviving parents, the parents are entitled to receive one out of 10 parts of the survivor's gratuity. If the Executive Member or State Assemblyman has no widow, widower or child, his or her parents shall receive the gratuity in full.

In addition, the apportionment of shares of survivor's pension and survivor's gratuity to wives and children shall be made equally where there is more than one recipient.

Dato’ Seri Mr Speaker, based on my explanation just now, I respectfully table the Amendment Bill to amend the said Enactment as follows:

(a) by replacing the word "Speaker" wherever it appears with the words "Yang di-Pertua";

(b) by replacing the words "Timbalan Speaker" wherever they appear with "Timbalan Yang di-Pertua"; and

(c) by inserting after Subsection 9(2) Subsections 9(3) to 9(5) relating to the apportionment of shares of survivor's pension, the apportionment of shares of survivor's gratuity, and the apportionment of shares of pension and survivor's gratuity where there is more than one recipient.

Dato’ Seri Mr Speaker and Honourable Members, this effort demonstrates the commitment of the Penang State Government to ensuring that the welfare and post-service rights of Executive Members and Honourable Members who have dedicated their service and contributions to the people of this State continue to be safeguarded. If this Enactment Bill is passed with the general amendments and the amendment to Subsection 9 as proposed, this Enactment will come into force on 25 September 2024. That is all, thank you.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Mr Speaker of the State Legislative Assembly, I beg to second.

Speaker (Speaker)EN

Thank you. Honourable Members, we are now in the debate session on the Rang Undang-Undang Anggota Pentadbiran dan Ahli Dewan Undangan Negeri (Saraan) (Pindaan) 2025. Honourable Member, if anyone wishes to debate, I invite you. I see there is an effort to update this Enactment so that everyone who is eligible can be in line with the law, right. Please, if there are any. If none, I will invite the Honourable Chief Minister to reply.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you, Dato’ Seri Mr Speaker and Honourable Members. I thank Honourable Members for their support for the amendment tabled this afternoon. I also wish to record my highest appreciation to the secretariat, which ensured that the preparation and tabling of this Bill proceeded smoothly. I therefore respectfully request that this Enactment Bill be passed by this August House.

Speaker (Speaker)EN

Thank you. Honourable Members, the question before us now is that the Rang Undang-Undang Anggota Pentadbiran dan Ahli Dewan Undangan Negeri (Saraan) (Pindaan 2025) be read a second time. Honourable Members who agree, say aye.

Honourable Members

Ya.

Speaker (Speaker)EN

Those who disagree, say no. So, we all agree.

Secretary of the HouseEN

The Bill entitled Satu Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, Saraan dan Pindaan 2025, to amend the Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, Saraan 1980, referred to as "Enakmen Ibu".

Speaker (Speaker)EN

The Bill has accordingly been read a second time. This Bill will now be considered in committee.

Secretary of the House

Fasal 1.

Speaker (Speaker)EN

Shall Clause 1 form part of the Bill?

Honourable Members

Ya.

Secretary of the House

Fasal 2.

Speaker (Speaker)EN

Shall Clause 2 form part of the Bill?

Honourable Members

Ya.

Secretary of the House

Fasal 3.

Speaker (Speaker)EN

Shall Clause 3 form part of the Bill.

Honourable Members

Ya.

Secretary of the HouseEN

The Bill entitled Satu Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, Saraan dan Pindaan 2025, to amend the Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, Saraan 1980, referred to as "Enakmen Ibu".

Speaker (Speaker)EN

Shall the long title and the enacting clause form part of the Bill?

Honourable Members

Ya.

Speaker (Speaker)EN

The House resumed.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Mr Speaker, I beg to report that the Rang Undang-Undang Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, Saraan Pindaan 2025 has been considered clause by clause in Committee and agreed to without amendment. I beg to move that this Bill now be read a third time and passed.

Speaker (Speaker)EN

Thank you. Honourable Members, the question before us now is that the Bill be read a third time and passed. Honourable Members who agree, say aye.

Honourable Members

Ya.

Speaker (Speaker)EN

Those who disagree, say no. None. We all agree. The motion that the Bill be passed is carried.

Secretary of the HouseEN

Enakmen Anggota Pentadbiran dan Ahli Dewan Undangan Negeri, Saraan dan Pindaan Tahun 2025. Enacted by the authority of the Penang State Legislative Assembly.

Speaker (Speaker)EN

The Bill has been read a third time and passed.

House Suspended

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Dato’ Seri Mr Speaker, I beg to move that this House be adjourned now.

Dato’ Dr. Mohamad bin Abdul HamidPKR · PHDeputy Chief Minister I · Batu MaungEN

Mr Speaker of the State Legislative Assembly, I beg to second.

Secretary of the HouseEN

Honourable Members, the Honourable Chief Minister has proposed that this House be adjourned, and the motion has received a second.

Speaker (Speaker)EN

Thank you, Honourable Members. Once again, thank you for your cooperation throughout this sitting of the House. The House is accordingly adjourned to a date to be announced later.

The House was adjourned at 4.35 pm.