Selangor · 8 December 2021
14th Assembly, 4th session, 2nd meeting · 364 turns · 36,782 words · official PDF ↗ · Digital Hansard ↗
ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.
(Opening)
Good morning and greetings of peace. The Order of Business for the Second Meeting of the Fourth Meeting of the Fourteenth Selangor State Legislative Assembly (Dewan Negeri Selangor) on 8 December 2021 begins with a prayer recital.
Bacaan doa.
Oral QuestionsQuestions
The next item on the Order of Business is questions.
Bismillahirrahmanirrahim. Assalamualaikum W.B..T and greetings of peace. I invite Subang Jaya.
Mr Deputy Speaker. Standing Order 24(2), I take the question from Subang Jaya.
Saya benarkan.
Oral Questions — 144. Real-Time Load River Pollutant Load Analysis System (r+plas)Questions
144. To ask the Honourable Dato' Menteri Besar:-
a)
What are the findings (including cost comparison) and the results of the Selangor Water Management Authority (LUAS) regarding the use of the Real-Time Load River Pollutant Load Analysis System (R+PLAS) to control river pollution problems?
Thank you Mr Deputy Speaker. A briefing was arranged by the Selangor Water Management Authority (LUAS) on 4 October 2021, inviting ASMA Sdn Bhd to present the use of the Real-Time Load River Pollutant Load Analysis System, namely (R+PLAS), in the monitoring of river water quality.
Among the findings of the briefing is that R+PLAS adopts the pollutant load approach, or the term often used is Total Maximum Daily Load (TMDL).
To support R+PLAS, the development of monitoring stations equipped with instruments for measuring water quality and quantity in real time is necessary at locations suitable for each river basin.
Therefore, a detailed review needs to be carried out to examine the infrastructure requirements and also the development of the system, including the costs involved in using R+PLAS in the identified critical areas.
In terms of its feasibility in helping to overcome river pollution problems, the use of R+PLAS is the same as other real-time water quality monitoring systems, in that the system can provide the current status of river water quality, but it still requires site investigation to identify the significant source of pollution each time a specified parameter's quality is breached.
Thank you.
Next question. Kota Damansara.
Thank you Deputy Speaker. Question from Kota Damansara, 145.
Oral Questions — 145. Maintenance/Repair of Strata HousingQuestions
145. To ask the Honourable Dato' Menteri Besar:-
a)
What is the state government's policy (if any) to help with the maintenance of such housing?
b)
Is there any plan to help housing that has financial problems due to rent collection issues?
Thank you Deputy Speaker, thank you Kota Damansara for asking about the Government's policy to help with the maintenance of strata housing.
For the information of the Honourable Member, until now there is no specific policy to help with the maintenance of strata housing, especially the low-cost type, which serves as the guideline for the State Government. This is based on the provision of Section 9(1) of Act 757, which clearly states that the responsibility for carrying out maintenance still rests with the developer if it has not been handed over to the Joint Management Body (JMB), or after it has been handed over, the responsibility then lies with the JMB or MC to carry it out.
Meanwhile, Section 21(1) of Act 757 states that the JMB is obliged to maintain and manage the apartment through the collection of maintenance charges from the parcel owners.
However, recently the Government has tried to help by discussing with JMBs that are facing problems, by identifying those who have payment problems. We start with a programme, namely a programme for them to get involved with the Community Garden, several economic programmes so that they can earn income, and eventually the income can be used to pay back those management charges. Yesterday, for the information of this august House, it so happened that I had a meeting with the Minister of KPKT (Ministry of Housing and Local Government). We have raised the issue of repair or maintenance, both repair and maintenance of strata housing must be taken seriously, and it may very well need to be seen, and need to be changed slightly in the provisions of Act 757 so that the collection is no longer burdened on the JMB/MC, but it must be done in a different way.
So that matter has been conveyed by me to the minister. We hope developments will be obtained for the future.
For the second question, what is the plan to help housing that has financial problems due to collection? Strata residential parcel units are privately owned and are subject to the Act to pay maintenance charges. So the factor of rent collection by parcel owners has no connection with the financial problems experienced by a management body. What I mean is, some parcel owners cannot pay, but that has no connection with the JMB/MC. The JMB/MC is merely the collecting body. So the responsibility still lies with the owner, and the Act is for legal action to be taken if they fail to settle the maintenance charges set by the management body, the JMB/MC. Thank you, Deputy Speaker.
Soalan tambahan.
Kota Damansara.
Thank you Honourable EXCO for that answer. While waiting for a new act or a new process, in the current situation right now. There are shared areas, for example a broken prayer room toilet or a building that is old and needs painting. My question is, under the present circumstances, to what extent can the Selangor State Government help these apartments to repair or paint the building, especially low-cost apartments. How much can be channelled to them? For your information, thank you.
Thank you, Kota Damansara. That is an additional matter, yes. What I mean is, there are indeed some allocations that can be applied for to repair these low-cost strata apartments under the CERIA Scheme. So several programmes such as roof repairs and lifts are given priority and we see many applications. I recall that under my Stanco, the closing date was given to all COBs, namely before last 31 October. We have also received additional funds for these repairs. So we understand that with the insufficiency of the sinking fund and the uncollected business costs, the Selangor State Government is not going to not help 100%, we will still help under the CERIA Scheme. Within the year we see there is also an allocation of RM 5 million for this matter next year. So I request that the Honourable Member perhaps look into it, see which parties or buildings need it, and they should have been submitted before last 31 October for next year.
Thank you.
Next question, Balakong.
Mr Deputy Speaker, I am taking this question under Standing Order 24(2).
Baik.
Oral Questions — 146. Sports UniversityQuestions
146. To ask the Honourable Dato' Menteri Besar:-
a)
What is the government's long-term plan for the sports sector?
b)
Does the government intend to establish a sports university or institute to train and provide a platform to produce more talent in the field of sports?
Thank you Mr Deputy Speaker, thank you Honourable Seri Setia for taking the question of the Honourable Member for Balakong. Question 146 concerns the government's long-term plan for the sports sector.
First of all, we must understand that the sports sector in Selangor makes sport a commercially valued and sustainable industry because it is able to have a positive impact on the economy and tourism, especially the country in general. We must understand that this sports sector must be simplified as an industry or as a career. The sports sector in Selangor has become something important and the components of the sports industry itself have already existed in Selangor. Among the components of sport are products and sports goods, the many sports facilities and infrastructure such as sports complexes in every district including stadiums in every district, as well as sport tourism such as golf, running, marathon, half marathon and cycling.
In Selangor, we have large-scale organisation of sports events, including at district and national level, among them PJ Marathon, Tour De Selangor (cycling) and the Asian Golf Tour.
Honourable Deputy Speaker, as for the long-term plan. First, I feel it is important that we strengthen this sport. First, we must strengthen the sports institutions themselves. For the long term, the State Sports Council (Majlis Sukan Negeri) must be strengthened and given strength so that it can organise and hold more sports programmes so that we flourish more. Among these is establishing a sports city (sport city) in Selangor with complete sports facilities. We no longer want the Selangor State Sports Council to lack a specific and permanent training centre. We do not want the Selangor State Sports Council to lack a specific programme, and that is why for the long term, to strengthen this sport, we strengthen the Selangor State Sports Council and the sports councils at district level.
The second is, does the government intend to establish a sports university or institute to train and provide a platform for our athletes in the field of sports? First, I am confident and believe that every state wishes to have its own sports university, but in our view establishing a university is a long-term programme. I would like to cite the Focus Group Discussion mentioned by Isaac & War & End 2020, which states that the need for a sports university is not only to provide sporting rights to all sports and not focus on just one sport, but also important for a sports university is to provide a guarantee after they become athletes or after they are involved in sports. With this academic shelter, our athletes and our sports people can survive after they are involved in sports. That is why, for the information of all Honourable Members, among our early initiatives is that we have cooperation with institutions of higher learning, including UiTM, by opening space for our athletes to study, and the latest is MSU, where we have signed a memorandum of understanding to review and study good modules and the best methods to improve our sports performance.
Second, we want to establish a sports academy. First we hold an MoU, then we establish our sports academy, and finally of course establish a sports university in the State of Selangor. If we do not establish a special university, the government proposes to make UNISEL itself one of our sports centres at State of Selangor level, where at present sports at UNISEL fall under Business Management, but we propose that UNISEL can hold a special course in this sports field and then we make UNISEL a sports hub to train our athletes.
Next question, Bukit Lanjan.
Thank you Mr Deputy Speaker, question 147.
Oral Questions — 147. Latest Status of Gazettement of Orang Asli Villages in SelangorQuestions
147. To ask the Honourable Dato' Menteri Besar:-
a)
On 30 December 2020, Selangorkini published a news report entitled "EXCO: 60 Percent of Orang Asli Village Land Gazetted". Please state the names, districts and areas of the Orang Asli villages that have been gazetted.
Mr Speaker, for the information of the Honourable Member, there are 75 Orang Asli Villages (KOA) throughout the State of Selangor, 29 of which have been fully gazetted either under Malay Reserve, Section 62 of the National Land Code, Section 6 of the Aboriginal Peoples Act or Section 7 of the Aboriginal Peoples Act. The latest information on the gazetting of Orang Asli Villages by district is a total of 8 villages in Sepang District, 2 in Hulu Selangor District, 2 in Gombak District, 3 in Hulu Langat District, 13 in Kuala Langat District and 1 in Klang District, with a total overall area of 1672.6777 hectares. I will provide the list attached to the Honourable Member in writing, because there are a lot of the 29, so I do not need to mention them one by one, thank you.
Next question, Banting.
Mr Speaker, thank you. I am Hulu Kelang taking part, taking over the question from Banting under provision 24(2). May I ask?
24 (2).
Terima kasih.
I allow it.
ORAL QUESTIONS FROM YB TUAN LAU WENG SAN (N52 BANTING)
QUESTION NO. 148: WTE IN TANJUNG DUA BELAS KUALA LANGAT
a)
Which tenders and contractors have been appointed to build the ISWMC at Tanjung Dua Belas?
b)
Please provide copies of the tender documents and explain how this ISWMC will operate?
Okay, thank you Mr Speaker. The Honourable Member for Banting asked which tenders and contractors have been appointed to build the Integrated Solid Waste Management (ISWMC) at Tanjung Dua Belas. For the information of the Honourable Member, the tender is still in the process of preparation and a contractor has not yet been appointed at present. The contractor is expected to be appointed in the second quarter of 2022 and the Integrated Solid Waste Management tender document is in the process of preparation by the consultant. Among the components of Integrated Solid Waste Management to be developed are Waste to Energy (WTE), Material Recycling Facility (MRF), Construction & Demolition (C&D), Anaerobic Digester (AD) and Composting.
For the information of the Honourable Member as well, WTE is the main component of the development of this Integrated Solid Waste Management. The method of operating WTE is by disposing of solid waste through incineration, thereby producing electrical energy. The ash produced from the incineration of solid waste will be used as daily cover for the Sanitary Landfill Site, while the incineration emissions produced will also be treated before being released.
The methods of treatment and release of incineration emissions comply with international standards. As for the Material Recycling Facility component, it has several stages of separation of various types of waste such as metal, glass, paper, plastic and organic waste. The waste will pass through a magnetic separator to separate metal from the solid waste. Next, the waste will pass through a trommel screen where this process will separate organic material from the waste. The waste will be sent to separation points to be reused.
Tambahan.
For the Construction and Demolition component, the waste will pass through a magnetic separator to separate metal from the waste. Next, the waste will go through a crusher process to be turned into coarse and fine aggregates. For components such as the anaerobic digester, organic waste will be crushed into smaller sizes before being put into the anaerobic digester system. Through this method, organic waste will go through a fermentation process which can produce renewable energy. For the composting component, organic waste will be decomposed by microorganisms in an oxygenated condition. This process will produce by-products such as fertiliser. Thank you.
Soalan tambahan.
Hulu Kelang.
Thank you Sir. My supplementary question is how this system can be made more practical for the residents of Banting
and Kuala Langat. Because those are village areas. For example, in Indonesia, the system is carried out at village level, so that all sides of disposal of stars, animals, rubbish can be applied to generate gas....
The Honourable Member's question is why this Integrated Solid Waste Management Centre system is better than other systems. Is that the question?
It's high technology, but is there anything that can be used at village level.
Kampung?
In Banting Kuala Langat.
Okay. Integrated Solid Waste Management is actually a modern method, where rubbish will be separated before being burned. So this will, if we compare it with a sanitary landfill, it is a greener, more modern method and we can also extend the lifespan of what is called a landfill, sanitary landfill, the landfill disposal site. And it can also help us in reducing carbon. The carbon that will, will what is that. Will be, produced after the disposal. Thank you.
Alright, next question, Hulu Kelang.
Mr Deputy Speaker, my question is number 149.
Oral Questions — 149. Veterinary Department and Control of Stray AnimalsQuestions
149. To ask the Honourable Dato' Menteri Besar:-
a)
If control over stray animals, especially dogs and cats, reaches a level dangerous to human health and safety, can this animal neutering and micro-chipping programme be led by the Veterinary Department in cooperation with local authorities (PBT)? If not, what is the reason?
Thank you, Honourable Hulu Kelang, Honourable Deputy Speaker. Hulu Kelang has asked a question concerning the control of stray animals, especially dogs and cats, to the extent that they are dangerous to human health and safety, and whether the animal sterilisation programme or micro-chipping can be used. This programme is led by the Selangor Veterinary Department together with cooperation from the Local Authority (PBT). For the information of the Honourable Member, sterilisation and micro-chipping are two separate and different methods that have different objectives. Sterilisation is a method of rendering animals infertile and is often practised for the purpose of controlling animal populations. Micro-chipping, on the other hand, is the injection of a microchip into dogs and cats that have owners, and they must be registered in the animal passport together with the owner's name. The installation of microchips and animal passports is aimed at responsible animal ownership. Besides that, microchips and animal passports are also a key requirement for the transfer of animals into or out of the country.
The Selangor State Veterinary Services Department, or DVS, is not able to lead an integrated programme with the cooperation of the Local Authorities (PBT) to carry out the sterilisation of dogs and cats for the following reasons: i. DVS Selangor lacks Doctors of Veterinary Medicine, which is the only position that has the licence to carry out sterilisation on pet animals. At present, DVS Selangor has only three (3) Doctors of Veterinary Medicine serving at the District Veterinary Services Office (or PVD for short). For the information of all Honourable Members, not all District Veterinary Services Officers across the state of Selangor hold a Doctor of Veterinary Medicine degree or an equivalent qualification that entitles them to carry out this sterilisation work, yes. ii. The duties of the Doctors of Veterinary Medicine placed at the PVD are not limited to the treatment and surgery of pets alone. In fact, they also cover administrative work, veterinary health preventing, controlling and eradicating other animal diseases. Developing the livestock industry and regulating livestock activities based on the law (regulatory), as well as enforcing the animal welfare act. Therefore, animal sterilisation activities cannot be prioritised and consequently cannot be carried out full-time. iii. DVS Selangor also does not have sufficient operating allocations for this purpose, to implement this animal sterilisation programme. iv. As an alternative to these two constraints, DVS Selangor once proposed a sterilisation incentive programme for dogs and cats for animal welfare purposes under the Twelfth Malaysia Plan, but this proposal was not approved.
v. As another alternative going forward, DVS Selangor is ready to assist in terms of technical advisory services and expertise should there be any Local Authorities who wish to carry out operations to control stray animals, including the sterilisation of dogs and cats, in the future. Thank you.
Supplementary question. I raise this issue because it is a very important issue for the residents of Hulu Kelang who love cats and dogs. For them, they see this issue as simple. If it can be done, it can be handled by veterinarians. However, I want to ask the EXCO: is it because the definition of veterinarian relates to livestock for consumption? Dogs and cats are not for that purpose, so they are not included in that category. Or perhaps there is no way we can share, where the expertise exists. It is for NGOs, to bill, the highest fee, but to be assisted by a department that can do it... or to sterilise these dogs and cats, so I want to ask that. Is the definition such that you are limited to do that?
As I mentioned earlier, it is indeed the responsibility of the DVS or the Veterinary Services Department. The Veterinary Services Department does indeed cover duties related to animals, whether domestic, pets or companion animals, but our focus here in the State of Selangor is more on livestock. For those reasons, the constraints mentioned earlier are that in terms of the scope of their work, there is so much to do in terms of welfare and also issues concerning livestock. However, it was also mentioned earlier that in terms of technical matters they are ready. But for them to provide these licensed personnel themselves, because they need truly licensed veterinary doctors to carry out this sterilisation work. So they are ready technically to cooperate with any PBT or NGO to provide technical advisory services for the implementation of this programme. And I think there is indeed a justification for a programme to control animals of any kind, especially to control pets, so that this sterilisation is carried out to protect safety and also the condition of the animals themselves; there is indeed a justification for that. And it can be done where the PBT must conduct a study of that need. Especially concerning dogs, I see. This leads to issues of stray dogs and so on. And if micro-chipping can be implemented, it is for control, more towards movement control. In fact, micro-chipping control is already carried out on livestock cattle. Thank you.
In MPAJ, a decision has been made to build a transit home for dogs one and cats one. In two state constituencies, and I am involved in initiating an NGO organisation with MPAJ. What are the advice and suggestions from the EXCO to make this happen? The implementation is there, the budget is not yet there, the NGO is ready to help.
