Selangor · 7 December 2021

14th Assembly, 4th session, 2nd meeting · 348 turns · 39,975 words · official PDF ↗ · Digital Hansard ↗

287 of 348 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.

(Opening)

Secretary of the HouseEN

Good morning and greetings of peace. The Order of Business for the Second Meeting of the Fourth Session of the Fourteenth Selangor State Legislative Assembly on 7 December 2021 begins with the recitation of prayer.

Assistant Secretary of the House

Bacaan Doa.

Oral QuestionsQuestions

Secretary of the HouseEN

The next item on the Order of Business. Questions.

Deputy SpeakerEN

Assalamualaikum W.B.T and greetings of peace. I invite the Honourable Member. Sungai Burong, absent. Rawang, absent. Bandar Utama.

Puan Jamaliah binti JamaluddinDAP · PHBandar UtamaEN

Thank you, Deputy Speaker. My question is No. 128.

Oral Questions — 128. Special Children Training Programme (Training of Trainers)Questions

Puan Jamaliah binti JamaluddinDAP · PHBandar UtamaEN

128. To ask the Honourable Dato' Menteri Besar:-

a)

Will the State Government make use of the talent produced through the "Training of Trainers" programme?

b)

Will the State Government allocate a special OKU Centre that is able to support the Integrated Special Education Programme in the State of Selangor?

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Member, Deputy Speaker. Thank you, Honourable Member for Bandar Utama, for the question on the Special Children Training Programme. For the information of the Honourable Member for Bandar Utama, in 2021 a smart partnership was carried out between the Selangor Children's Heritage Foundation (YAWAS) together with the Faculty of Education, Universiti Malaya (UM) and the National Special Education Association of Malaysia (PPKK) for the implementation of the Traninig Of Trainers (TOT) Selangor Special Children (ANIS) Special Education programme. The participants of this TOT programme consist of, firstly, undergraduates in their final year studying subjects other than special education. Secondly, graduates in education other than special education. Thirdly, educators in early education institutions such as tadika and taska, and fourthly, volunteers from within the community. Specifically, this training aims to expose participants to the latest developments in the field of special education locally and abroad. Inclusive education, the characteristics of children with special needs, methods of identifying early intervention, and effective teaching and learning strategies for Children with Special Needs. The State Government will make use of the talent that has been produced through this Training of Trainers programme in preparing participants, students and facilitators who are able to convey information effectively, secondly to answer questions and act as guidance and reference regarding special children from community institutions or the associations represented, and thirdly to guide parents and educators on matters concerning the management and learning of special children. With this TOT, programmes involving the public, especially the special children group, can be implemented in a more orderly manner. In addition, this TOT group will also be involved as facilitators for support group activities for several special children and will guide educators in mainstream tadika and taska that receive students with these special needs.

The Honourable Member also asked about the State Government allocating a special OKU centre that is able to support the Integrated Special Education Programme in the State of Selangor. In 2021, the State Government received an allocation to build an OKU centre that is able to support the integrated special education programme in the state of Selangor, named the Selangor Special Children Early Education Support Centre, or the ANIS Centre, located on the ground floor of the IDCC Convention Center, Seksyen 15, Shah Alam. The establishment of the ANIS Centre is an initiative of the Selangor State Government in providing early intervention services (early intervention programme) and educational support to the Selangor Special Children (ANIS) group, which targets children with disabilities aged 2 to 6 years who have been confirmed by a medical officer to have the following diagnoses. Autism Spectrum Disorder, Attention Deficit Hyperactive Disorder, Global Developmental Delay and Down Syndrome. This ANIS Centre is a collaboration between the Selangor State Government through the Selangor Children's Heritage Foundation (YAWAS) and the Ministry of Education Malaysia through the Genius Kurnia Centre, and this collaboration was sealed in the form of first, facilitating the implementation of the ANIS Centre and many, long, Honourable Member. I will continue until the red light, okay. Facilitating the implementation of the ANIS Centre through the Genius Kurnia External Cooperation Committee, monitoring the use of Genius Kurnia modules at the ANIS Centre to ensure compliance with the prescribed standards, and providing expertise and consultation services in accordance with the cooperation period of 2 years. The following is a list of the types of expertise that will be provided. The Genius Kurnia Centre will become the reference centre for the ANIS Centre. Targeted use of Genius Kurnia modules and curriculum. Advisory services and on-site training for staff of the ANIS Centre involving intervention officers, occupational therapists and speech therapists and

teacher assistants. Consultation services on comprehensive documentation and recording relating to the operations and process of student intervention, and counselling services by external psychology officers who collaborate with Genius Kurnia for staff and parents who need them. The ANIS Centre officially began operations in September 2021. Up until November 2021, the ANIS Centre has been receiving students in stages, and a total of 26 students have been registered and are currently receiving services. The ANIS Centre targets a total of 60 students who will attend therapy sessions weekly for one year. In implementing this intervention programme, the ANIS Centre has provided a total of 5 special education teachers, one occupational therapist and 3 teacher assistants. Thank you.

Deputy SpeakerEN

The next question, Sijangkang.

Thank you, Deputy Speaker. My question is question 129.

Oral Questions — Sungai Rasa Water Treatment PlantQuestions

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member for Sijangkang. Honourable Member, Deputy Speaker, the Honourable Member for Sijangkang is asking a question regarding the status of the development of the Sungai Rasa Water Treatment Plant. For the information of the Honourable Member, the Rawatan Air Rasa project is a project that has been planned to strengthen the water supply in the state of Selangor, particularly in the Klang district. And the plan is that the capacity or output of this treatment plant is 1,400 million litres a day. Phase one 700 million litres a day and phase two 700 million litres a day. So, 1,400 million litres a day. To date, the design work has been completed at the initial stage and tenders have also been called and are currently under evaluation. For information, for phase 1, 3 packages have been tendered, the tenders have closed, evaluated, and one has been awarded to the relevant contractor, namely package 1 is under evaluation. Package 2 is also under evaluation. Package 3 has been awarded.

129. To ask the Honourable Dato' Menteri Besar:-

a)

What is the status of the Development of the Sungai Rasa Water Treatment Plant?

For the information of the Honourable Member, there is still other work that needs to be done apart from the construction of this treatment plant, namely work known as source work, with permission, which is work on water sources upstream before the sauk dam. This will involve the participation of the Federal Government, which also needs to be carried out at the same time. That is currently under discussion between the State Government and the Federal Government for work upstream of this sauk dam. Thank you.

Soalan tambahan.

Deputy Speaker

Sijangkang.

I have been informed that the plan to build this water treatment plant in the Kuala Langat area, and the Klang River, which is one of the sources of raw water, as we know, the Klang River is a river that is polluted compared to other rivers, and at risk of pollution. However, I want to ask the Honourable EXCO what plans or initiatives the State Government has to ensure that the zero discharge initiative and also the Polluter Pays Pollution principle are promoted at the state level of Selangor for the ultimate purpose, that although our treatment system may be sophisticated, at least the water source is not so heavily polluted. Thank you.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Honourable Member, as I explained on Friday last week, there is a need for us to improve the water quality of the Klang River because the Klang River will become the main source for the Sungai Rasa Water Treatment Plant. The more polluted the water of this Klang River, the more costs will be involved at the treatment plant. The use of chemicals and the use of electricity. And for everyone's information, the water treatment technology for the Sungai Rasa Water Treatment Plant is the most modern introduced, including the use of ozonised water, which is a new technology that is expensive to use, the ozonisation membrane or ozonisation, which will solve problems relating to odour, odour pollution and so on. However, we cannot rely solely on this treatment plant. The raw water that enters the system must also be improved in its quality, and that is why we are implementing the Klang River development programme, one of its main purposes and also in its tributaries, including the Penchala River and the Damansara River, which are the main polluters of the Klang River. And we impose technological methods, we use our treatment methods and also the enforcement methods that I mentioned earlier in the Raw Water Guarantee Scheme, namely what is called the PPP or Polluter Pays Principle. Currently at the LUAS level and strengthening, there are several regulations in the Enactment that need to be corrected. For the implementation of this PPP, and God willing, we are confident it can be implemented next year. To provide as an incentive or as a guide to all parties, especially the industrial sector, so that we

cooperate in ensuring that the quality of our river water always remains at the best level. Thank you.

Deputy Speaker

Hulu Kelang.

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

Thank you.

Deputy Speaker. My question concerns a statement that was issued that 72% of Selangor's people use more water than they should, which is not quite accurate. The excessive use of water covers the entire population of Selangor, the Federal Territory of Kuala Lumpur and Putrajaya. So, what is the relationship between the high use of water and the Klang River, the place where we take water, our water source.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member. Everything is related. When we use a lot of water, we certainly need to treat more water. For everyone's information, actually the State of Selangor does have high water usage, far higher, not only higher than the national average water usage, but even more so than worldwide. In Singapore now, for example, the water usage per individual is 165 litres a day, which is almost the same as that set by the WHO. 165 litres a day per person. Each person. The national rate of our country is 200 litres a day. Selangor, how much do you think? 220 litres a day. More than the national. National is only 200. So we have to start reviewing why the people of Selangor spend or use water so much more than the required rate. Perhaps we need to do a study. I dare not say because perhaps each person has many cars at home. Washing the car one or two times, perhaps. Maybe there are many flower plants, I don't know. I also take care of agriculture, later they want piped water to water the plants. So, we have to look. But, however, Air Selangor together with the Government, we always hold campaigns so that water wastage does not occur. We do this and also the use of devices called water saving, which we encourage to be installed in toilets, in certain places, sometimes we go to surau, masjid too, we see the tap cannot be closed. The water just flows. So, these are among the things we can actually help in reducing water wastage in the State of Selangor.

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

The additional matter given is about the water used having its treatment. Here another issue arises that if the water comes from rivers, what about, is there information collected about water extracted from underground?

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member for Hulu Kelang. Your spirit today. For information also, this water actually, we have various sources, rain sources, underground and so on, and also sea water sources will also be considered for desalination plants later. But, at this stage we do not yet need it. What happens is that, if we do a study, if we calculate our dams, the dams that exist in Selangor there are seven (7) of our dams. Many ask why not just use dam water, polluted water, why take from rivers? Actually, if we use only these seven (7) dams, only half of the people of Selangor would have water. Not enough. So, we have to take from our rivers. Our rivers, coincidentally this water, what happens in the State of Selangor, the water still falls, it does not fall only at the upstream of rivers, in the dam areas or catchment areas, it also falls in the middle. So, we have to build ORS or ponds to hold back and collect this water. So, when it is in the middle, the downstream area a little, we certainly mix with industry. We face 15, the Langat River and the Selangor River alone account for more than 15,000 industrial factories involved in this basin. So, we make that, that is why we have to coexist, or exist together where industrial factories operate, we also monitor the water cleanly. For the other source, which is underground, we certainly have an underground water audit and we have a fairly large reserve, but the problem with underground water is that it is in a place that is not very suitable for us to develop on a large scale. And the pump capacity at these places may be around 1 MLD a day, 1 million litres. Not adequate, sufficient to help. Because the State of Selangor has high water usage. So, we give more priority to, now what we are doing is preparing for the future, I have directed and it is in progress and almost half is complete, auditing all the lakes and ponds that exist in the State of Selangor. And, God willing it will actually be sufficient, with many in Kuala Langat, there are some in Hulu Langat and so on, which we audit to determine water quality and in that place the water content and also the status of the land. That is being done by LUAS and we will complete it next year to ensure our water supply will be sufficient, our water storage will be sufficient when drought occurs, especially. Thank you.

Soalan.

Deputy Speaker

Ijok.

Thank you, Deputy Speaker. Just now, the Honourable EXCO mentioned that the water source comes from rain. What are the steps and initiatives of the Selangor State Government for rain harvesting or requiring houses to be built with it, because other countries have already created this problem, that is, one of the sources, we have a lot of rain but the water is wasted.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Yes, yes, Honourable Member for Ijok. Indeed, what you have mentioned is very accurate. We have another issue with the use of water, known as greywater, because greywater is water like this rainwater which is acidic and not suitable for drinking. And our main problem is the provision of infrastructure. We do indeed have considerations to use this water as a second piping to provide water for, why, the drinking water, the quality of this water, drinking water quality, if we use it for washing or use it, industrial use is also a waste, actually. That is why our rate is high. Because we use drinking water for all kinds of things. Those who wash also use drinking water, those for toilet use also use drinking water, those going to industry also use drinking water. But the infrastructure cost is quite high for installing a second pipe. We cannot use the same pipe. The pipe for supplying drinking water cannot be used for the pipe for the use of this greywater. And, rainwater is included in this category where we need a separate piping system for work, especially washing, watering plants and so on. And I will indeed, this proposal has arisen regarding the issue, we have done it before but there are constraints in terms of managing this rainwater due to mosquitoes, various issues, but I have to have this discussed together with the EXCO for PBT and also the EXCO for Housing to see how the prototype or pilot project method for the use of rain harvesting, what it is called, rain harvesting, can be implemented in certain housing estates, because it will involve developers and so on, because the piping has to be done and there are additional costs that will be involved in implementing if we want to implement this project or rain harvesting. Thank you.

Deputy SpeakerEN

The next question, Hulu Kelang.

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

Deputy Speaker, my question is Number 130.

Oral Questions — 130. Iks Au3 Along RiverbanksQuestions

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

130. To ask the Honourable Dato' Menteri Besar:-

a)

IKS AU3 has produced many successful Malays. Meanwhile, it has become a problem of nuisance, disturbance and pollution of rivers. It is believed that if they are given other places and facilities, business potential can certainly be enhanced. What are the government's plans?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, the Council is aware of the nuisance and river pollution issues that may arise from business activities in the IKS AU3 area. The Council constantly carries out regular monitoring of business premises that pose a risk of causing nuisance and pollution. Enforcement action will be taken if any offence is committed. However, the allocation for the proposal to upgrade the IKS AU3 building is still under discussion. So far, the number of IKS along Jalan AU3 is 83 units, including nurseries. The management of IKS, involving maintenance and rental, falls under the supervision of the Valuation and Property Management Department. The Licensing and Entrepreneur Development Department licenses traders or operators who accept rental offers from the Valuation and Property Management Department. That concludes my reply, thank you.

Tuan Haji Saari bin SungibAMANAH · PHHulu Kelang

Ya.

Deputy Speaker

Hulu Kelang.

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

Thank you, Honourable EXCO. Regarding the reply given, I thank you for also providing the list of compounds imposed on traders. However, I would like to understand here: when there are shops or workshops that violate the conditions, dispose of waste oil, dirty oil and so on into the river, this is something that should be given a heavier compound. My question is the number of licence cancellation notices issued, the number of compounds issued, eight (8), and the number of premises inspected, 91.

So, Honourable Member, you mentioned that the number of shops and workshops is 83, is that right?

Tuan Ng Sze HanDAP · PHKinraraEN

83, including nurseries.

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

What happened to the compounds that have been issued from 2008 until today? The total is 41. Is this a frightening rate or just ordinary? Total compounds, 41 compounds imposed on traders.

Tuan Ng Sze HanDAP · PHKinraraEN

Total compounds. Alright, okay. I have stated here many times that for all activities that will cause pollution, we will not compromise with activities that will cause pollution. And for the question on the number of notices and the number of compounds, I do not have the information at the moment. I will request it from the Ampang Jaya Municipal Council and will submit it to the Honourable Member in writing. Thank you.

Deputy SpeakerEN

Next question, Sungai Air Tawar. Not present. Sijangkang.

Thank you, Deputy Speaker. Question 132.

Oral Questions — 132. People's Agriculture ProgrammeQuestions

132. To ask Y.A.B. Dato' Menteri Besar:-

a)

What is the current status of the community agriculture programme to utilise idle State Government land?

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Sijangkang. Once again, we are talking about the agriculture raised by the Deputy Speaker, in relation to community agriculture that uses State Government land. For the Honourable Member's information, the State Government is at the stage of gathering, the gathering of some land that has the potential to be developed as agricultural areas, in addition to the TKPM. At present, we have 11 TKPM, or Taman Kekal Pengeluaran Makanan (Permanent Food Production Parks), managed by the Selangor State Agriculture Department, the Veterinary Department, Veterinary Services, and also the Selangor State Fisheries Department, covering an area of 1300 hectares with a production value of RM 38 million a year. This is land that has been distributed and approved for leasing to the people of Selangor State to manage agriculture and livestock farming. However, it is insufficient for us to resolve the issue of food supply or guarantee of supply, or food security, so the State Government has decided under the Selangor Agro Transformation Plan, or PeTA Selangor, the Agro Transformation Plan, to add to the land bank, or land that is suitable for the people to venture into agriculture or to increase agricultural output for Selangor State. These lands have been identified and are known as the Smart Selangor Agro Farm or Agro Park, depending on the area, or SSAP, SSAF for the areas to be developed. And the components in these areas will also involve modernisation, planting of high-value crops, modernisation, and also the development of agropreneurs, or farmers who are guided to carry out agricultural work in these areas.

For this purpose, the State Government has also identified, in addition to State Government land, suitable GLC land that has no development plans in the near future, or whose development may be delayed, which will also be used for modern agriculture. So far, several areas have been identified for the SSAP or SSAF programme to be implemented, including those that were mentioned recently, namely the land under PKPS at Changkat Menteri, 1700 acres, which is currently in the EIA process. Then, at Sungai Air Tawar, 120 acres, and at Sungai Panjang, 56 acres, which will be developed in the near future. The land processes and land settlement are almost complete. And next, also in Sepang, under MBI, there is land at Bukit Labu and at Bukit Changgang. These, all of these, at Bukit Labu it is 64 acres, at Bukit Changgang it is 50 acres, which will be developed in the near future, all of these, yes, which will involve participants, focusing especially on local children, young people, and also women whom we will encourage to take part in this modern agriculture. At the same time, we do not forget the role played by Agro Bandar, in urban areas that have land that we consider to have potential to be developed under community gardens. Thus, we cooperate with the local authorities and other private parties to develop idle land, as well as areas of Tenaga Nasional reserves, namely electricity reserves, and also river reserves. These too will be developed with suitable agriculture for these reserve areas, TNB's pilot areas, and also these river reserve areas, JPS.

And, apart from that, we also focus on areas to promote agriculture known as organic and also semi-organic agriculture, not fully organic but semi, pesticide free, which I am informed will be launched by the Federal Government in February, namely controlled products known as pesticide free or free of poison, yes, free from poison. This will be launched. So, all of this we will implement under the Selangor Agro Transformation Plan, or PeTA, with the aim of increasing food output for the State, secondly to increase the income level of our farmers and through the involvement of young people and also women in agriculture. And I, in conjunction with this question, I give encouragement to the use of, which currently our farmers face problems in terms of rising fertiliser prices and rising pesticide prices, which causes high production costs, high food prices. The State Government is concerned about this matter and we want to encourage our farmers to return to using local products, especially those of high quality, among them the use of organic compost fertiliser produced by PKPS itself, of high quality. We have tested various crops at Fruit Valley, yes it can, durian can, vegetables can, everything can, it thrives. And for that encouragement, I have proposed and we will give, for the information of all Honourable Members, one (1) tonne to each of our YB Service Centres. One (1) tonne of organic compost fertiliser is not only to help farmers in their respective areas but also to encourage, reduce pollution because it is organic compost fertiliser.

So, 1 tonne per Service Centre, we will distribute it. We will obtain the names, or those who wish to be supplied, and we will send it directly, yes. We will send it directly, and to Service Centre areas located in State Assembly seats where the farmers are more numerous, we will give 2 tonnes. So, the officers will later contact the offices of YB – YB all, Honourable Members all, to be contacted so that this assistance can be handed over for the use of our farming community, thank you.

Deputy SpeakerEN

Hulu Kelang.

Tuan Haji Saari bin SungibAMANAH · PHHulu KelangEN

Thank you for giving 2 tonnes of compost fertiliser. This fertiliser is indeed effective for use in the valleys of Hulu Kelang. However, when it comes as 1 tonne, piled up, we cannot manage it, that is, the washout. If possible, we would like to do it in stages, yes. It can be done in stages.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

That is why I mentioned earlier, we will obtain the names of the recipients. Service Centres, Honourable Members, you must prepare them, and then we will contact, we will send it directly to their farms, to their plantations. I will not pile it up in front of the Honourable Members' Service Centre offices, but we will make this, this evening, we will hold a launch once the Sitting finishes, so that we can spread the word and raise awareness on the use of organic fertilisers, namely these compost fertilisers, because they are not only cheap and of good quality, containing microbes, moreover EM, and at the same time they do not pollute our environment, especially our water, because that matter eventually goes into the rivers. So, if we get encouragement and we have a large stock at our factory at Sabak Bernam under PKPS, which we can promote widely throughout Selangor State. Thank you.

Supplementary Question.

Deputy Speaker

Sijangkang .

Thank you, Deputy Speaker. This means that this year, the plan to use idle government land for planting programmes, we have not started planting yet. However, it is still under study. Is it according to food security priority, for those who want to cultivate, or is it up to them to plant any type of crop, only that the Government provides or gives the opportunity to use idle government land.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Sijangkang. For the information also, under this Agro Transformation plan, when we set the policy, our first is high-value production. So we identify, for example, for crops there are 12 types of high-value crops that we have set. Those that we have identified, which we have expertise in. I give examples, among them, for pineapples, MD2. MD2 is a high-value pineapple, its price is, per kilo, between RM6 and RM5. So its production is high, so that our land, because Selangor land is expensive. If we use agriculture, agriculture that is not high-value, it is difficult for them to retain that land. So that is why we go with modern methods, using high-value products. If we mention jackfruit, J33. If we mention melons, High Value Melon, not Rock Melon. Rock Melon is cheap, RM3. We have melons at RM6 / RM8 per kilo, and for information also, in February we have completed seeds for planting for the Selangor State. In the name of Selangor State, we have been asking for research and studies for three (3) years on seeds for melon, papaya and also corn, which will be given the name in the name of Selangor State. We are still thinking about the name, there is no name yet, but the product already exists, and the seeds, which we will place under PKPS.

So among these efforts, we also include livestock. We have certain types of livestock that we have identified as high quality, for example for goats, Black Belly Barbados, hah! This is what we want, which we will, so that it gives high returns to our farmers and at the same time provides quality products for Selangor State.

Also in aquaculture, we have organic tiger prawns. White prawns, these are all high-value products which we will continue to introduce, enhance and expand in Selangor State. Thank you.

Soalan tambahan.

Deputy Speaker

Sementa .

Puan Dr. Daroyah binti AlwiPKR · PHSementaEN

Thank you, Deputy Speaker. Earlier, it was mentioned by the Honourable EXCO that the Government provides the opportunity to use the State Government's idle lands, as well as GLC lands and also lands from agencies such as JPS and river reserves, and so on. So I would like to know, how can these farmers, how do they apply for these GLC lands or agency lands and Government lands, and what types of agriculture can they plant on such land. If it is GLC land, how long can they lease the land and what types of agriculture are permitted. Thank you.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Sementa. Actually, for information on how the method works, as I mentioned earlier, these lands involve GLC and also Government land. As an example for GLC, PKNS, we are at the final stage at Broga, there is about 400 acres. Then MBI Sepang has 64 acres, which I mentioned earlier at Bukit Labu. There are several of these places which are at the final stage, and the method we practise here is that for some of them, we will give them to established companies that have a good track record in agriculture, and we require 30% of the land that we give to be developed for the development of young agropreneurs or new agropreneurs, and we give priority to local residents nearby. And for them, we open applications either through the departments under Agriculture, or through our subsidiaries, mainly PKPS. Right now, PKPS has already received many applications for Bukit Changgang, and we will open it publicly so that we can carry out assessments, and these people will be guided, yes. Why, we know that success in developing modern agriculture is not easy. The cost is high, so we need quite a large capital at the initial stage, but in the long run, modern agriculture is profitable. Small area, high yield, and also pest and disease control is easy to do. So they will be guided for one year, two years, three years until they succeed, not only in production but also in marketing. This is the mentor-mentee method that we have begun to implement at Fruit Valley for melon growers there, and, praise be to God, it appears to be going well, and we will expand it to many places and involve all these agricultural development areas to ensure success in this field of agriculture. Thank you.

Next question.

Deputy SpeakerEN

Next question, Ijok.

Thank you. Honourable Deputy Speaker. Ijok Question No.133.

Oral Questions — 133. Fly ProblemQuestions

133. To ask Y.A.B. Dato' Menteri Besar:-

a)

What firm action has been taken by the Kuala Selangor Municipal Council against chicken farm operators who are causing fly problems?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, until October 2021, a total of 32 chicken farms have been inspected as a result of complaints of nuisance from flies and odour received by the department. The following are the details of the achievement up to October 2021:

Month Number of Inspections January 2 February 1 March 2 April 1 May 17 June - July 2 August 2 September 4 October 1 Total 32 farms

Based on the achievement records, of the 32 farms inspected, 3 farms have been subject to closure seizure action because the farms failed to manage cleanliness of the farm, operated without a licence, and failed to control the nuisance of flies originating from the premises. A total of 49 notices have been issued to all premise operators, and 18 offence compounds involving nuisance offences committed by chicken farm operators have been issued to chicken farm operators who defied the compound notice directives given.

Soalan tambahan

Deputy Speaker

Ijok.

Thank you. This fly problem is an environmental and health problem. In my area, Parit Mahang, there are chicken operators. I want to ask what efforts the State Government of Selangor has, we have problems like from medicine, we have problems. What can we do to help them overcome the problem. Does the Selangor State Government have any efforts to identify the latest chicken operators that are clean, semi like a state, a developed country. This is not, they keep getting compounds, closures, but after 6 months the problem appears again. Ijok wants to ask whether there are the most modern, latest efforts to help chicken operations, because even now in the newspapers, we also have a chicken problem.

Tuan Ng Sze HanDAP · PHKinraraEN

Okay. Yes. Do you want to do it one by one or all together?

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

I'll ask first because it is more or less the same.

Tuan Ng Sze HanDAP · PHKinraraEN

Does Sungai Pelek have several parts?

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

May I ask first? May I?

Deputy Speaker

Sungai Pelek

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Okay. Thank you, Deputy Speaker. Sungai Pelek is also experiencing the same problem, flies, because there are also chicken farms. I myself, together with officers and experts, have gone in. It turns out these flies come because of chicken droppings. So, if there is regular, with permission, clearing or cleaning of the chicken droppings, the fly problem will decrease. So, I agree with Ijok that merely giving compounds is not an effective way. A better way is monitoring so that all farm owners do the things I mentioned just now. So, because of this work, the fly problem in Sungai Pelek has decreased a little. Thank you.

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

The Honourable Member.

Deputy Speaker

Jeram .

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Thank you. I heard the answer to the first question earlier. Regarding the firm action taken by Kuala Selangor Municipal Council (MPKS) against these chicken farm operators, Honourable EXCO, you said that among the 38 to 48 operators, are they located in the Kuala Selangor area? As far as I know, there is not a large number of operators that many. Thank you.

Tuan Ng Sze HanDAP · PHKinraraEN

Alright. Chicken farming is a very important industry in Malaysia to ensure that the supply of chicken meat and chicken eggs is sufficient. So we must find a method to modernise chicken farming. For new applications or the whitewashing (pemutihan) of chicken coops, the State Government and MPKS will only allow and approve closed-concept chicken coops for consideration. This will be considered and approved subject to compliance with the conditions of other related technical agencies. Earlier, the Honourable Member for Sungai Pelek also mentioned that we should not just issue compounds and that we need to carry out monitoring.