As I said earlier, our areas can start first. PBT areas that have many problems, especially with dogs, I know because I was also a Councillor before, stray dog issues are indeed a serious matter in most PBTs. And it is indeed difficult for us to carry out work to control these stray dogs because sometimes when we go, they seem to know, when we go there are none. When we have returned, they come again, they come back. And also when we make a tender to catch them, nobody dares to enter, nobody dares to catch them. I do not know what the problem is. But that is what actually happens. What we can do, as I said earlier, is that DVS is ready technically. If the PBT is inclined to agree to implement it, we will help by providing technical services. And they must provide the allocation, and if there is a need to also provide licensed doctors who are licensed to carry out this work. Thank you.
Kota Damansara.
Regarding dogs, there are people who put poison out. They are fed up with PBTs that cannot solve the problem. I also heard earlier about plans with the PBT and so on. What I mean is I propose an integrated effort, a more serious integrated cooperation with the PBT. Otherwise the public will take their own action to poison these dogs, and then before you know it, they will end up in jail, because we have the Animal Control Act. Please take this matter seriously. Thank you.
Thank you, Honourable Kota Damansara. It is true that among all the NGOs that look after dogs, they are the most vocal about cruelty issues towards these dogs, and we are careful and many times we have been, and we are indeed careful and we do not want to be cruel to such animals. And indeed there are processes and elements that have been carried out, but it needs such cooperation. And I see that sterilisation is one of the best methods, not only for dogs, even for monkeys. If the suitability is there, perhaps we can implement it. Because I receive too many reports, too many cases of damage to property and crops by monkeys and macaques, which we may be able to look at its implementation more carefully or more. Thank you.
Next question, Sungai Panjang.
Thank you, Honourable Deputy Speaker, my question is No. 150.
ORAL QUESTIONS FROM Y.B. DATO' MOHD IMRAN BIN TAMRIN (N03 SUNGAI PANJANG)
QUESTION NO. 150: SELANGOR RUMAH IDAMAN HOUSING
a)
Will the Government expand Rumah Idaman housing development projects to rural areas?
b)
What is the total number of Rumah Idaman Projects/Units that are available for application?
Thank you, Deputy Speaker. Sungai Panjang asked whether the Rumah Idaman housing development project will be expanded to rural areas. For the information of the Honourable Member, although the Rumah Idaman Programme targets development in urban areas, this Programme has also been expanded and launched to rural areas, such as in the Sabak Bernam District. For the information of the Honourable Member, so far there is one project that has been approved under rural areas, namely under the Sabak Bernam District, totalling 222 Rumah Idaman units, but they are terrace houses.
For the information of all, Rumah Idaman does not necessarily mean strata houses; there are also terrace houses. We look at the suitability of the location. If it is in a dense area, yes, there is no longer, what is this, sufficient land area, we allow strata. But mostly in rural areas or in Municipal Councils we recommend that it be implemented under Rumah Idaman of the terrace type. And so far a total of 2,059 Rumah Idaman units have been made available for application through the website of the Selangor Housing and Real Estate Board for eligible applicants. That is my answer.
Sungai Panjang.
Thank you, Honourable EXCO Batu Tiga, thank you, Deputy Speaker. My first supplementary question. Based on the information of the Honourable Batu Tiga, in Sabak Bernam there is already a proposal or perhaps approval of about 222 of those houses. Can it be informed in this august House where that location is. And secondly, is it the management or the committee of this Rumah Idaman that makes the selection, or who makes the selection with, pardon me, selection, who is eligible and also what is the method? Who does it? Who selects? Thank you, Honourable.
Thank you, Sungai Panjang. For the information of Sungai Panjang, the location that has been approved is at Lot 37343, Taman Air Manis, where the landowner and developer is MBI. So we have two types of housing projects, which we say are RM 250,000. If it is carried out by MBI, the house or project will be named Rumah Idaman. If the project is developed by the private sector, the name is Rumah Harapan, yes. Don't make a mistake. So that project has been approved. And for Sungai Panjang's second question, what is the method for applications and so on? Surely we have no one saying it is through the ADUN; you go directly to the website of the Housing and Real Estate Board to apply according to the location required by all applicants. And there we will enter and it happens automatically through the system. First come, first served, yes, with respect.
A little, Honourable Speaker. My earlier question, if I may correct it. Yes, the application is through the website system, but the selection, is it the MBI or is there another committee that will select from among those applicants?
Sungai Panjang, when we say automatic, it means the selection is also automatic. That means whoever applies first, we will see whether the application meets their criteria, and they will enter the second phase, which is now there are two filters. The first is approval according to the criteria. The second is that those who have passed the criteria will be asked some further questions to do a Self Check, with respect, that is, whether they will pass the loan or not. The previous issue was that we set the criteria, but when the waiting list is nearly several years, sometimes months, in the end they do not pass the loan, so they drop out from there, right. So now there are two things through the system: they enter according to the criteria, and after that they have a self-check whether they are burdened with financial commitments. If not, if they pass, they will go straight into the list placed as the priority list. And there is no involvement from any committee unless there is an appeal application. That is all, thank you.
Next question. Permatang.
Thank you, Deputy Speaker. My question is 51.
Oral Questions — 151. Domestic Violence HotlineQuestions
151. To ask Y.A.B. Dato' Menteri Besar:-
a)
What types of complaints are received through the domestic violence hotline?
b)
To what extent does the domestic violence complaints hotline help women?
Thank you, Deputy Speaker, and also Permatang for raising the question regarding the domestic violence hotline. I am answering on behalf of Seri Serdang, who was unable to attend. Permatang asked what types of complaints are received through the domestic violence hotline? Talian SELamat, the Dedicated Domestic Violence Complaints Hotline, officially began operations on Monday, 1 November 2021. Up to 11 November 2021, a total of 7 calls were received. 3 calls involved domestic violence cases and 4 others were unrelated cases. The 3 cases received were more about needing counselling and support assistance related to domestic violence matters. The second question, to what extent does the Domestic Violence Complaints hotline help women? Talian SELamat operates 24 hours a day as a first one-stop centre that can be referred to before seeking further assistance such as face-to-face or online counselling services. Complainants may make calls according to their comfort so as to avoid unexpected situations continuing to happen. Most importantly, the guarantee of the confidentiality of complainants' data is the responsibility of Wanita Berdaya Selangor. Thank you.
Next question. Pandamaran.
Thank you, Deputy Speaker. My question is 152.
Oral Questions — 152. Status of the Settlers' Issue at Jalan Papan PandamaranQuestions
152. To ask Y.A.B. Dato' Menteri Besar:-
a)
Please state the latest status of the development issue for the Jalan Papan Pandamaran settlers.
Deputy Speaker and also Pandamaran. Pandamaran wishes to ask about the issue of the Development of the Jalan Papan Pandamaran Settlers. For the information of the Honourable Member, so far I have held several meetings or discussions with the developer, Melati Consolidated Sdn. Bhd. And I can inform here that, in those meetings, in discussions with the developer and the Klang Municipal Council, at this time we are drafting to finalise. Yes, I said finalise, meaning there are already several decisions and agreements, but because it has not yet been tabled at the MMKN, which we expect will be held either in the last one this December or early next month, so I cannot state what the actual decision is. But offers have been made, and discussions have been held by both parties, and God willing I expect the Jalan Papan issue, which has been postponed for almost more than ten years, will be resolved next year, God willing. Thank you.
Next question, Sabak.
One is better than three, my question is 153.
Oral Questions — 153. Proposal to Build a Gateway between Sabak Bernam and Dangan PerakQuestions
153. To ask Y.A.B. Dato' Menteri Besar:-
a)
Is there no proposal to erect a state border gate between Sabak Bernam in Selangor and the forest crossing in Perak?
Thank you, Honourable Sabak. The proposed location is situated in the road reserve under JKR Malaysia. At present there is no plan to erect such a gate. Thank you.
Next, Bukit Gasing.
Thank you, Mr Speaker, my question is 154.
Oral Questions — 154. Selvax ProgrammeQuestions
154. To ask Y.A.B. Dato' Menteri Besar:-
a)
How many recipients received free vaccines from the SelVAX programme?
b)
Does the State Government intend to increase the number of recipients of free vaccines?
c)
What is the number of vaccines purchased by the State Government that have not yet been sold?
Thank you, Bukit Gasing, for raising the question. Today I am representing, or taking over, the question that should have been answered by the relevant EXCO, because he needs to undergo treatment for certain reasons. For Bukit Gasing's question, it concerns the community SelVAX programme that has been implemented by the State Government. For question A, in order to increase the immunisation efforts of the people of Selangor, the State Government introduced SelVAX starting July 2021. The implementation of SelVAX is targeted to help accelerate the immunisation rate to reduce the spread of the COVID-19 pandemic and to enable the people to return to living normally with the new norm through SelVAX. The State Government targets the provision of 250,000 individuals or 500,000 doses through community SelVAX. Up to 3 December 2021, a total of 312,928 doses or 156,464 recipients have received free vaccine benefits under the community SelVAX programme, and 3,572 doses or 1,786 recipients are under the teenage SelVAX programme. The main objective of implementing the Selangor vaccine programme is to ensure that the immunisation rate of the people can be accelerated regardless of race, religion or politics. To achieve this aim, the State Government always has plans to increase the number of vaccine recipients under the
SelVAX programme, subject to the total availability of vaccines and the current financial situation of the State Government.
The Honourable Member for Bukit Gasing asked for question (c), the total number of SelVAX vaccines that have not yet been sold. For the information of the Honourable Members, the State Government has ordered a total of 1.25 million doses under the SelVAX programme, of which 500,000 doses are allocated for the community SelVAX programme while 750,000 doses are for the industry SelVAX programme. As of 1 November 2021, the remaining vaccine doses allocated to the industry SelVAX that have not yet been sold amount to 537,045 units of doses. Thank you.
Soalan tambahan.
Bukit Gasing.
What are the State Government's plans to clear the 537,000 doses of the industrial vaccine that remain unsold? Will they be sold to other countries, or is there a new strategy?
Thank you. We have been given assurance by the supplier that this vaccine can remain viable for three years from the date of our purchase. Therefore we believe that, through this process, we can use up the SelVAX supply by selling it to other places, including the demands of other states, or it can be sold in other countries, since other countries are also facing a shortage of this supply. However, before that, we want to complete the applications for the booster shot programme for those who wish to receive it. Only yesterday we announced once again that we are the first state to announce free Booster Shots, which began today. I know it has received a very good response from the public and the people after we announced SelVAX for teenagers, and before that SelVAX moved, and before that we implemented SelVAX Komuniti. Therefore, from time to time, the State Government considers whether to sell it, or the State Government considers keeping this stock in the future for the State Government to make available to the people if needed, especially in view of recent developments, with the ups and downs of new outbreaks. Therefore, the strategy is: first, we will try to use it up within this one year for the communities and society in our state and our country, and if after that we still have some, we must think of additional strategies, especially in several neighbouring countries, if the shortage, with permission, or the scarcity, is still clear or still visible. Thank you.
Soalan tambahan.
Sementa.
Thank you, Mr Deputy Speaker. We were informed that the State Government of Selangor has already lent this vaccine to the State of Penang. So has this vaccine loan been returned, or what is the position?
Thank you. We had agreed to the loan, but at the same time, the Minister of Health, I was informed, also offered it to the State Government of Penang. So the loan could not be carried out, which means the loan did not actually take place. But on top of the loan that did not go through, we still gave 20,000 free to the State Government of Penang as a sign of solidarity to stand together in fighting COVID-19. So there is no issue of returning it, because our loan was agreed, but at that time there may have been loan applications from the states. In fact, it is not only Penang; the State of Perak also applied to us. But just as we were trying to deal with it, the Minister of Health offered the supply available at federal level after the appointment of the new Minister of Health, and I consider that not to have happened. Nevertheless, we are ready if any places wish to borrow or apply to us. Thank you. Buy from us.
Soalan tambahan.
Bukit Lanjan.
Thank you, Mr Speaker. Earlier, Dato' Menteri Besar mentioned the SelVAX Booster programme. So where? Who is eligible to receive this SelVAX booster? And where can they get this vaccine shot?
Thank you. In the statement that we issued yesterday, we opened this opportunity to those aged 18 and above. Of course, when they come, we will focus on the elderly who are queuing and also the community groups, but for those who come, God willing, we will give them the best possible service and opportunity. I know that today, so far, at several clinics, applications or attendance have reached a total of 17 clinics under SelCare across the whole Klang Valley. We are trying to increase this with other hospital and private clinic networks. We are starting with those 17 clinics first. They have a website, and there is SELangkah for making bookings. I advise that we make bookings to avoid congestion, as happened this morning. We are also improving and increasing, including adding the quota at the clinic centres, so that everyone who comes today receives sufficient supply. However, what is interesting here is that I think the concerns and sensitivity of the people towards this vaccine programme are very high, especially in obtaining the booster shot or booster doses.
With these booster doses (with this programme), I believe we can accelerate and also increase again the immunisation that is expected to decline after 6 months from the second dose of each Vaccination Programme in the country (our state) among the people. Thank you.
The next question is Taman Templer.
Thank you, Honourable Deputy Speaker. Baung fish, gelama fish, my question is 155.
Oral Questions — 155. Density of CemeteriesQuestions
155. To ask Dato' Menteri Besar:-
a)
What steps have been taken by the State Government to overcome the problem of cemetery land shortage for Muslims and non-Muslims, especially in the Taman Templer state constituency, particularly at Bukit Lagong and Sungai Tua?
Thank you, Honourable Taman Templer. For the information of the Honourable Taman Templer, development in the Templer state constituency does not involve development for which the provision of a cemetery site can be imposed as a condition. Referring to the manual, guidelines and planning standards of the State of Selangor, the lots of land in this area are individual and council land. There are no proposals for new cemetery sites. Also for the information of the Honourable Taman Templer, the local authority can only require the provision of a cemetery site if a development exceeds 100 hectares. Thank you.
But Honourable EXCO,
Taman Templer.
The cemetery near Taman Templer, eh? Supplementary question, yes. Eh, supplementary question. The one standing up there.
Ask for permission first.
Eh? The one standing up there. Eh?
Sila-silakan.
The Deputy Speaker already knows that when we stand up, we want to speak, right? Correct, Sabak? Right. Yes. The problem is that the cemetery land near Taman Templer is already full, that is the problem. If we follow those conditions too strictly, we are afraid that when someone passes away, and death is certain, birth is certain, death is also certain. That one. So I very much hope that the State Government must look into the matter of opening new cemetery land. Not only for Muslims, perhaps also for the Chinese, Indians, and other races and communities found especially in the Taman Templer state constituency. Thank you, Honourable Deputy Speaker.
Thank you. Yes, thank you, Honourable Taman Templer. In fact, providing cemetery sites is quite a difficult matter, because when we want to determine a location, we must find a suitable site with no objections. And usually cemetery site proposals receive many objections from residents. However, I agree with the Honourable Taman Templer that this is a responsibility of the local authority to provide sufficient cemetery sites. Therefore, this need will be studied from time to time by the local authority. If the Honourable Taman Templer has a suitable location proposal, the Honourable Member may propose that location and we will carry out a study. Thank you.
Soalan tambahan.
Hulu Kelang.
Deputy Speaker, thank you. I would like to draw the Government's attention. Previously, SELCAT held an open hearing on Chinese cemetery land. Will the government enact a law or anything related to control? Thank you.
Yang Berhormat.
SELCAT's proposal is that the government establish guidelines to control the construction of houses, cemeteries and so on in the state. There is no control. For example, a cemetery area, one plot of cemetery land, reaches 100,000, 200,000. Some reach a million. So we want to control it. If there is no control, it becomes a business.
Oh, Chinese cemetery sites?
Ya.
A committee like the one announced by the Honourable Bandar Baru Klang recently, a committee is proposed, will be proposed next year. A special committee to monitor this matter. Thank you.
Yes, Mr Deputy Speaker. Perhaps I have a little addition.
Bandar Baru Klang.
Thank you from Hulu Kelang just now. In fact, what the Honourable Hulu Kelang mentioned concerns the SELCAT Report from the year, from the session, two sessions ago. The SELCAT Report was accompanied by a proposal to control private cemetery land, and although there is a proposal in that report, there has not yet been any action by the government.
The second point concerns what the Honourable Kinrara mentioned just now, that two days ago an open proposal was put forward to place the management of non-Muslim cemetery land under the Local Authority, which at present is under Chinese associations or the Chinese Cemetery Association established by the community. Therefore, this matter will be studied by us, and we will look at whether we should have new cemetery land. The old ones are indeed under the associations, but according to the Local Government Act, it is the government's view that this should be the responsibility of the Local Authority. That is why we will carry out a study. Thank you.
Before moving to the next question, in relation to this question, I take this opportunity to ask the Kuala Langat Municipal Council to expedite the Christian cemetery for the Indian community that has been cleared, yes. In the process, the land is already there, yes. But it is in the process of further action.
Speaker, just ignore the PM. Just ignore the PM. Just WhatsApp WhatsApp.
Have to be a private message.
The Speaker has no opportunity to speak in the House. The next question, Sungai Burong.
With your permission, Mr Speaker. I, what's its name, draw the attention of this august House to Standing Order 24(2) to raise the Sungai Burong question as...
Ha, I thought there was another Standing Order. You seem to be speaking slowly. Alright, I allow it.
Soalan 156.
Ya.
Oral Questions — 156. Increase in Paddy Cultivation CostsQuestions
156. To ask Dato' Menteri Besar:-
a)
What steps is the State Government taking to help paddy farmers facing the rising increase in paddy cultivation input costs?
Thank you, Honourable Sungai Panjang, who represented the Honourable Sungai Burong, regarding the question on the paddy issue and the increasing cost of cultivation inputs. Yesterday, did the Honourable Member not know whether there were any efforts outside my own to encourage the use of local fertilisers in order to reduce dependence on chemical fertilisers, yes.
For the information of the Honourable Member, the State Government through the Department of Agriculture has understood this issue and has provided, under the allocation of the Twelfth Malaysia Plan for the State of Selangor, RM14.5 million over five years for the Paddy Cultivation Development Programme, and I have already touched on what efforts we have made so far to help increase paddy yields. This programme also aims, at the same time, to reduce the impact of the rise in input prices, namely the input price (input is, namely fertiliser and pesticide) on farmers, and to plan activities towards increasing paddy yields. In 2021, RM2.9 million was allocated for the development of paddy projects in the State of Selangor, and this allocation is expected to benefit 5,000 paddy farmers in the North-West Selangor area who are involved in the paddy cultivation development project this year.
At federal level, the Ministry of Agriculture, Industry and Food (MAFI) is monitoring the increase in the prices of fertiliser and pesticide that are burdening farmers and small holders throughout the state at this time. MAFI has now set up a task force together with the Ministry of Domestic Trade and Consumer Affairs and the Ministry of Finance to take integrated action in helping farmers face the increase in the prices of this fertiliser and pesticide. Thank you.
Soalan tambahan.
Sungai Panjang.
Thank you, Honourable Pandan Indah. Thank you, Mr Deputy Speaker. My supplementary question is: what is the real cause, or what actually happened, that has made the increase in paddy cultivation input costs so significant? Based perhaps on discussions or studies from the government. Thank you.
Okay, Honourable Sungai Panjang. I have already explained at length in my recent winding-up speech regarding the issue of rising input prices for crops. In fact, this phenomenon is occurring across the whole country (the world). The world, not just the country, where disruptions to the system or chain of supply, or supply chain, are occurring across the country and the world, where the impact of this pandemic has in fact caused many problems for this supply. So the need for chemical fertiliser is MPK, yes, namely MPK, which are the products needed to mix chemical fertilisers. So there has been a shortage in this supply, causing its price to rise. That is among the causes.
And secondly, that is why I mentioned here that our dependence on chemical fertilisers and also pesticides is at a high level. And I have proposed that we re-examine more environmentally friendly, organic and local methods for us (if not everyone replaces this fertiliser, so that we can use some of it) to reduce dependence on (what's its name) this input from outside the country. This can (especially) not only help reduce the burden on our farmers, but at the same time increase yields and also protect the sustainability of our environment. And this phenomenon also occurs in the food supply (chicken and also ruminants), where the highest increase is in chicken feed, because dependence on imports (from outside) due to this supply disruption (this supply chain) has caused prices to rise significantly, also in animal feed for livestock. Thank you.
Soalan tambahan.
Kuang.
I want to ask the Honourable EXCO, are there several hundred thousand goats and cattle in Selangor?
That is a specific question.
What relevance does this have to the question, Honourable Member? None. This is about paddy. Not about goats or cattle.
Cattle also eat paddy.
There is no meaning in cattle eating paddy. Honourable Member from Sabak Bernam, how can you say cattle/goats eat paddy?
Alright. The next question, Sijangkang.
Thank you, Mr Speaker. Don't be greedy eating gelama fish, my question is 157.
Oral Questions — 157. Selangor State Land Task ForceQuestions
157. To ask Dato' Menteri Besar:-
a)
What are the latest developments regarding the State Government's land use on land that has been fully identified and is in the State Government's inventory?
Patience, patience. Thank you, all Honourable Members, and also Sijangkang, who asked about the task force or the Selangor State Land Special Task Force.
For the information of the Honourable Sijangkang, information on state government assets or government land is updated and regulated through the application called the Land Asset Regulatory Data System, or known as the Selangor Land Information Systems (SeLIS), where the data is divided into eight layers: a) Known as virgin land; b) Temporary Occupation Licence (LPS);
c) Expired Notice 5A; d) Expired Lease Period; e) Forfeiture under Notice 8A; f) Reserves; g) Malay Reserves; h) Minerals and Rock Materials.
These are the categories within the State Government Land Storage System.
The process of updating the land inventory list is managed by each land office and district office respectively. Meanwhile, the monitoring and supervision of the status of government land is carried out by the Task Force Unit and Research of the Selangor State Land and Mines Office (PTGS). The updating and monitoring process is always carried out periodically by PTGS through meetings and on-site monitoring. On-site monitoring is also very important to ensure that government land is not encroached upon by any unauthorised parties.
Potential land that has been identified is licensed and is continuously reviewed in terms of property valuation, location, photographic condition, technical and legal aspects for the purposes of state economic planning and development. Some land with high economic value will be allocated as replacement sites if there are court claim cases against the State Government, based on the decision of the State Executive Council, the State Economic Action Council.
The status of this land inventory will also be presented periodically to the State Authority for information and further direction regarding the future direction of this government land. This is the land task force that was established from 2009 and 2010 onwards. Thank you.
Soalan tambahan.
Sijangkang.
Regarding the current status of the State Government's land use. The reason I see that there are several pieces of land in this inventory suitable for development, yes, in agricultural programmes using State Government land or GLC land that lies idle, such as at Pulau Carey, yes, and I think we are somewhat... in my view, we were late in implementing that programme after the budget was tabled last time. Perhaps the State Government could also consider using these lands for that purpose in the nearest possible time, to give opportunities to the people of Negeri Selangor.
Y.A.B. DATO' MENTERI BESAR
: Thank you, Honourable Member. That is indeed the exercise before a project such as the one implemented by Pandan Indah when we wanted to launch the programme with the hope of finding roughly 2,000 acres. In one year we will meet PTGS, which has the landbank or the list of the following lands, and we find subsidiary companies with the following lists.
So yesterday I think in the winding-up or in the question answered by Pandan Indah it was explained that there are several lands we have identified, Cangkat Menteri for example, 2,000 acres, but we have to go through the EIA process, that is why it is slow. But for Bukit Cheding, I think that is the 30 acres, Bukit Changkat, sorry. I think it can be implemented as soon as possible, but its size is small because it is only about 30 acres or so. We are looking at several more lands of subsidiary companies and State Government lands to view the whole picture.
But I would like to inform that at this time the management known as data slice is mostly office business, yes. It is not something the public can access outside yet, but once the integration with the e-Tanah system developed by the Federal Government for State Governments is complete, we will be the third state after the Federal Territory, Kuala Lumpur, and Perak, and now Selangor. This e-Tanah system will also give the public access to certain levels and specific information so that what is called overlaps and various issues that actually plague the State Government do not occur. The State Government faces court cases, for example just now, because previously what was managed manually caused overlaps, land recipients and land owners, and in the end the Government today is forced to bear certain costs to pay back or replace lands that had these overlaps.
Every year, in fact, we are cleaning up this matter. In syaa Allah, I believe that from time to time our checklist or our landbank list will become cleaner with the electronic or online monitoring system. Thank you.
Next question, Gombak Setia.
Mr Deputy Speaker, Standing Order 24 (2), I take the Gombak Setia question.
Alright, I allow it.
Terima kasih.
Oral Questions — 158. New Economic and Income SourcesQuestions
158. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
What are the State Government's strategic efforts to explore new economic sources and revenue to ensure economic sustainability?
Y.A.B. DATO' MENTERI BESAR
: Thank you, Lembah Jaya, for raising the question on behalf of Gombak Setia. In line with the advancement of high-technology industry, the State Government adopts an approach focusing on economic development through high-impact investment. As a state that contributes the largest GDP (KDNK), Selangor is resilient in facing the challenges of COVID-19. With the shift of geopolitical power and megatrends such as the rise of China's economy and the response of the United States.
And we do not ignore several issues such as Climate Change & Net Zero Goals and digital transformation. Selangor can take the opportunity to strengthen the existing advantages and address matters that are of concern.
Apart from improving the existing economic sectors, focus on new emerging sectors such as Life Sciences and Agri-Tech is also given emphasis to help sustain the state's economy. The State Government is very committed to building the digital economy and ecosystem with the aspiration to make Negeri Pintar a liveable place, and this process has been accelerated by the Pandemic that has struck us for several years. Several strategies that have been outlined by the State Government, for example to promote and focus on the eDagang process a few years ago.
The establishment of the Smart Selangor Delivery Unit and the initiative to become a Smart State have truly helped to provide resilience and immunity to the national economic system, Negeri Selangor, even though we were severely hit by various, by various effects of the COVID-19 Pandemic. To promote the available investment opportunities that attract investors to the state of Selangor, the State Government has drawn up several strategies, among them:-
(i) Through SIDEC with the development of the State Agro-Technology Industry, through the Selangor Accelerated Program or Program Pemecut Selangor. Its name is Pemecut, yes. Selangor Accelerated Program. New focus in this field is key to local economic recovery through digital transformation; (ii) Branding and promotion of potential industrial areas through print and electronic media; (iii) Updating and preparing a comprehensive and easy investment guidebook; (iv) Helping the industry resolve emerging issues related to investment; (v) Providing a strategic planning framework for the industrial sector; (vi) Increasing promotion efforts overseas; (vii) Increasing networking with relevant agencies whether from the Federal Government, the State Government or embassies; (viii) Establishing strategic partner relationships with relevant agencies; and (ix) Encouraging the opening of new industrial areas with the involvement of State Government subsidiaries and private developers with the concept of a Managed Industrial Park. The State Government also constantly explores new income from time to time as outlined, and to ensure revenue, the Revenue Collector optimises existing collection efforts and explores new revenue. Two committees have been established, namely the State Government Cash Management Committee, which helps the State Government manage surplus cash more efficiently while giving optimal interest returns, including investment. Second, the State Revenue Review Committee, which helps the State Government identify new proposals, monitor existing revenue collection efforts and, to the maximum, review laws and regulations to prevent revenue loss. Among the new State Government revenue policies that have been planned or are at the review stage relating to laws are as follows:-
(i) Special Permits as temporary use approvals; (ii) New office fees for transfer registration transactions; (iii) Proposals for leasing tower sites and telecommunication structures; What I mentioned here is more than 10. Some I have already mentioned during the previous winding-up. Among them is implementing a review of Veterinary Service Rates. Drafting the implementation of Inland Fisheries Regulations. Imposing Access and Benefit Sharing permits. Proposals to improve the leasing method for operators on Food Production Reserve land and the issuance of Special Licences for Wood-Based Factories monitored by the Forestry Department. At a Retreat held in March 2020, March 2021, we looked at these possibilities and in fact the State Government has estimated that each of these departments should explore, such as the timber fees I mentioned earlier. Veterinary, charges for the TKPM park, that means proposals from each department and proposals from each, from each department that wants or can increase the state's opportunities to add new revenue to Selangor's income, apart from being 100% fully dependent on land revenue such as Premium and Land Tax. However, I believe what was done in the Cash Management Committee earlier, how we can optimise investments on the surplus cash we have and how revenue collection brings in income. For example, this year our land revenue collection has reached land tax at up to 99% of the target. That is the fixed deposit amount that must be collected. The figure may be nearly 600, 700 million, we can achieve more or more than 90%, from time to time we will ensure this deficiency of collection can be created, especially with the digitalisation agenda being developed by the State Government. Thank you.
Next question, Pelabuhan Klang.
Mr Deputy Speaker, Standing Order 24 (2), Pelabuhan Klang Question 159.
Alright, I allow it.
Oral Questions — 159. Roda Darul Ehsan (RIDE)Questions
159. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
What was the total expenditure incurred by the Government in 2020 up to now?
b)
What was the total number of applications approved and rejected in 2020 up to now?
c)
Can the Government list the total number of beneficiaries of the RIDE programme for each DUN?
Thank you, Mr Deputy Speaker. Thank you, Pelabuhan Klang and also Sentosa. The question concerns the total expenditure incurred by the Government for the RiDE programme for the year 2020.
The State Government allocated RM 2,000,000.00 in 2020 and up to now, and RM 1.7 million has been spent on payments to 3,227 eligible applicants. Meanwhile, RM281,153.00 was used for management and administrative costs such as the RiDE initiative handover roadshow programme, payments to workers, website development and others.
In 2021, the State Government received a total of 8,144 applications and used the existing allocation. The State Government has disbursed the initiative to 3,227 eligible applicants and 1,761 applications were rejected on the grounds of not meeting and not complying with the stipulated conditions. As for the remaining eligible applicants who have not yet been paid, the State Government will evaluate and review the criteria that have been set and they will be paid using the allocation in the coming year.
As for the third question, can the Government list the number of beneficiaries? We have 3,227. I think this is a long list. I will give it in writing to the Honourable Deputy Speaker and to Pelabuhan Klang later.
Next question, Sungai Pelek.
Thank you, Mr Deputy Speaker. My question is 160.
Oral Questions — 160. Flood Mooring Project of Sungai Labu and Sungai ChincangQuestions
160. Asked of the Y.A.B. Dato' Menteri Besar:-
a)
Regarding the flooding caused by the breach of the Sg. Labu embankment, what is the long-term solution for the embankment that frequently breaks?
b)
Does the State Government plan to identify locations and build a Retention Pond as a flood buffer zone?
Thank you, Honourable Member for Sungai Pelek, and Honourable Mr Deputy Speaker. Sungai Pelek asks about the flooding issue at Sg. Labu, namely what the long-term solution measures are and also whether the State Government has identified a suitable location for a retention pond.
For the Honourable Member's information, for the long-term solution, the Sg. Labu Flood Mitigation Project has been approved by the State Government and is still under construction. This project, valued at RM17.754 million, was supposed to be completed in December this year, but due to the Pandemic and so on it has been rescheduled, continued, and is expected to be completed this time in the second quarter. The second quarter of 2022.
This project involves upgrading and strengthening the structure of the Sungai Labu bank, using sheet pile structures and armour rock in areas that frequently collapse. So under the embankment management approach, places that often break and collapse have been replaced. We no longer use earth; we replace it with armour rock, which is stronger and more robust. In addition, JPS, the Selangor Irrigation and Drainage Department (JPS), has also planned short-term action for 2022 to address the flood problems at Kampung Giching and Kampung Salak Tinggi through the construction of water control gates and the installation of pumps at the mouth of the main drain to Sungai Labu. We receive so much water from Negeri Sembilan through this Sungai Labu, and we have decided to install water gates and pumps at the main drain of Sungai Labu at an estimated cost of RM 5 million under the drain levy trust account allocation.
The JPS is also carrying out the Study I mentioned before, namely the Master Plan Study of the Drainage System for Stormwater Management, or PISMA, in the Sepang District. The Master Plan Study has commenced and will be completed by the end of February 2022, and this Master Plan will be shared and coordinated with the local authorities (PBT) and other agencies related to the drainage system.
The long-term implementation proposal is that this flood solution will be planned based on this study to ensure a holistic solution is implemented, including site planning for the construction of a flood retention pond. Thank you.
Batang Kali.
Thank you, Honourable Deputy Speaker. Regarding floods as well, although the EXCO intended to WhatsApp me, I still want the answer live in this honourable House. On 23 August 21 last...
Honourable Member, this is the Sungai Labu question, Sungai Gincing, Honourable Member.
Ha! This is also about floods. Ha! This is the same as floods. So I seek permission. This is also about floods. At the last meeting the State Government stated that it is now preparing the design with an allocation of RM 4.2 million and will call the tender at the end of this year, November 2021, and implement the project in April 2022.
Within 24 months, and in fact this question was prepared by my colleague, the ADUN for Kuala Kubu, who has very strongly championed this issue, and I am continuing this issue so that the current status of this project can be answered live. Thank you.
Yes, I cannot answer directly like that, yes. Later I have to look again because this question is specific, yes. What I answered earlier was specific to Sg. Gincing and Sg. Labu. As I mentioned before, whatever flood issues there are, we will examine them and implement them under the measures, plus, there are emergency measures now.
So if in that allocation we find there is none, what urgent action must be taken? We will obtain the allocation under the drain levy; we still have money under the drain levy to implement urgent flood-related issues. So I hope Batang Kali will be patient with me. I will give specific attention, even if it is not by WhatsApp, that is fine, I will give specific attention to
resolving the flood problem that I think has been going on for a long time in Batang Kali. Thank you.
Next question, Rawang.
Y.B. TUAN MOHD SANY BIN HAMZAN
: Templer will take the Rawang question. Went to the shop and bumped into a stone.
Which Standing Order?
Y.B. TUAN MOHD SANY BIN HAMZAN
: 24 (2). I said it correctly the other day, ha! The one going viral now, right. I said it correctly. Went to the shop and bumped into a stone. Rawang Question 161.
Oral Questions — 161. Ppn of Selangor StateQuestions
161. Asking the Right Honourable Dato' Menteri Besar:-
a)
How many businesses have been closed due to COVID-19?
b)
How has the National Recovery Plan (PPN) helped the economy of the State of Selangor?
Y.A.B. DATO' MENTERI BESAR
: Thank you, Templer, who is also a neighbour of Sungai Tua and Rawang. That is why you asked the question. Honourable Member, basically the economic impact of the implementation of the Movement Control Order (PKP) and COVID-19 is clearly visible. The contraction figure announced by Bank Negara is around 17%, and 16% is among the largest the country has ever experienced compared with the crises of 1999 and 1998.