In fact, issuing a compound or issuing a notice is also a monitoring action. If we do not go out to carry out monitoring, how would we know that the situation is not in order and that we can issue a compound? So monitoring will continue, and for new applications, the State Government encourages new farming methods, or Modern Chicken Farming. Thank you.

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Has the Honourable Member not yet answered my question of 38 to... the 38 to 48 that you mentioned earlier? What is that...

Tuan Ng Sze HanDAP · PHKinrara

Menurut.. menurut...

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Is it in the Kuala Selangor District or across Selangor?

Tuan Ng Sze HanDAP · PHKinraraEN

According to the statistics provided by Kuala Selangor, inspections were carried out at as many as 30 chicken farms in the Kuala Selangor area.

Deputy SpeakerEN

Alright, the next question, Kuala Kubu Baru.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

Thank you, Deputy Speaker. My question is 134.

Oral Questions — 166. Housing Residences in Forest ReservesQuestions

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

166. To ask the Y.A.B. Dato' Menteri Besar:-

a)

State the action of the Selangor State Forestry Department against residential houses built within permanent forest reserves.

b)

State the total number of residential houses located within HS Bukit Tarek and the ways of resolving the matter following media reports and statements made by 2 ministers on this matter.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Speaker, generally, no structure may be built within a Permanent Forest Reserve without first obtaining permission from the State Authority (PBN). This matter is in line with Section 32, Enakmen (Pemakaian) Akta Perhutanan Negeri Selangor 1985 (Pindaan 2018). If any person is convicted of an offence under this Section 32, he may be fined not exceeding one hundred thousand ringgit (RM100,000.00) or imprisoned for a period of not less than six (6) months but not exceeding ten (10) years, or both. Therefore, the action of the Selangor State Forestry Department against residential houses built within permanent forest reserves without permission from the State Authority is as follows:-

i. Issuing a notice to vacate the permanent forest reserve area within the stipulated period;

ii. Taking firm legal action if the area is not vacated;

iii. Carrying out operations to destroy structures or crops without permission located within the permanent forest reserve; and

iv. Restoring the affected area using appropriate methods such as restoring soil structure, repairing the irrigation/hydrological system, planting forest trees and so on.

To answer the second question regarding residential houses located within Hutan Simpan Bukut Tarik. The issue of residential houses alleged to be within Hutan Simpan Bukit Tarik, as reported in the Utusan Malaysia newspaper in October 2021, is still under further examination by the Selangor State Forestry Department. This requires verification together with the Department of Survey and Mapping Malaysia (JUPEM), namely JUPEM Negeri Selangor, and the relevant Land and District Office. The village referred to in this matter is Kampung Muhibah or Kampung Melayu Bukit Tarik, Mukim Hulu Yam, Hulu Selangor District.

Based on preliminary information obtained from the Hulu Selangor District and Land Office, this village area was already approved for alienation (pemberi milikan) for agricultural purposes through MMKN 9/2004, which is 18 years ago. This area is known as the Kampung Muhibah agricultural area, Mukim Hulu Yam, which is also listed in the Dusun Muklis project of the Hulu Selangor District Agriculture Office. Results of the current check show that 227 lots have already been registered for ownership, and only about 33 lots, or plots only, have semi-permanent or permanent buildings. The total area of this area is 259.434 hectares covering 228 agricultural plots, referring to the summary paper of MMKN 9/2004 mentioned. The Kampung Muhibah area is forest reserve land that has been revoked through WKNS 535-4, and the marking on the development plan also indicates Bukit Tarik Forest Reserve Park Revoke GN3.48-34 and also Park Revoke GN353-50. Therefore, the Selangor State Agriculture Department will carry out further examination with the relevant agencies for appropriate action. Thank you.

Deputy SpeakerEN

Next question. Jeram.

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Thank you, Deputy Speaker. My question is 135.

Oral Questions — 135. Comprehensive Development of Kuala Selangor Parliamentary AreaQuestions

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

135. To ask the Y.A.B. Dato' Menteri Besar:- How can the Selangor Government help Kuala Selangor, which has been upgraded to a Municipality, yet "Indah dan Bersejarah" is only concentrated in the Bandar Kuala Selangor area alone?

Tuan Ng Sze HanDAP · PHKinraraEN

Thank you, the Honourable Member for Jeram. The overall development of Kuala Selangor District is based on the Kuala Selangor District Council Local Plan 2025 that has been gazetted. Any proposed development must comply with and be consistent with the proposed land-use zones. For the Honourable Member's information, for more comprehensive development, the Kuala Selangor Municipal Council is currently in the process of replacing the local plan with the Kuala Selangor Municipal Council Local Plan 2035, and mobilisation work has begun to be aligned with the upgrading of MDKS to MPKS as well as the latest policies by the state authority. Therefore, the public and local ADUNs are welcome to review and submit proposals and views during the publicity programme and public participation for the draft plan concerned. Thank you.

Deputy SpeakerEN

Next, Dengkil, not present.

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Deputy Speaker, since Dengkil is on the evening shift today, he has asked me to take over and, using Standing Order 24(2), seek permission for question 136.

Deputy SpeakerEN

That's a bad assumption.

Tuan Mohd Shaid bin RosliBERSATU · PHJeram

Boleh?

Deputy SpeakerEN

That bad assumption.

Tuan Mohd Shaid bin RosliBERSATU · PHJeram

Sorry?

Deputy Speaker

Shift petang?

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Evening shift. He is on the evening shift.

Deputy SpeakerEN

That bad assumption. I allow it.

Oral Questions — 136. Review of Status of Memorandum of Transfer (MOT) Issue at Taman Putra PerdanaQuestions

Tuan Adhif Syan bin AbdullahBERSATU · PHDengkilEN

136. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What is the status of the remaining six plots that have not yet been transferred in ownership after discussions between the Sepang District Land Office and the developer?

b)

What is the status of the land for public facilities in the plot area whose transfer of ownership status is still unresolved?

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. Still close even though we are now in different parties. Honourable Members all. We can swap shifts. For the information of the Honourable Member for Jeram, who represents Dengkil, this question concerns the Memorandum of Transfer, or MOT, for Taman Putera Perdana. For the Honourable Member's information, the Selangor Lands and Mines Office (PTGS) held a meeting with the developer concerned on the premium value for the remaining six plots of the Putera Perdana Development on 2 April 2021. Following that, Talam informed us through a letter dated 24 May 2021 that it was unable to pay the premium based on the current valuation, or the valuations of 2012, 2008 or even 2002, because they were too high. Discussions between the Sepang Land Administrator and Y.B. Tuan Borhan bin Aman Shah, Chairman of the Standing Committee on Rural Development and Traditional Villages, Malay Customs and Adat, Culture and Heritage, were held on 2 November last to find a solution to this issue and subsequently table a Paper for MMKN Consideration. For question (b),

the Director of Lands and Mines Selangor approved the application for surrender of part of land for public use under Section 200 Kanun Tanah Negara over title PN 39254 Lot 14004 (Plot E) Mukim Dengkil, Sepang District, by Cekap Mesra Development Sdn Bhd (holder of power of attorney for Continental Height Development Sdn. Bhd.) on 6 May 2021. The public land surrendered with conditions is as follows:-

First, the main distribution substation site of 0.56 acre and electrical substation of 0.21 acre, with TNB required to apply for alienation subject to the conditions and payments in accordance with PTGS Circular No. 11/2010. Second, the mosque site of 2.69 acres, open space of 1.29 acres and road reserve of 0.92 acre gazetted under Section 62 KTN or Kanun Tanah Negara. Third, the fire station site of 2.84 acres, police station of 2.93 acres and post office of 0.95 acre, with the Federal Land Commissioner (PTP) required to submit an application under Section 76 KTN or Kanun Tanah Negara. Fourth, the water tank site of 0.64 acre and pump house of 0.17 acre, with Air Selangor required to apply for alienation of land under Section 76 Kanun Tanah Negara. These are among the infrastructure facilities stipulated for the construction. Thank you.

Deputy SpeakerEN

Next question. Taman Templer.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

My question is 137. Thank you.

Oral Questions — 137. Construction of Community HallsQuestions

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

137. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What is the latest information regarding the construction of the community hall in the Dun Tmn Templer?

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker and the Honourable Member for Templer, actually, the Honourable Member for Templer raised this question during his debate, and I also answered it during my winding-up. The answer is that there are two plans for constructing community halls in DUN Taman Templer. The first is Dewan Setia Eco. This hall is located in the Setia Eco Templer area, where the developer developing this site is Setia Eco Templer, and the land for this hall is 1.03 acres, which will be equipped with a 1-storey community complex together with 2 badminton courts. The development of this hall will be carried out together with the development of Rumah Selangorku. However, MPS has requested the developer to expedite the development of the hall to meet the needs of the Templer community. And based on feedback from the Setia Eco Templer developer, construction of the hall will begin in February 2022 and it is expected to be handed over to Selayang Municipal Council (MPS) in July 2023. The second is the Dewan or Community Complex at Bandar Baru Selayang. This hall is located in the Bandar Baru Selayang area next to the MPS food court. The site is government reserve land accessible via Persiaran 2. The Municipal Council has submitted a letter of application for the alienation of government land as a hall site to the Gombak District and Land Office on 4 April 2021. The hall site is 2.5 acres and will be developed into a community complex equipped with badminton courts, a kindergarten and an MPS file room. The current status of this hall site is that Selayang Municipal Council has not yet received gazettement approval from the Gombak Land Office for the purpose of the hall site. Thank you.

Deputy Speaker

Soalan seterusnya.

Puan Dr. Daroyah binti AlwiPKR · PHSementaEN

Deputy Speaker, allow me to raise Standing Order 24...

Deputy SpeakerEN

I have not yet called Sementa. Hulu Bernam, yes.

Puan Dr. Daroyah binti AlwiPKR · PHSementaEN

Allow me to raise Standing Order 24(2) for Question 138.

Deputy Speaker

Baik.

Oral Questions — 138. Urban Poor and Single MothersQuestions

Datuk Rosni binti SoharUMNO · BNHulu BernamEN

138. To ask the Y.A.B. Dato' Menteri Besar:-

a)

State the latest statistics on poor urban families and single mothers in Selangor by district.

b)

State the efforts of the State Government to help these groups upgrade their lives through planned programmes.

Tuan Ganabatirau A/L VeramanDAP · PHKota KemuningEN

Thank you, Deputy Speaker. Thank you to the Honourable Member for Sementa who took the question. Mr Speaker, JKM does not have data focusing on poor families and single mothers. However, the latest statistics on aid falling under this category are the Child Aid (BKK) and the General State Aid (BA). As of October 2021, there were 4,205 cases of BKK recipients with expenditure of RM14,694,700.00, and there were 5,261 cases of BA with expenditure of RM10,966,900.00. Deputy Speaker, as a state government founded on caring for the people, various IPR programmes and plans have been arranged to help poor urban families and single mothers. As we know, one of them is that the State Government has introduced the Kasih Ibu Smart Selangor (KISS) Programme, which may be converted to BINGKAS in 2012, to help mothers whose families have income of RM2,000 and below, or mothers from the B40 group, where those receiving financial assistance for purchasing basic necessities use the KISS Card with a limit of RM200 per month. The State Government has also provided 5,000 KISS Card quotas solely for single mothers, and the latest data as of October 2021 shows that 1,661 persons have received aid. In addition, programmes such as Kad Peduli Sihat also aim to help poor families, including single mothers, obtain free clinic and hospital treatment, with a financing limit of RM200 per year for the individual category and RM500 per year for the family category according to the type of basic treatment. Meanwhile, the State Government has also implemented various Inisiatif Peduli Rakyat programmes, consisting of 33 programmes such as the Free Water Scheme, Free Smart Selangor Bus, Free Internet and many more.

For information, the State Government has also implemented the Blueprint Poverty Eradication Aid Programme, where based on records from 2008 to 2021, a total of 5,035 persons have received aid in the form of equipment or machines, with total expenditure of RM16,697,203.10. Meanwhile, the latest is the establishment of the Indian Selangor Empowerment and Entrepreneurs Development (I-SEED) Programme in March 2021, which also focuses on empowering the economic sector for the Indian community in the B40 group. Not forgetting the Festive Voucher Aid Provision, better known as the Jom Shoppping Perayaan Programme, which has been implemented since 2012 with an allocation of RM8 million each year, where each family that is less well-off will receive vouchers for purchasing essential items worth RM100 at selected supermarkets. In addition, we are aware that in facing the COVID-19 pandemic, the state government issued an additional allocation of RM50,000 to all state constituencies under the Pakej Kita Selangor 2.0 to implement the Food Basket Programme for all citizens of Selangor affected by the spread of COVID-19. Finally, the state government is also ready to continue studying and making improvements and to prepare new programmes in the future that will benefit the people of Selangor, using existing allocations.

Deputy Speaker

Soalan berikutnya.

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

Honourable Speaker.

Deputy Speaker

Ya.

Tuan Harumaini bin Haji OmarBERSATU · PHBatang Kali

Soalan tambahan.

Deputy Speaker

Ya.

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

Thank you, Honourable Deputy Speaker. Earlier it was said that 5,000 quotas for single mothers were offered to single mothers in the state of Selangor.

It is understood that 1,661 recipients means there are still many vacancies, meaning many have not taken up this opportunity. What are the problems causing this to happen? Whereas at our offices, the state assemblies, especially DUN Bebas, are often visited by single mothers, because previously we handled matters like these, and now we are not handling the opportunities offered by this Government to single mothers. And I am confident that when we are still given the opportunity and space to help realise this Government's good intention, it will be fulfilled. Thank you.

Tuan Ganabatirau A/L VeramanDAP · PHKota KemuningEN

Thank you, the Honourable Member for Batang Kali. Actually, we all know that there are indeed many single mothers out there. However, when applying, they must prove that they are truly single mothers, with a proper divorce or at least supporting documents to verify their income and their single-mother status. And for the Honourable Member's information too, it should be reminded here that because a new programme will come, BINGKAS later, all will be aligned with the rate later, thank you.

Deputy SpeakerEN

Alright, next question, Sentosa.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Thank you, Deputy Speaker. My question is 139.

Oral Questions — 139. Welfare of OKU PersonsQuestions

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

139. To ask the Y.A.B. Dato' Menteri Besar:-

a) What is the total number of registered OKU persons in DUN Sentosa? b) What efforts does the State Government have to overcome the problem of homelessness in Selangor?

c) What actions have been taken by the State Government to help senior citizens and OKU persons who are not eligible for welfare aid other than SMUE?

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Sentosa. Honourable Sentosa asked about the number of Persons with Disabilities (OKU) registered in the Sentosa State Constituency, and for the information of the Honourable Member, out of the total of 99,897 Persons with Disabilities in the State of Selangor, a total of 1,426 persons are registered OKU in the Sentosa State Constituency. The category of OKU with the largest number registered in the Sentosa State Constituency is physical OKU, 641 persons, which is 45% of the total registered OKU in the Sentosa State Constituency. The other totals are learning OKU 397, visual OKU 113, mental OKU 109, multiple OKU 85, hearing OKU 75 persons, and speech OKU 6 persons, totalling 1,426 persons in the Sentosa State Constituency.

Honourable Sentosa also asked about how the State of Selangor is overcoming the problem of homelessness in Selangor. The State Government, through the Selangor State Social Welfare Department (JKM), is always concerned about the issue of homelessness in Selangor. JKM is the agency responsible for enforcing the Akta Orang Papa 1977 or Act 183, where the role of the Department is to rescue destitute persons (PAPA) among citizens such as vagrants and beggars. Destitute persons who have heirs will be handed back to their heirs or guardians, and monthly financial aid will be given if they meet the eligibility requirements. As for cases of destitute persons who have no heirs or guardians, these groups will be placed at Non-Governmental Organisation (NGO) care centres or welfare institutions.

JKM always makes case referrals to other relevant agencies such as the Lembaga Zakat Selangor, the State Islamic Religious Department, the National Anti-Drug Agency and the local authorities. If the cases require other assistance such as financial aid, rental assistance, employment assistance and other suitable assistance, JKM also provides counselling services for cases that require them. Cases of non-citizen destitute persons fall under the purview of the Immigration Committee for further action. Meanwhile, cases of destitute persons with mental illness are subject to the Akta Kesihatan Mental 2001.

For the next question, Honourable Sentosa asked whether the State Government assists elderly persons and OKU who are not eligible for welfare assistance other than the SMUE. To assist elderly persons and OKU who are not eligible for welfare assistance other than the Skim Mesra Usia Emas, it is provided by the State Government. JKM Selangor also provides financial assistance schemes for these groups to benefit from, as follows. First, the Persons with Disabilities Employee Allowance (POKU), an OKU allowance at a rate of RM450 a month is considered for OKU who are working and whose income is less than RM1,500 a month, as an incentive for them to continue working. Second, the assistance for Persons with Disabilities Unable to Work (BTB) at a rate of RM300 a month is considered for OKU who are unable to work because of their severe disabilities and are unable to work.

Third, the assistance for caregivers of bedridden Persons with Disabilities and bedridden chronically ill patients (BPT) at a rate of RM500 a month is considered for caregivers of bedridden OKU or bedridden chronically ill patients, to reduce the burden of family caregivers' expenses and ensure quality care. Fourth, the assistance for prosthetics or support aids at the actual rate of the prosthetic or support aid, to help JKM target groups who are unable to afford prosthetics or support aids such as artificial legs, wheelchairs, hearing aids and other suitable equipment recommended by the Medical Officer.

Fifth is the Bantuan Warga Emas (BWE) at a rate of RM500 a month, considered for elderly persons who have no income to continue their daily lives. And sixth, the State general assistance with 3 rates, namely RM250 or RM300 or RM350 a month, is considered for poor families and other target groups in need. Thank you.

Soalan tambahan.

Deputy Speaker

Sentosa.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Thank you, Mr Deputy Speaker, and thank you to the Honourable EXCO for the answer which was very complete, with many programmes that have been planned and announced to the people of Selangor, especially persons with disabilities (OKU). My question may be a little strange, but I want to ask, regarding the programmes that we have, do we have any programmes for Transvestite persons with disabilities, of whom there are many Selangor citizens who experience this problem in Selangor. They too can be considered as Persons with Disabilities, but there is not a single programme for this group. Especially many in this group cannot get jobs because of the name problem. And also many face problems that transvestites or my friends call by the term "pondan", but I think that term is not appropriate, it is a rude language. But I also do not know other names, whether there are any or not, but, transgender, okay. So, this group needs help, perhaps the Honourable EXCO can think of a programme for this group so that we can also bring or make a little change for them. Thank you.

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Sentosa. There is indeed no classification for this Transvestite OKU. So perhaps I do not know, perhaps if we include them under Mental OKU, some people may disagree, yes. However, what I want to say is that in these JKM assistance programmes, the issue of transvestites has never arisen. If they are truly OKU and they need the help that I mentioned earlier, they will surely have received it. But if the issue is to provide help in terms of problems, their mental problems, yes, we can consider it, and I will discuss it with the Director of the Community Health Department and also with KPWKM, because we know that the issues of maknyah, pondan, transvestites and so on are very controversial issues. If we are given the responsibility of looking after these citizens, regardless of all that, we must provide assistance. For example, if it is health assistance, whatever they are, we give it. However, once this matter becomes public knowledge, for some people, this is a perception that we need to correct in our country, that these are groups which I think are marginalised. If they are given assistance and support, it will spread, meaning oh everybody sees there is no problem with this, if we are transvestites. This is a perception, I want to share with you, with permission, because it is very sensitive, and the Government must not only, not only the policy, we in Selangor need to think about it, but at the level of the whole country. Thank you, Honourable Member.

Deputy Speaker

Taman Templer.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Thank you, Deputy Speaker. I want to ask the Honourable EXCO for a small explanation. Earlier it was mentioned about RM500 if the elderly are already truly sick and cannot manage themselves, that is the first. That is the second, earlier there was RM500 for the heir who cares for them. That means RM500 for the elderly and RM500 also for the heir who cares for them, I would like a little clarification.

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

No. Honourable Member, if there is a bedridden OKU at home, who cannot go out to work, who is lying down. If a helper, or for example one of his children or family members, cannot work because they have to look after him at home, it is given to his child to look after, whatever it is, this bedridden OKU. Yes, this does happen, provided the child cannot work because they have to look after the bedridden person. InshaAllah, they will receive it.

Puan Wong Siew KiDAP · PHBalakong

Soalan tambahan.

Deputy Speaker

Balakong.

Puan Wong Siew KiDAP · PHBalakongEN

Thank you, Mr Deputy Speaker. Honourable EXCO, I just want to ask. We know many programmes will be held by JKM and I feel very grateful, but is there an SOP or time frame, with permission, for approving or receiving a response to all these applications? Thank you.

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Alright, a rather specific question, I also forgot. Usually I receive a briefing that they will have a certain SOP to obtain assistance after they have completed their investigation. I just want to tell the Honourable Members here, regarding the elderly, even though it was not asked, for me we should all know this matter. Many elderly persons apply to obtain the elderly assistance, this BOT money, this Bantuan Orang Tua. However, one of the criteria that becomes an obstacle for them to receive it is when they have children who are working. Yes, if we look at this, this is something that the Social Welfare Department finds difficult to approve for elderly persons who have children who should be responsible for them. And if indeed the children have completely abandoned them and so on, the Honourable Members must help them to obtain this Bantuan Orang Tua. Proof must be provided first, children overseas who do not send money home and so on, there are indeed many within this criterion. So I hope all Honourable Members will appeal to our elderly citizens, they need to instil awareness in the children that they must take care of their parents. They must take care of their parents and not feel that they can simply leave it to the Government to look after their parents. Thank you. Honourable Balakong, I will look for that SOP later, yes.

Deputy SpeakerEN

Next question, Kampung Tunku.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Thank you, Mr Deputy Speaker, my question is 140.

Oral Questions — 140. OrphansQuestions

Puan Lim Yi WeiDAP · PHKampung TunkuEN

140. To ask the Right Honourable Dato' Menteri Besar: -

a) What is the number of orphans and double orphans in the State of Selangor due to COVID-19 from January 2020 until September 2021?

b) Please state the 3 State Constituencies with the most orphans due to COVID-19.

c) What is the State Government's plan to help this group?

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Thank you. Honourable Kampung Tunku asks about COVID-19 orphans, yes. What is the number of orphans and double orphans in the State of Selangor due to COVID-19 from January 2020 to September 2021? The information we have is from the Selangor State Education Department, and the information is not consolidated with that of the social welfare departments. The COVID-19 pandemic has had a profound impact on the people of Malaysia, especially school pupils who have lost their parents and guardians. Many have become orphans, and according to the records of the Selangor State Education Department, the number of school pupils in the State of Selangor who are now double orphans due to the loss of their mother and father from COVID-19 is 55 persons.

Meanwhile, the number who have become orphans is 1,648 persons. The details of this information are as I have here, it is lengthy, each district will be attached together with the answer to the Honourable Member, yes. Each is given by district, yes, because our information is through the District Education Departments, yes.

Honourable Kampung Tunku also asked about the data on the 3 State Constituencies with the most orphans due to COVID-19. However, the Selangor State Education Department does not have data on the number of orphans or double orphans due to COVID-19 by State Constituency. The Selangor State Education Department only records data overall and by the number at the District Education Offices in the State of Selangor. And among the 3 districts with the highest number of orphans due to COVID-19 are the districts of Hulu Langat, Klang and Petaling Perdana.

The next question concerns what the Government's plan is to help this group. The Selangor State Government, as usual, is very concerned and empathetic towards the plight that has befallen children who lost their parents due to COVID-19. The Government's support measures through JKM in assisting cases of children who need protection care and rehabilitation are as follows. First, conducting detection and background investigations of heirs and close relatives or any other person who is eligible and suitable to care for the children. If there are no heirs or no eligible and suitable persons identified to care for the children, they will be temporarily placed at JKM's Child Protection Institutions.

Second, JKM's follow-up steps for cases of children requiring permanent placement are based on the principle of the best interests of the child. Family-based child care and admission into institutions as a last resort. So far, all cases of double orphans due to COVID-19 in Selangor have been cared for by their respective nearest heirs.

In addition, social support and monitoring of children and families at high risk are also carried out by the Child Protectors, assisted by the District Child Protector Teams (PKKD). There are 11 PKKDs in the State of Selangor with a membership of 77 individuals, who are volunteers, averaging 7 persons in each district. PKKD members are selected from various suitable backgrounds to assist JKM and are appointed by the Minister under the Akta Kanak-kanak 2001 for a period of 3 years.

Next, for cases requiring financial assistance, JKM provides child assistance or BKK, Bantuan Anak Pelihara (BAP) or Bantuan Am Negeri (BA). Based on eligibility, monthly assistance up to October 2021, there were 4,205 cases of BKK recipients with expenditure of RM14,694,700.00 and 108 cases of BAP with expenditure of RM329,250.00. Meanwhile there were 5,261 cases of BA (Bantuan Awam), yes, with General Assistance expenditure amounting to RM10,966,900.00.

In situations where children or families face a crisis, JKM also offers psychological support and counselling to listen to clients' problems and carry out interventions to reduce emotional stress or to obtain appropriate isolation for clients. Up until October 2021, a total of 1,737 cases of psychological support and counselling have been handled by JKM Selangor.

The number of COVID-19 orphan children in Selangor who are cared for by JKM and receive social welfare assistance is 29 persons. In addition, the State Government recently, through the Budget 2022 that has just passed, announced that it will implement the COVID-19 Orphan Assistance with an allocation of RM1.25 million. This financial assistance will benefit 2,500 orphans across the whole State of Selangor who lost their parents due to COVID-19, with financial assistance of RM500 each. The State Government will also coordinate with agencies such as the Social Welfare Department, the Selangor State Health Department and other units for purposes such as estate management, child care, health assistance and emotional support. Thank you.

Puan Lim Yi WeiDAP · PHKampung Tunku

Soalan tambahan.

Deputy Speaker

Kampung Tunku.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Thank you, Mr Deputy Speaker, and thank you, Honourable EXCO. My first question is why the data on orphans and double orphans from the Selangor State Education Department is not consolidated with JKM. That is the first. The second question concerns families in crisis who receive psychological support and intervention. Does the State Government have any plan to, with permission, sync and into Selangor Mental Sihat, that is SIHAT? Thank you.

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Actually, the State Education Department and JKM are 2 different departments. If we request data, we request it separately. I am sure the data I gave just now has overlaps between what was assisted by JKM and what was also assisted by the State Education Department. I am trying to consolidate the existing data, Honourable Member.

Next, for those who experience emotional disturbance and so on, counselling is needed. I think there is no problem for those who are already able and have their own device to access SELangkah Sihat, yes. And perhaps they need guidance on how to use this application so they can express, whatever it is, their feelings to counsellors and subsequently receive guidance from the counsellors. Thank you.

Deputy SpeakerEN

Next question, Semenyih. I have changed my question.

Tuan Zakaria bin Hj HanafiUMNO · BNSemenyihEN

Thank you, Honourable Deputy Speaker. My next question is question 141.

Oral Questions — 141. SeldecQuestions

Tuan Zakaria bin Hj HanafiUMNO · BNSemenyihEN

141. To ask the Right Honourable Dato' Menteri Besar: -

a) State in detail the effectiveness of the SELDEC programme under Invest Selangor in online business?

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Deputy Speaker, SELDEC, or with permission, Selangor Digital E-Supply Chain, has been developed and operated by Selangor Industrial Corporation Sdn. Bhd., which is a subsidiary of PKNS. SELDEC has no connection with Invest Selangor Berhad.