However, after several procurement and recovery processes were carried out, and not forgetting some sectors that suddenly improved well, among them the manufacturing of rubber gloves, this has offset to some extent the weakness and sluggishness of businesses.
Basically, the question raised is how many businesses have been closed? Basically, the State does not receive this information directly from the departments, so we cannot provide the figures. However, from the indicators that can be proven, when the PKP Order was implemented there was indeed an increase in unemployment and an increase in economic difficulties and economic weakness.
I myself can see the data shown by the EPF (KWSP), for example how EPF contributions experienced a significant decline, and within a few months after that we expected these companies to face risks or problems arising from their operations and production. But when we reopened the economic sectors under the national recovery plan, which I consider to be an exit plan that should have been prepared from the beginning but was not prepared and not drafted from the beginning, some economic sectors are now running again and putting renewed pressure on the services sector, which has shown extraordinary growth in terms of attraction and also the activities taking place.
Now, in my view, we are in a process of adjustment between the services sector that was growing before and online businesses, for example, which are also growing considerably and providing very good economic opportunities, with adjustment to physical activities that are resuming. Various sectors that we see experiencing the expected pressure will receive the final impact through recovery, such as the hotel and hospitality sector, which has indeed been affected very greatly, and this also involves several State Government subsidiary companies that were forced to close their operations due to excessively high operating costs and as a result of the Movement Control Order announced by the Government.
So how does the PPN help? Of course it helps, because it reopens sectors that were restricted for a long time. Previously these sectors had to obtain approval or apply to the Ministry or the Federal Government before they could operate, and there were changes to SOPs, yes. There were frequent changes in directives that caused confusion and anxiety, as well as the messaging or method of communication regarding COVID-19, which I consider somewhat distorted, resulting in extraordinary fear and in the end the economy did not function. The spread continued, and we failed to address the real issues, namely physical distancing, the wearing of masks, or the correct behaviour when facing COVID-19.
So the figures, I promise I will obtain them because they are information from DOSM and bodies such as the EPF (KWSP), which are beyond our control. I will obtain them and convey them in writing to Rawang and also to Templer if Templer wishes, but
the impact of the PPN is indeed there, and we can see the positive growth expected in the fourth quarter of this year after the reopening of the economic sectors, as expected for the economy. Thank you.
The next question, Bandar Utama.
Thank you, Mr Deputy Speaker. My question is 162.
Oral Questions — 162. Support and Assistance for P-Hailing and E-Hailing WorkersQuestions
162. Asking the Right Honourable Dato' Menteri Besar:-
a)
Given the increasing number of P-hailing and E-hailing workers, what policies or initiatives have been developed by the Selangor State Government to provide support and assurance to P-hailing and E-hailing workers?
Thank you, Mr Deputy Speaker. Thank you, Honourable Member for Bandar Utama. Regarding support and assistance for P-hailing workers, what policies or initiatives have been developed by the Selangor Government?
Our policy in general is to help all those who live and have an address within the State of Selangor. Our initiatives are many, among them the Rebate Initiative, namely for Grab Transport to PPV, which was introduced by the Right Honourable Dato' Menteri Besar under the 25 initiatives of the Kita Selangor 2.0 Package, which has provided great support to E-hailing workers. More than 14 thousand applicants under this initiative have used the Grab to PPV service. The second initiative is the Agenda. The Digitalisation Agenda, namely the Government has implemented several initiatives such as Rakan Digital Selangor and Selangor E-kitchen, and this programme is able to open income opportunities for those who need them. This portal can be accessed through the PLATS Selangor website on our web.
The third is the programme we are well aware of, namely the RiDE Programme, which encourages the participation of young people and the gig sector in e-hailing, especially as food couriers. Honourable Member, previously we limited the age to 21. Now there is no longer any age limit for these people. We have opened it up, so those involved in e-hailing or P-hailing can apply for this RiDE programme, and this is the Government's continuous effort to encourage their participation. And the latest, for the information of the Honourable Member for Bandar Utama, we have discussed with the EPF (KWSP) how to improve the benefits of the RiDE programme with the i-Saraan EPF contribution, namely voluntary savings for workers without an employer. i-Saraan enables workers who are self-employed and have no fixed income to make voluntary contributions for retirement purposes and receive additional contributions from the Government. And finally, for the information of the Honourable Member for Bandar Utama, we have contacted and worked with the E-hailing Malaysia Alliance (Gabungan E-hailing Malaysia), which has held several discussions, and among the complaints from the E-hailing Malaysia Alliance is that they feel like they are floating in the air. For the information of the Honourable Member for Bandar Utama, those involved in E-hailing or P-hailing feel that they have no specific platform or employer recognised by the Federal Government.
From the discussions with the E-hailing Malaysia Alliance, the State Government wishes to set up a form of Committee or Council or any platform that can carry their voice and help them.
Soalan Tambahan.
Bukit Gasing.
I appreciate the assistance given to riders by the State Government, but perhaps the most challenging matter for riders as a whole is negotiation with the giant companies. So when Grab or Foodpanda change these incentives, it will greatly affect their income. When there is a dispute and they are suspended for a month or a week, this will cause them to lose income, so I think the government that is most powerful and has the greatest impact to provide help is the one that can do so. Does the Honourable EXCO and the State Government intend to get involved as mediators, intermediaries, or to form a relationship to resolve problems with the giant companies that now seem very powerful in making any policies and actions against riders, and riders have no ability to find lawyers to defend themselves?
Thank you, Honourable Member for Bukit Gasing. You are right. In the eyes of the Federal Government, those involved in E-hailing or P-hailing are the same as those who sell nasi lemak by the roadside. That is, they have no employer, they can come and they can go. There is even a court case that has ruled that they are not even considered workers.
But how do we resolve the problem? The problem can be resolved by the Federal Government through amendments to the existing laws within the Federal Government itself. The role of the State Government is that we can form a Committee and link the E-hailing Malaysia Alliance to be the spokesperson or voice to the Federal Government.
Honourable Member for Bukit Gasing. This Alliance has met many parties at the Federal level, but so far there has been no resolution. That is indeed a very great concern, Honourable Member, because it involves more than 15/20,000 E-hailing workers in Selangor, and their platform is very uncertain.
At the State Government level, we can only help in terms of initiatives and assistance. In terms of Policy and Regulation, that is within the jurisdiction of the Federal Government. However, for the information of Bukit Gasing, we will move with the E-hailing Malaysia Alliance and become one voice so that we can help them in Malaysia.
Mr Deputy Speaker. Supplementary question.
Next question. Sungai Air Tawar.
Y.B. DATUK RIZAM BIN ISMAIL
: Thank you, Mr Deputy Speaker. My question is 163.
Oral Questions — 163. Role of PBTQuestions
163. Asking the Right Honourable Dato' Menteri Besar:-
a)
What is the role of the Local Authorities (PBT) in efforts to curb the spread of COVID-19 in Selangor in Phase 4?
b)
How many factories were ordered to close due to SOP breaches throughout 2021? List them by PBT.
Mr Speaker. The Local Authorities (PBT) always carry out routine monitoring such as patrols and enforcement operations under the Local Government Act, namely Act 171, and the existing PBT legislation, namely the existing By-laws.
The PBT also enforces the Prevention and Control of Infectious Diseases Act 1988 (Act 342) as delegated by the Ministry of Health Malaysia (KKM).
In addition, the PBT also participates in integrated operations and monitoring of compliance with COVID-19 SOPs in PBT areas together with the respective District Police Headquarters (IPD) and other enforcement agencies to ensure compliance with the COVID-19 SOPs issued by the National Security Council (MKN), especially in the manufacturing sector such as factories, workers' hostels, and construction sites.
Among the other efforts carried out by the PBT to curb the spread of COVID-19 in Selangor are as follows:
i) Implementing Operations for Monitoring Compliance with SOPs outlined by the National Security Council at business premises such as checking body temperature before entering premises, scanning the MySejahtera code, and monitoring SOP distancing and the number of customers at any one time;
ii) Providing halls as Vaccination Centres (PPV) and COVID-19 Assessment Centres (CAC);
iii) Assisting the District Health Offices (PKD) in investigating positive cases and close contacts;
iv) Assisting PKD in active case detection (ACD) in PKPD localities from time to time; v) Conducting publicity and briefings on the SOPs issued by the National Security Council and the Ministry of Health Malaysia;
vi) Carrying out disinfection activities on premises under the Council's care from time to time; and
vii) Serving at the Vaccination Centres and at the COVID-19 Assessment Centres.
For the information of all Honourable Members, integrated operations in the manufacturing sector have been led by the respective District Police Headquarters. PBT departments always provide cooperation in every operation carried out. As of August 2021, a total of 388 premises have been inspected and 132 factories were ordered to close in the Integrated Operations. Thank you.
Honourable Members, the time has reached 11.30 am, and I hereby adjourn the question session for the next business.
Continuation of Motion No. 2 of 2021. Motion on Development Allocation 2022Motion
The next order of business, continuation of Motion No. 2 of 2021. Motion on the Development Allocation 2022.
I now invite the Government, if it wishes to clarify any matters raised by Honourable Members during the debate session.
Mr Deputy Speaker, may I, allow me to add a little to the debate.
The debate ended yesterday. It was stated by Mr Speaker yesterday evening. So I invite the Government.
Thank you, Mr Deputy Speaker. I would like to thank the Honourable Member for Kota Damansara and also the Honourable Member for Sijangkang, who raised two matters. First, the Honourable Member for Kota Damansara raised the issue concerning the empowerment of workers, the Stanco Workers' Empowerment. For the information of the Honourable Member for Kota Damansara, UPS, yes, the Selangor Workers' Empowerment Unit (UPS), is in the process of studying and taking systematic steps to protect the dignity and rights of workers. Therefore, MTUC is listed as one of the main agencies for establishing understanding and cooperation. A courtesy visit to MTUC is being planned and will be held at the earliest opportunity with the intention of paving the way for discussions on the direction and collaboration of both parties. Since it began operations two months ago, with four UPS staff, it is now actively implementing initiatives to relocate workers who have lost their jobs and working shoulder to shoulder with various government agencies such as PERKESO, the Labour Department (Jabatan Tenaga Kerja), the Department of Skills Development (Jabatan Pembangunan Kemahiran), HRD Corp, and so on. UPS has also held discussion sessions with dozens of private and multinational companies such as Panasonic, Epson, West Port, Adabi, Sky Net and so on. Now the results of Stanco's efforts are beginning to bear fruit, where they have succeeded in identifying more than 2,000 job opportunities, especially for young people as well as older groups. They have also provided an online platform to help the people of Selangor affected by the COVID-19 pandemic. In addition to channelling job opportunities, UPS is confident that the discussions to be held with agencies such as MTUC will certainly strengthen the position of workers in Selangor.
Regarding the Honourable Member for Sijangkang, who is concerned about estate workers. Thank you, Honourable Member, although a leader from the party... the Honourable Member from the northern state, always belittles the contribution of the Indian community, nevertheless as a very caring, patient, and long-serving person, I in the MMKN, I admire that he has the intention to help, because his area, the Honourable Member's own, namely Pulau Carey. The three divisions, the Ministry of Human Resources, or the Federal Government, are planning to move all of them to Sungai Buaya. A housing estate in the area there. Most of them, almost all of them, oppose it and protest. And I have been with them, I have met the Ministry of Human Resources, the Minister, and conveyed their wishes. However, the federal government's housing project is still maintained in Sungai Buaya. These are among the matters, in the meantime, I also take note of the Honourable Member's concern about how we need to help, and we actually use the Estate Land Board. Each time development needs to be carried out, we have to go through, not force, we conduct negotiations through all approvals under the LLB. To ensure their rights are guaranteed. Thank you.
Sedikit penjelasan.
Sijangkang.
As I recall, some time ago, a few years back, there was a lot in Pulau Carey, which I remember as land granted to Sime Darby that was allocated, and there were also discussions with the Federal Government to develop it into a residential area. I think perhaps, if the Honourable EXCO already has a relationship with the Federal Government for that purpose, I think the best settlement for the estate workers in Pulau Carey is the site that has been prepared. I do not know how far the status of that site is, rather than being moved to Sungai Buaya, I think as a local people's representative, I do not agree. Thank you.
Honourable Member for Sijangkang, I myself actually find it unreasonable. We all know that before 2018, there was a groundbreaking by our former Prime Minister, Dato' Seri Najib Razak, in the Carey Island area, for housing estate workers there. The programme, however,
the groundbreaking programme was indeed carried out. Groundbreaking means all planning for estate worker housing was acknowledged and made, but without discussion with the State Government. However, recently, I saw, this year, apparently there is a new programme, by the current Government. Which is also a component of the Honourable Member as well. The senior ministers on the side of the right and also there, all of them, because in the end they are moving a housing area that is far from Carey Island. It will cause not only the estate workers, but 19 temples there, the area there is among the oldest settlements for the Indian community in Selangor, will also be moved. 13 Tamil schools need to be moved, and so on. It will create a situation in which massive protests will occur. I believe I have personally brought this matter to the current Minister of Human Resources. I have met personally and I have given all the explanations and also the expectations of the area's residents. I hope the Honourable Member will also bring up the same matter, all Honourable Members here, who have close ties with the Federal Government, will inform them. And we are only defending justice here. It is not merely politics. Thank you, Honourable Member.
Please, Batu Tiga.
Thank you, Mr Deputy Speaker. There are three Honourable Members who asked questions regarding PK 15. I would like to answer the Honourable Member for Seri Setia, who raised the issue of Lembah Subang 1. For the Honourable Member's information, by coincidence, yesterday there was indeed a meeting between the Minister and the EXCO of the Ministry of Housing and Local Government (KPKT), and I also raised the issue relating to Lembah Subang. First, if we look back at some history, in 2019 there was an intention from KPKT to hand over Lembah Subang 1 to the State Government. However, on 7 April 2021, KPKT had already replied that it would be retained under KPKT. But in my discussion yesterday, I found that the Minister was a little confused. He thought Lembah Subang was only one, but in fact Lembah Subang has two. Two components, namely Lembah Subang 1 and Lembah Subang 2. Lembah Subang 1 is the one that is rented out. Lembah Subang 2 is the buildings or units that are sold on a rent-to-own basis. So, the Minister answered me several times, he said that he had visited almost three times since he was appointed as the new Minister. But it turns out he only went to Lembah Subang 2. So, Alhamdulillah, with the question raised by the Honourable Member for Seri Setia, I have raised the dilapidation or the many problems that exist there, and he promised to look into this matter. And I suggest that the Honourable Member's side submit a formal application through me and I will forward it to them.
But for everyone's information, I found that although this is not under the Selangor Government, the Selangor Government has entered and contributed several times to ensure the comfort of the residents there. I think last year too we resolved, earlier this year, sorry, we resolved the rubbish piled up almost one storey high, and so on. And we have resolved this well. Although we did not take into account that it is actually under the administration of the federal government. So that is some information that I can give to Seri Setia. Please.
Seri Setia.
Thank you, Honourable Batu Tiga. I highly respect what the Honourable Member said to the Minister of KPKT himself. However, they have appointed a maintenance company there. The company maintaining it is also not sufficient. The budget given to the company is not sufficient. That, I think, is why there are many problems that cannot be resolved in Lembah Subang. We, that is, I have also held discussions with the company. He himself is waiting for his term of service there to end. However, I would like to ask Batu Tiga whether the Minister mentioned the problem of the small allocation or what his plans are for next year.
Honourable Seri Setia, the Minister did not share any issues or his plans, because he himself did not realise that Lembah Subang 1 actually exists. He only went to Lembah Subang 2. But I am confident that the maintenance company can, if I were, the proper way of dealing with it should be, it can discuss directly with KPKT, considering KPKT is the committee that appointed them. Or the agency that directly appointed this maintenance. So, the Housing Department also needs to look into this serious matter, but what is important, I would like to record in this august House, we have already proposed that action be taken because it has affected 3,004 housing units there and almost 5,000 residents have been affected.
Mr Deputy Speaker, I would like to move on to the issue raised by Kota Anggerik. Kota Anggerik asked about low-cost housing or the damage that occurred to low-cost housing in Seksyen 7, Shah Alam. And the necessary proposals. So indeed, the visit by the Most Honourable Dato' Menteri Besar to the damage or to the matter has been taken note of. So, for this matter, the State Treasury of Selangor has held a coordination meeting with PKNS and the Shah Alam City Council (MBSA). So, MBSA has prepared a cost estimate for repair works for Block 48 only. And also a cost estimate for repairs for 13 other blocks that were also damaged. What will be seen as the total amount is RM 560,600.00 that needs to be provided for the apartments around Seksyen 7 here. So, on 29 September 2021, the State Government approved a grant to MBSA for the repair of the most critical Block, namely Block 48, with an estimated repair cost of RM 96,500.00. So, an open quotation process has already been carried out by MBSA. And I expect the repairs will be carried out as soon as possible. As for the remaining 13 other blocks, the State Government is currently examining in detail the cost of critical damage, and an application will be brought for approval using 2 allocations, either the PKNS Maintenance Fund or the CERIA Scheme in 2022. That is the information for Kota Damansara.