SELDEC was launched on 24 June 2021 by the Right Honourable Menteri Besar of Selangor, and until now it has 1,200 entrepreneurs registered and conducting business on the SELDEC platform. Meanwhile, the SELDEC platform has more than 8,000 entrepreneur products, comprising fresh products namely fish, chicken, meat, vegetables and fruits. Also included are frozen food, ready-to-eat food, dry products and many more. The products in SELDEC consist of PMKS (Micro, Small & Medium Enterprises).

Following the positive response received from the public, SELDEC has upgraded the portal product and operations, where delivery of entrepreneurs' products is carried out not only within Selangor but throughout Malaysia, with the cooperation of local logistics companies such as Pos Laju, Line Clear and Logistika. SELDEC also collaborates with other government agencies such as SSDU, HIJRAH, SIDEC and also 12 local authorities (PBT) across Selangor in strengthening entrepreneurship programmes in Selangor towards a Smart Economy and Smart Digital.

Deputy SpeakerEN

Next question, Batang Kali.

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

Thank you, Honourable Deputy Speaker. I came to the meeting by Perodua. My question is 142.

Oral Questions — 142. Laptop AssistanceQuestions

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

142. To ask the Right Honourable Dato' Menteri Besar: -

a) At the Government level, the 1 Family, 1 Laptop Scheme has already been held. Will the State Government implement a programme of this kind?

Dato' Seri Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Honourable Batang Kali, for your question on the provision of laptop computers. So far there is no centralised programme or centrally managed programme for providing laptops or tablets to the public in the State of Selangor. However, in line with the Federal Government's announcement regarding the distribution of 150,000 tablets or laptops, and this year with an additional specific figure, the State Government has announced that it will help students in particular, and also traders, through a programme called the Selangor Internet Data programme, which began to be distributed by August 2021. This programme is part of the Stimulus package that we announced, and the Selangor Internet Data is expected to help more than 70,000 individuals with free internet data subscriptions for one year, funded by the State Government at a cost of RM 17 million.

In the 2022 Budget announcement, I announced the SEPINTAS programme. SEPINTAS is not a programme of giving out items in large numbers, because it will assist with a programme for disposing of or recycling computer units, desktops or personal computers, laptops and certain tablets that are no longer wanted by departments, individuals or companies, for refurbishment and upgrading, to be given to B40 students. We have allocated RM1 million for the activities and initiatives, which will be carried out or managed by two of our units, namely the Perbadanan Perpustakaan Awam and SmartSel. Thank you.

Deputy SpeakerEN

The next question, Meru.

Thank you, Deputy Speaker. My question for the morning session is 143.

Oral Questions — 143. Water Supply Problems at Kampung Bukit Cherakah JayaQuestions

143. To ask the Y.A.B. Dato' Menteri Besar: -

a) What are Air Selangor's plans to overcome the problem of inconsistent water supply in this village?

b) Does Air Selangor have plans to re-align the water pipe routes in this village, which currently pass largely through privately owned land?

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Meru. Thank you, Mr Deputy Speaker. Honourable Meru asks about Air Selangor's plans to overcome the problem of inconsistent water supply in Kampung Bukit Cherakah Jaya.

For the Honourable Member's information, Air Selangor has appointed a contractor to carry out repair works on the old and leaking water tower reservoir in Kampung Bukit Cherakah Jaya. The overall repair work on this tower reservoir, or tower point, and this tank, and the pipe connection, is scheduled to be completed at the end of January 2022, which means next month. And the problem of inconsistent water supply in Kampung Bukit Cherakah Jaya is expected to be resolved after that. The estimated cost for repairing this water tower reservoir is RM 2 million.

Certainly the reservoir is important to ensure sufficient supply and adequate pressure for the water to reach its destination. At the same time, the issue of pipe routes, or pipes, is also important. Air Selangor has a plan to carry out a programme of replacing old pipes in part of the Kampung Bukit Cherakah Jaya area, based on the method we commonly use, namely the frequency of pipe burst cases in that area.

This programme will be carried out at the end or beginning of 2023 until 2025, involving the replacement of pipes in Kampung Bukit Cherakah Jaya. And when the replacement is done, it will be arranged according to the correct routes. Once this major replacement that we are carrying out is done, the routes can be corrected, which will ensure that they no longer pass through privately owned land areas. Thank you.

Soalan tambahan.

Deputy Speaker

Meru.

Okay, thank you, Honourable Deputy Speaker. My question, the issue related to my question, concerns mainly the areas on the hills, and as far as I know, those areas have no water pipe construction. And for the Honourable EXCO's information, the residents there still actually use rainwater. And indeed Air Selangor has previously given me a report that it is not suitable or not very relevant for us to build water pipes there because it is too high and the cost is large. So perhaps I would like to ask about other plans that could be made to ensure that the people in that area can receive a water supply. Because I think perhaps what the Honourable EXCO stated, that the area is not involved in that project, which may not have any impact on the area, perhaps there are other plans, water pumps and so on.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

On the issue of this reservoir, this reservoir or tower reservoir, also called tower point, tower tank, it is indeed an important component in any development or water supply system. Because it not only ensures sufficiency of water when supply disruptions occur for use. It also helps increase the pressure, or pressure, to the place concerned. That is why these low-lying areas, their pressure is low and they cannot receive water because the pressure is rather low. So when we place this tank, it helps increase the pressure so that the water reaches the places that could not be reached. And also to ensure adequate supply, that is the purpose for which these reservoirs were set up. That is why there are actually many of these reservoirs and tanks. In the past, at one time, they were not connected directly but bypassed, because of cost. The cost of operating these reservoirs is high, water supply and so on. The maintenance of the pumps, so they simply bypassed it and went directly from the main pipe into the residential area. As a result, when this happens, two things will occur: first, low pressure; second, insufficient supply. If it stops working, there is no water, the place has no water for a while. So under the NRW programme and also Air Selangor's modernisation, these reservoirs have all been repaired, upgraded and connected, corrected. So this programme is ongoing in stages, and this is one of the items included in Air Selangor's plan, which is being implemented in stages to repair these reservoirs or tanks again. And this is what will help the Honourable Member to ensure that water reaches places that previously did not receive it in terms of pressure.

Nevertheless, we will see how the study shows the extent to which this water will reach and its sufficiency, and apart from this tower reservoir, we also need a better piping system, because as I have often said, our pipes are many AC pipes, asbestos cement, which are of quality but are over 40 years old and need to be replaced, and when we replace them, we ensure that they are of better quality. Thank you.

SpeakerEN

Honourable Members, the time is now 11.30 a.m., and therefore I adjourn the question session for the next business.

Continuation of Kuala Selangor Municipal Council Bills 2021Bill

Secretary of the HouseEN

The next Order of the Day, continuation of the Kuala Selangor Municipal Council Enactment 2021.

SpeakerEN

I invite the Honourable Ijok to continue the debate.

Thank you, Deputy Speaker. I continue my debate on the Kuala Selangor Municipal Council Enactment. Yesterday I touched on the possibility of increases in business taxes, door taxes, and also the possibility that roadside places where cars could previously park for free would perhaps be made into parking bays. Honourable Members of this august House, upgrading from a Council to a Municipality is a progress, but with every upgrade in progress or in raising our status, we must think about the welfare of the community. We do not want this upgrade in status to burden the community, especially the community in rural areas. I consider Ijok is no longer a town, it is rural, in Kuala Selangor, apart from the big town of Kuala Selangor, other places do not have big towns. So I hope that certain parties in the government will not arbitrarily raise taxes or impose road charges, because people now, especially during this COVID-19 period, are in great difficulty, especially rural people. I know that with every progress, every new organisation, we must think about generating revenue. This is the KPI of many organisations, many municipalities have KPIs on how much revenue we collect. I think this is one of the criteria we use, but we do not think about the welfare and comfort of the community.

I hope the government will think out of the box, other ways to obtain revenue, especially in Kuala Selangor. We have potential, tourism in terms of agro-tourism, I want to mention the agriculture fruit valley. Honourable EXCO, land has been given to companies for many years, but in my opinion, the way it is cultivated, or given to companies, the company is not cultivating it and it is left idle. This is a good potential to attract tourism, increase property value, or another source of funds. HORAS is a good, beautiful area; I raised it two or three years ago, but where is the tourist attraction?

Industry is one way to obtain funds, Ijok certainly has many industrial parks, but what is very sad is that sometimes we open parks, and there are cases where foreign companies come to set up factories, but there is no telephone line. Water is a problem. How do we approve a place for industry but the basic facilities are not reached? This sometimes weakens, or weakens the spirit of people who want to come and invest in Ijok. As ADUN for Ijok, we in Ijok have much potential in terms of agriculture, tourism, and heritage, from which we should attract tourists and increase funds, because Ijok is indeed a rural area with no other source of revenue. And finally, when we want to upgrade, from Council to Municipality, I hope that in terms of municipal management it will improve. Do not follow old ways. Many residents go to the Council to manage something, but return by a long route. Ijok to Kuala Selangor is not near, but far. So, Council Members and civil servants, do not be complacent about upgrading and salary increases. We too must improve our performance, our KPIs must improve. That is all. Ijok certainly supports this Enactment, but we must change our mindset to the new situation, and so on. Thank you.

Deputy Speaker

Jeram

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Thank you, Mr Deputy Speaker. This is the first time I have been given the floor earlier. Mr Deputy Speaker, regarding the Bill on the Kuala Selangor Municipal Council Enactment, I fully support it and also congratulate the Kuala Selangor Municipal Council, as well as the State Government for giving full support. However, I also support to some extent what was proposed by the Honourable Ijok regarding the increase in taxes.

It must be in line: tax increases, development and infrastructure must be in line with the status as a Municipal Council. There is no use in being called a Municipal Council if the State Government does not provide a proper allocation, which places pressure on the Kuala Selangor Municipal Council to receive or face pressure or condemnation from the people of Kuala Selangor because of its municipal status, but its facilities or infrastructure are rather lagging. So I request the Honourable EXCO and the State Government to balance the budget rate or allocation appropriately for the Municipality, so that the Kuala Selangor Municipality achieves the appropriate Municipal status by having the appropriate infrastructure. Related to this, when we speak of a large Municipal Council that has facilities, basic facilities such as those I proposed in my debate regarding police stations and fire stations, in certain rapidly developing areas, must be emphasised.

Apart from that, I also propose to the Honourable Member that every municipal council, not only the Municipal Council, every local authority (PBT) in the Selangor area must hold discussions or meetings with people's representatives on town planning. Until now, from 2018 until the end of 2021, there has not been a single specific meeting with people's representatives from the ADUNs to discuss development in the PBT areas themselves. For example, I say that if there is a town planning officer, he does not call the people's representatives to ask for their opinions and to discuss, because usually people's representatives know better the situation in their own areas, what is wanted by the young and what is wanted by the senior residents. So we can sit down, discuss and give opinions. Is town planning only to be planned by the Council, the Council officer called the Director of Town Planning and also Council Members, but without involving people's representatives? People's representatives should know better what is needed for the area, especially for places like Jeram. Indeed, its ideas are out of the box and beyond the capacity of others. So these sound ideas can be adopted to improve, as the Honourable Ijok said, out of the box, Ijok, so that things can be achieved if we sit together with the representatives together with the Director of Town Planning, and to raise the status of the Municipality appropriately. So I fully support the status granted by the State Government to the Kuala Selangor Municipal Council, and congratulations again. Thank you.

Deputy SpeakerEN

I invite Bukit Melawati.

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Thank you, Mr Deputy Speaker. I stand to debate briefly on the amendments to the Kuala Selangor Municipal Council Enactment Bill 2021. First, I offer my congratulations and compliments to all the staff and also the management of the Kuala Selangor Municipal Council for the upgrading to Municipality in August, which everyone has long been waiting for.

In my service, there have actually been many changes and improvements carried out by the Kuala Selangor Municipal Council recently, especially roads and tourist areas under the management of the Kuala Selangor Municipal Council, which have been greatly upgraded and improved. And I believe this is the result of the formulation or drafting of the special plan for the Melawati 2025 urban area for a period of 5 years, which was launched two years ago, if I am not mistaken, and this covers several areas such as Pekan Lama Kuala Selangor, Bandar Baru Kuala Selangor and also Bukit Melawati. I believe this is specifically to upgrade assets and tourism products under the Kuala Selangor district and to preserve the assets we have, because these are the areas that are the economic zone and also the tourism zone in the Kuala Selangor district.

Therefore, in this connection, I would like to know the status of the RKK, its implementation, because I believe the COVID-19 pandemic has affected all the plans we have made, and how the Council can continue these plans perfectly and on track, with permission, and how the Council can improve and enhance internet access over the telecommunications network in line with the upgrading to Municipality, because we have now become a town, so we can no longer lag behind, especially since many young people in Kuala Selangor are involved in online business, online learning and education, as well as working from home. So all of this is rather affecting their performance if the Municipal Council is unable to provide good service in terms of internet access and telecommunications networks.

So I hope the government can help residents and the people of Kuala Selangor to enjoy better internet access at this time. Mr Deputy Speaker, I also welcome the commitment of the Kuala Selangor Municipal Council to continue two-way meetings with Members of Parliament and ADUNs, involving Members of Parliament and ADUNs of the government as well as non-government, Opposition. I think Jeram, whom I mentioned just now, perhaps Jeram is not present, yes. We indeed hold these meetings continuously...

Y.B. TUAN MOHD SANY BIN HAMZAN

: Say that once more

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Jeram has already left the House. Because we are present, Jeram must show more commitment to help the people of Jeram from now on.

May I interrupt?

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

May I interrupt, Honourable Member?

Puan Juwairiya binti ZulkifliPKR · PHBukit Melawati

Sila Ijok

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

What the Honourable Member means is a full meeting involving ADUNs and officers, and at that time it is not suitable for us to discuss development and so on. What I meant in my debate was a special meeting involving the 5 ADUNs of the areas and the Director of Town Planning to discuss in more detail. In a full meeting, the time may not be suitable as it would be rather short, that is what I mean. Thank you.

Deputy Speaker

Jeram

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Jeram did not ask for permission.

Deputy SpeakerEN

Are you aware that there is no Engagement Session between PBT and ADUN, are you aware?

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

I accept, although we are no longer in the government, but that is what I said: it is good that the State Government of Selangor invites these independent ADUNs.

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Jeram is not present here.

May I interrupt?

Deputy Speaker

Ijok

Thank you, Mr Deputy Speaker. We were indeed invited, but the role of ADUNs in the Council, we cannot speak. In Ijok, we are only observers at the Council. This must be done in...

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

I support what the Honourable Member for Ijok said. A full meeting only makes us observers. A two-way meeting involving Members of Parliament and the DUN can give suggestions and so on, right, Ijok?

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

I think we can ask, we can speak. If we are not allowed, that is not right.

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Thank you to the one who interjected. Seri Setia. Please.

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

Okay, here it is. Sometimes, I am not sure at State Government level, perhaps the EXCO can answer. Sometimes there may be other Councils, other Municipalities, each one different. I'll give the example of Petaling Jaya earlier, but the new Datuk Bandar, not yet. We have never attended yet, right. Before this we could speak, but requests, we had to apply first. We cannot stand up to speak, to voice our views, cannot. Not permitted. Because we are as observers. But if we want to speak, we must apply early, must inform the Datuk Bandar's office first. This is at the Petaling Jaya City Council, and I think in Shah Alam it is the same. Dato' SS, the former one, he knows. At the municipality or district level I am not sure. And perhaps there is a policy from the State Government or a view from the EXCO to make everything the same.

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Thank you, Seri Setia, Ijok and Jeram. I believe the Honourable Member for Jeram just informed us about other meetings, specific ones. I believe in fact the Kuala Selangor Municipal Council (MPKS) does continue two-way meetings with Members of Parliament and State Assembly Members, both, yes. Both the Opposition and the Government. And I believe we can raise this, because many issues and problems in the area can be put forward and resolved during the meeting or this platform. In fact, there are many matters, Honourable Members, that we can settle through this meeting if we attend and are also involved in this process. However, regarding what was raised by the Honourable Member for Ijok and also Jeram just now, and the Honourable Member for Seri Setia, where State Assembly Members only act as observers in the meeting, the full meeting, yes, the other meeting, yes, I perhaps also hope the Government can provide a guide, tips on how State Assembly Members can function better in meetings or in discussions with the local authority (PBT). Please.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Honourable Member for Bukit Melawati, I would like to ask the views of the Honourable Member for Bukit Melawati regarding the implementation of engagement between the PBT and the Honourable Members. What is the view of the Honourable Member if these Honourable Members are also appointed or named as full meeting members, not Councillors, but automatically members of the meeting so that the process of brainstorming or views can be given directly. But I also do not agree if these Honourable Members are appointed to certain committees in the PBT. Only the full meeting, Honourable Members, these Honourable Members are appointed or placed as Councillors in the full meeting. Thank you, Honourable Member.

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Thank you, the Honourable Member for Sungai Panjang. I disagree somewhat with the proposal because it is contrary to separation of power and also the institutional reform introduced by the Selangor State Government all this time. Nevertheless, in fact, many spaces are provided by the local authorities for State Assembly Members as well as Members of Parliament to be involved in the planning and development process, yes. I believe this matter can be settled well and managed better even without such appointments. Mr Speaker, finally I hope that with the upgrading of this municipality, it can raise the motivation and spirit of the staff and the management of the Kuala Selangor Municipal Council (MPKS) to provide better services, yes, must be more people-friendly, must go down to the ground more, must implement services better and also better cooperation with the people's representatives and also the Councillors in MPKS. That is all. I therefore, Mr Speaker, support the amendment to the Enakmen Majlis Perbandaran Kuala Selangor 2021. Thank you.

SpeakerEN

Thank you, Bukit Melawati. Now I invite Permatang.

In the name of Allah, the Most Compassionate, the Most Merciful. Peace be upon you, and the mercy and blessings of God. Thank you, Mr Speaker. Today I stand to support the Enakmen Majlis Perbandaran Kuala Selangor. Mainly I would like to extend congratulations and best wishes on the change from the district council to the municipal council. My hope is that the services must be improved for all the people of Kuala Selangor, must be continuously upgraded, especially in basic services, namely rubbish management, building maintenance and also solutions for dilapidated buildings. Apart from that, I also hope there will be regular monitoring by the local authority of factories built within village areas. That is the most important, which, as we saw this morning, how Ijok mentioned the many flies during chicken season, and it is indeed a major problem for all residents in this Kuala Selangor district area. So I hope that monitoring must be carried out because we don't know when, we speak of changes, once a factory exists it has become an industry which requires special monitoring from the PBT. Apart from that, we also hope that all street lights under the management of this Council function properly and perfectly, especially lights in all residential areas, all lights in shop and business areas, all lights in industrial lot areas, lights on connecting roads, promenades or lanes under the maintenance of MPKS, lights in open spaces and playgrounds or courts under the care of MPKS. Apart from that, I hope for good cooperation from all Councillors of the Kuala Selangor District Council so that they have close relations with the ADUNs of the areas, there must be regular reports to the area ADUN on what action has been taken regarding their own zoning areas, because when there is no reporting, that becomes a problem, when there is a report, we do not know whether the Councillors have carried out their work well or otherwise. Apart from that, I also wish to thank MPKS because every time there is an engagement session, they will ensure there are invitations and the attendance of ADUNs is very important in generating ideas on how to further improve our district area. Finally, I hope the Municipal Council will further strengthen progress in that we want to ensure that the main target, that these people obtain facilities and also balance in all forms of taxes that have been paid can be accepted comfortably by the people, that is the most important. And finally, I once again extend congratulations and best wishes for all the services provided by all departments of the PBT, the Local Authority, and then I support the Enakmen Majlis Perbandaran Kuala Selangor 2021. Thank you.

SpeakerEN

Very well, I invite the Government to wind up. Please, the Honourable Member for Kinrara.

Tuan Ng Sze HanDAP · PHKinraraEN

Very well, thank you, Mr Speaker. Thank you to the Honourable Members who have made proposals and views and then given support to this Kuala Selangor Municipal Council Bill 2021. I would also like to thank the Honourable Member for Bukit Melawati for praising the two-way meetings between the PBT together with Honourable Members, including people's representatives from the Opposition. This never happened in the Barisan Nasional era. The Selangor State Government has agreed that these two-way meetings be held four times every year, and I believe the Honourable Member for Jeram, is he not here? Where is the Honourable Member for Jeram? The Honourable Member for Jeram can put forward any proposals or problems that, yes, the Honourable Member can take the opportunity of the two-way meeting with the PBT to put forward views, problems and proposals in that meeting. And I am confident because this meeting will be chaired by Mr Speaker himself, and I am confident that any views or problems raised in this meeting can be dealt with immediately, so I would like to encourage the Honourable Member for Jeram to attend this two-way meeting and, as for what the Honourable Member for Ijok mentioned about the role of ADUN in the PBT, in fact the role of an ADUN is in this august House, and we appoint Councillors to carry out their duties in the PBT. We must empower our Councillors, the role of our Councillors in the PBT, and regarding full meetings, whether members of the public or people's representatives may speak in the full meeting. That is subject to the Local Government Act. We cannot arbitrarily appoint anyone to be a member in that full meeting but not a committee member, all this is subject to the Local Government Act 17. So, the full meeting members are Councillors and people's representatives or members of the public are permitted to attend the full meeting but as observers. If they wish to speak, of course they must obtain approval from Mr Speaker or the chairman. That is subject to the Local Government Act. I hope the Honourable Members can understand this and the Honourable Members can check with the Local Government Act, and our stance as the Pakatan Harapan Government coalition is the separation of powers, we do not agree to appoint people's representatives as Councillors in the PBT because each has different roles, Members of Parliament have their role, ADUNs have their role, and Councillors have their roles. That is a method of separation of powers, and I would also like to answer the question raised by the Honourable Member for Bukit Melawati regarding the problem of unsatisfactory internet in the areas. The State Government, through the State Executive Council (MMKN) meeting on 3 November 2021, agreed in principle to support the initiative and to improve the digital infrastructure and communication services of the nation through the Pelan Jalinan Digital Negara programme or JENDELA and the implementation of digital infrastructure.

This programme will be implemented by the Malaysian Communications and Multimedia Commission. With this decision, the State Government together with the PBT will work with the Communications Commission to ensure Internet services can be improved throughout Selangor State, not only in Kuala Selangor but throughout the whole of Selangor State. And the Honourable Member for Ijok also raised two main problems. First, the increase in taxes, here I would also like to emphasise that the upgrading of a PBT's status has no direct connection with tax increases. There is no direct increase in taxes, especially assessment tax. PBT Selangor State may implement a new schedule list for the purpose of reassessing assessment tax. To balance the increasing expenditure of PBTs, following the process or method stipulated under the Local Government Act, before re-tabling it for the confirmation of the State Government. And for the information of the Honourable Member for Ijok, the valuation level or rental rate for determining the assessment tax on property holdings in the Kuala Selangor District area is from 1997, it has been a very long time since we have carried out any revaluation, where the rental rate does not reflect today's value. However, due to the COVID-19 pandemic factor, to ensure the people of Selangor State do not face additional burden, the Selangor State Government does not intend to enforce the new assessment tax rates for the time being, and the Honourable Member for Jeram requested the allocation of funds from the State Government to the PBT. In fact, I do not agree with this because one of the eligibility requirements for upgrading a district to a municipality is sustainable financial resources exceeding RM 20 million every year. So PBTs that wish to apply for upgrading, whether from district to municipality or from municipality to city, must show that they have sustainable financial resource capacity. As for parking charges, MPKS, the Kuala Selangor Municipal Council, is in fact bound by an agreement signed during the Barisan Nasional administration. We are bound by this agreement, and MPKS has implemented the operation of paid parking phase one beginning in 2019 only in commercial areas, namely the town of Tanjung Karang, Kuala Selangor, Bestari Jaya, Puncak Alam and Saujana Utama. The implementation of paid parking in MDKS will be carried out in stages and phases according to suitability and vehicle capacity in an area, and the main purpose of us implementing or charging parking fees for now is in fact not to increase revenue because the contribution from these parking collections is very small compared with other revenue received by MPKS. Therefore it aims to ensure members of the public park their vehicles in an orderly manner and thus create an orderly and planned Kuala Selangor town environment through a systematic, efficient and effective parking service so as not to disrupt traffic. However, these parking charges do not apply to non-commercial areas. And the Honourable Member for Ijok also raised a proposal to develop HORAS as a tourism site. Earlier the Honourable Member for Kajang told me that this proposal will be studied by Tourism Selangor regarding the suitability of developing the area into a recreational area. Any more? I think that is all, thank you, Mr Speaker.

SpeakerEN

Very well. Honourable Members, the motion before the House is that this Bill be read a Second Time now. Honourable Members who agree with this motion, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed to.

Secretary of the HouseEN

Second Reading. This Bill is entitled An Enactment to make provision for the change of title and other matters arising from the conferment of municipal status on the Kuala Selangor District Council.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I move that this House resolve itself into a Committee to consider this Bill clause by clause.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Speaker, I second.

SpeakerEN

The House resolved itself into a Committee.

Secretary of the House

Fasal 1.

ChairmanEN

Clause 1 stands part of the Bill. Honourable Members who agree with this motion, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed to.

Secretary of the House

Fasal 2.

ChairmanEN

Clause 2 stands part of the Bill. Honourable Members who agree with this motion, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed to.

Secretary of the House

Fasal 3.

ChairmanEN

Clause 3 stands part of the Bill. Honourable Members who agree with this motion, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed to.

Secretary of the House

Fasal 4.

ChairmanEN

Clause 4 stands part of the Bill. Honourable Members who agree with this motion, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed to.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Chairman, I move that this Bill, as has been discussed and agreed, be reported to the House now.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Chairman, I second.

SpeakerEN

The House resumed.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I beg to inform the House that the Bill...

Speaker

Silakan.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I beg to inform the House that this Bill has been considered in Committee and has been agreed to. I therefore move that this Bill be read a Third Time and passed now.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Speaker, I second.

SpeakerEN

Honourable Members, the motion before the House is that this Bill be read a Third Time and passed now. Honourable Members who agree with this motion, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed to.

Hulu Selangor Municipal Council Bill 2021Bill

Secretary of the HouseEN

Third Reading. This Bill may be named the Enakmen Majlis Perbandaran Kuala Selangor 2021. The next item is the Rang Undang-undang Majlis Perbandaran Hulu Selangor 2021. This Bill is an Enactment to make provision for changing the title and other matters arising from the conferment of municipal status on the Hulu Selangor District Council.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker and Honourable Members, the purpose of the Government in tabling this Bill is to make provision for the change of title and other matters arising from the conferment of the status of Majlis Perbandaran Hulu Selangor (MPHS) on Majlis Daerah Hulu Selangor (MDHS), effective from 21 October 2021. MPHS has an administrative area that now covers the entire Hulu Selangor District according to Gazette Plan 414 dated 3 July 2008, with an area of approximately 175,630.11 hectares. It comprises 13 mukims, namely Mukim Serendah, Mukim Batang Kali, Mukim Hulu Yam, Mukim Rasa, Mukim Ampang Pechah, Mukim Buloh Telur, Mukim Kerling, Mukim Sungai Gumut, Mukim Kalumpang, Mukim Kuala Kalumpang, Mukim Hulu Bernam, Mukim Sungai Tinggi and Mukim Peretak. MPHS is bordered by the Sabak Bernam District Council and the Kuala Selangor Municipal Council to the West, and the Selayang Municipal Council on the Southern boundary. As for the state boundary, MPHS is bordered by the Tanjung Malim District Council to the North, while the Raub District Council and the Bentong Municipal Council lie to the East. The projected population was also expected to increase from 194,387 persons in 2010 to 328,289 persons in 2020. Bandar Kuala Kubu Bharu is the Administrative Centre of Hulu Selangor District, developed in 1930. It is the first colonial town planned by town planners with a garden city concept. Bandar Kuala Kubu Bharu still retains its function to this day. In addition, the Hulu Selangor District Local Plan 2035 (Replacement) has designated Bandar Bukit Beruntung and Bernam Jaya as Main Towns, and Serendah, Batang Kali and Kuala Kubu Bharu as Local Towns.