Next, the issue raised by Bukit Lanjan, namely regarding the 130 strata titles of Desa Temuan that have not yet been handed over. For a little information to all Honourable Members, the resettlement project for the Temuan Orang Asli at Desa Temuan began around the 90s, when rapid development of surrounding areas, such as Sungai Buluh, Bandar Utama and Taman Tun Dr Ismail, caused the government to think about a mechanism to ensure that the Orang Asli community of Bukit Lanjan would not be trapped by the tide of development. At that time, the most suitable way was to use the privatisation method. And in March 1995, Saujana Triangle Sdn. Bhd., a subsidiary of MK Land Group, was appointed to develop an area of 320 hectares which at that time was gazetted as an Orang Asli reserve. This matter is long ago, it is already past. They have also been given all the matters that had been determined. But the issue raised is the Pangsapuri Dewa Temuan project. Whose ownership title is under Mukim Sungai Buluh, Daerah Petaling, which contains 130 strata parcels. So, for Bukit Lanjan's information, they received an application for the Unit Share Formula Certificate, or C-FUS, for this scheme on 4 March 2020. And the application for the Re-certificate of C-FUS Unit was approved by the Director of Land and Mines on 22 April 2020. They have already lived there. Or taken their rights to be there. Unfortunately, so far we have found from the check by PTG, the Selangor Land and Mines Office, that the developer has not yet, has not yet submitted the strata application for the apartment units concerned.
So, I have been informed that a specific discussion for this issue will be held together with PTG, the Housing Board and the Petaling Jaya City Council and the developer to obtain a solution to this, and insyaAllah I think we will see it directly so that in the end the Orang Asli will obtain the title to their parcels. Thank you.
Thank you, Honourable EXCO. Apart from the strata for the 130-unit Desa Temuan Apartments, I would also like to state in this august House, and perhaps the Honourable EXCO could also help include this issue, namely that the title deeds for 6 lots of shophouses have also not been handed over. This is in Desa Temuan, and also the title deeds for 3 lots of shops in Desa Riang, Damansara Damai have also not been handed over. So, it is not only the strata but also the titles that have been promised for more than 20 years that have not been handed over. Also the public lands that should have been given to the MPKK Orang Asli, Desa Temuan. So, I ask for the Honourable Member's goodwill to resolve this, and also together with the developer, if they are still, the developer in that area, so that rights and justice can be given to the residents of Desa Temuan.
I have taken note of what was raised by Bukit Lanjan, and for Bukit Lanjan's information, the issue arising directly under the Housing Board is the strata issue, and insyaAllah I will work together with the PTG because it is under the purview of the Land Office, so we will ensure, insyaAllah, that what was raised by Bukit Lanjan will be brought along together. That is all from me, Speaker. Thank you.
Thank you, Honourable Batu Tiga. Next, Sungai Kandis.
Thank you, Honourable Mr Speaker, and all Members of the House who have raised several matters relating to my portfolio. Thank you to Dusun Tua, Sijangkang, Kota Damansara, Seri Setia, Rawang and Meru, most of whom raised matters about mosques. So, for the information of the House, the Islamic Affairs portfolio consists of the Selangor Islamic Religious Department (JAIS) and also the Syariah Judiciary Department, the Syariah Prosecution Department and the Mufti Department, but most of the matters raised were largely related to mosques. For the information of the House, for mosque construction projects that have been included in the Twelfth Malaysia Plan (RMK-12) to be implemented in 2022, there are 3. The first is Masjid Kota Damansara 2, Daerah Petaling. Masjid Al-Ikhsan, Kampung Tok Muda, Daerah Klang, and Masjid Kampung Sungai Serai 13, Daerah Hulu Langat, which have indeed been raised by the relevant Member. Because of the pandemic, many projects could not be completed during the Eleventh Malaysia Plan (RMK-11). That is Masjid Klang Gate, Gombak. It has been completed, but has not yet been handed over and is expected to be handed over in January 2022. The second, Masjid Kampung Melayu Rasah, 90% completed and expected to be handed over in January 2022. The third, Masjid Putera Height, Petaling, 98%. The fourth, Masjid Setia Alam, Petaling, 96%. The fifth, Masjid Kota Kemuning, Klang, 96. The sixth, Masjid Seksyen 24, Petaling, 77%. The seventh, Masjid Seksyen 13, Petaling, 73%. The eighth, Masjid Taman Bukit Belimbing, Hulu Langat, 68%. The ninth, Masjid Bandar Teknologi Kajang, Hulu Langat, 45%. The tenth, Masjid Jamek Cina Muslim, Klang, 18%, and Masjid Subang Bestari has not yet started. InsyaAllah next year.
The question raised by Dusun Tua regarding the construction of Masjid Bandar Mahkota Cheras. For information, this mosque has successfully been listed in the RMK-12 project list in the Hulu Langat district. The project code for this mosque is 03504, and the approved project ceiling cost is RM 12,000,000.00. The construction of this mosque will begin as early as 2024 when the State Government channels an initial allocation of RM4,000,000. The construction of this mosque will be carried out by the Selangor State JKR in
2024 after the allocation is channelled by the State Government to JAIS. The question from Sijangkang, the construction of MaDR. .asah Mujahidin. Detailed explanation on the construction of MaDR. .asah Mujahidin, Daerah Kuala Langat. For information, the construction project of MaDR. .asah Mujahidin is a continuation project of RMK-11. This project should have started construction in 2021. However, due to constraints on the part of the Selangor State JKR in completing 17 other continuation projects under RMK-11 in 2021, this project was agreed by JAIS and the Selangor JKR to be implemented in 2022.
The project ceiling cost approved by the State Government under RMK-12 is RM 5.7 million under project code 01601. The State Government has allocated RM 2.2 million this year for its construction to be implemented. However, as explained earlier, because of constraints at the Selangor JKR level in implementing the project this year, the construction of this project will only be implemented starting 2022 with an allocation channelled by the Selangor State Government of RM 2,000,000.00. Next, Sijangkang raised the construction of Masjid Al-Amin, Kebun Baru. JAIS has been informed about the need for planning to enlarge Masjid Al-Amin, Kampung Batu 9, Kebun Baru, Kuala Langat. However, taking into account the increasingly dense population growth, the actual need is to build a new mosque. A new site of at least 3 acres must first be identified so that the proposal for the takeover process can be implemented. The question from Kota Damansara regarding the construction of a mosque.
Tuan Speaker.
Masjid Subang Bestari.
Silakan Sijangkang.
Sila.
Thank you, EXCO. As I recall, it was previously discussed at the district level, a site of roughly between 3 to 5 acres at the FELCRA site that is still, still empty, and I do not know to what extent the proposal for that site has continued. I ask that if possible it be looked at again, because as is well known, the site for Masjid Al-Amin, Batu 9, Kebun Baru, I remember its area is roughly 1 acre or less than that, with a very high need. I think the site that was once considered can be looked at again. Thank you.
Okay. Thank you, Sijangkang, for the information provided, and insyaAllah follow-up action will be taken to identify the status of that land. I will continue to the question from Kota Damansara regarding the construction of Masjid Subang Bestari. That mosque will be built next year. So far, the Selangor JKR is holding discussions and preliminary meetings towards the construction of the mosque.
Explanation on Masjid Subang Bestari. I have already gone to visit the site of Masjid Subang Bestari. The plan from the former previous Menteri Besar was publicised, saying the mosque would be built in Subang Bestari, I hope that was not his political gimmick. If this year we still do not have it, I fear we will be jeered at by the people, especially the residents of Subang Bestari. I really hope that from now on there will at least be a signboard. Because there is not even any signboard. No signboard, yet the allocation has already been released. So people have asked whether this mosque is really going to be built. So I hope the Honourable EXCO can at least put up a sign board, to relieve the residents of Subang Bestari a little.
The Honourable Member, mic.
Yes, Honourable Kota Damansara, as I mentioned earlier, Masjid Subang Bestari has been included, listed in the project to be implemented in 2022, and the committee can discuss further with JKR for the further matters. Then Kota Damansara also raised the facilities at Surau Nurul Iman and Masjid At-Taqwa, Damansara. That is right. JAIS has requested that the surau and mosque submit their intention to be given merit in the implementation of the 3-year rehabilitation and maintenance plan starting from 2021 to 2023. Because the allocation is limited, priority will be given to matters involving comfort in the prayer space, the safety of worshippers and structure. Then the matter raised by Seri Setia.
Mr Speaker, explanation regarding Masjid At-Taqwa. Masjid At-Taqwa is right by the roadside. It is indeed a favourite, lorries also stop for Friday prayers, buses, taxis and so on. The addition to the back portion is to provide facilities for people performing Friday prayers especially. We have asked for a long time, directly to the Most Honourable Menteri Besar last May, if I am not mistaken. I hope the Most Honourable Menteri Besar and JAIS can consider an allocation for us to put a roof at the back portion of Masjid At-Taqwa itself. Really hope so.
Thank you, Kota Damansara. InsyaAllah we will check the application that has been submitted, and that involves the structure. So insyaAllah it will be given priority. Then Seri Setia raised the construction of a religious school. This falls under the EXCO for Education, but never mind, I will answer directly. In JAIS's review and information, there are already KAFA Schools in that area and they are assisted by JAIS. In terms of teaching staff, building repairs and other necessary needs that are being considered. In JAIS's review too, the KAFA Schools in that area can still accommodate most of the residents' needs. The JAIS land in Lembah Subang is quite far from the residential areas, especially the PPR areas, and parents prefer to send their children to a school near their homes without having to incur additional costs for transportation and so on. However, JAIS will study and consider the need for school development in those areas to be proposed for construction in the future.
Question. Mr Speaker, I would like to ask the Honourable EXCO, Sungai Kandis, who stated just now, that JAIS apparently has carried out repairs. If possible, I would like to know when the repairs were done and what damage was repaired.
Yes, thank you, Seri Setia. Regarding the question on repair works that have been carried out, a written reply will be given to Seri Setia for further information. Then Rawang raised the construction of Masjid Taman Pelangi. That is right. Since the proposals for the construction of that mosque were dropped from RMK 12, JAIS will bring the proposal for the construction of that mosque again under the upcoming RMK. InsyaAllah. Meru raised the construction of a mosque in the Kapar Indah area. That is right, and its SRA. JAIS will propose the construction of the Kapar Indah Mosque and SRA under the upcoming RMK for consideration and approval by the State Government. This is insyaAllah. Thank you.
Dipersilakan.
Mr Speaker wants an explanation.
Ada lagi.
No, want an explanation. Because there is a question.
Kota Damanara still not satisfied.
About this, this temple question, who should answer, yes. Sorry, which EXCO for temples, the temple question.
It's over, it's over, it's difficult, the Honourable Member missed the car, the bus. Today, where is Kuang? Kuang has now missed it, Kota Damansara. That's alright, please sit. Please sit, yes. Please, the Honourable EXCO for Pandan Indah.
Thank you, Honourable Speaker. I would like to take this opportunity to thank all the Honourable Members who have been involved in asking questions and discussing the development allocations in the budget, and I will try to answer as many as possible, because there are many questions relating to issues concerning Infrastructure and also Agriculture. For the Honourable Seri Setia, who asked about the flood issue at Taman TTDI Jaya and also Taman Mesra, which coincidentally is also where I was a councillor for five or six years. And as the Honourable Member is aware, this place is a low-lying area, which is indeed difficult for us to resolve the flood issue completely because the area is very low, lower than the river. What we can do there is cooperation between the Shah Alam City Council (MBSA), which manages the pump system or pump houses there, together with the large drains managed by the Drainage and Irrigation Department (JPS). So for action, although we have implemented several measures including JPS and also MBSA, the flooding still occurs. My proposal at the latest meeting was that we have approved an increase in the capacity of the pumps, the pumps on the MBSA side and also on the JPS side. That is a measure we have recently approved as an urgent measure. And secondly, we have enlarged the retention pond near JPS. Those are only the two methods we can take to resolve the flood issue in the Taman Mesra area.
May I know when that meeting was?
What I just mentioned is the urgent measure we approved recently under this new State Government. We, we held a meeting with MBSA to discuss not only Taman Mesra but all the flood issues in the Shah Alam area, including in Seksyen 13 and also other places.
It is not like this, Honourable EXCO. Sometimes I ask for cooperation, if we can discuss and inform the State Assemblyman so that I too can hear the problems. Perhaps the Honourable EXCO can arrange a meeting, or MBSA itself can arrange a discussion meeting, because I want to know. Yes, Honourable EXCO has stated that this problem cannot be solved because the area is low, but I want to know from time to time in discussions at meetings that we can arrange, we can meet, and I too can give my views on the area.
Yes, thank you, Honourable Member. Of course we will involve the parties responsible, especially the local authorities (PBT). Usually in the coordination that I do, when I go down, I involve the PBT, like in Meru. I also always invite the Honourable Member to join. Perhaps this time, when we go down to the relevant area, we will invite the Honourable Member to attend. But what is important is that the coordination between agencies and departments was previously rather loose. Sometimes the PBT carried out their own work, sometimes reports did not reach the flood task force. This flood task force is managed by JPS, but now this coordination has been improved.
It's the ADUN's responsibility.
Yes, yes, I understand. But at this technical level we need to coordinate first. And the Public Works Department (JKR) is also sometimes involved, from drains, roads and so on, and sometimes this also causes flooding, and the coordination is being done now. So for future purposes, God willing, I will invite the Honourable Member to join in or take part in the related aspects.
So I hope, I think after this State Assembly sitting, we can arrange a meeting for the Honourable Member, yes.
I will arrange it, thank you. For Dusun Tua, there was mention of flooding at Kampung Batu 10, and there is indeed an allocation in P13 for it, although it is rather low at RM 100 thousand. This is the initial work, consultancy work. The consultancy, the overall consultation of this project is RM 5 ribu for the flood mitigation plan or project at Kampung Batu 10. And for 2022, it is the initial consultancy costs and also the procurement work after that. For Kampung 16, the system to upgrade the drainage system at Kampung Dusun Tua, the initial work will begin in 2022, valued at RM 500 thousand. The overall upgrading project is RM 19 million under the Twelfth Malaysia Plan (RMK-12). So this initial work of RM 500 thousand is for the early stage, for the commencement of upgrading this drainage system, yes. Next, from the Honourable Meru, which I have touched on several times and which I mention once again, regarding the need to build a water gate at Sungai Kapar Besar. Indeed we have built a water gate at Sungai Kapar Kecil; it has a small and a big one, so for Kapar Kecil we have built its water gate, and the high-power pump system has also been completed. As I mentioned just now, the current issue is the internal drainage at Taman Daya and also at Jalan Teratai, which does not reach the required time; it has to reach the pump before it can be pumped, but when it does not reach, the high-capacity pump cannot solve the problem. That is why my coordination now is with MPK, because MPK has a proposal, and the consultants' work will be completed within these two months to upgrade the internal drainage system, and this will connect directly to Sungai Kapar Kecil and Sungai Kapar Besar. I will also look at the possibility of it helping to channel water, especially water coming down from Fairy Park and its area. We have already built a retention pond there, currently in the process of land acquisition. That is included in the plan for us to upgrade and resolve the flood issue in the area. For Sijangkang, I agree with what the Honourable Sijangkang mentioned regarding Jalan Manggis. I went there myself to Jalan Manggis, the large drain, the JPS drain, and of course the name Jalan Manggis is not suitable, it is too foul. I got out of the car and the smell was there. So when I went out, I was indeed with the department concerned at that time, the PBT, and there was JPS too, but LUAS was not there. I asked LUAS to examine how we can take firm action. I feel there are industries there involved with palm oil, I think, I suspect, do a proper investigation, yes. To resolve this, I asked JPS to include in the planning also the extension of the upgrading of the Jalan Manggis drain, because there are still another 100 to 200 metres to reach the river. I have personally gone down to this Jalan Manggis. For the Honourable Kota Anggerik, there is nothing. It's alright, I will mention it, but I will also mention this matter.
Mencelah.
Sijangkang wants to interject a little.
Want to interject? Okay, please.
The EXCO's answer just now on drainage issues, roads as well, or ..
My method is that I deal with the flood issue first, then roads. For Kota Anggerik I mention it in general terms. I have already mentioned in my previous speech that an allocation of 5 million ringgit has been approved for the retention pond for Jalan Mutiara. We will begin tendering in January 2022 for the implementation of that retention pond. For the Honourable Sentosa, the issue raised regarding ponds, drains, ditches and also unowned roads, the small ones, the ones with low capacity. As I mentioned, our drains are, for the most part, only built based on the ARI 50 design, previously some were ARI 100. But because when we designed them, based on certain criteria, which at that time were found to be insufficient to accommodate rainfall flow due to rapid development, that is why we have to either enlarge these drains or build retention ponds to hold the water before it enters. So both these efforts are indeed being carried out, yes, we are implementing both of these to ensure that ...
Tuan Speaker.