Based on the Hulu Selangor District Local Plan 2035 (Replacement), the area of industrial estates has been increased to 4,277.64 hectares compared with 2,813.07 hectares in 2020. Of the 2,813.07 hectares of industrial land use zone zoned in 2020, 1,155.62 hectares have been developed and are in operation. Hulu Selangor is the National Transportation Manufacturing Hub. Serendah is the main nucleus of the Automotive Industry with the presence of the PERODUA Assembly Centre and Tan Chong Industries Motor. Serendah has also been included in the international Aerospace industry map when UMW Aerospace opened an engine casing or aircraft fan case manufacturing centre. UMW Aerospace is a Tier-1 Supplier for the international Aerospace industry. In addition, Hulu Selangor is also a locomotive assembly hub. SMH Rail Sdn. Bhd. has established a locomotive assembly and repair centre at the Zurah Rasa Industrial Centre. An proud achievement was when, in 2021, this assembly centre successfully produced the first Malaysian-made locomotive, which was exported overseas. In addition, planned industrial areas at Bandar Bukit Beruntung, Bandar Bukit Sentosa, Bandar Sungai Buaya, Zurah Rasa Industrial Area, Bandar Utama Batang Kali, Tengas Industrial Area, Hulu Yam, MIEL Industrial Area, Batang Kali and Kalumpang Industrial Area have succeeded in attracting local and foreign investors, especially automotive vendors, and have become among the highest tax contributors in Hulu Selangor District. Apart from industrial areas, new township, housing and business development has also been enhanced throughout the area and is expected to increase the number of ratepayers, especially in areas with potential and good accessibility via the North-South Expressway, Federal Route 1, the Karak Highway via Genting Sempah, and also rail links. Tourism is also one of the sectors that provides economic sources for the local population and Hulu Selangor District in general. Hulu Selangor District is well known for tourist attraction sites, among them Serendah Waterfall, Hulu Tamu Batang Kali Natural Therapy Centre, Sungai Kedondong Batang Kali Educational Recreational Forest, Sungai Chiling Fish Sanctuary, Sungai Semangkok Waterfall, Kerling Hot Spring Pool, Alor Lempah, Bukit Batu Pahat and Sungai Inki Recreation Area, Kalumpang. The number of assessment ratepayers in MPHS increased from 87,369 in 2010 to 108,298 in 2021. The number of ratepayers is expected to continue increasing to 130,000 by 2025.

MPHS is a Local Authority (PBT) that is financially autonomous. MPHS's annual revenue in 2010 was RM48,865.088.00 and in 2020 increased to RM126,332,676.00. Meanwhile, the total expenditure implemented was balanced with the total revenue collected by MPHS. Mr Speaker and Honourable Members, this Bill aims to enable MDHS to be re-designated as MPHS effective from 21 October 2021, in accordance with the provisions under the Local Government Act 1976, Act 171. To upgrade MDHS to MPHS,

there is no need to amend the existing legislation in force. This is because Section 2, Act 171 already provides the interpretation of the Yang Dipertua and Councillors. However, the State Authority needs to table a Bill to make provision for changing the title of MDHS to MPHS. Therefore, this Majlis Perbandaran Hulu Selangor Bill 2021 is made with the purpose of maintaining the powers, obligations and privileges of the office holders at the time when the status of Majlis Daerah was upgraded to the status of Majlis Perbandaran, including the change of title, namely the reference from Daerah to Perbandaran. In addition, there are several requirements that must be fulfilled to declare MDHS as MPHS, namely notification through the State Government Gazette as provided in Section 3 and Section 4 of Act 171 as follows:

Section 3 Declaration and Determination of the Status of Local Authority Areas:

1. Declaring any area within the State to be a PBT area. 2. Giving a name to the PBT area. 3. Determining the boundaries for the PBT area. 4. Determining the status of the PBT for the PBT area, and the status shall be that of a Majlis Perbandaran or Majlis Daerah.

Section 4 Change of Name and Status and Alteration of Boundaries:

1. The State Authority, after consulting with the PBT, may by notification in the Gazette change any PBT area. 2. The State Authority, after consultation with the Minister and the PBT, by notification in the Gazette may change the status of a PBT area. 3. The State Authority, after consultation with the Minister and the Secretary of the Election Commission, may by notification in the Gazette alter the boundaries of any PBT area.

Mr Speaker and Honourable Members, the notification of MDHS as MPHS in the Government Gazette under Section 4 (2) of Act 171 was gazetted on 12 August 2021 and took effect on 21 October 2021. Hereby, the Bill entitled Majlis Perbandaran Hulu Selangor Enactment 2021 is tabled for second reading. Mr Speaker and Honourable Members, I respectfully move the motion.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Speaker, I support.

SpeakerEN

Honourable Members, the motion has already been seconded. I now put this Bill forward for debate. Kuala Kubu Bharu.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

Thank you, Mr Speaker. I extend my congratulations and well wishes to all the staff of Majlis Perbandaran Hulu Selangor on the status of Majlis Perbandaran. I look forward to excellent services from MPHS. Mr Speaker, MDHS, which is now a Majlis Perbandaran. They have a strong financial source; as mentioned by the Honourable Kinrara, they have tabled their Budget exceeding RM 100 million in recent years. I am confident their Budget will continue to reach RM 100 million in the coming year. With this, I would like to raise two (2) matters in this august House. The first is the term of service of a Yang Dipertua at MPHS. Since 2013, MDHS has had Yang Dipertuas who served for a very short period each. A Yang Dipertua served only for months at MDHS. I do not blame the State Government or MPHS because this is due to the promotion of Civil Servants. However, after the Yang Dipertua is promoted, the Public Service Department (JPA) should take prompt action to approve the Yang Dipertua proposed by the State Government so that he can take up duties and begin work immediately. But in the period from 2013 until this year, we, MPHS, have often been without a YDP, so I hope that with the status of Majlis Perbandaran this can...

Tuan Sallehudin bin AmiruddinBERSATU · PHKuangEN

Mr Speaker, may Kuala Kubu interject?

Puan Lee Kee HiongDAP · PHKuala Kubu Baharu

Ok.

Tuan Sallehudin bin AmiruddinBERSATU · PHKuangEN

I want to ask Kuala Kubu: since changes of the Yang Dipertua of this Majlis Perbandaran occur frequently, does this disrupt the administrative affairs of the Majlis Perbandaran? Thank you.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

Thank you to Kuang, the Honourable Kuang. It does not disrupt, but it burdens the Deputy YDP. As in MPHS, the Deputy YDP of MPHS also holds the post of Director of Enforcement; he already has two (2) duties. Without a Yang Dipertua, he has three (3) important duties. So, this is a burden on their work. That is why I request

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Kuala Kubu Baharu.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

Okay, okay, sure.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Yes, would Kuala Kubu Baharu agree with me if the problem concerns the appointment of this Yang Dipertua or this Mayor? I would like to propose that, some time ago, we in Selangor here once appointed politicians. Here in Shah Alam, as far as I recall, we once appointed the late Datuk Abu Sujak, former Deputy Menteri Besar of Selangor, as Mayor. Apart from that, Dato' Solomon, if I am not mistaken, Solomon Selamat, Solomon, yes? Ha? Ha, meaning the Members of this House, he is alert, he is alert, he is alert. So, I would like to ask for a little of the view of the Honourable Kuala Kubu Baharu: why not the State Government appoint politicians in the matter of appointing the YDP or the appointment of this Mayor? Thank you, Mr Speaker.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

This is a proposal from the Honourable Templer regarding the appointment of a YDP from among politicians. The State Government may have more detailed plans on how to deal with YDPs who are constantly changing. So, we focus on, not so much politicians or professionals, but we focus on the duties that can be carried out by a Yang Dipertua. That is more important than politicians or, the Civil Servants who hold Jusa, Jusa grade or high grade. So, our problem is that we cannot be without the presence of a YDP for long, because if he does not carry out his duties, then his Deputy YDP will have a very heavy responsibility. Okay?

The second matter, after attaining the status of Majlis Perbandaran, MPHS needs to pay attention to the landscape of their controlled areas. This is important so that Hulu Selangor is beautiful and attracts tourists, as mentioned by the Honourable Kinrara, Hulu Selangor is also a tourist area, so I hope MPHS can allocate a large amount of allocation to landscaping works, including buying plants and hiring consultants who can create or produce designs that make the people of Hulu Selangor proud. This is also commensurate with the status of Majlis Perbandaran. That is all my speech, thus I support the Majlis Perbandaran Hulu Selangor Enactment 2021, thank you.

Speaker

Batang Kali.

Tuan Harumaini bin Haji OmarBERSATU · PHBatang KaliEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you. Greetings of well-being. Thank you, Honourable Mr Speaker. First of all, I also do not want to be left behind in extending congratulations to the State Government that has upgraded Majlis Daerah Hulu Selangor to Majlis Perbandaran Hulu Selangor. As we are well aware, the upgrading of a PBT whether from Majlis Daerah to Majlis Perbandaran, or to Majlis Bandaraya, the EXCO said earlier, yes, among its requirements is consistent income, income that can pay salaries, income that can develop the area, income that does not require dependence on the Selangor State Government. These are among the factors that are

very important before we upgrade any status, apart from good services, which are provided and offered by a PBT to the local community. In this regard, I also hope that the profit orientation is not too emphasised in carrying out the duties and responsibilities of the PBTs concerned. We can also see that after this pandemic, we see many people in an area, taman or kampung whose jobs are no longer available, whose salaries have been reduced, whose income can no longer sustain household expenses, school expenses for their children and so on. This pushes them towards small-scale business, selling from folding tables and so on.

So, I hope that with the upgrading of Majlis Daerah to Majlis Perbandaran Hulu Selangor, the Majlis Perbandaran can provide better business spaces, strategic locations, areas that are focal points for the public, not setting up shops in places that are difficult for people to visit, and this will provide space and opportunity for these small-scale traders to obtain their income. And I also hope that with this upgrading, licences and business permits are not increased by 100% or can be increased at appropriate rates. If a permit is RM100.00, do not let it rise to RM200.00, for example. Likewise with licences, if they increase by 100%, 200%, this will affect the income of the people after this pandemic. Likewise with the shops, formerly the PLB shops, which were handed over to the Majlis Daerah, to the PBT, and many of these shops we can see are dilapidated, abandoned, outdated, with no basic facilities such as toilets, let alone a surau and so on. And I also hope that, there are PBT shops that have been demolished in certain areas, that those shops can be rebuilt so that they can become a source of income for the local people. Regarding the matter of tourism mentioned by the EXCO in the earlier presentation, Hulu Selangor is a tourist area with many attractive places in the Hulu Selangor area.

We also hope that the DUN Batang Kali, especially as the main contributor to the income of Majlis Perbandaran Hulu Selangor, is given attention, and there alone we have four, four towns, namely Batang Kali, Bukit Beruntung, Bandar Sungai Buaya, which are the main contributors to the income of Majlis Perbandaran Hulu Selangor. In keeping with good services, I also believe and am convinced that if good services can be delivered by the staff of Majlis Hulu Selangor in future, it will provide satisfaction to the people. Although there may be some increases here and there, the people may be satisfied with the good services that can be provided by Majlis Perbandaran Hulu Selangor in future.

Likewise with the promise demanded by my colleague from Kuala Kubu Baharu earlier, regarding cleanliness. When we enter Hulu Selangor, we do not see that Hulu Selangor appears as a Majlis Perbandaran. We see it as far away, upland and so on. So, we also hope that Majlis Perbandaran Hulu Selangor will focus in future on matters of cleanliness and landscaping for the people there, and I also propose that the Majlis Perbandaran provide offers after this pandemic, especially in terms of landscaping, to young people, supplying them with small polybags and so on for them to plant flowers at the ends of their houses, and those flowers can be purchased by Majlis Perbandaran Hulu Selangor.

For those who stay at home, encourage them to plant paper flowers and so on, or whatever flowers are needed by Majlis Perbandaran Hulu Selangor, which can be planted by single mothers at home, youths at home, and they are purchased by Majlis Perbandaran Hulu Selangor.

I do not intend to speak at length, other than for the best services, and perhaps also, perhaps the State Government has a good method, one suitable for looking at any PBT staff who may have been in a portfolio for quite a long time, who may need fresh air, a new place, and perhaps the State Government has a suitable method for looking at such issues. Thank you, and I, I thought I would interject earlier. Thank you. I support this Bill.

SpeakerEN

Alright, Batang Kali, I invite Sungai Panjang.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Okay, thank you, Honourable Member, Mr Speaker. Honourable Kinrara, EXCO for PBT, my fellow Members, Honourable Kuala Kubu Baharu and also Batang Kali, who are debating together on this Bill. I take this opportunity to also debate because the district of Sabak Bernam is today surrounded by municipal councils: Majlis Perbandaran Kuala Selangor and also Majlis Perbandaran Hulu Selangor.

The first point I want to raise concerns development and also the implementation of tax valuations in areas that have already been declared as municipal councils. So here we ask Honourable EXCO, representing the State Government, to please give a commitment in this House that any increase or change in tax rates in the areas that have just been declared as municipal councils will be raised gradually, or in stages, and during the period of the increase or change in valuation, there will be engagement meetings between the stakeholders in the area. This is because if we look at the areas or segments of society bordering the district of Sabak Bernam, for example in Hulu Selangor, on the side of Felda Soeharto, on the side of Felda Sungai Tengi, Sungai Selisek and so on, those areas are still village areas.

In contrast with the industrial area in Batang Kali and also the town area of Pekan in Kuala Kubu Baharu. So these areas must be looked at. Likewise in the area of Majlis Perbandaran Kuala Selangor, which was agreed to a short while ago. In the area of Parit 4 Sekinchan, which borders the State Constituency of Sekinchan, it is still a village area when compared with the town or city areas of Kuala Selangor, Ijok and also Saujana Utama, which already border the areas of Sungai Buloh and also Shah Alam.

So development and also local planning must be balanced at the local authority level, to arrange and manage so that there is no shock to the residents and society. I also ask Honourable EXCO from Kinrara and also the State Government to correct the stigma in society that sees, when a status changes from a District Council to a Municipal Council, that many things will change: tax increases and also implementations that may pressure and further constrict the lives of the community while the country and the state are trying to recover post-COVID-19. So at the level of, I think if the local plans still in force are to be continued into the next local plan, please do not have a drastic increase such as what was informed by Honourable Batang Kali earlier, an increase of 100% or 50%, and please make all the affairs of the residents and society in that area easier.

The second point is in terms of administration. What I interjected earlier to Honourable Bukit Melawati, and was answered by Honourable EXCO Kinrara earlier, referred to appointments and the method of appointing Council Members. I refer to Section 10 of the Local Government Act, in which Section 10 does not mention any exclusion of State Assemblymen (ADUN) from being appointed specifically or not in that meeting. It only says that they may be appointed from those who are resident. The purpose is not anything else, Honourable PBT. The first is that we want to immediately provide direct input, even though in a section, what's that section, the next section, I don't, I don't remember whether it allows, the Council may hold a Special Meeting, which may appoint or invite other persons as members can also be implemented, but ordinary meetings are held at least once a month. If possible, we can be involved in providing input, or in the spirit of Institutional Reform mentioned by Honourable Bukit Melawati, and also raising the issue of Separation of Powers. In the Act and in the Enactment, it does not mention State Assemblymen or the State Legislative body. It only mentions the State Authority.

So the State Authority refers to the Members of the State Government Executive Council, or what's it called, the EXCO, and also the Menteri Besar. Therefore among the Members of the State Government Executive Council, they cannot be involved as Council Members. State Assemblymen are not involved in any relationship with Separation of Powers. If we look at the Federal level, this spirit of Separation of Powers involves three (3) branches: the legislature, the executive and also the judiciary. So at this level there is none, in my view there is no clash of power between the State Assembly and the local authority, and the local authority is placed under the State Committee or under EXCO for PBT.

So there is actually no issue of overlapping power or conflict of interest, unless the PBT is made up of Members of the State Government Executive Council, then there is a problem. Because Members of the State Government Executive Council will make decisions under collective responsibility, even those made by Honourable EXCO Kinrara. So they must take responsibility. We Honourable Members, Government ADUNs and also non-Government ADUNs, are not collectively responsible for what is decided by the State Government Executive Council. So I think, I see there is actually no issue regarding Separation of Powers.

Regarding Institutional Reform, if it may not be suitable, or the State Government sees another angle, that Government or non-Government ADUNs cannot be directly involved in local authority meetings, I suggest that in my debate at the policy level, in a spirit of mature politics and also to give empowerment to non-Government State Assembly Members, the PBT zones placed under these non-Government State Assemblies, the names of those zones should be proposed by the Central Service Office of Non-Government ADUNs, just as the Government and non-Government, so that we can together take part in or further strengthen checks and balances at the PBT level.

Otherwise, at this PBT level, Council Members appointed from among Government ADUNs, or with full discretionary power under this Ministry of Housing and Local Government (KPKT) Act giving power to the State Authority to appoint anyone, it would become one-sided. That decision is a one-sided decision. If we want to see democracy beginning even at the PBT level before we take steps to hold elections at the PBT level, what harm is there in considering the appointment of Council Members at this PBT level also involving non-Government ADUNs, considered according to the conditions and criteria that have been set by the State Authority.

It is not that we can appoint whomever we like. It is not that we can appoint someone because they hold a certain position in the party, but because of the qualifications that have been set by the State Authority in line with the appointment method under KPKT.

Puan Lee Kee HiongDAP · PHKuala Kubu Baharu

Mohon mencelah.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Yes, Honourable Kuala Kubu Baharu.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

Yes, I want to ask the Honourable Member whether the Honourable Member really agrees that only ADUNs should be appointed as Council Members, or also Members of Parliament, or as what's his name just mentioned, Templer? The Honourable Templer, regarding experienced political figures also being appointed as part of the Council Members.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Okay, thank you, Honourable Kuala Kubu Baharu. Regarding the appointment that has already been raised by our fellow Honourable Member, the Honourable Member from Taman Tempeler earlier, it relates to the appointment of the Yang Dipertua (YDP) at the District Council level or at the level of Dato' Bandar.

I believe whoever is appointed, whether or not they have a political background, the most important thing is that the person has the qualifications and is able to discharge, with permission, discharge their duty professionally with integrity. If this matter is given focus, then the issue of the person being a politician does not arise. This position is not a position we give as a consolation or as a gift to politicians, but these are positions for a person to contribute their services, especially those who are truly resident, live and also know about local affairs.

That is also the spirit placed in this KPKT Act, that if possible the Council Members appointed are people who are resident within the area of that PBT, not outsiders, and nor can anyone be appointed at will, because there is a purpose and original intent when this law was made.

So I hope these matters at the administrative level and at the implementation level can be looked at together, and I also hope that at the other PBTs they continue to engage directly with Government and non-Government ADUNs, and as much as possible, as I have said, Honourable Kuala Kubu Baharu, if we are not even appointed as Council Members who can vote in the PBT meeting, at least our attendance is given leeway with a declaration or with a specific guide and standard from the State Authority, so that ADUNs, non-Government ADUNs or Government ADUNs, can speak and contribute input during the full council meeting.

Honourable Bandar Baru Klang.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Yes. Thank you, Sungai Panjang. Mr Speaker, I do not understand why Sungai Panjang is so keen to become a Council Member. I was also an ordinary ADUN for three (3) terms. I was never appointed as a Council Member, but there was no problem for me to give views and suggestions to the Council, no problem at all.

I do not see why this new Member has a problem. Perhaps he needs to learn how to deliver his input. It is not about asking to sit there. If we have influence, we do not necessarily have to sit in that chair, that's the first point.

Second, if we consider that ADUNs are more qualified than the Council Members we appoint, that is why we want to enter there, then what if today a Member of Parliament says he also wants to sit here and discuss together to make decisions. Can we allow Members of Parliament to sit here?

Ah! Klang says that even though we have ADUNs from Bandar Baru Klang, from Pelabuhan Klang, from Sementa, from Selat Klang, it is not enough. We Members of Parliament, we are more highly qualified, we want to sit here. Can we equate them? That is the second question.

Third question, in states under UMNO rule, there is not a single one that allows Opposition ADUNs to appoint Council Members in their zone. Why has UMNO not done so for decades until today? Meanwhile in Pakatan Harapan states, Sungai Panjang asks for it. Hah! Where is the consistency?

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Okay, thank you, Honourable Bandar Baru Klang. Perhaps Honourable Bandar Baru Klang is speaking in the context of Honourable Baru Klang, who has been an ADUN for several terms and has also gone through what's this political path from the Opposition benches. Then became Speaker of the State Legislative Assembly. Then reappointed as EXCO, so Honourable Bandar Baru Klang has a long political career. If Honourable Bandar Baru Klang tells me decades, perhaps at that time I was only about 1-2 years old. So today we want to step into the era of mature politics that we need to begin from now, from, perhaps from our generation, I am interested in the spirit of institutional reform mentioned earlier. We want to have checks and balances, it is not that we are really after that position. Only to make things easier and in the Act also silent regarding the position of ADUNs. For me, answer first, then I will give this. Regarding appointments, there is no harm if we want to appoint. But if we do not want to appoint, that is also fine, in terms of implementation I want, in terms of policy and also the stance of the Government. If we do not appoint ADUNs, give empowerment to ADUNs to appoint according to the ADUN zones, Government or non-Government ADUNs, we are involved together. Indeed other states do not do it. Let us begin to do it, what is the harm in it.

There is no problem with it and this is something new that we can discuss together and also think about. Regarding the analogy or comparison that Honourable Bandar Baru Klang mentioned earlier, if in the Selangor State Assembly he says Members of Parliament want to come in and sit. Indeed they cannot, because this is not allowed by the Act. The Act has already provided for that. The State Constitution has already stated that those who can sit in this State Legislative Assembly are those elected during elections. So Members of Parliament cannot sit in here. That is not permitted. In the KPKT Act, there is no specific, specific Act or specific section that prohibits or does not allow ADUNs or State Assembly Members except the State Authority to become Members of the Council. So, these matters, we want as the wish of Yang Amat Berhormat Dato' Menteri Besar, who wants to speed things up. Let there be no bureaucracy, two or three meetings to resolve one problem. Meeting in the session, then engagement and finally the one who will decide is the discretionary power of the YDP, or the matters proposed and brought to the PBT Council Meeting. So, my wish and also my stance is to look at something new that focuses more on solving the problems of the people and also the voice of the people, and whatever can be resolved immediately and it goes directly to everyone, when we are appointed, it does not matter which political party, when we go to elections later, we can carry our respective flags. But when we serve, we serve for everyone. If Honourable Bandar Baru Klang wants to interject again.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Yes, Sungai Panjang says he is indeed enthusiastic. Talking is easy. Want us to do it, want us to reform. If we are to reform, I suggest the Honourable Member reform within UMNO first. Under UMNO states, appoint first. Let Opposition ADUNs be given power to appoint Council Members according to zone, according to proposal. If the Honourable Member can do it in UMNO, then we will consider it. Secondly, according to the Act, the State Authority will appoint, yes, a maximum of 20 Council Members. Once we have made the Council Members, there is no reason why we need to appoint ADUNs. We have candidates who are qualified enough to appoint all of them. It is not necessary, and a clear weakness, if we go by the Barisan Nasional era. Barisan Nasional had 50 years as Federal Government and in Selangor State also 50 years. A clear weakness in the Barisan Nasional era is that much leakage occurred at the PBT level. Many corruption cases occurred because there was abuse of power because ADUNs were appointed too. When an ADUN is appointed to the Council, he becomes too influential, so much so that the YDP is afraid, the officers are afraid, and that is where they make very unfair decisions. That has already happened, we do not want that to happen. That is why I have never heard of any accusation against any State Assembly Member sitting here who abused power in the Council, because he has no room to abuse power. That is what we want to correct.

Tuan Adhif Syan bin AbdullahBERSATU · PHDengkilEN

Honourable Bandar Baru Klang. Asking to interject a little. Yes.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Wait, Honourable Member, I will allow the interjection. Let me first reply to the Honourable Member for Bandar Baru Klang. The Honourable Member for Bandar Baru Klang said that perhaps, a while back, members of this State Assembly, or people's representatives, were seen as occupying a high position in society. As the Honourable Member for Bandar Baru Klang said, they were influential and so on and could influence the decisions of the Council at that time and today. Many of us are clever, well read, and professionals. Even civil servants know that the Members of this State Legislative Assembly, at our level, in terms of administrative hierarchy, are only equivalent to grade 52. The YDP is bigger than us. We can influence, we can speak, and in the end the ones who make the decisions are the Government. Abuse of power, or not abusing power, does not concern only political figures, Honourable Member. Civil servants and administrators are also exposed to abuse of power. It is not necessarily politicians. Politicians, such as State Assemblymen and so on, if we have abuse of power or whatever it is called, corruption and so on, involving our positions. If at that time he held his position as an Assemblyman and also happened to be a Council Member at that time, and he abused his power as a Council Member, the Honourable Member cannot say it is all treated equally. A politician, a State Assemblyman, when he becomes a Council Member, can abuse power. Existing Council Members too, if they lack integrity with the position they hold as a Council Member, can also abuse power. It is not necessarily State Assemblymen, because most of those appointed, I do not say all, most of the Council Members appointed are also from among political figures. They too are exposed and vulnerable to abuse of power. So we cannot treat everyone the same. This is the spirit of the new administration.

Tuan Adhif Syan bin AbdullahBERSATU · PHDengkilEN

Honourable Member, wait a moment, I would like to ask for a little room.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Just a little more. So we hope we do not, with permission, orchestrate too much. Politicians, State Assemblymen, people's representatives, Members of Parliament, are corrupt and abuse power. Please, Dengkil.

Tuan Adhif Syan bin AbdullahBERSATU · PHDengkilEN

A little clarification, can I, Honourable Mr Speaker? Can I? A little clarification.

Speaker

Sila Dengkil.

Tuan Adhif Syan bin AbdullahBERSATU · PHDengkilEN

On the issue relating to the appointment of Council Members. We are well aware that there are three Governments, the Local Government, the State Government, the Federal Government, and people's representatives at certain levels represent, among, or in between, the Governments. However, when I was in the State Government, the problem that arose was that the appointments of Council Members did not receive any proposals from the State Assemblymen who did not hold the posts of Branch Chief, Division Chief or Area Chief. This became a cooperation problem with no mutual understanding, and it became a burden on the people's representatives. This is what I understand Sungai Burong meant earlier. Like Bandar Baru Klang.

Speaker

Sungai Panjang.

Tuan Adhif Syan bin AbdullahBERSATU · PHDengkilEN

Eh, Sungai Panjang.

SpeakerEN

Sungai Panjang. Sungai Burong is not there.

Tuan Adhif Syan bin AbdullahBERSATU · PHDengkilEN

The Honourable Member for Bandar Baru Klang said there is no issue relating to State Assemblymen being linked to integrity issues, correct. I agree. Indeed there is none. But when a little power is not placed under State Assemblymen who are not Division Chiefs or Branch Chiefs, what happens is to civil servants who are convicted or subjected to integrity action by the MACC. I also agree with Sungai Burong, eh, Sungai Panjang, that there must be reform, the appointment policy of Council Members must be reviewed so that priority is given to area State Assemblymen. I agree with the proposal of Bandar Baru Klang. We have no problem with a State Assemblyman not becoming a Council Member. But we want cooperation so that the problems of the people can be addressed together. I understand there are also among the State Assemblymen, my friends over there, who are not Division Chiefs, Branch Chiefs, or Area Chiefs, and who face the same matters and situation. Like Kota Anggerik. Who else are the State Assemblymen who are not chiefs? Meru, Ijok, Templer, Kuang, Batang Kali. That is the situation I wish to add for the Honourable Member for Sungai Panjang. Please.

Puan Dr. Siti Mariah binti MahmudAMANAH · PHSeri SerdangEN

Sungai Panjang, may I interject? Can I?

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Thank you, Honourable Member for Dengkil. I thought there would be no more interjections. At the level of State Government Executive Council Members, I think the Honourable Member for Seri Serdang and Bandar Baru Klang have already conveyed it.

Tuan Sallehudin bin AmiruddinBERSATU · PHKuangEN

The Government need not answer. EXCOs, sit down and be quiet.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Honourable Member for Banting, let me answer for this Dengkil Member.

Tuan Lau Weng SanDAP · PHBantingEN

Okay, okay. Thank you.

Tuan Sallehudin bin AmiruddinBERSATU · PHKuangEN

The EXCOs want to jump over to this area too. Border gate as well.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Honourable Mr Speaker, I largely agree with the views and suggestions given by the Honourable Member for Dengkil. Returning to the Honourable Member for Bandar Baru Klang, who often mentions the Barisan Nasional era in the past and so on. Why were people from among politicians appointed at that time? Because at that time, and even until today, UMNO, Barisan Nasional, is a party with deep roots, present in every corner of the areas of the local authorities (PBT). So it is suitable that we appoint those who may be influential in the community and in that group to represent the voice of that community in the Council. That was its policy. That was the policy at that time, its implementation. But if today the State Authority wishes to look inclusively at professionalism, at integrity, at certain criteria, perhaps in terms of educational level and so on, then it would also be appropriate if local leaders propose those who may not be qualified, perhaps lacking in academic terms, perhaps in terms of age, even though they hold high positions or sustainable positions in the party but do not meet the criteria. These people may then be proposed. What is important under this Act says those who live and are domiciled in a place, in zones or areas of the PBT. That is the most important. Do not appoint people from outside. So, Council Members in the PBT area. So while finishing this lunch, I will give the floor to Banting if there are interjections.

Tuan Lau Weng SanDAP · PHBantingEN

Okay, I would like to ask the Honourable Member in a scholarly way, namely what the problem is now. If we feel the person appointed does not meet the stipulated conditions or does not meet the wishes and, what is this, the wishes of the people, then we hold an election. I am not sure why we cannot agree. If we do not hold elections, how do we know whether the person is suitable, whether that person, what is this, the one proposed, is able to do this work or not. If we do not hold elections, in the end it is the political figures who receive a mandate from the people who will be criticised, because they will feel that this is an appointment from a political party, and we as people's representatives contest and go down to the ground to, what is this, take part in an election which will bear, what is this, the problem. So I am not sure, perhaps the Honourable Member for Sungai Panjang can initiate a discussion on, what is this, such reform at the party level, Honourable Member. If Branch Chief, or Branch Chief, or Division Chief, how can we say he represents the voice of the people? Yet his own party has not even won in an area of an election. Correct? I think that is too subjective and we need to ensure the grassroots voice, the grassroots voice. If we are too proud of, what is this, returning power to the people, strengthening the democratic structure in our country. We want to empower young people, if not at the grassroots level, at the PBT level. Where else? I would like to ask the Honourable Member, will the Honourable Member begin efforts to obtain agreement from UMNO to agree to study the implementation of PBT elections throughout Malaysia in phases. That is my question.

Speaker

Terakhir.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Okay, thank you, Honourable Member for Banting. InsyaAllah, that matter may, after this, have engagement among political parties. If at the Federal Government level it can sign an MoU, it is also open to discuss with other parties. Why not discuss this matter. But I speak with facts and the existing situation. The Act, as it stands, has no elections, so we do not want to rush like Pakatan Harapan, which rushed to lower the age and other decisions, before the ecosystem and situation were ready. Only when the ecosystem and situation are already prepared can it be implemented in that way. But I do not reject it if one day it becomes a desire to hold them, but not now. The ecosystem and the readiness of the people and also in terms of the administrative system are not yet prepared. So this matter can be after this. So Honourable Mr Speaker, thank you. I support this Bill.

SpeakerEN

I have given Sungai Panjang such a long time, yes, this is how we give the best opportunity to all Members of the House. Yes, Honourable Members all, the time has shown 1.00 p.m. So I adjourn the House until 2.30 p.m. The House is adjourned.

(HOUSE ADJOURNED)

(HOUSE RESUMED)

(DEPUTY SPEAKER PRESIDED)

Deputy SpeakerEN

The House is resumed. I invite the Government side to give its explanation and wind up.

Tuan Ng Sze HanDAP · PHKinraraEN

Thank you, Mr Speaker. I would like to begin by answering the Honourable Member for Kuala Kubu Bharu. The Honourable Member for Kuala Kubu Bharu requested that the term of office of the YDP be examined to ensure that services to the people are not disrupted. Mr Speaker, the appointment of top management of the PBT, such as the Datuk Bandar (Mayor), Yang Dipertua (President), Deputy Datuk Bandar, Deputy Yang Dipertua and Secretary, is based on Act 171 through the approval of the State Government or open host. However, at present most of them are from civil servants appointed to public service positions. Therefore they are bound by the provisions of the Public Service Department (JPA), where their service is for a specific period. The State Government will examine this matter to ensure that the continuity of service of the Datuk Bandar or YDP to the people is not disrupted and is aligned with the upgrading of the Hulu Selangor Municipal Council (MPHS). Hulu Selangor's landscape, the Blueprint 2035, is being drafted so that all landscape development in Hulu Selangor is inclusive, including development planning in tourist areas, and applications for landscape allocations will use this blueprint as a reference. And to answer the issue raised by the Honourable Member for Batang Kali, Mr Speaker, the State Government has taken note of the proposal of the Honourable Member for Batang Kali and it will be properly examined by the Majlis Perbandaran Hulu Selangor. At present the door tax rate or business licence fees at MPHS remain as they were, even though it has been upgraded to a Municipal Council. Here I wish to emphasise once again that the upgrade from a District to a Municipality has no direct connection with an increase in assessment tax or licence fees, yes, no direct connection. For information, the State Government has agreed that the assessment tax exemption programme for the low-cost residential category and village residential category, as well as hawker and small trader licence fees, will continue for the year 2022. And the State Government has also requested that all PBT help hawkers by expediting temporary licence approvals and identifying new suitable locations for small traders. As for hawkers, hawker licences are free, and up to now a hawker licence has never been charged. If there are any complaints conveyed to the Honourable Member for Batang Kali that the licence has become increasingly expensive, please WhatsApp me the receipt. And the PBT only charges a very nominal amount, namely a service fee of RM30.00 a year, that is not a licence fee, that is a site rental which has been, and what is this, service fee and site rental have been harmonised to ease the burden on traders, to RM170.00 a year only. And the PBT must, and wants, better service to the residents of MPHS, but out of care and determination to make hawkers at home successful, these offers have been prepared to help hawkers.

Mr Speaker, I also see that many of the Honourable Members are interested and determined to engage in the administration of PBTs. At present the State Government of Selangor does not intend to appoint State Assemblymen to be ex-officio members, ex-officio Council Members, of all PBTs, including Members of Parliament, yes. I see one good and more comprehensive way is to realise what the local people, my friends over there who are allied with the Federal Government, should do, try to inform the Federal Government so that local elections are held as soon as possible. And with that, Honourable Members who feel they are qualified or more interested in PBT matters can contest those local elections. Thank you.

Deputy SpeakerEN

Honourable Members, the motion before the House is that this Bill be read a second time now. Honourable Members who agree, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed.

Secretary of the HouseEN

Second reading. This Bill is named an enactment to make provision for the change of title and other matters arising from the conferment of Municipality status on the Hulu Selangor District Council.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I propose that this House sit as a Committee to consider this Bill clause by clause.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Speaker, I support.

Deputy SpeakerEN

The House sits as a Committee.

Secretary of the House

Fasal 1.

Deputy SpeakerEN

Clause 1 forms part of the Bill. Honourable Members who agree, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed.

Secretary of the House

Fasal 2.

Deputy SpeakerEN

Clause 2 forms part of the Bill. Honourable Members who agree, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed.

Secretary of the House

Fasal 3.

Deputy SpeakerEN

Clause 3 forms part of the Bill. Honourable Members who agree, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed.

Secretary of the House

Fasal 4.

Deputy SpeakerEN

Clause 4 forms part of the Bill. Honourable Members who agree, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Chairman, I respectfully propose that this Bill, as has been discussed and agreed, be reported to the House now.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Chairman, I support.

Deputy SpeakerEN

The House resumes.

Tuan Ng Sze HanDAP · PHKinraraEN

Mr Speaker, I respectfully inform the House that this Bill has been considered in Committee and has been agreed. Therefore, I propose that this Bill be read a third time and passed now.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Speaker, I support.

Deputy SpeakerEN

Honourable Members, the motion before the House is that this Bill be read a third time and passed now. Honourable Members who agree, please say YA. Honourable Members who do not agree, please say TIDAK.

Agreed.

Secretary of the HouseEN

Third reading. This Bill may be named the Hulu Selangor Municipal Council Enactment 2021. Motion No. 2 of 2021 – Development Allocation Motion 2022.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Speaker and all Honourable Members, I respectfully request to table a motion in this august House, which reads as follows:

"that, pursuant to Section 9 Subsection 4(iii) of the Development Fund Act 1966, this House hereby determines that the allocation of Ringgit Malaysia: One Billion One Hundred Twenty-Three Million Ringgit stated in the Development Expenditure estimates tabled before this House under Section 4 (i) of the same Act, as contained in the Schedule, be approved."

Honourable Mr Speaker and all Honourable Members, a total of Ringgit Malaysia: Six Billion Five Hundred Fifty-Eight Million Seven Hundred Ninety-Six Thousand Sixty has been allocated for the Selangor State Twelfth Malaysia Plan (RMKe-12) series for the years 2021 to 2025. This total includes Ringgit Malaysia: One Billion One Hundred Twenty-Three Million allocated for financing state development projects for the year 2022. The allocation by head is as set out in the 2022 Development Proposal. P01 – Office of the Menteri Besar and State Secretary. A total of Ringgit Malaysia: Eight Hundred Twenty-Three Million Seven Hundred Eleven Thousand has been allocated to the Office of the Menteri Besar and State Secretary. Allocations by sub-head (PK) are as follows:

A total of Ringgit Malaysia Thirty-Four Million has been allocated to sub-head 1 or PK1 – Economy. This allocation is intended to cover expenditure on research into economic development, industry and investment.

For PK2 – Rural Areas, an allocation of Ringgit Malaysia: Twenty-Seven Million Fifty Thousand is provided to finance agricultural, plantation and agro-based industry programmes, socio-economic development, traditional village economic development, village development, public amenities or village infrastructure, upgrading or rehabilitation of rural roads, and new village development.

For PK3 – Entrepreneurs, an allocation of Ringgit Malaysia: Five Million Five Hundred Thousand is provided for the Selangor micro-entrepreneur fund, entrepreneur promotion, micro-entrepreneur training, and product packaging design for Selangor State entrepreneurs 4P.

Meanwhile, for PK4 – Social

A total of Ringgit Malaysia: Eighty-Nine Million Two Hundred Ninety-Eight Thousand is provided for community services, development of Orang Asli affairs, human capital development programmes, social development programmes, consumer affairs, cultural programmes, Islamic affairs, citizen mindset development programmes, the halal industry and disasters.

Next, for PK5 – Education, a total of Ringgit Malaysia: Seventy Million Three Hundred Thousand is provided to implement education and higher education programmes, school assistance projects, technical skills programmes and development of education for the Indian community.

For PK6 – Women, Welfare and Health, a total of Ringgit Malaysia: One Hundred Twenty-Six Million Eight Hundred Thousand is provided to cover expenditure on women and family development, community welfare, public health development and unity.

For PK7 – Youth and Sports, a total of Ringgit Malaysia: Twenty-Four Million Four Hundred Ninety-Six Thousand is provided for youth development projects, upgrading or building new sports infrastructure, sports development, SUKMA and SUKSES, and football development in Selangor State.

For PK8 – Caring Government, a total of Ringgit Malaysia: Three Million is provided for caring government programmes, development of the Indian community, assistance to non-governmental organisations and workers' empowerment.

For PK9 – Municipalities, a total of Ringgit Malaysia: Thirty-Four Million Two Hundred Fifty Thousand is for basic facilities and public amenities of PBT, transportation, solid waste management in Pulau Ketam, and local government.

For PK10 – Tourism, an allocation of Ringgit Malaysia: Five Million Two Hundred Eighty Thousand is provided to cover the cost of tourism promotion and events, to develop handicrafts and to upgrade tourism products.

Next, for PK11 – Information Technology and Innovation, a total of Ringgit Malaysia: Twenty-Six Million Five Hundred Sixty-Six Thousand Sixty-Six is provided to implement ICT development, science, technology and innovation projects, and the ICT Smart Selangor programme.

For PK12 – Environment

A total of Ringgit Malaysia: Seven Million Seventy Thousand is provided for environmental programmes, green technology and the conservation of disposal sites.

For PK13. Malay Customs and Heritage. A total of RM1,500,000.00 is provided to upgrade the facilities of the Sultan Alam Shah Museum, upgrade the facilities of the Anggerik building, develop district museums, research Malay customs, language, arts, culture and heritage, upgrade historical sites and old monuments, purchase artefacts or collections, establish the Shah Alam Modern Art Gallery (SAMA), and provide infrastructure and facilities for the Stamp Museum and the Sports Museum.

For PK14. Libraries. A total of RM10,040,000.00 is provided for RATU Phase 2B projects to upgrade district libraries, namely the extension of the Kuala Selangor district library, building new district libraries in Sepang and Klang districts, the Special Library Project at Jaya Supermarket Shopping Centre, upgrading the Tanjung Karang branch library, namely an extension project, building new village libraries, upgrading town libraries, upgrading branch libraries, demolition and reconstruction of village libraries, upgrading village libraries, the Special Library Project at Taman Seri Medan Kuala Langat, joint venture projects with agencies, equipment and collections, IT infrastructure development projects and international translator programmes.

For PK15. Housing and Urban Wellbeing. A total of RM11,500.00 is provided to cover the costs of several identified projects, which include repair works for people's housing projects, the Sejahtera Community Urban Living programme, the Ceria Scheme, namely with the permission of caring government for residency, and TEPAT, namely the Abandoned Projects Rehabilitation Fund.

For PK16. Selangor Water Supply Project Development.

A total of RM102,000,000.00 is provided by the State Government. Among the main projects under this sub-head are the construction of a treatment plant, namely the Labohan Dagang Kuala Langat Treatment Plant (LRA), and the Selangor Raw Water Guarantee Scheme (SeJAM).

For PK17. Special State Projects. A total of RM900,130,000.00 is provided to cover several identified costs. These include the construction of public car parks in Section 5 Shah Alam, the Stamp Museum, the Textile Museum, Taman Rakyat, the Seri Banting Dredger, the establishment of the Batu Arang Historical Zone and the establishment of the Klang Royal Town Historical Zone.

For PK18. Caring Citizens Initiative. A total of RM113,800,000.00 is provided for the Women's Health Scheme and the Child Nursery Allowance (Asuh Pintar), national awareness, the IPT study grant programme, the Tunas Scheme, the Selangor Children's Heritage Fund (TAWAS), the Golden Age Friendly Scheme (SMUE) and the Free Water Supply Programme.

For PK19. General. A total of RM122,160,970.00 is provided for repair works to government buildings, land acquisition and various other projects.

Honourable Deputy Speaker and all Honourable Members, next is the Development Allocation for P04 Selangor State Treasury. A total of RM180,000.00 has been allocated to P04 Selangor State Treasury under PK1 for ICT development for the purpose of upgrading one unit of PAC server room is sebelas Selangor State Treasury.

P08 Selangor State Department of Agriculture (Jabatan Pertanian Negeri Selangor). A total of RM12,528,000.00 has been allocated to P08 Selangor State Department of Agriculture. Of this amount, RM1,760,000.00 has been allocated to PK1 for the development of Food Production Conservation Areas (TKPM) in Sungai Belangkan and Ulu Chuchoh in Sepang, Bukit Canggang and Kundang in Kuala Langat, Batangsi in Hulu Langat, TKPM Semenyih in Hulu Langat, TKPM Ulu Yam in Hulu Selangor, TKPM Batu Arang in Gombak and TKPM Sungai Panjang in Sabak Bernam.

For PK2, Good Agricultural Practices Development. A total of RM400,000.00 has been allocated.

For PK3. Agricultural Downstream Product Development. A total of RM1,340,000.00 is allocated to finance the Capacity Building Matching Grant programme, upgrading of premises, branding and packaging, and promotion of Agricultural Downstream Products.

For PK4. Target Group Development. A total of RM1,700.000.00 is allocated for target group training programmes. Agricultural engineering training at PLKP Tanjung Karang, Agricultural Incubator Training at PLP Kalumpang, Innovation and Technology Development, Strategic Partner Development, and direct sales programmes for crops and agro-based industries.

For PK5. Paddy Cultivation Development. A total of RM2,300,000.00 is allocated for increasing paddy yields, conservation and rehabilitation of paddy fields, paddy production, MyGet and the management of integrated paddy cultivation enterprises. For PK6. Coconut Cultivation Development. A total of RM600,000.00 is allocated for coconut replanting and rehabilitation of coconut plantations.

For PK7. Fruit Cultivation Development. A total of RM580,000.00 has been allocated.

For PK8. Vegetable and Market Garden Cultivation Development. A total of RM700,000.00 has been allocated.

For PK9. Herbal and Horticultural Industry Crop Development, a total of RM548,000.00 is allocated for herbal and spice crops, mushroom cultivation, and horticulture and ornamental gardens.

For PK10. Fertigation Technology Development. A total of RM1,500.000.00 has been allocated.

For PK11. Animal Feed Crop Development. A total of RM50,000.00 has been allocated for the programme.

For PK12. Honey Bee and Kelulut Honey Production Development. A total of RM250,000.00 is allocated.

For PK13. Agro-Tourism Development. A total of RM300,000.00 has been allocated for the programme.

For PK14. Agricultural Complex and Centre Development. A total of RM500,000.00 has been allocated for the Sabak Bernam District Agriculture Office and for repair and upgrading of agricultural centres.

P10. Selangor State Forestry Department (Jabatan Perhutanan Negeri Selangor). A total of RM6,080,000.00 has been allocated to P10, Selangor State Forestry Department. Of this amount, RM1,430,000.00 has been allocated to PK1, Forest Resource Management Programme, which aims to strengthen forest resources. Next, the central forest spine and the conservation of forest resources.

For PK2. Forest Resource Development Programme. A total of RM1,200,000.00 is allocated for the maintenance and conservation of degraded forest areas. Conservation and maintenance of mangrove forest areas, namely planting under treatment and maintenance of planted areas. Development and management of the peat swamp forest centre of excellence, development and management of nursery sites, development of herbal plantations, management of rare plantations, management of dara forest conservation forests, VJR and management of High Conservation Value Forest (HCVF).

For PK3. Forest Protection and Innovation Programme. A total of RM400,000.00 has been allocated for the protection of forest resources.

For PK4. Social Forestry Programme. A total of RM1,550,000.00 is allocated for forest empowerment.

For PK5. Forest Development and Engineering Programme. A total of RM840,000.00 is allocated for the infrastructure and development of the Sungai Burong Forestry Complex and forest road connections.

For PK6. Forest Enforcement Programme. A total of RM310,000.00 has been provided for forest enforcement.

For PK7. Forest Produce Entrepreneurs Programme. A total of RM350,000.00 has been provided for the development and management of non-timber forest produce or rock materials in the permanent forest reserves of Selangor State.

Honourable Deputy Speaker and all Honourable Members. Next, the development allocation for P12 Selangor State Public Works Department (JKR). A total of RM138,130,000.00 has been allocated to P12 Selangor State Public Works Department.

Of this amount, RM15,500,000.00 has been allocated to PK1 for various road development programmes aimed at rehabilitating slopes throughout Selangor State. Land acquisition, upgrading of roads throughout Selangor State, preliminary works and gazettement of state roads throughout Selangor.

For PK2. Construction of Bridges and Footbridges. A total of RM8,230,040.00 is allocated for the construction of bridges and footbridges identified by district in Selangor State.

For PK3. Road Construction. A total of RM44,050,000.00 is allocated for the construction of new roads throughout Selangor according to priority and actual need.

For PK4. Road Upgrading. A total of RM65,420,210.00 is allocated to upgrade roads throughout Selangor by district.

Meanwhile, under PK5. Building Construction and Upgrading Projects. A total of RM4,979,700.00 is allocated for various development projects, repair of palaces throughout Selangor State, and integrated development of workshops and related facilities for district JKR offices.

For P13 Selangor State Irrigation and Drainage Department (JPS).

A total of RM57,950,000.00 has been allocated to P13 Selangor State Irrigation and Drainage Department.

Of this amount, RM12,099,890.00 has been allocated to PK1, Flood Mitigation Project Development.

PK2. Drainage System Development. A total of RM9,200,070.00 is allocated for programmes to build, upgrade and retrofit drainage systems throughout Selangor.

For PK3. River Basin Development. A total of RM15,610,000.00 is allocated for riverbank strengthening projects, construction of embankments and dikes, and construction or upgrading works for trash traps or, with permission, log booms.

PK4. Water Resources and Hydrology Development. A total of RM1,200,000.00 is allocated for the development of stations and flood forecasting and warning systems.

Under PK5. Environmentally Friendly Drainage Development. A total of RM9,050,020.00 is allocated to build and upgrade retention ponds under the Environmentally Friendly Drainage Master Plan (PISMA) in various districts, and for the control of sediment erosion and water quality in various districts.

PK6. Coastal Development. A total of RM5,200,000.00 is allocated to strengthen coastal embankments under the conservation plan, coastal and estuary conservation, and coastal embankment studies.

For PK7. Mechanical and Electrical Infrastructure Development. A total of RM4,000,000.00 is allocated for the modernisation and upgrading of hydro-mechanical sluice gate control systems, pump houses and trash racks.

Next, for PK8. Building Infrastructure Development. A total of RM500,010.00 is allocated to build and complete 6 new sluice gate quarters units, replace 2 existing units, and construct an office complex for the Irrigation and Drainage Department.

PK9. Departmental ICT Development. A total of RM600,000.00 is allocated for the modernisation of ICT infrastructure and information systems, the department's Geospatial data development programme, and the Smart Security Programme with the installation of IP cameras at pump houses and sluice gates.

Meanwhile, under PK.10 - Miscellaneous, a total of RM500,000.00 is allocated for the department's unforeseen emergency works.

Honourable Deputy Speaker and all Honourable Members,

Next, the development allocation for P14 - Selangor Islamic Religious Department (JAIS), a total of RM76,716,000.00, has been allocated to P14 – Selangor State Islamic Religious Department. Of this amount, RM24,360,960.00 has been allocated to PK 1 – Religious Schools, for the purpose of repairing religious schools in every district of Selangor State.

For PK 2 – Islamic Affairs Office, a total of RM10,900,000.00 is allocated for repair and upgrading of the building of the Sabak Bernam District Islamic Affairs Office, the Selangor Islamic Complex and the Selangor Dakwah Training Institute (ILDAS).

PK 3 – Mosques, a total of RM38,455,040.00 is allocated for repair and upgrading of mosques throughout Selangor.

PK 4 – Surau, a total of RM500,000.00 is allocated for repair and upgrading works on surau.

Meanwhile, under PK 5 – Miscellaneous, a total of RM2,500,000.00 is allocated for upgrading mosque quarters in every district of Selangor State.

P.16 – Selangor State Town and Rural Planning Department, a total of RM1,650,000.00 has been allocated to P.16 - Selangor State Town and Rural Planning Department. Of this amount, RM600,000.00 has been allocated to PK 1 – Development Planning for the physical review programme of the Selangor State Structure Plan 2035 and Local Plans.

PK 2 – Policy Planning, a total of RM450,000.00 is allocated for the Selangor Sustainable Development project and the World Heritage Site.

PK 3 – Special Projects, a total of RM400,000.00 is allocated to cover the costs of special studies and special action plans to be carried out by the Town and Rural Planning Department.

Meanwhile, under PK 4 – Selangor State Geospatial Information Centre, a total of RM200,000.00 is allocated for the Development Plan Monitoring System.

P.17 – Selangor State Veterinary Services Department, a total of RM6,055,000.00 has been allocated to P.17 - Selangor State Veterinary Department. Of this amount, RM670,000.00 has been allocated to PK 1 – Ruminant Livestock Commodity Development, namely the Selangor Ruminant Modernisation Programme and the Selangor Ruminant Feeding Programme.

For PK 2 – Poultry or Non-Ruminant Livestock Commodity Development, namely or non-ruminant, a total of RM200,010.00 is allocated for the Poultry or Non-Ruminant Farming Transformation Programme.

For PK 3 – Livestock-Based Downstream Industry Development, a total of RM270,010.00 is allocated for the production and development of livestock base industry products and the development of livestock base workshops or livestock base laboratories.

For PK 4 – Veterinary Health, a total of RM270,000.00 is allocated for the Caring Animal Society Programme, animal disease control and veterinary clinics.

Next, for PK 5 – Regulatory, a total of RM2,060,010.00 is allocated for slaughterhouses, animal welfare, sustainable livestock farming and food safety.

PK 6 – Agropreneur Competency and Guidance Development, a total of RM254,970.00 is allocated for offices and staff quarters, as well as Agropreneur competency development, veterinary extension programmes and strategic marketing.

PK 7 – Veterinary Service Quality Enhancement, a total of RM320,000.00 is allocated for offices and staff quarters, as well as the development of the Selangor Veterinary Information System (VETSEL).

PK 8 – Food Production Conservation Area (TKPM) Development, a total of RM1,500,000.00 is allocated for the development of TKPM or Agrotek, TKPM Broiler Chicken and TKPM Fodder development.

PK 9 – Selangor State Ruminant Breeding Development, a total of RM410,000.00 is allocated for the development of ruminant breeding and the development of the Smart Selangor sado cattle.

Meanwhile, under PK 10 – Sg. Nilam Veterinary Technical Training Centre Development, a total of RM100,000.00 is allocated for that purpose.

Honourable Deputy Speaker and all Honourable Members, accordingly, I respectfully move the motion.

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Honourable Deputy Speaker, I support.

Deputy SpeakerEN

Honourable Members, the matter before this House is a motion tabled by the Y.A.B. Dato' Menteri Besar, or the Government, namely the 2022 Development Allocation Motion. Accordingly, I put this motion forward for debate. Dusun Tua.