Let me finish first, let me finish the words first. So that this can be done holistically. So the use of retention ponds, drains and also pumps must run simultaneously to ensure that the solution can be done comprehensively. So regarding the issue I mentioned just now, the coordination problem does indeed occur, and that is why I said just now that the flood must be seen as involving all agencies, especially these four, which I mentioned: JPS, PBT, JKR for drains, roads, and also the District Office. So that is why now, when I discuss the flood issue, I will look at it in terms of the flood system. Not looking at whose JPS or whose PBT it is, but looking at it as a system, because the water flow will involve these four. So that is what we are doing, and the implementation of the PISMA Master Plan that I mentioned just now is very important. It is through PISMA that we want to know how the water flow goes, where it goes, the required drain size and so on. Coordinate with these four agencies so that they use the same master plan, because if they do not use the same master plan, sometimes the invert level of the drains is not the same size, not the same height. So when water flows down, it will rise up. So water will not flow upward, which causes it to stagnate and so on. This is what happens, and what we have coordinated. So for Sentosa, JPS has handed over the drain inventory under JPS's supervision. I said that JPS has its own, while the PBT's has not yet. So I will coordinate this matter to upgrade some of the large drains and systems at Sungai Aur and Sungai Jati through projects under the Eleventh Malaysia Plan (RMK-11). So what is being implemented is: 1. RTB Sungai Aur Phase 5. 2. Taman Sentosa drainage system. 3. Kolam Sentosa Project 4. Kampung Jawa Drainage Project 5. RTB Pandamaran. These are related to the system, yes. Meanwhile, under the Twelfth Malaysia Plan, efforts to upgrade the main drainage system will be implemented through the upgrading of the Sungai Aur project. This is what we are doing in RMK-12. Is there anyone else?
I have a question.
Sentosa first, Sentosa.
Thank you, Mr Speaker. My question was indeed answered by the Honourable EXCO, but regarding flood mitigation, the flood mitigation project where the Government has built the Bandar Puteri retention pond, but Phase 2 and Phase 3 have not yet started, namely the drainage from the retention pond to Sungai Aur, which needs to be done urgently, otherwise there is no use in us spending millions on the retention pond. Thank you, Honourable Speaker. I also take this opportunity to thank the Honourable EXCO for the budget yesterday.
Thank you, Honourable Sentosa. So we will consider, we will re-examine what was said just now, we take note, yes. Next, the Honourable Rawang mentioned the issue of the retention pond that should be made, and he mentioned here that the Honourable Member had said that flooding has decreased. Indeed we have made many solutions in the area concerned. Only he proposed that, if possible, the function of the flood retention pond be looked at as a Recreational Park. There is no problem, we will consider it, and not only for a Recreational Park: a large part of this park will also be made a storage place for our water supply. For our raw water, so it has many functions; for example, at Sungai Gong, it is also a treatment centre, for treatment before it enters the Sungai Selangor. So it has many multi-purpose functions, we can consider them, and if there are parties who are interested in developing these ponds into Recreational Parks, we will consider it, including the Local Authority. Next, regarding the flood issue raised by the Honourable Kota Damansara at Kampung Melayu Subang, this is also related to the Flood Mitigation Plan at Sungai Pelampas and so on, which we have implemented in phases, and for Kampung Melayu Subang, we are closely linked with the upgrading of the drainage system under JKR. We have also looked at this, and I have asked JKR to examine the action so that we can make a solution to the flood-related issues at Kampung Melayu Subang. For Pelabuhan Klang..
Mr Chairman, Mr Deputy Speaker. Kota Damansara. Has it finished or is there more? If not, I have something I want to ask.
Now let's talk about flooding first, then the road later.
Okay, if it's flooding, 4D drainage.
The Jalan 4D is actually under the JKR road and drain. What I mentioned just now will be examined, the implementation of its solution will be looked at. For Pelabuhan Klang, I and many have talked about Pelabuhan Klang, so is it necessary for me to repeat these road issues? We have indeed talked about them a lot. We will certainly give consideration, and I will say this is a lengthy comment showing that Pelabuhan Klang has received a lot of allocation for roads in fact. So..
Honourable Member, that allocation is an old allocation, and it has become a backlog. As is clear to the Honourable Pandan Indah. It still cannot complete all the road works, there are many problems. I can show a video this morning, there is still this, the road problem.
However, Honourable Member, this flood issue, in my view, when the Honourable Pandan Indah explained this conclusively, I see that this is a failure of the Department of Town and Country Planning (JPBD) in planning an area. This is very, very clear: areas by the seaside are also flooded. Moreover, planning in seaside areas is also wrongly planned, wrongly planned, there it is wrongly planned. In the end the State Government has to spend millions, billions of ringgit to repair and solve problems originating from the weakness of the early planning by the Department of Town and Country Planning. In managing technical issues like floods.
In fact, each department and agency has its own role, which is why I mentioned it just now. Sometimes one and the same matter is the responsibility of many departments and agencies. So coordination sometimes has a little issue, and that is what I try to manage. To ensure that cooperation, or in terms of coordination, can be done well. This is what I can see as a positive aspect, how we can take an approach. And I have seen that with floods, if before we looked at it from the agency side, one agency has its flood problem and the PBT has its own. But when we examine it again, the flood water goes to all the same places. So we need to coordinate according to the water system. If it comes to a place, sometimes, for example, I gave the example of Meru. Meru knows this, and is angry at its neighbour, its neighbour from MBSA. The water from MBSA flows down to MPK, so I have to look at both. How the coordination can be done from both sides. Because this water, usually, if the retention pond is at its upstream, it must hold it upstream. Once it has flowed down to the downstream, what more can be held? So if the upstream is placed in the MBSA area, the downstream that receives the impact is on the MPK side. So we must have that coordination. That is why this kind of work needs study according to the system. We cannot treat managing the flood issue the same as walking. It is different. So this is what I try to implement. And the Selangor Malaysia Plan party also plays an important role in ensuring this can be implemented well. So I just want to say to Klang, Pelabuhan Klang, we will continue to examine, and I am of the view that for Klang, this is because of the excessive road use. This has now entered the road matter, Honourable Mr Speaker. This has now entered the road matter, the flooding is finished. So if in managing this road, in places where heavy vehicles..
Untuk penjelasan.
Yang Berhormat.
Let me finish this word first.
How about Banting, Banting?
Let him finish first, because he forgot just now.
He forgot just now.
He forgot for a moment, he'll come back to it shortly.
He has also gone off track.
That's because Banting always speaks briefly but talks at length.
That means don't give him the chance, okay. Don't give him the chance, lah.
Let me finish briefly first, please. On the Port Klang matter that I mentioned earlier, the road issue and traffic management. First, I think we need to carry out segregation. I have already proposed to the federal government, the Central Government, that it make a separation from the outset before entering Port Klang, in terms of heavy vehicles and light vehicles. They cannot be treated the same, because different road technology and different safety aspects apply. This is what we will propose, even though there is a proposal to build an expressway linking the three ports: the North Port, the South Port and also West Port. But there is also a need to look at a comprehensive way of resolving the road management issue there. And I have taken note of the issues relating to the budget as well as road maintenance in the Port Klang area.
Let him in or not, Banting?
Yes. Banting, please go ahead.
Otherwise he'll go off track again.
Perhaps I want to put my question across, before I miss the point or go off track. It concerns the issue of erosion in the Kuala Langat area as well as Banting. Actually, Mr Speaker, the problems in Klang are not really serious, lah. The government probably does not have sufficient allocation in the near future to overcome all the problems they face. But for the District of Kuala Langat and Banting, including Sijangkang and Morib and so on. The District of Kuala Langat is up and coming. So I always say, prepare the umbrella before the rain. So I request allocation and also attention from the Honourable Member for sub-head 034031 concerning this erosion. We need to increase it along the riverbank areas of the Langat River basin, especially in the downstream area, namely in Kuala Langat. Because this problem usually occurs in the downstream part. Look at the Klang River. Klang, if it's in Kuala Langat, on the Langat River, must be Kuala Langat. If it's the Selangor River, it must be Kuala Selangor. So I ask, what is the plan?
Can you shorten it? I still have a lot more.
Ya, ya.
I take note, because it is indeed the turn of the Honourable Member for Banting to speak. I have to answer this. He touched on building a bridge for road B124 from Jalan Jenjarum to road B340 Sg. Buaya and the District of Kuala Langat. Building an upgraded alternative road to Klang, which is often mentioned, from the junction of route FT05 to Jenjarum and Jalan Kebun, and upgrading the main road of Sri Serding, which I recently visited, to the Garmuda Cove interchange. For the Honourable Member's information, our focus next year is on roads that connect. Developments that are connected, and also projects that have been completed, consultancy works. Consultancy works. So for these three, there is indeed no more planning for implementation in the coming year. That is what I need to say here, and we will most likely only begin preliminary works for these three projects in 2023. So I am informing you of this because of the constraint I mentioned, the budget constraint just now; we have to give priority first to projects that are connected. And these projects, and we will examine them, whether there are additions and whether there are any in early 2023. Please.
Thank you, EXCO. I return to the alternative route from Jenjarum to Jalan Kebun. Because I can say it is a very congested route today as an alternative road, and its road status, which sits on peat soil, I believe with the use of very heavy vehicles there. This may cause poor road conditions, and I can say quite frequently patching and embankment works are done to keep it in good condition. If, say, next year we have only RM10, no allocation at all for repair and upgrading. I believe this road needs allocation every year to provide a little comfort to the users of this alternative road.
Thank you, Honourable Member for Sijangkang. I also need to remind the Honourable Members that the allocation for maintenance of state and local authority roads is actually not in this budget. This is under MARRIS. So there is no issue of patching or maintenance. We handle that under the existing MARRIS allocation. Only, the Honourable Member for Sijangkang may be referring to upgrading. Upgrading is what I mentioned just now in terms of allocation, and we do not yet have it for this project. But I will try to obtain it if there is a need, because under MARRIS, what is permitted so far is RM15 million. I recently applied for approval of 15% or RM15 million, whichever is lower, but we want to request 15%. If it is 15%, that is excellent. But if we do something at 15% or RM15 million, whichever is lower, it will eventually be RM15 million, which cannot upgrade much. But in any case I will try. I understand the other matter too; I have also used it when going to Kuala Langat. So the need is indeed there. But for maintenance, we will use the existing MARRIS allocation.
As for Bandar Utama, which mentioned that the allocation for non-physical projects is rather low. That is RM500,000 which needs to be increased. So the approval of RM500,000 for non-physical projects in each district is only for small-scale projects. Honourable Member, such as installing guard rails, street light installation works, repair works, signboards and works to upgrade junctions. For small works only do we allocate RM500,000. But for works that are large-scale infrastructure projects. This allocation is being included in those projects. Not under this RM500,000, and under the sub-head PK for building bridges and footbridges, building roads and upgrading roads, a total of RM117.65 million under that sub-head. Covering these works that I mentioned, which involve projects. For..
Honourable Member for Rawang also asked about project PK404205 to upgrade road B27, the missing link. Actually, I have been aware of this road from the beginning, and I have asked JKR to expedite it because this road causes congestion because it is rather low, causing flooding. It often floods here, and this road, Rawang to Batang Berjuntai, and we have indeed carried out survey works for this purpose, the land and also the alignment design, and JKR is in the process of preparing the acquisition plan, which involves land acquisition. This is if we apply at the land office, in the process of completing the land acquisition plan. To expedite the planning of this project and also to expedite the procurement works for this project, we have included this project within the existing project there. That is the project to build a bridge over the North-South Expressway at Batang Berjuntai. It includes the additional works from this project, so we can accelerate the implementation of the project at the missing link and on this B27.
As for the Honourable Member for Kota Anggerik who asked, there is Kota Anggerik, no, there is none, no need for me to mention it, okay. From the Honourable Member for Meru, regarding the road, project code PK505301, which is the Integrated Development Proposal for the Workshop and also related to the JKR Klang in Pekan Meru. Please consider allowing the public to use the field at the JKR Klang quarters road, Meru. The development proposal in Pekan Meru has been approved for construction. In the Twelfth Malaysia Plan, it has been approved. For preliminary works, the project is currently being implemented. The location of the field requested for use by the public is within the proposed site itself, and JKR Klang permits the field to be used by the public temporarily as long as the project has not yet started. JKR has agreed to allow it. The Honourable Member may contact JKR there.
Next, regarding, the secretary has already left. There is a little I want to touch on, not much, okay Honourable Member. Just a little more on agriculture. In the aspect of agriculture...
Sebelum itu..
Sijangkang.
I raised the matter of upgrading and repairing rural roads, an allocation of RM1 million next year. I think that is a rather small allocation if one considers it, even though in the Twelfth Malaysia Plan, RM15 million was allocated, if you think about it, for roads of the nature of the Missing Link. Public access routes that are permitted to pass through, or access roads to public facilities such as schools, surau, mosques and so on, which I believe have a very large impact on this rural community. If one considers it, if each State Assembly constituency (DUN) received half a million, I think that would be sufficient. Not to resolve everything, not for upgrading, but for maintenance or even resurfacing, I think that would already be something good for the rural community.
Thank you, Honourable Member. I will ask the rural EXCO to explain this issue. On agriculture, for the issue raised by the Honourable Member for Banting, about Sg. Kelambu, the Honourable Member raises it very often. Praise be, we already have a solution, but it will be answered by the EXCO for the Environment, who handles forestry matters. On the issue of the TPKM Sungai Kelambu, in Kuala Langat.
Regarding the issue proposed or the proposal from the Honourable Member on the paddy area of Kg. Sawah here. Indeed, we, the focus now is more on the North-West. We are more on the North-West. The rice bowl of the State of Selangor, although there are other places where planting of paddy is proposed, for my part, personally I request that they be studied first. In terms of it being rather difficult to manage paddy cultivation, other crops are more viable. Nevertheless, we must still maintain paddy as our staple food crop, which we must also defend, and we focus on the North-West because it has many technical aspects considered before we make this paddy field.
Firstly, soil suitability: it must have clay soil to hold the water, and then the need for a good water system and also an integrated pest control system that must be coordinated. So I hope the Honourable Member may focus on other suitable crops. As for what was raised by Bandar Damansara, the Honourable Member for Bandar Damansara, there is main time, okay. Bandar Utama, okay. Bandar Utama raised by Bukit Lanjan, Sentosa and also Kota Damansara. Regarding community gardens. These community gardens are one of the aspects of urban agriculture development or urban agro, which is important. For this year I have also allocated a lot of allocation, RM250,000, which we have given to community gardens. For
encouraging the planting or production of vegetables and fruits.
So, I only ask the Honourable Member's side to ensure these Community Gardens are registered with the Local Authority, which is the most important, and we together with the Selangor State Department of Agriculture will coordinate related programmes to increase yields and at the same time for marketing the products of these community gardens. So, that is the most important to implement.
Tuan Speaker
Bandar Utama
Please, please.
Let me ask for the floor briefly. So, Bandar Utama has also raised this issue, but the main question is, if the Local Government only wants to follow the guideline or the SOP, which in fact is not practical to implement. What is the action of the State Government to help residents' associations or communities in the area, because now there are many community gardens which, as said, have been asked to be demolished and so on, but when Bandar Utama visited, for example the SS22(A) area, actually there is no problem there at all. So, will the State Government facilitate the activities or programmes of our gardens? Thank you.
Thank you, Honourable Member for Bandar Utama. I understand this is also the same matter that arises when we implement Friends of River, which manages the NGOs that manage our rivers. So sometimes it carries over, they build structures that the local authority does not permit or the JPS does not permit, this sometimes happens. But there is no problem, because we indeed have regular meetings between the Standing Committee on Agriculture and together with representatives of the local authorities involved in managing Community Gardens, and we review, and sometimes I have even asked the local authorities to identify suitable land. Do not wait for us to obtain land, even small plots, it's alright, including those under lease, so that we can manage them in an orderly and better way, but the condition is, there are conditions that remain. For example, it must be a Community Garden; the garden cannot be managed by one person alone. There are places where only one person runs the garden, and when the garden develops, residents fight with residents. Who is this, the garden... why are you alone, we want a community. So these matters... because it is called Community Garden, so there are things that we permit, for example
structures. If they do, usually if there is a garden they want to build a structure. So sometimes that structure is under his lease. That becomes a problem later with the... I will give an example, Honourable Member. I understand, but if issues arise, the Honourable Member may contact my office or me personally, we will look and examine, what the problem is and how we can overcome these matters, okay. In terms of assistance, in terms of the assistance we provide, the issue raised by Kota Damansara about water or electricity supply. So far we have not provided that assistance; we provide input equipment, various seeds, fertiliser and so on. Quite a lot, okay, we distribute to the Community Gardens. But we have not yet reached the stage of providing electricity or water supply to them. Not yet.
Deputy Speaker.
Kota Damansara.
A brief explanation. That is regarding utilities, sometimes we have problems receiving pipelines or water from TNB. We hope the Government can help us to facilitate that process, yes, that is actually it.
Thank you, Honourable Member. That is what I mentioned earlier: the Community Gardens are indeed managed under the Local Authority (PBT). We only provide support and assistance to the PBT so that they can implement the programme better, and I congratulate in particular the PBT that have long been involved in Community Gardens. In Shah Alam and Subang Jaya, for example, there are more than seventy Community Gardens registered under them that are running well, and they contribute a great deal. For the year before the pandemic, 46 tonnes of produce from these Community Gardens were marketed to the people of Selangor, a major contribution in terms of fruit and vegetables, and we will improve this further by adding the use of environmentally friendly materials as well as biopesticide to prevent disease or simply to make it more environmentally friendly. So those are among the matters that, and also under the Selangor State Agriculture Department there are incentives and grants. Under my portfolio, as Exco, we did provide RM5,000 last year to Community Gardens, but under the Agriculture Department there are also incentives of up to RM10,000 per community allocated to strengthen the operations of the Community Gardens.