Thank you, Mr Deputy Speaker. First of all, I have examined the details of the project codes and so on. I want to draw the attention of all Honourable Members, especially

Deputy SpeakerEN

Honourable Member, Honourable Member, a 10-minute time limit, please, for each debater.

God willing, that's enough. So, Vote P.14, I will go back first here just to express appreciation to the State Government for its efforts to complete Masjid Kg. Sg. Serai, which you can see has an allocation, because this is something that the people of Sg. Serai have truly been waiting for, who want to see their mosque in a safer location. I am confident the Dato' Menteri Besar also visited Sg. Serai last year when there was a major flood and saw the damage there with his own eyes, and one of the things that was submerged during the flood was the mosque itself. Moreover, last month, at the end of last month, when there was also a flood in Sg. Serai, that mosque was submerged again. So I hope that, with this effort, God willing, the people of Sg. Serai will see that mosque relocated to a safer site, because the current mosque site is lower. I also noticed that in the same Vote there is also an allocation prepared for the Development of Bandar Mahkota Cheras Mosque. This is not my area, but it is my neighbour's. Yes! Because I have heard many times this Bandar Mahkota Cheras Mosque being raised on TV AlHijrah, about when this mosque will be built and so on, and at least, given that this Vote exists, I believe the State Government has the intention to help with the construction of this Bandar Mahkota Cheras Mosque. Perhaps we should ask the EXCO to explain its plans further and so on.

Next, I would also like to obtain an explanation from the Government regarding Vote P.13, where there is a Kg. Batu 10 flood mitigation project and also the upgrading of the Kg. Dusun Tua, Batu 16 drainage system. If we look, yes, OK. Vote P.13, Project Codes PK 1 and PK 2, you can see these on page 234 and page 237. Both of these items actually also appeared in our Budget Book last year. So this year, they appear again, and I would like to get an explanation as to why they are still there this year. Is it because they are not yet completed, or what process is ongoing regarding the Kg. Batu 10 flood mitigation project, which, as seen this year, has an allocation of RM10K. If I am not mistaken, in the remarks of the Yang Amat Berhormat EXCO last year, there was a promise of RM10 million. So, perhaps we need to ask for a bit of explanation. And next, of course, regarding the Kg. Dusun Tua, Batu 16 drainage system, which also appeared in last year's Budget, and it appears again for next year. Next, for Vote P12 - Road Development, first of all I want to commend the State Government, which has spent RM125 million on road development, which can be said to be 10% of total development expenditure. This is something I think, from my own experience, the roads under the State Government, as far as I have seen in my area at least, are indeed well maintained. Compared with Federal roads. Federal roads, whatever you ask for, are sluggish. Even when asking for something simple, they are sluggish. So in this world there are two (2) sluggish things: one is meat that is not properly cooked. The other is the Federal Government's allocation for Federal roads.

So, is there anyone who wants to object? No, everyone agrees. Good. So, second, I would like to ask specifically about this road development. Has the JKR's application to the State Government for upgrading the loop sensor at the Pekan Batu 14 section, for the traffic lights, been included in this? Because I was informed that JKR has applied to the state for the upgrading of the loop sensor there, which currently still uses cables, and we want to switch to wireless, because the cables can no longer cope. Every time vehicle capacity is high at the Hulu Langat area, at the Batu 14 junction, the loop sensor simply cannot cope anymore and it goes crazy. So all traffic flow and so on runs away. So JKR has informed them, and they have requested wireless. So I want to ask whether this has been included in this road development. Agreed, yes. Good.

Next, we bring attention to Vote P10 regarding Forest Enforcement. There is Project Code PK 6, so there is an allocation for Forest Enforcement of RM310,000.00. I would like to get an explanation from the Government: what is this RM310,000.00 for, and how will it be spent? I agree that Forest Enforcement needs to be strengthened, because there are many forms of encroachment on forests. Unfortunately, when we mention encroachment, what usually comes to the minds of environmental activists and so on is only developers. Developers or whoever, cutting down trees and so on. We forget there is another form of encroachment that also violates Section 47 of the Forestry Act, namely entering the forest without a Permit for recreational purposes. Yes! We have found this to be a problem too, when people crowd into the forest without a Permit, which not only causes problems in the forest, but in some forests they take it upon themselves to modify it, put up chairs, there are even exercise areas, so this too can be said to damage the forest. And when they enter in crowds without control, without taking a Permit, it also causes nuisance and disturbance to the people living in the surroundings. We have come across many complaints already. Complaints regarding those who enter the forest without a Permit. And every time we raise this with the Forestry Department, the reason given is that there are not enough staff to monitor, to the point that we have to, we monitor. Indeed, we have to hire our own RELA to guard these forest areas. So if it has come to this, it is a problem, and we become the forest guards, don't we? I am afraid that in time I will be going, "Wohhh, call the animals to come and help guard our forest." So I think, I agree that we need to strengthen enforcement, and I also want to know where this allocation actually goes and how it will be done. And next, for Project Code Vote P.1, regarding the disaster allocation, there is a dedicated allocation of RM1 million for disaster relief. So I want to know how it will be used, what it will be used for, and I also hope that, if it can be considered by the Government, I understand that disasters are usually floods and landslides, but we should also look at soil erosion issues that sometimes occur in village areas, where the land, yes, the land is privately owned,

because the erosion disrupts housing, and usually in such cases, when we bring them to the Disaster Unit, we are asked that this matter be handled by the landowner or the homeowner themselves.

So if development, which people call the more, what people call the high-rise and so on, is fine, of course they have that, but usually when it enters village areas, rural areas, the landowners and residents there have no capacity to overcome problems of soil erosion, landslides and so on. So we hope the Government can help those who live in these rural areas who face threats like these. Because when we raise it, the usual response is that if nothing can be done, they have to relocate. That is the only solution available. So we hope there can be at least some financial assistance and so on to help them resolve the problem of erosion or landslides. And finally, I would like to bring up PK13. This is the project code of the Vote, I do not remember it. This is the Malay Customs, Language, Arts, Culture and Heritage Research Division. Okay, there is an allocation of RM150,000 for research. We see this every year, but this time I would like an explanation from the Government: what form of research is planned to be carried out with this RM150,000? Because I noticed that for previous studies, I was actually also unsure what the studies were and how we could gain access to these studies. This is something I have raised several times in previous sittings: we not only want to carry out a research, a study, but must also have access. Especially with regard to Malay Customs, Language, Arts, Culture and Heritage. So we do not want it to just end there. Research remains research, stored in a room or in ivory towers or whatever, without access, without it reaching the community itself. So that is all from me, thank you.

Deputy Speaker

Banting.

Tuan Lau Weng SanDAP · PHBantingEN

Thank you, Mr Deputy Speaker. I also want to take part in the debate on the development motion tabled earlier. But my speech will not be very long. However, whatever it is, there are two or three issues that I feel I need to raise here. The first concerns the construction of a bridge under Project Code 02401, page 73..

Deputy SpeakerEN

Please state the Vote and also its PK, Honourable Member.

Tuan Lau Weng SanDAP · PHBantingEN

P12 Public Works Department (JKR). Project Code 02401, page 223, relates to the construction of a bridge connecting road B124 in Bandar Jenjarum to road B340 in Kampung Sungai Buaya, Kuala Langat District, where for 2022 only a token estimate of RM10 has been provided, compared with a project cost of RM84 million

for this project. I believe this matter has already been raised in the Dewan during the previous budget sitting, where at that time I earnestly hoped that the initiation or study of this project could begin as a preparation for the development of Kuala Langat District, which is expected to grow rapidly. For the information of this honourable House, we only have two bridges crossing the Langat River in the Kuala Langat area. And we need to, we actually need to make early planning to ensure traffic dispersal in the Banting area can be achieved with the availability of a third bridge crossing the Langat River. Therefore, Project Code 02401 is a project which, in my view, needs to be planned early, now. Therefore, if the allocation for next year is only a token sum, I think last year was also just a token sum. Or the estimate or amount is very, very small. Then I feel this does not match the needs of urban planning and the future of Kuala Langat. That is my point, and for this I request information from the Honourable Infrastructure EXCO.

The second concerns Object Codes 04401 and 04402 regarding the upgrading of the Klang alternative route from the FT005 junction at Kampung Jenjarum to Jalan Kebun, and also the upgrading of the Sri Ciding main road P060 to the Gamuda Golf Interchange within Kuala Langat District. Both of these are under Kuala Langat. Again, only a token sum of RM10 has been allocated. In my view, we need to look again at whether we can speed up these two upgrading projects, although I know that perhaps for 04402 we may try to obtain allocation from the private sector to ensure this upgrading can be progressed.

We understand that the previous PKP may have caused the allocation for these upgrading projects to be delayed somewhat. But as I argued earlier, under Object Code 02421, projects like these are important for the Kuala Langat area, because both these roads, including their bridges, including the Federal road, are roads frequently used by road users in Kuala Langat, not only for tourism but also for logistics, transport and so on. We cannot hope that, we cannot depend too much on the WCA to disperse traffic. Although I acknowledge that the construction of the Lebuh Raya Pantai Barat (West Coast Expressway) is very important to drive development in Kuala Langat, at the same time we need to use the existing allocation to ensure that the Federal roads and State roads, and also their bridges, are given serious attention. Because if we do not, if our memory is still fresh, the current Minister of Health, former Minister of Science and Technology, once cycled and fell and was injured. That road was this B60 road. So I think we need to look again. At that time I also had to issue a statement to help the JKR Kuala Langat, because we know their hands are tied and they do not have sufficient allocation to implement upgrading projects and also

road maintenance allocations. So I earnestly request that the Federal and State Governments give attention to this matter.

Next, I would also like to take part by touching briefly on the DID, Plan page 239, Object Code 03401, log booms for all districts. Although rubbish log booms in various districts totalling RM250,000 has been allocated. I feel this allocation is very small, because this is not one district, it is for all districts, and the allocation is very small. As I said, what is being done in the Sungai Klang is very good, although it is a project funded by the private sector. But at the same time, we also take lessons from this effort so that more log booms can be installed in other districts, especially in the Kuala Langat district, which I have also informed is a district receiving very high attention from foreign investors. Recently I thanked the JPS Kuala Langat because they have installed many log booms according to their capacity in areas such as in my constituency, for example Sungai Nangka has been installed. If we do not install them, we do not know how serious the rubbish problem in this area is, but when we install them, we can see that what JPS needs to do is a lot, not only to clean our rivers but also to make our rivers truly sustainable, with greenery and environmental care and so on. Therefore I request that this very low allocation, which is only RM250,000, be increased so that not only Sungai Nangka but other rivers in need of cleaning can also be given some attention. On agriculture, let us look at page 211 under PK01. I cannot let go of the issue of Sungai Kelambu. This was once criticised in the Audit report, 211 PK01, Development of Halal Food Production Permanent Garden. We know it has two, 001, 003 Bukit Canggang, and 01005 Kundang, Kuala Langat. But it is common knowledge that Sungai Kelambu is a Production Garden, a Permanent Food Production Garden that is to be established under the Department of Agriculture, but because its current location is on land of the Kuala Langat Selatan Forest Reserve, I would like to ask what the direction or future of this matter is. I understand there is good news, but I request that if we have any update or latest feedback, we share it with the people out there. Also, I would like 05001, which concerns Paddy Development, in my own. Although in the Kuala Langat area now, this Kampung Kuala Langat is actually a village called Kampung Sawah, yes. In the area of the Honourable Deputy Speaker. So in fact, in this State of Selangor, we cannot think that only Sekinchan and Sabak Bernam have ever produced paddy. Kampung Sawah had it too, but now Kampung Sawah is no more, there is no sawah. So I would like to ask out of curiosity, with permission, whether perhaps 05001 is this one, yes.

Deputy SpeakerEN

Honourable Member, which page?

Tuan Lau Weng SanDAP · PHBantingEN

Page 212. Is it possible for us to go down to the ground and re-examine whether we might create paddy fields in the Kuala Langat area and make. To make the Kuala Langat area a district that is truly based on agricultural activity. As we know, we are now facing the problem of rising prices of goods, food, meat, vegetables, everything is going up. But if we can, I consider that Kuala Langat has very great potential to stabilise food prices with the existence of diverse vegetable and paddy crops in our area. We can supply at least, we can meet the needs of the people of Selangor through agricultural activity in the Kuala Langat area. Next, Deputy Speaker, I cannot overlook this matter about the Sri Banting Dredger, which uses the name Banting. I myself am very great. But...

Deputy SpeakerEN

Page number, Honourable Member?

Tuan Lau Weng SanDAP · PHBantingEN

Page 203, item 17007. It turns out that in the Kuala Langat area, or rather it is actually located in Dengkil, actually the Dengkil State Assembly seat. In Selangor there is a dredger that I still say stands magnificently, though I don't know, I'm not really sure. We have, what is this, 203 171007 Sri Banting Dredger. It has the name Banting, but when we go to YouTube, we go to that place to look, it seems rather neglected. But we want to spend, we will spend RM100,000 on this dredger. So, I don't know what for? I hope this money can be used as well as possible. So this is under the state special budget. I have for a long time. Have long observed this Sri Banting Dredger, there is always an allocation every year. In the Dengkil area, I just saw it actually, it is actually located, it is still located in the middle of a tin ore mine, yes. So I understand this is the only dredger still existing in... I don't know, in Selangor or in the whole of Malaysia. So I very much hope that if we want to allocate a sum of RM100,000 for this project..

Deputy SpeakerEN

Dredger, ore dredger, is it, Honourable Member?

Tuan Lau Weng SanDAP · PHBantingEN

I don't know, I also want to go and see it.

Deputy Speaker

Bijih timah?

Tuan Lau Weng SanDAP · PHBantingEN

But if we can make it a cultural heritage, a tourist destination and so on, for the viewing of future generations. That is all that I wish to raise here.

So I request to support this development motion and I hope for a response from the government side, thank you.

Deputy Speaker

Pelabuhan Klang.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Assalamualaikum W.B.T. Thank you to the Honourable Mr Speaker. Before I begin my debate speech, I wish to state in this august House that all of us Honourable Members were elected and voted for by the majority of the people in our respective areas. In our respective State Legislative Assembly (DUN) areas. So what I want to say today is the voice and heartfelt feelings of the people in my area and Pelabuhan Klang. I only wish to touch on one very, very important Department in the state of Selangor, and whatever decisions are made at the level of this department will have positive and negative impacts depending on whatever decisions are made. Pelabuhan Klang wishes to bring Members of this House to page 255 of the Selangor State Town and Rural Planning Department. Project Code PK01 Development Plan, PK01 Development Plan, 01002 Local Plan, 01003 Special Area Plan (RKK), PK2 Policy Plan, 02001 Sustainable Development of the state of Selangor, PK03 Special Studies, 03001 Special Studies, 03002 for the Special Action Plan, PK04 Selangor State Geospatial Information Centre, 04001 Development Plan Monitoring System. Honourable Members all, I wish to thank the Honourable Mr Speaker for providing this space, which I consider very, very important for me to convey the voice and hearts of the people of the Pelabuhan Klang area, especially in the Teluk Gong area. On this occasion, Pelabuhan Klang wishes to extend many thanks and congratulations to the Selangor State Town and Rural Planning Department and the Klang Municipal Council (MPK) because, apart from the MPK Local Plan, Teluk Gong area, 2035, MPK has also prepared, on the initiative jointly with the Selangor State Town and Rural Planning Department, the Teluk Gong Infrastructure and Community Facilities Master Plan. And at the same time, the MPK has taken the initiative to set up a Technical Committee, and at the same time the MPK has involved the local community to obtain views to ensure that the infrastructure and community facilities master plan of Teluk Gong that has been well planned can be implemented smoothly. However, during the special briefing on the establishment of the Teluk Gong Infrastructure and Community Facilities Master Plan Committee on 24 November 2021, presented by the Klang Municipal Council to me as the State Assembly Member for the Pelabuhan Klang area, to the Member of Parliament for Klang, Honourable Charles Anthony Santiago, to the Teluk Gong Area Councillor, Puan Puspavali, the Village Head of Teluk Gong, and community representatives, as well as representatives of the Teluk Gong Manufacturers Association. We found that there was one matter that was very shocking and astonishing to all of us, where there had been a change in land use zoning in a mangrove swamp forest area of 202.091 acres

equivalent to 81.757 hectares to an industrial zone, which previously was a green ecological gazetted forest zone, and which had been defended and again proposed by the MPK to be retained as a green ecological zone during the preparation of the Klang Municipal Council Local Plan 2035 for the Teluk Gong area. In that briefing, I and the Member of Parliament for Klang, Honourable Tuan Charles Santiago, as well as all who were present, strongly objected to the change in land use zoning. But the answer given by the MPK was that they could not do anything to change that decision, because it was a directive from the Selangor State Town and Rural Planning Department to the MPK to change the land use zoning from green ecological zone to industrial zone. Even though the area is a mangrove swamp forest which has all this time functioned as a buffer zone, as a natural flood barrier for the Teluk Gong area when sea water is high at high tide.

Pelabuhan Klang also wishes to inform the Honourable Mr Speaker and the other Honourable Members. During the preparation of the draft Proposal and Klang Municipal Council Local Plan, Teluk Gong Area 2035 in 2018, and it was presented to my office and all Members of Parliament's offices, and also the councillors' offices and the local community, it was still proposed as a green ecological zone. That means the mangrove swamp forest of about 200 acres remains proposed by the Klang Municipal Council as a green ecological zone. Likewise, the presentation of the final draft report of the Teluk Gong Infrastructure and Community Facilities Master Plan that was presented to my office on 23 March 2021 by the MPK. To obtain views and proposals as well as ideas for improvement, the MPK still maintained the area in question as a green area. This is the plan that was presented to me on 23 March 2021, the area I am referring to was still green. And the Klang Municipal Council still proposed the area as a green ecological zone. When a significant difference arose regarding the change in land use zoning, I and the Member of Parliament for Klang, Honourable Tuan Charles Santiago, as well as the members who attended the briefing, requested the MPK to submit a detailed report on the change of land use zoning in the Teluk Gong area, and we received that report on 26 November 2021. And based on the report given by the Klang Municipal Council to my office and also to the office of the Member of Parliament for Klang, it shows that all government departments objected to the proposal for the change of land use zoning. I have documents, all the documents show, prove that all technical agencies did not agree for this land to be changed from green ecological zone to industrial zone. And this land, this area was once gazetted as the Teluk Gong forest reserve since the British era. Gazette number 2581 of 1914, and now we go and change this green ecological zone to industrial zone. And in principle, based on this report, indeed all technical agencies did not agree, but because of the directive from the Selangor State Town and Rural Planning Department, which we hope will plan Selangor State well for the sustainability of the residents of this Selangor State, especially in coastal areas, the Town and Rural Planning Department should have listened to the advice of these technical agencies. And I am not sure whose directive this is, but I was also informed that the Klang Land and District Office also constantly pressured and contacted the MPK to change this land use zoning from green ecological to industrial zone. The question that arises is among us, the Teluk Gong village communities and the residents of the Pelabuhan Klang area as a whole, why are they still disturbing green ecological areas such as this mangrove swamp forest, which we all know is a natural flood barrier created by God for His people to ensure the safety and sustainability of us who live by the sea near the coast.

So, I want to ask, when the Town and Rural Planning Department directed the Klang Municipal Council to change this land use zoning, why was it not exhibited and not informed to the local residents. Why in 2018, was the Local Plan exhibited not only in the open halls and local community places, but my office was also used for a week for this exhibition. And at that time, I kept it, it was still green ecological zone in 2018. But why did the Town and Rural Planning Department do this secretly this time, change this zone, and now the local residents accuse me, accuse the Member of Parliament for Klang, accuse the Councillors, of trying to hide something, as if there is something, as if there is a hidden agenda. So I also hope the Planning Department, I want to ask, does the Planning Department not pity the community in the Pelabuhan Klang area who constantly face the risk of flash floods when sea water is high at high tide? That is why if these 200 acres are touched, Honourable Members all, imagine what would happen to the Teluk Gong area which currently always faces flash floods that always plague us every year starting from October, November and also December. Now touch another 200 acres, what will happen to the community in the Teluk Gong area who even now are still facing it, and I say thank you to the Department of Irrigation and Drainage for helping Pelabuhan Klang to resolve the flood problems. But planning like this, whichever department is involved, cannot be resolved at all, because the planning from the beginning already shows its defects and will cause problems in the future. So I hope the Town and Rural Planning Department, with this I firmly demand, I give a period of just one month for the Town and Rural Planning Department to change this land use zoning back from industrial zone to green ecological zone, however it is done, do not ask me, if they just change it on that day secretly without exhibiting this change plan to the local residents, make sure the Town and Rural Planning Department does not give the excuse that it cannot be changed.

I hereby, together with the Member of Parliament for Klang, together with the community of village residents and also the factory community in the Teluk Gong area, hereby firmly demand that the Selangor State Government help us in Teluk Gong, help us in the Pelabuhan Klang State Assembly area to defend the mangrove swamp forest to defend the existing green ecological zone. I thank the West Port, the North Port, Central Spectrum and the various other NGOs who came to Pelabuhan Klang to help together plant these mangrove seedlings, sown in the mangrove areas that were stolen, the mangrove swamps that were lost, suddenly today we want to remove 200 acres just like that. Once again, I, Pelabuhan Klang, hereby strongly object to the change of this green ecological zone to industrial zone on the mangrove swamp forest land of 200 acres in Teluk Gong village. So Honourable Members all, I hope this is not my voice alone, this is the voice of the community in the Pelabuhan Klang area, especially the community in the Teluk Gong area.

I hereby conclude my debate speech supporting the 2022 Development Expenditure Estimates on condition that the land use change from green ecological zone to industrial, which has now been made into the RT or Local Plan Special Area Teluk Gong 20235, is changed back to green ecological zone. Thank you, Assalamualaikum WBT.

Deputy SpeakerEN

Waalaikummusalam wbt. Sijangkang.

Alright, thank you Deputy Speaker for giving me the opportunity to also debate the 2020 Development Expenditure Estimates for the Year 2022. So, I want to touch on several matters in this Development Expenditure Estimates. Firstly is Vote 01 Office of the Menteri Besar and the State Secretary (SUK), page 199. PK2 Rural Areas 02003 Traditional Village Economic Development. I see today, especially in night market or morning market areas in villages or rural areas, some are set up on the roadsides, which I think the condition is very uncomfortable and sometimes it disrupts traffic. The movement of the community in village areas. Only I think perhaps the allocation used is for economic development programmes, but I see also how it may be possible for the Government to provide a little allocation in certain areas or certain specific villages to be developed, economic plazas or commercial plazas for the purpose of this night market or morning market so that the condition is more perfect. So the traders also feel fairly comfortable...

Deputy SpeakerEN

Which project, Honourable Member? Which code, Honourable Member? Which PK?

Kod 02003.

Deputy Speaker

Ok.

Next, 02005 Basic Public Facilities in Villages. This may be an addition, but I see that today the State Government has already taken the initiative with the allocated programme for the disposal of domestic waste, which has been allocated to the Local Authority Council. I think there is also an issue because the way this waste is collected in these village areas is not, not very neat, yes. Sometimes it is also the nature of these people that it is not only domestic waste; bulk waste and various other types of waste are also dumped. However, I suggest that if possible, in certain villages, if there are areas or government sites that are not very large, they be made into a more suitable transit centre. People who want to dispose of rubbish do not just bring it by motorcycle or bicycle and dump it in the orchards; there should be a more comfortable area. Failing that, perhaps, if waste bins are placed along the roadside, they should be placed in a more proper location, whether at the premises or on a flat concrete base, so that when the party managing this waste, KDEB, collects it, it can be done automatically and not manually. So I think that sometimes the bins also fall over and sometimes they cause villagers and others to burn them, and this is something I think needs to be improved there. Next, 10006, upgrading and rehabilitation of rural roads with an allocation of 1 million. I think this allocation is far too small, because I see that in rural areas there are many roads that need repair, especially roads that are permit roads, on private land, which sometimes really need to be used a great deal by the general public, as well as mukim roads and access roads to schools, to cemeteries and so on. In my constituency I see several areas that I would like to request here because the condition is so bad.

Among them is the route from Taman Seri Medan to Sijangkang Jaya Secondary School, to Seri Medan National School, to the Kampung Medan Religious School, the route to the Batu 9 Kebun Baru graveyard, and also, this is one of the access roads that I think is used by many school children and our students to get to school, and the condition is very dilapidated and needs rehabilitation. Of course, I think this is not included in the allocation, perhaps the MARIS allocation used through the District Office or the Local Authority Council or the Public Works Department (JKR). I also see that there is a road used for permit access to the Teluk Panglima Garang estate, which I think is also not included in the roads I categorised just now, but it is one of the main roads in and out, especially for the Indian community there.

Next, PK4 (Social) 04002, Development of Orang Asli Affairs. As I mentioned the other day, I think this allocation is certainly also related to the development of education for the Orang Asli, and I think this is also related to PK5 (Education) on page 200. Education, which I think must continue to be developed for the Orang Asli community, especially in my area, which has so many Orang Asli villages, and I see that their education is still far behind compared with other communities.

Next, PK8 (Caring Government) 08002, Development of the Indian Community, allocation 500,000.00. I am debating that these are development programmes or programme-type items, but I also want to raise here that perhaps the State Government should look especially at the Indian community, as well as other communities, especially those who work on estates, where they live in housing provided on the estate. But the issue in the area, for example in the Pulau Carey area, is that there is a lot of housing, yet they also consider their interests or needs when they retire, a place to live, which I think should also be considered, and how the State Government should also plan, although it is the responsibility of the estate management, but for the sake of their interests. I think most of them move out of their estates to rent, but they cannot even afford to rent; only sometimes they are helped by their children. They can live in fairly comfortable conditions in areas where they can rent.

Next, PK9 (Municipal), I touch here on the allocation, especially for domestic waste management. I obtained information mainly from the Kuala Langat Municipal Council that the allocation given is small, so the amount for managing domestic waste in these villages is very little, and that is why it cannot be done as frequently as it should be, and sometimes the waste piles up and burning incidents at the places where waste is placed in these villages keep happening repeatedly. I can say that in several villages in the Sijangkang State Constituency (DUN) this problem still occurs.

Next, PK12 (Environment) 12001, Environmental Programme. I thank the year 2019, when there was a launch of the Selangor State River or Drain Lifting Programme under the Kuala Langat Municipal Council, and I think that may become an awareness campaign for the local community, especially the workers' areas, because it is the industrial area of Teluk Panglima Garang. However, what I see is that after that campaign, or after that launch, I think what was done has no continuity. The trees that were planted mostly died. I think there has been no change, perhaps in terms of awareness, especially among the industries there, which, in my view, also pollute the drains there. I think the Coordinator of the Sijangkang State Constituency (DUN) also once went to the Sungai Manggis Drain in Kampung Medan, whose condition is stinking. It is not a recent stench; the stench has become an old problem, and I

hope that, as I mentioned this morning, the Zero Discharge Programme or population programme must be implemented so that, in the end, we can maintain the sustainability of the environment.

Next, PK14 (Library) page 2002, 14014, Special Project for the Taman Seri Medan Library. I think this has been the case since 2018. The other day there was an allocation, but last year there was no allocation. Alhamdulillah, in 2022 there will be an allocation of 1 million ringgit for the development of the library, and I hope it can be realised, because if we look at it, the land gazetted for the development of the library in Taman Seri Medan is in an area surrounded by 4 schools.