So, I ask the Honourable Member and all Honourable Members to take active steps with their respective PBT so that these urban agricultural areas, which we see overgrown with weeds, can be expanded and multiplied. Indeed, I have accepted a suggestion that land under the federal government, PT(P), that is, the Federal Land Administrator (PT(P)), which was intended for a school but has not yet been developed and remains a jungle, could perhaps be looked at to see whether we can use it. Because such places usually become dumping grounds for solid waste, and we can use them for, for example, Subang Jaya may be able to look at USJ1 near the. There is a mosque there, is there not? A clinic site or school site that is jungle and used as an illegal rubbish dump.
So, we can discuss with the PT(P) later on how we can use it for modern agriculture in the meantime. And finally, I would like to touch on the idea of Honourable Sentosa, who raised the issue of the Cattle Translocation Project in Olak Lempit. The project has actually been completed, but there is a problem with the electricity supply. It has been completed for a long time, but the electrical matters are taking far too long, and so far nine of our cattle breeders have been offered places. These are the stray cattle. Only one refused, on grounds of finances and family, the family issue, but the others have accepted and they will be included in the letter from Tenaga Nasional, which has confirmed that all the work will be completed by early March 2022. So they will be able to start moving this March for the programme of the Olak Lempit Cattle Translocation Centre. I think that is all I can answer, and God willing, for the others I will look into them and we will.
Still more, still more.
Kota Damansara
There is a question from 2 that has not been answered. The first one is the dangerous junction at the mosque; I mentioned Jalan Alpha U6/2, the junction with Jalan Sungai Buloh. This road is at 90 degrees, many people go to the mosque, and we ask for the ingress and egress in that area to be widened. Earlier there was no answer to this, I ask that it be explained so that the road can be upgraded. And the second is Jalan Pekan Subang, which connects to Jalan Subang Permai U6/1 through a factory, said to be an illegal factory. Large lorries pass through the residential area. The process is very long, we talk about 100 days for approval. It seems this requires an RSA Report at levels 1, 2, 3, 4 and 5. I do not see that any one day could approve it. So I hope that, in this particular case, Desa Subang Permai, the residents have already complained, large lorries pass and the road is damaged, endangering the children in the area. This is an alternative road. I hope the State Government can seriously consider resolving this problem. Thank you.
I take note, because I need to investigate this road, whether it falls under the PBT or under the JKR, I will investigate. But we will take action on what the Honourable Member has just mentioned, thank you.
Thank you.
Thank you, Honourable Pandan Indah, our EXCO. I invite the Honourable EXCO for Paya Jaras.
Thank you, Honourable. Mr Speaker, I have only two responses to two debaters, namely the Honourable Meru and the Honourable Kota Damansara. First, to the Honourable Meru, who proposed the construction of a public hall, of course I do not, I do not know whether this is a sports hall or an assembly hall. If this hall is more of a sports complex, then yes, it is a hall. If this hall is more within the authority of the PBT or the PLB for the construction of a hall. However, Honourable Meru, I would like to quote what I said to the Honourable Templer regarding the proposal to build the whole, that is, if there is a need, there is land and there is allocation, God willing we will consider it, and whatever happens we will ask the Selangor State Sports Council (MSN) to look at a suitable site in Meru, and I also hope that the Honourable Meru can identify a suitable site. Is there a site?
There is a proposed site at SKI, but the developer has not yet handed it over.
In that case, we will look at the status of that site. Then, Honourable, second, regarding Kota Damansara, which also asked that the sports infrastructure in the Kota Damansara area be repaired. Regarding this infrastructure, I extend my heartfelt thanks to the State Economic Planning Unit (UPEN) (AP), Section AP and MSN, which have greatly helped to handle this infrastructure matter, and in 2021 we approved a total of RM2.24 million for infrastructure construction programmes in the State of Selangor. I will look at the specifics of the Honourable Member's application. However, Honourable Members all, for all the infrastructure we carry out, ideally it should reach my office as early as January or February, and we also prepare a form, namely a form, Honourable Member must tick whether they want repair, or upgrading, or something new. There are cases we received where they ticked upgrading but they wanted a new court, so the communication is very.. because in terms of costing everything is different. So for that form, we will ask whether the Honourable Member is requesting which category and who the ownership is. Because we want to inform the PBT or the District Office for the purpose of this upgrading. If the Honourable Kota Damansara has proposals for next year, please submit them urgently. There are many Honourable Members, many of whom submit applications around June or July, when we need to prepare the BQ, and we need to conduct site visits, which take a long time. So hopefully the Honourable Kota Damansara can do it quickly next year.
Thank you, Honourable. I invite the Honourable EXCO for Tanjung Sepat.
Thank you, Mr Speaker. To answer the issue raised by the Honourable Dusun Tua, regarding the application and research-based explanation that I have planned, the allocation is RM150,000. For the information of the Honourable Dusun Tua, for the allocation of RM150,000, PADAT is planning to carry out a review of Selangor's history, considering that Selangor has yet to undertake a re-evaluation and writing on the history of the State of Selangor.
For this purpose, the research planned and applied for allocation to the State Government is as follows:
1) Research on the Selangor State Sultanate dated from 1700 – 1850; 2) Research on Selangor records in the Netherlands and also in London, research on Malay customs and also Selangor heritage.
For studies that have been carried out by PADAT, they can be accessed and viewed in various ways, namely through:
1) Publication of books and journals; 2) Presentation of working papers in the state and overseas, and in the form of exhibitions, cultural performances based on the study of dance movements, and also the organisation of festivals, for example the Selangor Heritage Food Festival 2019. As for the second question, from the Honourable Sijangkang, firstly the Honourable Sijangkang informed that the allocation for upgrading and repair of rural roads, valued at RM1 million, is insufficient and needs to be increased. Thank you, Honourable Sijangkang, for the proposal. The government, the State Government, has noted the proposal of the Honourable Sijangkang that the allocation for rural purposes be increased, and compared with the current allocation it is still RM1 million. In addition, the allocation under P01/02006 for upgrading and repair of rural roads is RM1 million, and allocations for rural road development are also given by the Federal Government through the MARRIS Grant, and in 2021 a total of 328 project items, with a ceiling of RM29 million, were approved under MARRIS for the development of roads in rural areas.
Apart from that, the KPLB, through the Village and State Road Connectivity Allocation of Selangor, has also approved a ceiling allocation of RM1 million for rural repair purposes in 2021. This brings the distribution and allocation for rural road purposes to RM31 million in 2021.
Secondly, Mr Speaker, for information, Village Roads and also Agricultural Roads can be repaired and registered under MARRIS as land with "izin lalu" status. Written permission must be obtained from the landowner, and official approval must be obtained from the District Land Office in order to be registered under the MARRIS system. For the answer to the third question, for the information of the Honourable Sijangkang, the road proposed for attention, namely Taman Sri Medan road, Sekolah Kebangsaan Sijangkang Jaya, will be notified to the Kuala Langat Municipal Council to be included in the 2022 application. Meanwhile, the road to SRA, or Sekolah Rendah Agama Kampung Medan, has been tarred, having been tarred in 2020 at a cost of RM33,000 using MARRIS allocation.
As for the third question from the Honourable Banting, regarding the dredger, it seems synonymous, because this dredger is, there is mention of the dredger named Sri Banting, yes. Regarding the issue raised, it is located under, this dredger is located under Sepang or the DUN Dengkil, based on the EXCO MTES Paper No. 7/26/2021, the State Government agreed for the Sepang Municipal Council to purchase one dredger, Sri Banting, to be used or intended to be established as the National Mining Heritage Park, where the RM100,000 allocated is for the initial study for democratisation and documentation. For everyone's information, in addition, this dredger is the largest dredger in the world. Yes, it has a displacement of 6,650 tonnes, and this dredger can dig to a depth of 150 feet, and is the first in the world able to dig at a speed of 36 buckets per minute, making its capacity output 7.9 M3 per year. What I mean is, the use of this dredger, it does not use diesel engines, cubic metres. It does not use diesel engines but uses electrical power whose cable is floated from the land to the dredger. So, we become one, we have, our purpose or goal is to make this dredger a national heritage, and God willing it has been brought to MTES and approved, and hopefully it can be implemented. Thank you.
Thank you, Honourable EXCO for Tanjung Sepat. Anyone else? I invite the Honourable EXCO for Kajang.
Thank you, Mr Speaker. To answer the question raised by the Honourable Member for Dusun Tua regarding the details of the planning of projects or activities under the Forest Enforcement Programme - PK6 Development Budget in Selangor B10 for 2022, the details are as follows:
1. Installation of 10 boom gates and warning signboards as well as notice signboards at an estimated cost of RM150 thousand. This installation is at locations that have already been identified as routes frequently used by forest intruders.
2. Forest Empowerment Programme at an estimated cost of RM100 thousand. Among the activities planned under this programme is the purchase of drones for use by the intelligence team and for forest investigations, as well as other enforcement activity equipment such as seizure equipment, safety cones and so on.
3. Integrated Operations Programme, in collaboration with the agencies involved, at an estimated cost of RM30 thousand. This programme will focus on areas that have already been identified, with the implementation of activities such as dealing with unauthorised cultivation of crops and structures.
4. Public Awareness Programme and the eradication of encroachment into permanent forest reserves at an estimated cost of RM30 thousand. This programme will also involve efforts to eradicate forest encroachment activities, namely unauthorised entry, under Section 47 of the Selangor State Forestry Act 1985 (Application Enactment). Among the activities under the programme are the following:
i. safety brochures or signboards
ii. pamphlets on forest offences
iii. preparation of plans or maps of permanent forest reserves
iv. public awareness information kiosks; v. courses or workshops or talks relating to enforcement.
Mr Speaker, to respond to the proposal from Bukit Lanjan, to establish a Standing Committee on Climate Change. For the information of the Honourable Member, the Standing Committee on Environment and Green Technology is responsible for issues relating to conservation and the environmental industry under the scope of green technology, and climate change has already been included as one of the scopes of the committee, where it plays a role in monitoring any emerging issues and actions relating to climate change, such as organising car-free days, encouraging community tree-planting activities and so on. So, in general, because we wish to welcome the proposal to establish a Standing Committee on Climate Change and, subsequently, will ensure that the Standing Committee on Green Technology plays a role in all issues relating to climate change. The programmes that have already been implemented are also initiatives of the State Government in addressing climate change issues, and indirectly they are able to sustain the environment.
For the issue also raised by the Honourable Member for Bukit Lanjan, I seek an explanation regarding the Bukit Cerakah Forest Reserve. Mr Speaker, the State Government of Selangor wishes to explain the issue of the Bukit Cerakah Forest Reserve raised by the Honourable Member for Bukit Lanjan. For the information of the House, there are 2 permanent forest reserve areas located in Section U10, Shah Alam, namely the Bukit Cerakah Forest Reserve and also the Bukit Cerakah Additional Forest Reserve. Both of these permanent forest reserves have already been gazetted under the Selangor State Forestry Act 1985 (Application Enactment). The Bukit Cerakah Forest Reserve was already gazetted as a permanent forest reserve in 1909 with an area of approximately 23,826 acres. This forest reserve has already undergone several degazettements since 1976 for development purposes such as Bandar Puncak Alam, Alam Budiman, UiTM Puncak Alam and so on. Currently, the Bukit Cerakah Forest Reserve that remains is approximately 3,208 acres and is still managed by the Selangor State Forestry Department (JPNS) as a Protection Forest class, while in 2007 a portion of the Bukit Cerakah Forest Reserve that had been degazetted previously was re-gazetted as the Bukit Cerakah Additional Forest Reserve with an area of approximately 2,427.51 acres. This forest reserve area is also known as the Shah Alam National Botanical Garden, which is among the main public recreational parks around Shah Alam in the Petaling district. At present, the management of the Shah Alam National Botanical Garden is under the Department of Agriculture in line with the decision of the 27th/2019 State Executive Council Meeting (MMKN) regarding the approval of the owner's usage for the purpose of the Shah Alam National Botanical Garden. In this regard, the budget allocation through the State Development Budget P10 of the Selangor State Forestry Department (JPNS) in 2022 involving the Social Forestry Programme does not involve these 2 forest reserve areas. The allocation is focused on the development of eco-park areas, prepared forests, and matters fully under the Selangor State Department of Agriculture. As for the issue involving, this, I want to give a little explanation, not yet, let me finish first. As for the issue involving the degazettement status of the Bukit Cerakah Forest Reserve that was circulated by certain parties previously, it is based on the decision of the previous government, previously, based on records, there was an approval to degazette the permanent forest reserve for alienation by the State Government in 2006 through PW1443. In this regard, the management and development aspects in areas that are not permanent forest reserve status are subject to the jurisdiction of the relevant Local Authority and the District and Land Office. It must be emphasised here that only the current Selangor State Government practises the process of simultaneous replacement whenever any permanent forest reserve area is degazetted. This is in line with the amendment to the Selangor State Forestry Act 1985 (Application Enactment) that was implemented by the Selangor State Government in 2011, which concerns the requirement of public inquiry for proposals to degazette permanent forest reserves. However, the degazettement of the Bukit Cerakah Forest Reserve had already taken place before this amendment to the Selangor State Forestry Act 1985 (Enactment), namely in 2006. Therefore, the simultaneous replacement of permanent forest reserve areas was found not to be practised by the State Government at that time. This clearly proves that the current Selangor State Government is more concerned and committed to protecting permanent forest reserves while increasing the percentage of area from time to time.
In general, the current Selangor State Government will ensure that all development activities around the Bukit Cerakah Forest Reserve area comply with the procedures and regulations in force at this time. Among them are requirements such as the Environmental Impact Assessment (EIA) under the Environmental Quality Order 2015 and planning approval (KM) under the Town and Country Planning Act 1976. In addition, other development control measures such as the retention of green areas and the provision of wildlife corridors will also be taken into account. These requirements are to ensure that environmental sustainability continues to be preserved while socio-economic influences in the State of Selangor can be managed in a more strategic manner.
Please, Bukit Lanjan.
Thank you, Mr Speaker, thank you, the Honourable Member for Kajang. I actually want to touch on what the Honourable Member for Kajang mentioned earlier, namely that areas approved decades ago for degazettement have supposedly been degazetted but their gazette was not printed. So, if we look at it from a legal perspective, if it is not gazetted, it means this matter still needs to complete the degazettement process. That is one.
Secondly, I also want to ask the Honourable Member, the State Government, about the group or association that is encouraging a new forest reserve to be gazetted, specifically what is called the Setia Alam Community Forest. So, the area involved is within the area that was gazetted out. So, what approach will the State Government take so that, first, we can preserve as much of the remaining forest area as possible, and secondly, how can we also encourage sustainable development in that area.
Thank you, the Honourable Member for Bukit Lanjan. For the information of the Honourable Member, the Setia Alam Community Forest does not actually exist, yes, they are not registered under the State management or the Local Authority. And for the information of all, the areas surrounding this area had already been given ownership by the government before 2006. So at that time, there was no need for a replacement forest to be permitted. That is why many parties have misunderstood. They think this is still a permanent forest reserve, no, it has already been given ownership, so now the development question arises in that area. So some have submitted objections, so some have proposed that the area be re-gazetted as forest, I think this does not arise because there are certain companies or certain agents who already own this land. If they submit an application for planning approval (KM), we cannot object or cancel their application. So I want to give the explanation that we indeed have no intention to degazette, to not re-gazette all of this, because the previous government, although they had not yet been given ownership, the land had not yet been gazetted. That is the problem that has arisen now.
Mr Speaker, to answer the question raised by the Honourable Member for Banting, yes, regarding the direction of the Permanent Food Production Plantation.
Honourable EXCO Member for Kajang, please sit down. Continue later. Honourable Members all, the time has shown 1.00 p.m., 1.00 noon, hereby I adjourn the House until 2.30 p.m. The House is adjourned.
(THE HOUSE ADJOURNED)
(THE HOUSE RESUMED)
(DEPUTY SPEAKER IN THE CHAIR)
Assalamualaikum W.B.T., peace be upon you. The House reconvenes, I invite the Honourable Member for Kajang.
Mr Speaker, I request to be allowed to take the floor.
Bukit Lanjan.
Because there is a matter I raised yesterday that has not been fully answered by the Honourable Member for Kajang. This is what the Honourable Member for Kajang mentioned before 1 o'clock. That is about the forest area now called the Setia Alam Community Forest, although it is not an official forest reserve, it is a forest area that thousands of people visit. I am informed, no, I am informed. When I was an EXCO, I still remember that in 2017 PKNS returned a large part of that area, which at that time should have been made into a cemetery, but the State Government at that time gave it to MBSA (Shah Alam City Council) to be made into an open space or green area for public use. So perhaps the Honourable Member for Kajang can provide a more detailed explanation of what has happened to that land.
Thank you, the Honourable Member for Bukit Lanjan. A fairly good question and a complicated one to answer. Where the Selangor State Government has already made a decision, where previously, this happened in 2006. So, that area was given ownership to NGOs or companies. Although it has been gazetted, it has not yet been re-gazetted, but the Selangor State Forestry Department and the District and Land Office and the Land and Mines Office (PTG) are working to carry out re-gazettement. So, this is the first.