Next, Vot P12 (JKR) page 227, PK4, code 04401, upgrading of the alternative route to Klang from the FT005 junction at Kampung Jenjarom to Jalan Kebun, with an allocation next year of 10 ringgit. I think I should also touch on Banting just now, but this is actually my area, where I see that the use is very heavy, with heavy vehicles passing through, especially during floods or the monsoon season. Many roads are damaged at this time. I think every year, even when they are repaired, there are always roads that are damaged. If there is no allocation, I think how can we maintain these roads? I think the best is full premix. Recently there was partial premix, but the other side has already begun to crack due to heavy use and heavy vehicles.

Next, Vot P14 (Selangor State Islamic Religious Department) page 247, PK1, code 01601, Development of the Mujahidin Madrasah School. Last year the allocation was 2 million, but it could not be implemented. This year there are 2.2 million for this allocation. I hope this is part of the government's project. There were 3 pilot projects, I think one in Kuala Selangor, in Sijangkang, and another one I have forgotten. In Kuala Selangor it has been completed and I think the model already exists, but perhaps in Sijangkang only the model needs to be adopted, and the allocation has been provided. I hope it can be carried out next year.

Lastly, PK2 page 250, 03400. I hope that in Kuala Langat, especially in my State Constituency, there will be an allocation later to build the Al-Amin Mosque at Batu 9 Kebun Baru. This mosque is a very old one. I think since the early 1970s, or the end of the 1960s, it was built, and the needs of worshippers are very great, even though there are 2 mosques in Kebun Baru, the Kampung Batu 9 Mosque and the Kampung Batu 10 Mosque, but the population is growing because of the development of many small 3-acre lots. If we look at the students of Kebun Baru National School alone, the Kebun Baru National Primary School has a total of 2,700. Let us imagine how many families there are there. I think there is already a need to develop it, because I see that the mosque itself is not very safe, as there have been cracks

and so on, in addition to its very small capacity. So those are some of the matters I have mentioned. Thank you, Mr Deputy Speaker. I support the 2022 expenditure estimates. Thank you.

Puan Wong Siew KiDAP · PHBalakong

Tuan Speaker

Deputy SpeakerEN

I invite Balakong.

Puan Wong Siew KiDAP · PHBalakongEN

Thank you, Mr Speaker. I would like to debate matters relating to page 200, Project Code PK6 06001, Development of Women and Families. In the 2022 development expenditure estimates, 126.8 million ringgit has been planned for the Women, Welfare and Health Programme. This estimate is also the largest budget compared with other projects under the Office of the Menteri Besar and the State Secretary. I would ask the government, because this allocation shows the government's concern for women in the state. However, if we check the details and breakdown under PK6, most of the allocation is actually distributed to Project Code 06002, namely Community Welfare, amounting to 64 million ringgit, and Project Code 06003, namely Public Health Development, amounting to 56.5 million ringgit. The allocation that will actually be channelled to Development of Women and Families is only 5.3 million ringgit. It cannot be denied that Welfare and Public Health are important topics that require the government's attention. I support the allocation channelled to these two topics. I would only like to propose that these two topics be separated and become their own topics apart from women and families. Community Welfare and Public Health are important topics and should not be placed under the topic of women, as if these two topics were the responsibility of women alone.

I would also like to debate matters relating to page 201, Project Codes PK10 10002, Advancing Handicrafts, and 10003, Upgrading Tourism Products. I welcome the government's efforts to allocate 150,000.00 for advancing handicrafts and 1.35 million ringgit for upgrading tourism products. Tourism products are the economic activity that most quickly has a positive impact on the local economy, with allocations to encourage handicrafts produced by individuals or factories, and to upgrade tourism products, such as providing transport or giving incentives to existing tourism packages so that tourists' comfort can be maintained at a lower price. At the same time, we can help existing or new tourism companies to rebuild after the winter season of 2 years since the COVID-19 pandemic.

Tourism companies could not survive these 2 years; many tour assistants or tour guides, with permission, have changed jobs. The tourism sector has experienced the worst crisis compared with other sectors, and

Balakong wishes to help not only small and medium industry players within the Balakong area, but also to revitalise economic growth in our area by creating a new type of tourism, namely industrial tourism. Therefore, Balakong really needs assistance and encouragement from the government, and very much hopes to be included in the projects for advancing handicrafts and upgrading tourism products. I would like to propose that incentives be given to local handicraft makers and producers, and that cooperation be created among various fields, such as the field of makers producing these tourism handicrafts in large volumes, the transport field providing tourism vehicles, and the creative field producing promotional products such as sulam pendek to promote local tourism. I am ready to help by contributing ideas or views in this matter. Yes! Finally, I can invite Seri Setia to act together. Nice (laughter). But the allocation must arrive, yes (laughter). Finally.

I would like to debate matters relating to page 202, Project Code PK1414016, Equipment and Collections. The Selangor State Government has channelled RM100,000.00 for this part. I would like to propose that we can start thinking about and planning for the existence of an e-Library or online library, especially an online digital archive that functions as a storage centre for scientific and research information collections at universities and higher education institutions in the State of Selangor. I only completed my Master's thesis last year, over a period of five (5) years, very long indeed (laughter). In producing my thesis, I encountered one major problem, namely that information sources were difficult to obtain, especially theses or research produced by our own researchers, because we do not have an online digital archive that collects or unites all the archives of universities and higher education institutions in Selangor or in other states. This has slowed our steps towards a future that is more knowledgeable and advanced, especially as the whole world is now facing the COVID-19 pandemic, and daily affairs are encouraged to be conducted online to reduce gatherings or the crowding of people in public places. A digital archive is a small part of an online library. Therefore, I believe it is a suitable and easily managed starting point, provided the State Government has the intention to begin this project.

Selangor is the most advanced state and we have the most universities and higher education institutions in this country. We should, and ought to, become the leaders of the education and research revolution in Malaysia. I very much hope that with the completeness of this library, more Selangor residents can be encouraged to conduct more research and become a catalyst for the progress of Selangor. With this, I respectfully support the motion.

SpeakerEN

Alright, I invite Bukit Lanjan.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

Thank you, Mr Speaker. For this year, the total development expenditure for next year, sorry, amounting to RM1.123 billion, is in my view a very good amount, considering that at this time many people are in difficulty, so for a Government to help the people, the Government should spend as much as it can for the people through various projects, programmes, assistance and so on. Mr Speaker, I was very touched when the State Government tabled the Budget in which the Orang Asli were allocated a sum of RM1.5 million. This was during the tabling of the Budget one week ago, and the RM1.5 million is for building, repairing and upgrading the dilapidated housing in Orang Asal villages. This is in the speech. Then there are also existing infrastructure facilities that will also be upgraded, thereby raising socio-economic standards and preserving the culture of the Orang Asal community that has been practised for a very long time. This is a quotation. I refer to page 200, Vote P01 PK4, Project Code 04002, Development of Orang Asli Affairs, and I have a question. Why? Although the Budget tabling mentioned RM1.5 million, in this Budget Book only RM500,000.00 is allocated? I ask the Treasury to examine this matter so that the Orang Asal next year can fully benefit from the Selangor State Government's Budget. I also take this opportunity to raise an issue. This issue concerns the residents of Desa Temuan, where I am the Representative of the People. Recently, I had a meeting with the JKKK there, MPKK, sorry, MPKK there, and both of us were shocked because there are various land issues that until today have not been resolved. They requested me to raise this matter so that the State Government can look at how the agreement signed more than 25 years ago can be resolved as quickly as possible.

This matter arose when we wanted to build a Futsal Court that is very simple and very straightforward, and the land issue was raised because at this time, MBPJ (Petaling Jaya City Council) says the land for the playground falls under MBPJ. But if we look at the MOU, this playground land, together with the Balai Adat, the Orang Asli Museum, the Orang Asli Multipurpose Hall and the surau, should have been given back, returned to the village, but at this time it is still held by the State Government. There are several issues related to strata titles, because there the first Orang Asli apartment in the entire country is located, but today, 130 strata title units of Pangsapuri Desa Temuan still have not been handed over to the residents there. Likewise with the ownership titles for shophouses, six (6) lots in Desa Temuan, the title for the Desa Temuan Orang Asli Community Complex, and also in the Desa Riang Damansara Damai area, where the ownership titles for three (3) shop lots in Desa Riang have also not been handed over. These are outstanding issues, perhaps because we always look forward, but sometimes there are some issues that we have still not resolved. I ask the State Government to look seriously at how we can expedite the handover of the strata titles, lot titles and also the shophouse titles, including the public assets that are designated for the residents of the Kampung Orang Asli Desa Temuan.

Mr Speaker, I now refer to page 200, PK9 Municipality, where Project Code 09003, Transport Provision, amounts to RM25 million. I think this is a very good amount because transport, especially public transport, is an issue that can be said to be a solution to the problem of climate change. So, my question to the State Government: within this RM20 million, apart from perhaps the Selangorku bus and various other transport, will cycling lanes also be built by the State Government? I raise this matter because if we look at development or progress, with permission, cycling lanes in many cities across this country, across the whole world, sorry, we can see, we have a kind of trend or development, with permission, where cycling lanes are a very important tool that we can use to fight climate change. So, as a developed state, Selangor, I recommend to the State Government that, apart from ensuring that the people can use public transport, cheap or free transport, we also have an alternative transport system that is healthy, which all of us can also benefit from.

Mr Speaker, I refer to page 202, Libraries, where this is actually a question for the State Government. I see a very good programme, Project Code 14017, Mobile Library, and I still remember that I attended several State Government programmes before, where the Mobile Library was among what can be said to be the highlights of those activities, where many children liked to go into this Mobile Library. But for next year, not RM10.00, yet I do not see any figure placed in this Budget Book. So, perhaps the State Government can provide some clarification: are we no longer running this programme, or do we have perhaps an alternative to this programme? Mr Speaker, I also want to congratulate the State Government because on, on page 203, PK17 State Special Projects, we can see there is some renewal, namely under Project Codes 17003 and also 17004, we can see in the line item, with permission, the Stamp Museum and the Textile Museum have a very large amount, where we can finally see the development of the Stamp Museum and the Textile Museum in Selangor State. However, I want to emphasise that under PK17, the State Special Projects, there is one project that I think is also important, namely Taman Rakyat, Project Code 17005, where the amount allocated is only RM10.00. I still remember when we raised, presented the Taman Rakyat project, Taman Rakyat should be a park where the whole, not only in Shah Alam but throughout the state, residents here can visit Taman Rakyat, and we can see during the MCO, these two (2) years, how important Taman Rakyat is, community areas, fields, playgrounds, where people flocked to visit these parks. So, I suggest to the State Government, to look again, so that Taman Rakyat can be expanded, can be enlarged, and a sufficient amount

to promote and also beautify this Taman Rakyat can be obtained, or we can, we can settle it, or put in a sufficient amount there. So, if we can give RM100,000.00 for the dredger Seri Banting, Project Code 17007, then I think for Taman Rakyat we should have, not less than RM1 million for an asset for the people.

Mr Speaker, the Environment is a matter that is often raised in this august House. Earlier we heard several Honourable Members here, not only Pelabuhan Klang, many. I think in Selangor State there are indeed many ADUNs who are very concerned about environmental issues, and if we look at page 201, PK12 Environment, Project Codes 12001 and 12002, two (2) important issues, the Environment and Green Technology, are always given focus by ADUNs and also EXCOs. So, I would like to suggest an improvement. Now the issue of climate change is a very important issue, climate change, and if we only focus on the environment, it seems insufficient. If we only look at green technology, that is also only one of the tools, with permission, that we use to tackle the issue of climate change. So, I suggest to the State Government to, not combine, but to set up a new STANCO, namely STANCO for Climate Change, where we can look at and also tackle the problems raised due to climate change in Selangor State. Apart from that, I am not sure where to place this, whether under PBT or the Environment, but I understand that the EXCO for Environment has a special grant for green projects, and among them includes Community Gardens, correct? Honourable Kajang? Community Gardens, anyone who wants to set up a Community Garden can apply for a special grant from the EXCO for Environment. I want to raise a problem now, especially in the Municipal areas. This morning we heard Honourable Pandan Indah raise the issue of Agro Bandar. The issue of Agro Bandar or Community Gardens is an activity that is actually supported by the State Government, but sometimes at the PBT level, we have some problems. Let me give as an example, in my area, this is not my State Assembly area but the area where I live (laughter), there is a Section Rukun Tetangga, SS22A, where their garden, their Community Garden, has been seized and there is also a problem given by MBPJ. So, I suggest to the State Government that a clearer policy be given to the PBT and also the Land Office, where we can encourage Residents' Associations, JMB, Rukun Tetangga and so on to start Community Gardens. We have been hearing for days, today many have mentioned the problem of rising vegetable prices, and Community Gardens are a way in which residents can have access to cheap and sufficient local vegetables for the areas where they live. Mr Speaker, one last matter I want to raise is P

SpeakerEN

Yes, yes, the last one, yes.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

The last one, thank you. Page 217, Selangor State Forestry Department. This is PK4, Social Forestry Programme, Project Code 04001, Forest Empowerment. I want to ask the State Government about the issue of the Cherakah Forest Reserve in Shah Alam, because we have read various news reports about this Forest Reserve. Some say it has been removed from the gazette, others say it is still in the gazette, so I think it is important for the State Government to give a sufficiently sound explanation, especially for this august House, and if possible we find a good solution, good for the residents and also good for the State Government. With that, Mr Speaker, I support the motion on Development Expenditure 2022, thank you.

SpeakerEN

Alright, I invite Sungai Pelek.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Thank you, Mr Speaker. Sungai Pelek would like to refer to page 218, P10, Selangor State Forestry Department, PK6, Object Code 06001, Forest Enforcement Programme. I was surprised when I received a call from my Orang Asli community that their land in that forest had been given to new owners. In fact, the local Orang Asli community has been using that forest area for many years, but I am also puzzled why the Forest Director could give rights to others to enter the same place that has been cleared by the local Orang Asli? So, I would like to draw the attention of the EXCO in charge of forests and the EXCO in charge of Orang Asli affairs, thank you.

Tuan Hee Loy SianPKR · PHKajangEN

Can you name which Orang Asli, which Orang Asli village? Or which forest?

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Bukit Bangkong, Bukit Bangkong.

SpeakerEN

Alright, I invite Seri Setia. Sg. Pelek, please switch off your mic.

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

Thank you, Honourable Deputy... Thank you, Mr Speaker. I would like to refer to PK15, 15001, page 202, which, in terms of its wording, reads Repair of People's Housing Projects. I am aware, and everyone is aware, that the Seri Setia area has no People's Housing Project. There is only one (1), owned by the Ministry of Housing and Local Government (KPKT). However, KPKT does not pay attention. You can see for yourself how the residents in the People's Housing Project area of Lembah Subang 1 are living, in very dilapidated conditions, with damaged roads and water tanks that have still not been fully repaired. I do not understand why the Government housing project in Lembah Subang is, I believe, the only one in Malaysia that is not looked after by KPKT. So, I would also like to make a plea, even though this is under the Federal Government, under KPKT, but because, as I mentioned earlier, it is not being attended to, I humbly ask for some consideration

from the State Government so that at least a small amount can be included, at the very least repairing the road would be sufficient because the residents, it can be said, the potholed road has become like a drain, the condition is terrible. So, I ask for a small allocation from the State Government, please help, okay.

Next, Mr Speaker refers to page 233 under Project Code 01100, which is under the Survey, Design and Investigation Study for Land Acquisition of Gazetted Land from the Department of Irrigation and Drainage (JPS). When it comes to floods, I already know, Honourable, yes, our Honourable EXCO from Pandan Indah is not here. He already knows what issue I will bring up about floods. Seri Setia is a great area, it can be said there are no floods except these two (2) places, in TTDI Jaya, the area is, it can be said, the area is great, and this is also where Sementa lives, Honourable Sementa lives in TTDI Jaya. The second is in the Taman Mesra Shah Alam area. Recently at Taman Mesra, 107 houses were flooded. I thank Honourable Paya Jaras, who helped with the SERVE team the other day. 107 houses were flooded, with much damage. Also in Taman TTDI Jaya, sometimes when it rains heavily, the water rises. I believe and trust that JPS is making every effort in various ways, but I ask once again for help once again, and that the allocation is there, yes, for repair and restoration, MBSA has also helped, but I do not know where the solution lies, as they still cannot reach a solution. Now, whenever it rains, they become afraid. Just rain, they are afraid of the siren sound. Sometimes the siren does not sound but the water rises. Ha, in villages we normally have sirens, here in the city there are also sirens. When the siren sounds, everyone quickly moves their cars.

Then, Mr Speaker, on page 247 under PK101100, which is the repair of religious schools in every district. The Seri Setia area, as I said earlier, the People's Housing Project in Lembah Subang is neglected by KPKT, and the Lembah Subang religious school is also there, nearly similarly ignored. I am also saddened by the condition of the religious school there, with its roof damaged. I have contributed to help repair it, but it is not enough. And the residents are already many, the school is also crowded, our children want to study but are not comfortable. At one point they had to study in the school canteen. We know that People's Housing Projects are indeed heavily populated and the religious school is too small to accommodate them. I ask for help, please. Please help the Islamic Religious Department, please help and look at the religious school in Lembah Subang. Second, the religious school in the PJS 10 area, Taman Dato' Hormat. PJS 10 is the same, its school is small, its residents are many, and they are asking for help to repair the school. And third, the Kampung Lindungan Religious School. The condition is the same. I know that if we want to build or enlarge this school, it will be included in the RMK, how long must we wait? At the very least, some allocation should come out to repair these schools.

SpeakerEN

The Honourable Member, Seri Setia, please sit down for a moment. Honourable Members, as the business of this House is still lengthy, the House today needs to be extended. I invite the Most Honourable Dato' Menteri Besar or the Government to move the motion.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Speaker and Honourable Members, I would like to move a motion as follows: that the House sitting today, in accordance with Standing Orders 11 and 26(4) of the Selangor State Legislative Assembly Standing Orders, shall be extended until 5.30 p.m.

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Honourable Mr Speaker, I second.

SpeakerEN

Honourable Members, this motion has been seconded. I put it for agreement. Honourable Members who agree, please say yes. (Members of the House said yes.) Honourable Members who do not agree, please say no. The motion is agreed. Please continue, Seri Setia.

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

Thank you, Mr Speaker. Back at Sekolah Lembah Subang just now, at the Sekolah Agama Lembah Subang. I identified a piece of abandoned land, which is the property of the Islamic Religious Department in the Lembah Subang area itself. I hope the Islamic Religious Department will give this attention so that we can speed up, or be able to build, a religious school there. Alright, the next one, the last one. I also thank the Islamic Religious Department under Code 03109, page 250, in this Allocation, where an allocation was included for the Masjid Lembah Subang 2. That is all, thank you, Speaker.

SpeakerEN

Alright, I invite Rawang.

Tuan Chua Wei KiatPKR · PHRawangEN

Thank you to Mr Speaker for giving me the opportunity to debate this Motion. So, to summarise, I want to refer to page 201 regarding PK10 Tourism. The issue I want to raise concerns tourism in Batu Arang, and we also know that every Saturday and Sunday, many tourists, especially tourists who cycle and also, they convoy to Batu Arang to eat and also to convoy. However, in my view, there is a lack of infrastructure there and we do not have an opportunity to present the history that took place in this historic town. So, my question is, will tourism in the coming year be upgraded in terms of infrastructure in the Batu Arang area? And the second point is regarding PK12, the same page, concerning the environment. We understand that throughout this time, especially when water pollution occurs, and the issue of water pollution in the State of Selangor, the Selangor State Government has also provided a very large allocation of millions of ringgit to improve enforcement and also monitoring technology. However, recently in Rawang there have been frequent complaints regarding factories releasing smoke, especially at night, and also open burning of rubbish. I think most of the areas of the YBs, the Honourable Members, also face the same issues, but my question is whether the Government has the technology or intends to increase enforcement. I have received complaints from the Department of Environment that, I will give one example, in the Gombak district Department of Environment area, the area it covers is from the Gombak district and also the Hulu Selangor area. The staff they have may be between five (5) and six (6) people for monitoring purposes. And the vehicle, the only vehicle available is just one. They have to share it among the existing staff at the Department of Environment. So, I think the Selangor State Government, if possible, can help the Department of Environment in terms of enforcement and also monitoring technology so that action can be taken and monitoring can be carried out easily. The next is regarding page 226, Object Code PK 404205, I would like to thank in particular the Most Honourable Dato' Menteri Besar, who has tried to resolve the issue of the project to upgrade the state road B27. Over the last two or three years we have indeed seen progress, and there are several YBs here who are residents of Bandar Kanching Hong, so many are affected if they want to go home, they are very much affected. Here I want to raise the issue of upgrading the state road B27. Because it has three roads, and the front and back have almost been completed, but the one in the middle, although it has been included in the details, only in two years I have seen the state has allocated 300,000, but on the ground, we still do not see any progress on the ground, so I hope to get a bit of explanation or progress on whether the State Government will do something in the coming year. Next, regarding Vote B13 page 241, PK505108 Construction of a Flood Retention Pond at Rawang Integrated to overcome the flood problem in the Sungai Gong. Once again I want to thank the Selangor State Government because over the last two or three years the flood problems in Rawang have indeed decreased compared with before, when in a week there might have been three or four floods in the Rawang area. Fellow Members of the House met me and asked, how is Rawang now? Has there been any more flooding? So thank you for the efforts of the Selangor State Government to resolve this problem, but recently in Rawang two of these retention ponds have been added. I would like to propose that the Selangor State Government, apart from the function of a retention pond, can also upgrade them as recreational parks, like what developers do in their townships, and to provide a comfortable place for residents to exercise and also for recreational activities. Next is regarding Vote B14 page 250, Project Code 03200 for the Gombak District. I would like to ask the Government, because in the Eleventh Malaysia Plan (RMKe-11), the details included a mosque for the Rawang area in the Taman Pelangi area, but when it entered the Twelfth Malaysia Plan (RMKe-12), that detail has disappeared. Rawang has grown with many residents, and the residents of Taman Pelangi have asked to build a mosque in that area. So I hope to get consideration from the Government. Lastly, okay, that is all from Rawang. In closing, I want to support the Development Motion tabled by the Government. Thank you.

SpeakerEN

Alright Rawang, I invite Kampung Tunku.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

Thank you Mr Speaker, firstly I want to refer to Vote P01 Office of the Menteri Besar and State Secretary, page 199 PK4 Social 04002 Development of Orang Asli Affairs. Thank you to the State Government for always being attentive to the development of Orang Asli affairs. During the COVID-19 Pandemic I saw that the State Government always looked after the welfare of the Orang Asli community, for example by organising targeted screening with Orang Asli villages with the Selangor and Federal Territory Department of Orang Asli Development (JAKOA) and also the District Health Office, as well as the mobile vaccination programme where, up to 18 August this year, the percentage of vaccination achieved among eligible Orang Asli in Selangor was 65.1%. I fully support the Third Pillar of the Selangor State Budget 2022, namely Strengthening the Selangor Public Health Agenda, however, while we move towards the digitalisation of health services, with permission, digitalize healthcare system, I hope the Orang Asli community will not be left behind. Vaccination, nutrition, I think, is a major issue. Sometimes when we enter Orang Asli villages I see children's hair looks like it has turned reddish-brown, and when I asked the villagers, it is because they do not get enough nutrients. Before the COVID-19 Pandemic, school attendance among Orang Asli children was quite low. During the pandemic, many Orang Asli children stopped studying at their schools, and there is a possibility that we will see a higher drop out rate, with permission, among Orang Asli children, as raised in the UNICEF study entitled, with permission, Understanding The Impact Of COVID-19 On Vulnerable Children And Families In Malaysia. I want to ask the State Government what is the new method for distributing child nutrition food assistance, namely Anak Selangor Anak Sihat? If it is through schools, we must be prepared, there is a possibility that Orang Asli children will be left behind. This problem is also relevant to children from urban poor groups, for example in Petaling Jaya, who are left behind because the school has no devices or because they help their parents run businesses, so I hope the State Government will give attention to this issue.

Second point, I refer to page 206 PK Women, Welfare and Health, Code 06001 Development of Women and Family. I welcome the Lifelong Learning Programme under Selangor Empowered Women (Wanita Berdaya Selangor, WBS). While we encourage women to continue their education in various fields, I want to remind that the Rang Undang-undang Anti Gangguan Seksual has still not been tabled in Parliament. Therefore, I hope the State Government will implement policies and an Anti-Sexual Harassment Awareness Programme in terms of programmes organised by the State Government. We often discuss domestic violence, but sexual harassment is no less serious. I once heard of a case handled by the NGO All Woman Society Awam, with permission, a disabled woman who received obscene pictures from her boss via WhatsApp, and besides disrupting her work performance, her mental state also deteriorated because she did not feel safe at the workplace. We should not wait for the Federal Government. I think we in Selangor can lead, compared with the Minister at the KPWKM who prefers photoshoots. Third point, I refer to page 201, PK10 Tourism, Object Code 10001 Tourism Promotion and Events. Today I have been informed that the kebaya I am wearing is the Kebaya Selangor.

Just now during the coffee break, with permission, I had a chat with the Honourable Member for Tanjung Sepat, and he explained to us about the different ways of wearing the tanjak and keris and their meanings behind them, very interesting. And here I want to refer to Discover Selangor and Tourism Selangor. I think Discover Selangor, especially on the Instagram medium, has made good efforts to promote Selangor, but I want to refer to soft power, with permission, and soft power is something where tourism agencies or tourism operators can plant ideas or branding, with permission, branding a place in the minds of tourists. For example, when we say padi, we think of Sekinchan, the area of Mr Speaker. And yesterday I mentioned BTS, today I want to cite South Korea again as an example of a country that uses a lot of soft power, with permission, in tourism. For example, when we watch Netflix dramas, they often have eating scenes, perhaps a scenario where a family gathers together, but in every Netflix drama there will be food scenes, and we see kimchi, it looks delicious and wow, I feel like going to the shopping centre to buy kimchi. Secondly, among their efforts during the pandemic, quite interesting, under Tourism Korea they launched a campaign called, with permission, Feel The Rhythm of Korea, where they used TikTok as a medium, there was a dance challenge, and they also used a band called Linachchi. Linachchi is a music band of the pansori genre, which is traditional Korean music, but it is presented in a very interesting way, so much so that we can see on TikTok teenagers from Vietnam, to the Philippines, to Indonesia, and also Malaysia trying the dance challenge. So I think in Selangor we also have attractions, perhaps in historic places, we can promote food or also try traditional clothing in our country. And finally I refer to page 217, Vote P10 Selangor State Forestry Department, PK3 Forest Protection and Innovation Programme 03001, and also page 218, PK6 Forest Enforcement Programme. Earlier the Honourable Member for Dusun Tua raised the issue of enforcement in the forest, and I want to ask the State Government whether part of the allocation set aside will be given to the Orang Asli community in efforts to protect forest resources. We must make use of the wisdom they possess for the sustainability of the environment. If not yet, I ask the Selangor State Government to consider, and we can also provide allowances or wages to the Orang Asli involved, so we can help them generate economic income. That is my debate so far, I support the Development Expenditure Estimates 2022. Thank you.

SpeakerEN

Alright Kampung Tunku. I invite Bandar Utama.

Puan Jamaliah binti JamaluddinDAP · PHBandar UtamaEN

Thank you, Mr Speaker, for allowing Bandar Utama to debate the Development Expenditure 2022. Bandar Utama wishes to focus on several Votes, the first of which is the Office of the Menteri Besar and the Office of the State Secretary, namely P01 under PK10001 and 01002, page 199, relating to Economic Development, Industry and Investment Research. Bandar Utama wishes to obtain an explanation from the State Government regarding economic development under the State Government, specifically concerning the implementation of the entertainment tax in the State of Selangor for this year and also the following year. Bandar Utama is of the view that if we truly want to develop the State Government's economy, we must not only allocate funds for economic development in the State of Selangor, but at the same time we should also consider how we can encourage the people of Selangor to invest in or develop their businesses and their creativity, including in the field of entertainment. Bandar Utama wishes to obtain an explanation because, in Bandar Utama's view, the entertainment industry is also an important industry that has a very large impact on the State of Selangor. This year and in the years before, not only in the State of Selangor but throughout Malaysia, the impact has been very serious because of Covid-19 and the years of the pandemic. So Bandar Utama would like to ask: at present, many entertainment activities have indeed decreased because of the severe emphasis on allocations and so on, so how does the State Government decide to still implement the entertainment tax at this time when there is an economic downturn, and this downturn will take a long time to recover from the losses incurred over a period of two to three years. For this reason, Bandar Utama is of the view that, if possible, the implementation of this tax could be considered for exemption, because if we agree to a tax exemption like this, the entertainment tax and so on, Bandar Utama is of the view that more talented people will be able to produce better ideas or projects for the State Government and also in the entertainment industry, and then, if they make a profit in the coming year, they will certainly be more numerous and more capable of paying tax. Therefore, Bandar Utama hopes that the State Government can consider whether this tax can be exempted for next year at the very least, and with encouragement like this, Bandar Utama feels that the State Government can also encourage more people or Selangor residents to carry out entertainment programmes and so on in the areas of local authorities (PBT) under the State Government, and this approach can also encourage revenue from rentals of stadiums and so on, and this action can also provide job opportunities for equipment suppliers, sound suppliers, organisers and so on.

Next, Bandar Utama wishes to debate P01 PK6 06004 together with PK1, PK10 10001, namely Unity and Promotion as well as Tourism Events. Bandar Utama is of the view that whether it concerns unity or promotion in tourism events, just like other State Assemblypersons, the allocation provided is not very large, so Bandar Utama hopes that with the existing allocation the State Government should be able to use the funds in a more creative way. The State Government is a government that charts or drafts the direction and future of the state. At the same time, if we want to do something related to promotion, doing something related to publicity, I think that may not be the wisest thing for the State Government to carry out. Therefore, Bandar Utama hopes that if there is promotion about unity or promotion about tourism events, we should consider third parties who are certainly clever and capable of carrying out such matters. Take influencers as an example. I think many influencers in Malaysia are actually more capable and have very creative ideas in publicising a place, an activity, a programme and so on. If we look at followers, whether on Insta or Youtube, there are indeed many influencers in Malaysia who are the most common, with respect, or the most well known. I take Neelofa as an example; she has 8 million followers on Intagram. I think not one State Assemblyperson here has 8 million followers, and perhaps not one State Assemblyperson here has 80 thousand followers or more, so when we want to take steps to carry out promotion or publicity, will the State Government make a decision? I hope to get an answer so that we can move forward and hand over this task or role to parties who are more capable and more knowledgeable. As was said earlier, Kampung Tunku also said that we need soft power and so on. But can the State Government do it alone, or do we need help or advice from third parties? So I hope this matter is also considered: if we allocate funds for promotion and tourism events or unity and so on, I hope the State Government will use parties who are more capable in carrying out this task, so as to ensure that this promotion or publicity truly reaches the people of Selangor and all the people of Malaysia.

Next, Bandar Utama also wishes to look at P01 PK9 Project Code 09005, namely Local Government, page 200. Bandar Utama is interested in debating development under local government. As was raised just now, Kebun Kita is a good initiative under the State Government. Bandar Utama has also provided a great deal of allocation to residents of areas or associations under the Bandar Utama State Assembly constituency so that they develop Kebun Kita, because Kebun Kita, especially in urban areas, is a project and a programme that is very much liked by local residents. As it was said, S22A, an area where Kebun Kita was in fact initiated with funds provided by Bandar Utama. Previously, in 2020, Bandar Utama actually allocated RM109,000 under the BU Green Grant, and part of the BU Green allocation was used to develop Kebun Kita under the Bandar Utama State Assembly constituency. Therefore, I recall that at that time Bandar Utama also invited the EXCO for Environment to attend the event or programme. Therefore, when we as local government or from the side of the ADUN have allocated so much funding for Kebun Kita, Bandar Utama is actually very disappointed that Kebun Kita under S22A has been informed that they must demolish, with permission, or in other words they must tear down the Kebun Kita area. In Bandar Utama's view, this is a matter that wastes government allocations greatly, especially when in that area, not most but all residents in that area support and really want Kebun Kita, and only because certain policies and SOPs have been issued by the Federal Government, without understanding the circumstances of each area under the State Government in the State of Selangor, should we therefore demolish and destroy existing Kebun Kita, because it was said earlier that Kebun Kita in the S22A area would be demolished if it does not follow the guidelines. But in fact, it is not only Kebun Kita S22A; many other gardens are also threatened, because local government has decided to follow policies blindly and does not look at the needs of the area and the needs of the community. Therefore, I also support and hope that the State Government will issue a new policy that is simpler and more suitable for use in areas that can hold Kebun Kita safely and comfortably, and if it does not disturb the residents, if it does not disturb the lives of residents there, I hope the SOPs will be relaxed so that, especially during this pandemic, we can provide facilities that encourage residents to look after their mental health, because gardening and so on is a good activity for maintaining mental health when it is rather rare to go out of the house and meet friends and so on compared with previous years before the pandemic. Finally, Bandar Utama wishes to debate pages 221 to 222, Selangor State Public Works Department, namely P12 PK1 Project Code 01000 to 01990. Bandar Utama has seen and found that each district has been allocated RM500,000.00 for various road development programmes, namely the development of street lights, traffic lights and also from the aspect of safety. So based on the allocation given, it is clearly not based on statistics, and not based on needs, but all allocations are distributed equally. Bandar Utama hopes that, if possible, there will be

many allocations given to areas that need them, and overall RM500,000.00 for one district is indeed not sufficient. So Bandar Utama hopes this matter will be given attention by the State Government. That concludes Bandar Utama's debate, and with that Bandar Utama supports. Thank you.

SpeakerEN

Alright, Bandar Utama, I invite Kota Damansara.

Tuan Shatiri bin MansorPKR · PHKota DamansaraEN

Thank you, Mr Speaker, for allowing Kota Damansara to take part in the debate on this occasion. Kota Damansara wishes to thank the Selangor State Government for allocating funds to two mosques, namely Masjid Subang Bestari, page 250, PK3 Code 03104 Masjid Subang Bestari, RM3,000,000.00, and also 03107 Masjid Kota Damansara 2, RM500,000.00. Thank you to the Selangor State Government for providing those allocations. However, I have gone to the sites of both mosques, but we do not see any physical progress. I earnestly request the State Government, the local authority or JAIS (Selangor Islamic Religious Department) to review the development of both these mosques, which at the initial stage should have been completed in 2022. Then Kota Damansara also wishes to thank the Selangor State Government for creating the UPPS brochure. I think all ADUNs have received it under the Workers' Empowerment Unit (UPPS). I refer to page 200, PK8 Code 08004, Workers' Empowerment. Mr Speaker, I very much hope that this unit will be directly connected with the body that represents workers in Malaysia, namely MTUC (Malaysian Trade Union Congress). For the information of Mr Speaker, MTUC represents 15 million workers in Malaysia. Therefore it is very important, and extremely important, that UPPS establishes a connection, starts relations with MTUC, and then, as stated in this brochure, protects the dignity of workers and safeguards their rights. MTUC has been fighting for the working class since 1949. I believe and am confident that a meeting can be arranged with the Most Honourable Dato' Menteri Besar, in particular, with MTUC so that the EXCO for the Workers' Empowerment Division can be advanced. Next, I go to page 199, PK4 04007, Non-Islamic Affairs. This relates to a temple to be built in RRI; the name of the temple is Vanathurkai Amman temple. So I also request the Most Honourable Dato' Menteri Besar to look into this, because they have sent letters personally requesting donations for the temple. Next, page 200, PK7 07002, Upgrading Sports Infrastructure. In Kota Damansara there are two futsal courts as well as volleyball courts, in Seksyen 4, Kota Damansara, Gugusan Matahari. I hope allocations can be given to both sports infrastructure sites.

Next, I go to page 202, PK15 15002. I see there is nothing specific here, but this issue is very much related to the Desa Subang Permai housing area, where Jalan Alpha U6/2 and Jalan Sungai Buloh are very dangerous and may cause accidents at any time, because the road junction is 90 degrees. So in Desa Subang Permai there is a mosque, named Masjid Taqwa. The mosque is indeed beside the road, and everyone, lorries, vans and so on, will stop at the roadside, and I am worried that if this road is not made into a lay-by, it may cause major problems, accidents. I really hope that the allocation under PK 15 15002 can be used to build ingress, egress and lay-by roads so that the road is safe for them to go to the mosque, Masjid Taqwa in Desa Subang Permai.

Mr Speaker, next, under the same item, PK 15 15002, namely the alternative road from Jalan Pekan Subang to Desa Subang Permai Jalan U6/1. This issue has long been raised by the residents of Desa Subang Permai because there are factories around the housing area. Whether they are illegal factories or legitimate factories, we do not know. But large 50-tonne lorries pass there, large lorries pass through the housing road, and this has caused danger to residents. The road has also been damaged. Those lorries should not pass through the housing area. Proposals have been made by MBSA, and so on, to connect Jalan Pekan Subang and Jalan Subang Permai U6/1. This road has been discussed and debated for a long time, and I see there are many procedures that must be carried out. There must be consultants, there must be tabling and so on. I very much hope the State Government will expedite the process for this alternative road to be built connecting Jalan Pekan Subang and Jalan Subang Permai U6/1, so that the residents of Desa Subang Permai will be safer, more peaceful, and free from disturbance from large lorries passing through the housing area.

Next, under the same item, PK 15 earlier, namely the 4D drainage system, Jalan 4D, Kampung Baru Subang. I also noticed in the expenditure book, this expenditure. This one does not mention 4D drainage because this is an old issue, flooding in Kampung Baru Subang. I hope that under the same heading, it can be looked at and allocated funds if needed. Because I found that MBSA says there is, GPS says there is, and so on. I very much hope that the flood problem at 4D, Jalan 4D, can be resolved.

Next, Kota Damansara wishes to refer to page 212, P08 08001 and 08, 00, 08001 relating to vegetable cultivation or crop farming. I listened carefully earlier to the EXCO encouraging the creation of community gardens. There is a community garden association, Kebun Komuniti Taman Subang Murni. They are very persistent in running the garden, with all kinds of vegetables and crops. Only perhaps there is less attention from the Government. I really hope that these people will be given attention. For example, they recently applied to have electricity and water supplied. There are so many procedures and regulations, Mr Speaker. They must apply to TNB and water and so on to connect, to pump water to the farm. So, I hope the Government can help the Kebun Komuniti Taman Subang Murni association.

Next, Kota Damansara also on page 225, P12, PK4 04102, Kota Damansara wishes to thank the State Government for helping to repair roads in Seksyen 6, 7, 8 and Seksyen 11. Kota Damansara next refers to page 233, P13, Project 1301, continuation of RTB Kampung Melayu Subang. We know the flood issue in Kampung Melayu Subang is still ongoing, and alhamdulillah the Government has allocated that allocation for the year 2022. Kota Damansara thanks the State Government, especially the EXCO, for having put in what name, what budget, for this time. Also phase 2 under project code 1302, phase 2 Sungai Pelepas. Likewise, Kota Damansara thanks the State Government for being concerned about solving the flood problem in Kampung Melayu Subang.

Next, page 251, P14, PK4 04100, various surau. For example, Surau Nurul Iman. A new surau that has been upgraded to a Friday surau, Seksyen 6 Kota Damansara. I request JAIS especially to resurface the road at the front of the surau, because many people have come to perform Friday prayers there, whereas before it was only a normal surau. And also Masjid Taqwa, same page 251, P14, PK3 03901 Masjid Taqwa. Masjid Taqwa is indeed my constituency mosque. I live there. They have also written a letter to the Most Honourable Menteri Besar, requesting help for widening the back of the mosque.

SpeakerEN

Kota Damansara, time.

Tuan Shatiri bin MansorPKR · PHKota DamansaraEN

I hope, I hope that the State Government, the Most Honourable Menteri Besar, will look at the allocation for that Masjid Taqwa. Next.

SpeakerEN

Time is up, there is no "seterus". Please sit down.

Tuan Shatiri bin MansorPKR · PHKota DamansaraEN

Thank you. One.

SpeakerEN

No, none, none, none. Finished.

Tuan Shatiri bin MansorPKR · PHKota DamansaraEN

Alright, thank you. I convey that Kota Damansara supports the Rang Undang-Undang Perbelanjaan Perbekalan 2022.

SpeakerEN

I invite Meru.

Thank you, Honourable Speaker.

Speaker

5 minit.

I will move straight to our discussion. The first item is Vote P12, page 229, Public Works Department (JKR). Project code PK5, building and upgrading of building projects. Project code 05301, proposed integrated development of the workshop and related facilities of JKR Klang in Pekan Meru. I thank the JKR for developing the area, but what I am requesting in this development is that in the area there is a field, which has long been used by the residents nearby for recreation, and as we all know, there is no recreational place in Meru. I hope the area will not be closed off, and I urge that consideration be given to how the area can still be used by the public. This is because I am worried that when the development is carried out, they may build fences and so on, making it difficult for the public to use the area.

Next, Vote P14, page 247, project code PK1, religious school. Project code 01500, Daerah Klang. What I see is that in the Klang district, religious schools have only been built in Bukit Kemuning. Eh, Kota Kemuning. Sorry. Yet if we look at Klang, the district is large, and especially in my area, Sungai Kapar Indah. The population keeps growing and it is in great need of a school, a religious primary school there. I hope the Government can plan and start from next year to plan the construction of a new religious school. This is because at present, as I have stated in the earlier debate, the residents have organised on their own, or the committee of Surau Al-Faizin has arranged, to provide a religious primary school for the children in the area concerned, using only their own allocations, donations from the public, and so on. At present, in my view, this has become an urgent need, especially since recently they were ordered to relocate because the premises were sold to a third party, forcing them to move from place to place to find a place to accommodate the students, who number in the hundreds. I think this is an urgent need that the State Government must pay attention to, to build a religious primary school in the Sungai Kapar Indah area.

Next, Vote P14, also page 250. In relation to the Selangor Islamic Religious Department (Jabatan Agama Islam Selangor, JAIS), PK3 - Mosque. Course code 03300, Daerah Klang. Proposal to build a mosque. I also propose that a mosque be built in the area, or that a surau that has been permitted to be established be upgraded to hold Friday prayers so that it becomes a larger mosque. This is because the population keeps growing, and in my view it is also an urgent need. I am confident that the earlier study carried out by the Selangor Islamic Religious Department was an old study, which requires new information to ensure this place can be built as a mosque.

In addition, I would like to refer to VOT P13, page 240. Drainage and Irrigation Department (JPS). PK5 - Drainage Management and Environmental Friendliness. Code 05101 - upgrading the flood retention pond at Kampung Budiman. I thank the State Government which has approved and will also start this project next year. Here I also want to raise the issue of improving the Sungai Kapar Besar floodgate. At present, the floodgates in the area are small, with only two gates. Perhaps I propose that the floodgates be upgraded or expanded, or that the water pump system be upgraded to high capacity to speed up the flow of water in the area.

Next, Vote P01, Office of the Menteri Besar and State Secretary. Page 200. Page 200. PK7 - Young generation and sports. Upgrading and building new sports infrastructure. Code 07002. As I mentioned earlier, there is no recreational area in Meru. I propose that a community hall also be built in SKI, which can also be used as a recreation centre. The area has no community hall at all, nor any hall for carrying out community activities there. I also propose, for the information of the State Government, that land has already been allocated to build a mini stadium opposite the site of the Kapar Hospital construction project. I hope development there can also be expedited so that it can serve as a recreational place for the people of Meru, whatever their name is.

Next, relating to PK11 - Information technology and innovation. Matter 11003, ICT Smart Selangor Programme. ICT Smart Selangor Programme. Selangor, as a leading state for the country's economic sector, should view the opportunities of the digital asset industry as an urgent need. The State Government can take the initiative of offering industry players the establishment of digital asset rights, so that Selangor is seen as technology-friendly not only within this country but also abroad. For example, the country Singapore has already started. And for the information of all Honourable Members, this proposal is very important for us to consider, because of the State Government's interest in driving the future of crypto technology from a different angle. For example, many parties carry out crypto mining or mining in commercial premises that are not given clear guidelines, to the extent that some of them are involved in the offence of electricity theft. Besides that, these crypto miners are also exposed to security threats such as robbery and bribery from enforcement officers who secretly protect their operations. This industry actually provides high returns. If there are better efforts from the State Government level, it will certainly be able to benefit all parties. This industry also actually spans the currency aspect as well as security. For example, Non-Fungible Tokens (NFTs) have now become a new source of income for artists, especially young people. Those with skills in this field, such as graphic designers, songwriters, video makers, and so on, earn incomes of four to five figures in a month. And I think this is one of the ways for the State Government to reach out to young people, where those with skills in this field, such as graphic designers, songwriters, video makers and so on, earn incomes of four to five figures in a month. And I think this is one way for the state government to reach out to young people. This crypto level is also seen as able to play a role, providing education to secondary and primary school students across the state on development and economics in the crypto world, as has been implemented by a European country, especially Slovakia. This also plays a role in attracting investors from abroad, especially from global crypto players, so that they know that giant companies such as PayPal, Tesla, MasterCard, Visa and many more have been involved in the development of this crypto. The State of Selangor can take advantage of this opportunity if opportunities are opened for unlimited cooperation. I want

SpeakerEN

Alright Meru. Crypto already. Time is up already.

Not telling us to do business. No.

SpeakerEN

Time is up already. Time is up already.

One minute, one minute.

SpeakerEN

I have already given you 2 minutes more.

But we want to make our state a state that offers education/understanding. And the last one (sorry) PK1920

Speaker

Dah habis.

This is the most important, namely the problem issue here (what's it called) at our SUK here. The lobby road is slippery, and many accidents have already happened. I hope the allocation is used to repair the area concerned. Ok, thank you.

SpeakerEN

Thank you, Meru. I call on Kota Anggerik.

Tuan Mohd Najwan bin HalimiPKR · PHKota AnggerikEN

Thank you, Mr Speaker. I have only about four matters. First, I refer to Vote P01 (page 202), Project Codes 15001 and 15003 relating to housing. I refer to the follow-up from the visit of YAB Dato' Menteri Besar in March 2021 in Shah Alam, specifically at Pangsapuri Seksyen 7, and at that time I showed the problems faced by the residents there, particularly relating to roof problems. And also the issue at Pangsapuri Seksyen 6, which has been built for a long time (decades), but until today has still not been given attention for beautification. So I ask for consideration from the State Government, especially regarding Seksyen 7 just now, because Dato' MB has already come down, and I understand that the Shah Alam City Council (Majlis Bandaraya Shah Alam, MBSA) has taken follow-up action by repairing the block where the Dato' Menteri Besar came down; the roof in that area has been repaired, but not just one block. Many more blocks need attention from the State Government, and I hope this matter can be given due consideration.

Second, I refer to Vote P12 (page 224), Project Code 03101, namely building a new road from Setia Alam, Bukit Bandaraya and Bukit Jelutong. I understand that this project falls under the State Public Works Department (JKR) and not under MBSA. However, I would like to draw the attention of the government that, if possible, such projects should be explained more widely to the residents around (surrounding community), and we must ensure that any infrastructure projects, including road construction, must take into account the ecosystem and the surrounding environment. In the case of Setia Alam, Bukit Bandaraya and Bukit Jelutong, I think most of it will involve forest areas around the National Botanical Garden, namely the Bukit Cherakah Forest.

I also want to raise in this House the proposal of MBSA in the Local Plan 2035, where they propose to build a connecting road from Seksyen U10 to Setia Alam, and this plan has received much objection, especially from environmental NGOs because it involves forest clearing. So perhaps the State Government, through the local authorities (PBT), can consider other options, meaning we do not reject the need for roads, but they can be built in a more environmentally friendly way. If we take Rawang as an example, they built the Rawang Bypass, right. The Rawang Bypass is higher and the forests beneath it are not affected. So these are among the solutions that the State Government may implement in Shah Alam because we still have forests. However, if all the gazetted forests that we want to cut down, where else will the people go for recreation? Where else will they go trekking, hiking? So this is merely my suggestion.

Next, I refer to Vote P13 (page 240), Project Code 05102. This is also a project that has long been raised with the YB Exco from Pandan Indah. I have raised this issue since 2018, and thankfully last year it was announced in the 2021 Budget to build a flood retention pond at Lebuh Raya Shapadu next to Taman Mutiara Bukit Raja. However, I ask for attention and action from the State Government to expedite this project, because from 2018 to 2021 it is already three years. So next year it will be 2022,

the budget has been passed and I understand that approval from the LLM has also been obtained, and I ask the government to consider expediting the construction of this retention pond, because this is a flood issue that has persisted for decades. So if it can be resolved as soon as possible, thank God. I thank you very much.

And lastly, Vote P01 (page 200), Project Code 13004 relating to research on Malay customs, arts, culture, language and heritage. I like it when the government gives focus or attention to this research (this research), especially involving history and also our cultural heritage in Selangor. If we all look, Selangor is a state that is truly rich in tradition and culture. The problem, however, is that we are not very aggressive in promoting our heritage and culture. We have 9 districts. Each of these 9 districts has its own strengths, has its own food, its own culture, its own dance, although we are synonymous with Selangor being the state of the Bugis people, in fact the diversity of Selangor is greater than that.

So I would like to propose to the government that, in giving grants or allocations for this research, we must improve our efforts to expose the community to the history and also the heritage of the State of Selangor. For example, the Selangor Sultanate, our heritage, the ethnic groups in Selangor. If that is the case, the EXCO announced the day before yesterday about Batik Selangor. I praise this proposal and this plan, because this is the time for us as an advanced state; people see us as an advanced state, but we may be somewhat marginalised when it comes to culture and heritage. As the EXCO announced earlier, we, people who come to Malaysia, enter through Selangor, but they will travel to other states. Why is that? Perhaps other states, for example Kelantan, have their own attractions, their own culture, but in Selangor there is also plenty, only we are not mobilising that effort, and at this time I think it is necessary, especially among young people, to understand the history and traditions of the people of Selangor.

And I am pleased to briefly share about a book I recently read, Sejarah Selangor, written by Buyung Adil. This book was published in 1971 by Dewan Bahasa dan Pustaka. When I read it, it was quite interesting because this Sejarah Selangor is very comprehensive and was reprinted in 2019. However, it is left hanging. That is to say, it only tells the story up to the reign of the late Sultan Salahuddin. In this book it stops there. So perhaps the State Government, since we are already moving forward, should publish

SpeakerEN

Honourable Member, your time is up.

Tuan Mohd Najwan bin HalimiPKR · PHKota AnggerikEN

Just a little more, Speaker. We have already published great works, we have translated foreign works. What is wrong with us uplifting the culture and history of this state of Selangor, printing a comprehensive book about the history of Selangor, about the Selangor Sultanate, our culture, our heritage, and bringing this matter to the community, especially young people? Because when young people understand history, they will have a high love for the State of Selangor. Not only young people, but we as Members of this House must also understand that although the State of Selangor is diverse, with various races, our culture, heritage and history must be defended for the sustainability of this state as an advanced state, and at the same time to preserve the traditions and heritage of these people. Thank you, Mr Speaker.

SpeakerEN

Alright, I invite Sentosa.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Thank you, Honourable Mr Speaker. I will continue straight away to speak about the development of Vote P17, page 260. I want to ask about the Veterinary Department (Jabatan Veterinar) regarding the Olak Lempit project. Olak Lempit, where over these two years there have been many cattle roaming in Klang, and there is a project that has been built by the Veterinary Department for construction at Olak Lempit, but until today it has not been completed. And many cattle are still roaming in Klang.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Already breeding, breeding even more.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

And we must take action. Action must indeed be taken, but before the Olak Lempit Project is completed, we had already started trapping these cattle, and then they were released again. Up to today it has not been resolved.

The second is regarding Vote P12 (page 221), Project Code 01300 Public Works Department (JKR) installing lamps. In my debate speech I raised the matter of Jalan Sungai Jati and Jalan Raja Nong. The lamps, which are decades old, often break down. Every day we face the problem of darkness. Right. I ask the Honourable EXCO to please look at Sentosa, yes. Help Sentosa obtain new lamps like Pelabuhan Klang. Pelabuhan Klang is very noisy, with high voices and work, yet work can still be carried out. I don't want to make noise. But I ask respectfully. So please, because I often compare Air Selangor (Air Selangor's contractor) with TNB's contractors. Air Selangor's contractors are good. Once a report is made, Air Selangor appoints a contractor who completes the work according to its KPI within 24 hours or less. But the JKR contractors or the Municipal Council (MPK) contractors always have problems. They say there is no allocation, no this and that, and so on. So if possible, please hand over all (what is this) issues of these street lamp works to TNB. Its KPI is excellent, completed within 48 hours. Right. We do not need to go and meet the contractor, check the allocation and so on. Honourable EXCO, sorry, yes.

The third is Vote 08 PK8089001. I thank the Honourable EXCO for Agriculture, who often helps the community garden at Jalan Kebun Nanas, which was once a rubbish dump. For years it could not be resolved. But with the participation of residents and the presence of the community garden, these ideas have allowed us to solve a major problem, namely the problem of rubbish that is often dumped on Jalan Kebun. What I ask of the Honourable Member is to allocate training, or to get us some assistance, for phases 1 and 2, where we already have more than 60 people who are interested and many more who wish to venture into the field of community gardening. I ask that, if you can, you provide ideas and also help, even if only a little, the community garden's gardeners.

Tuan Azmizam bin Zaman HuriPKR · PHPelabuhan KlangEN

Send him off to Sekinchan, Honourable Member.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Vote P01 PK8, PK9 Project Code 08001 Caring Government Corporations. We have learned a lesson from Covid-19, where there were many deaths, and we have already discussed how important crematoriums are in all municipalities or City Councils. We are well aware that Petaling Jaya and Shah Alam each have their own crematorium. But we do not have crematoriums in municipal areas such as Kuala Selangor, Selayang and other areas. I ask that, if possible, the State Government build them and help these councils to operate them. That is the fourth.

Vote P13 (page 240) – floods. The Honourable EXCO is aware, but the problem we face in Sentosa is a development problem, where many housing projects are built but the drains that channel rainwater of high intensity into the rivers are inadequate. The drains are very small in size. I hope (I hope) that the Public Works Department (JKR), together with the Municipal Council (MPK) and the Drainage and Irrigation Department (JPS), can sit together to resolve this matter. Right.

SpeakerEN

Sentosa, Sentosa, sit down. It's over. Sit. Thank you, Sentosa. Honourable Members, the debate on the Development Allocation Motion 2022 has ended. I ask the government to be ready for the winding-up tomorrow. Honourable Members, the time has reached 5.30 pm, and I hereby adjourn the House until tomorrow, 8 December 2021, at 10.00 am. The House is adjourned.

( THE HOUSE ADJOURNED AT 5.30 PM )