Second, although this area has already been given ownership and also where planning approval (KM) will be given, the Shah Alam City Council (MBSA) will ensure that this area, although it is made into a cemetery, its status is a cemetery, but in future planning it will ensure this area has a connectivity where it will not disrupt those who want to go hiking, no. So, for the Setia Alam Committee Forest, they can continue this activity. This area is not affected, so they can hike, can walk, and we ensure there is connectivity, that the forest will have a connectivity where we will ensure it has 20% green that will be provided by MBSA in their planning. So, it will not disrupt those who want to climb, and only because previously we received many complaints, complaints where people who climb often park their cars everywhere including in the housing estates. That is why we receive many complaints from the housing estates because it causes parking problems for the entry and exit of local residents. That is why there are controls and MBSA will take action against cars that deliberately park there to block traffic flow. So, to answer the question of Bukit Lanjan, I think this is already clear. We will ensure there is a route for wild animals. Where roads are built, we will build tunnels. And ensure that it becomes a green area for those who want to hike and also to go there for walks. So, to answer the question raised by the Honourable Member for Banting. The direction of the Permanent Food Production Plantation (TKPM) Sungai Kelambu, located in the Kuala Langat Selatan Forest Reserve.
Mr Speaker, the Selangor State Forestry Department (JPNS) has already prepared a summary paper for the State Executive Council Meeting (MMKN) regarding the application for approval by way of a usage permit to the Selangor State Department of Agriculture. The approval of this usage permit is to develop and manage the Permanent Food Production Plantation (TKPM) Sungai Kelambu in the Kuala Langat Selatan Forest Reserve. The summary paper is expected to be tabled at the early part of 2022 at the MMKN level before the Selangor State Forestry Department prepares the usage permit. To answer the question raised by the Honourable Member for Sungai Pelek, regarding the issue of the granting of a usage permit to other persons in an area already cultivated by the Orang Asli of Sungai Kelambu in the Sepang Kecil Forest Reserve. So, the Selangor State Forestry Department (JPNS) has already granted a usage permit approval, namely Form 4, in the Sepang Kecil Forest Reserve area of 20 hectares to a local individual on 29 August 2019. So, the approval of this usage permit is through a valid process, namely based on the deliberation of the Selangor State Forestry Management Committee (JKPPNS). In general, this JKPPNS was formed through the approval of the 36th/2015 State Executive Council Meeting (MMKN) on 2 December 2015. The MMKN has considered and approved the proposal to delegate powers of the state authority to the Director of Selangor State Forestry through the Selangor State Forestry Management Committee (JKPPNS). This committee is chaired by the Director of Selangor State Forestry, and its members consist of representatives of the State Economic Planning Unit (UPEN), the Selangor State Department of Environment and also the Selangor State Department of Mineral and Geoscience. Basically, this delegation of power only grants the authority to approve any application for a licence/ small licence/ transfer licence/ usage permit/ road permit with an area not exceeding 50 acres, and the renewal of existing licence/ small licence/ usage permit/ transfer licence and road permit.
As for the issue involving the plantation area said to have been cultivated by the Orang Asli of Kampung Sungai Kelambu, it is to be informed that the orang asli's plantation area is actually involved in the same usage permit area, namely the Sepang Kecil Forest Reserve. So, the plantation said to be cultivated by the orang asli is also an oil palm plantation which is not in line with the department's current policy. So, it is not possible that it did not obtain any approval by way of a usage permit from the Selangor State Forestry Department. So, that is why the oil palm plantation said to be cultivated by the Orang Asli of Sepang Kecil Forest Reserve is categorised as an invalid settler and has never obtained any approval before.
Sungai Pelek.
Thank you, Deputy Speaker. I would like to ask why the local Orang Asli community, who have opened up that area over many years, was not given consultation? In a manner that forces them to leave that land or that area, and why, then, can outsiders, traders from outside, be given permits to use that same land? This is like a married woman: how can you still ask that married woman to marry someone else, when you have already given the same place to the Orang Asli to open up? I agree with the EXCO that, according to the law, forest reserves do not permit planting such as oil palm and so on, but the reality is that the Orang Asli community has lived and earned their livelihood in that place in the forest for years, perhaps from generation to generation. So, if there were efforts to help the local Orang Asli find land more suitable for planting in another place. If such efforts were being carried out, I think, as a state assemblyman (ADUN) for that area, I would have no objection. But as long as the local Orang Asli community still depends on that land, that area, why is it that the Director of the Selangor State Forestry Department (JPNS) has the power to give the same land to others? This does not make sense. This is like an injustice against the local Orang Asli community. The Orang Asli find it difficult to earn a living in the towns and other places. That land is where they earn their livelihood. So, traders from outside may be given other land if the Forestry Department feels they are eligible to use the land. Look for other land. Do not look for the same place for them. So, I question why JPNS has power over that land. I ask the EXCO to examine this matter. Thank you.
Thank you for the question raised by the Honourable Member for Sungai Pelek. Indeed, the Honourable Member for Sungai Pelek has raised a question as to why the Director of the Forestry Department has power. It is provided that there is power to approve the extent of permit use, not exceeding 50 acres. So, that power lies in his hands. As for how we are to resolve this issue, I will hold a meeting in the near future to call all parties involved, including the Selangor State Land Department, the Orang Asli, and JAKOA (Jabatan Kemajuan Orang Asli), so that we can resolve this issue. Whether we will look for another place for them, or how we are to resolve this issue, we will discuss at the upcoming meeting. This meeting will involve all the agencies and the Orang Asli concerned so that there can be a solution. We know that forest reserves are areas where the Orang Asli roam and also a source from which they earn their livelihood. If they do not have forests, it is difficult for them to live.
May I interject, the Honourable EXCO. Thank you, Honourable EXCO, for explaining at length the importance of protecting this environment, the importance of protecting forests, and that the State Government is committed to protecting forests, including mangrove swamp forests. But what I hear from this explanation is that it largely describes how we are not looking after welfare, such as the welfare of the Orang Asli, as raised by the Honourable Member for Sungai Pelek. I hope the Honourable EXCO, who is together in Parti Keadilan with me, is one of the 18 pillars of struggle of Parti Keadilan Rakyat. Item number 16 is to improve the quality of life of the Orang Asli or indigenous people, while respecting their customs, preparing development plans appropriate after consulting with them, and protecting their rights over customary land. I hope that the existing Orang Asli lands, we should try to defend them. Next, item 17, the basic policy and objective of our party, Parti Keadilan Rakyat, is: protecting the natural environment from destruction, preventing pollution and improving the quality of the environment, and ensuring sustainable development. This is what we learn; in the party we are sometimes taught by our party President, Dato' Seri Anuar Ibrahim, to ensure we are guided by the aims and objectives of our party. That is why the people chose us. But if this is the answer I hear, wanting to chase the Orang Asli to move here and there, that is not like Parti Keadilan Rakyat.
For the information of the Honourable Member for Pelabuhan Klang. The forest reserve is actually not a residential area of the Orang Asli, so that is not a planting area. That land is indeed a forest reserve. No one may plant trees such as oil palm there. This forest reserve does not permit oil palm planting. So, this must be corrected. And then the permits we issue in that manner are for planting crops for food needs for the residents of the State of Selangor. So, as for the Orang Asli, we do take care of them. We certainly ensure their land is gazetted, ensure their welfare is not neglected, ensure they can compete with ordinary people,
not just confining them to remain in the forest, but there is development, or in terms of economy and education, they are not developing or advancing. So, we want to ensure their economy and education keep pace with us. So, that is our aim. We are not oppressing any Orang Asli, no, we will help them. For this matter, I will hold a coordination meeting to resolve this issue as quickly as possible.
To answer the question raised by the Honourable Member, the Honourable Member for Sijangkang, yes, in 2019 MPKL had already established and launched the Selangor State Ditch Uplift Programme, Majlis Perbandaran Kuala Langat, MPKL. However, there was no continuity of the programme, and many trees died; industrial activities have also caused pollution in the foul-smelling ditch in Sungai Manggis and Kampung Medan. So, this is the question: what steps have been taken to overcome these problems? So, Honourable Mr Speaker, the Sungai Angkat Programme or @Parit DPLMX organised by MPKL was launched on 25 November 2019. This programme is a CSR programme involving cooperation with UITM, UPM, NGOs, MPKK, MPP and also factories in the Telok Panglima Garang industrial area. So, this programme was held following the complaints received by MPKL involving foul-smelling pollution in the area concerned. So, following that, it was proposed to carry out a special study that could identify the best method to resolve the problem. This study will involve several stakeholders according to their respective jurisdictions, especially in terms of expertise in identifying the root cause of the problem. This includes from the aspect of research, academic study and also technical methods of controlling environmental pollution. Following the pandemic in 2020 and 2021, the progress of the programme's implementation was rather slow. So, however, several tasks have been carried out to ensure that every plan to overcome the problems or issues concerned is monitored continuously, and reporting is done through the Industrial Park Management Committee Meeting, namely IPMCMPKL. And three (3) meetings a year have been held, as well as the Technical Committee Meeting of the Sungai Angkat @Parit DPLMX Programme. Among the activities that have been carried out are as follows:
1. River water sampling work by the Working Team from the Faculty of Applied Sciences, UITM, has been carried out three (3) times, namely in November 2019, March 2020 and April 2021. It aims to identify the cause of pollution of the river or ditch water.
2. Proposal to install rubbish traps in the Jalan Raja Wali ditch, Teluk Panglima Garang industrial area, in cooperation with the Drainage and Irrigation Department (JPS) and UPM, and this will be installed in February 2022.
Sijangkang.
Thank you, Deputy Speaker. May I know the results of the study or sample analysis that has been carried out, if it can be informed in this House, so that it gives a statement or impact to the community. The status of that river water.
I will get the details from the relevant party, so at the moment I do not have, the, what the chemical content or the results of the study are. So, I will do it in writing lah. For the Honourable Member for Rawang, regarding feedback, regarding the environment, the issue of strengthening enforcement and also pollution monitoring technology. The Honourable Member's question has already cited the issue of strengthening enforcement and environmental pollution monitoring technology by the State Government. Following the constraints of enforcement agencies such as the Department of Environment, namely JAS, which does not have sufficient enforcement personnel. It is the responsibility of the State Government to ensure that water resources and the environment in Selangor are always clean and safe for use. As the Honourable Member is aware, the Selangor State Government is concerned and sensitive to the issue of environmental pollution and the need to strengthen enforcement actions and the use of effective monitoring technology to ensure the environment is always preserved and also free from any pollution issues. In this regard, the State Government will help coordinate integrated enforcement operations involving other relevant agencies, and at the same time at the level of Local Authority (PBT), environmental management governance will also be strengthened through the establishment of a Special Environment Unit so that more holistic enforcement can be carried out as provided under Part 8 Pollution of Tributaries – Local Government Act 1976. Meanwhile, the Federal Government is also drafting the Department of Environment Transformation Plan, including the need to add enforcement personnel and also establish more branches of the Department of Environment in every district.
For the Honourable Member for Rawang also, who has raised and proposed that the State Government upgrade tourism infrastructure in the Batu Arang tourist area, so, the State Government is ready to study and also consider applications to upgrade and also rehabilitate infrastructure, including potential tourist areas, especially in Batu Arang, which can be applied for through the Local Authority (PBT) and Government Agencies. In addition, the Ministry of Tourism, Arts and Culture (MOTAC) also provides allocations to implement programmes and also upgrade tourism that can be applied for through the Local Authority (PBT) to develop and also rehabilitate facilities and also infrastructure at tourist places. So, there are also plans and also proposals for the development and upgrading of tourism facility infrastructure in Pekan Batu Arang. Among them, include the proposal to upgrade the car park, the gateway, public toilets, rehabilitate the existing location signboards, rehabilitate the existing plaza at the roundabout, supply Uplight lamps, park benches and also landscape upgrading that will be implemented by the Selayang Municipal Council (MPS).
For the Honourable Member for Balakong, who is always sensitive to and also fights for industrial tourism. So, this answer is very long, yes (laughter), very, very long. For the information of the Honourable Member, industrial tourism in the State of Selangor certainly has high potential, yes, especially in urban and industrial areas. The State Government through the Local Authority (PBT) and also Tourism Selangor has already implemented various initiatives to develop this industry including with Pasti and Pengerusi, some of the sidelined industry operators are being made into industrial tourism products in Selangor, especially in Balakong. A special workshop will be held and will also involve several agencies and also tourism industry players to build a good ecosystem to promote industrial tourism products in Balakong. The findings from this workshop will also be used as a model to be applied to other areas with potential for industrial tourism. This workshop is expected to be held in the first quarter of 2022.
For the issue of the tourism vehicle sector, the State Government of Selangor through Tourism Selangor also promotes tourism in the State of Selangor by publicising the strength of state tourism products that have good accessibility and also good transport networks. Among the collaborations carried out are as follows: airlines, cooperation with Malaysia Airlines, Malindo Air, Firefly and Air Asia. Second, public transport, Bas Smart Selangor, KTMB and also MRT. Third, the car rental application, namely Mobile. Fourth, cooperation with the Tour Bus Association. So, regarding the creative sector and short films, yes, the Government wishes to take note and also focus on Creative Tourism through the development of the creative and film industries. The State Government through Tourism Selangor is actively collaborating with various film, TV and broadcasting production companies, whether local or international, helping to promote Selangor State tourism products. Among the cooperation programmes carried out are as follows: first, local TV stations, namely through Media Prima, the Nona programme, Documentaries, Kembara, Hutan, Aroma, Tradisi, RTM through the RTM Anniversary Documentary, the Jalan-jalan programme, Bernama TV, the Pit Stop programme; second, overseas TV stations, Japanese TV programmes and City One On One for China, Centra TV, and its television CCTV 4. So, Tourism Selangor also collaborates with several creative productions such as Animo Star Studio to promote Selangor State tourism products through the Boboiboy animation series. Tourism Selangor will further intensify cooperation with creative industry players who have provided several production areas to be used as filming locations for films and TV programmes such as in Pulau Ketam, Kuala Kubu Bharu, Sekinchan, Tanjung Sepat and also Kuala Selangor.
Regarding incentives to encourage handicraft practitioners, the State Government through the Standing Committee on Tourism focuses on the handicraft industry through the organisation of various programmes under the allocation for developing handicrafts. Among the programmes whose promotion is focused on this industry are the Kembara Kraf programme and also the Craft Bazaar held at the State and district levels. This industry also highlights the culture and also handicraft practitioners among the Orang Asli community. The State Government has also already allocated a total of RM2.55 million for the implementation of the Selangor Stimulus Package 2.0 to help tourism industry players in the State of Selangor who consist of various groups and associations, including among the Handicraft Associations. So, the list of initiatives and assistance under this Stimulus Package related to handicraft associations or operators is as follows: first, the Tourism Activity Programme Financial Assistance Grant. So, through the Stimulus Package, associations or tourism industry bodies can apply for the Financial Assistance Grant offered for the purpose of carrying out activities related to promoting the tourism industry in Selangor, subject to the eligibility, terms and conditions outlined. The total allocation provided by the State Government under this Financial Assistance Grant for the Tourism Programme and Activities is RM1 million. So, operators can also apply through Community Associations or the Village Community Management Councils (MPKK) registered in the State of Selangor. So, the Tourism Digitalisation Learning Programme, industry players also know about digitalisation training to help increase awareness, knowledge, productivity and the marketing of tourism products that are already online under the Selangor State Tourism Digitalisation Learning Programme. So, with the existence of this programme, industry players are able to increase productivity, marketing and also promotion, and it will indirectly increase the economic development of the Selangor State tourism sector.
Bandar Utama proposed that the State Government use third parties or influencers in promoting tourism. So, for the information of the State Government, through Tourism Selangor, has certainly already used the services of influencers or Key Opinion Leaders (KOL) to help expand promotional coverage for Selangor State tourism products. Among the initiatives that have already been carried out are as follows: first, the appointment of Che Puan Juliana Evans as the ambassador of the Pusing Selangor Dulu campaign, who has more than 3 million followers on social media. This campaign has also received coverage of more than 20 million views and wishes on social media. Second, cooperation with several well-known influencers such as Dato' Rosyam Nor, Kumaar Family, Hafiz Hamidun, Aishah Izara, Dayana Roza, Fikri Zamri and also many others in promoting programmes organised by Tourism Selangor.
The last one, regarding Kampung Tuanku, Mr Speaker, Kampung Tunku (laughter). It has Tengku, Tuanku, Tunku, ha, this one is Tunku. Tunku, T, U, N, K, U. Mr Speaker, the Honourable Member for Kampung Tuan, Tunku, proposes (Members laughing), soft power (Members laughing), for the tourism sector and also tourism branding. So, for the information regarding branding, promotional branding for tourism in the State of Selangor. The State Government of Selangor through Tourism Selangor has already introduced two (2) campaigns according to the main phases, namely domestic, the Hendak Bercuti campaign, Pusing Selangor Dulu! For international, Splendid Selangor, Take Me Anywhere. These two (2) campaigns have been strengthened in their branding through various initiatives. Corporate branding that has received good response and also coverage, especially on digital platforms and online. Among them are as follows: first, the Tourism Selangor Social Media Campaign, which is among the Tourism Boards with very high social media followers compared to other states, with more than 600,000 followers and also receiving more than 20 million views on social media. Second, Tourism Selangor has 15 official social media accounts in various languages, namely Bahasa Melayu, English, Japanese, Chinese and Arabic. Third, the provision of songs and promotional videos for Pusing Selangor Dulu that have received more than 700,000 views on social media. Fourth, the provision of engagement materials and also a systematic tourism directory. Fifth, the branding of tourism promotional programmes and activities that are more targeted according to needs and also the breadth of market strength. Sixth, comprehensive advertising campaigns for the domestic and also international markets. Thank you.
I invite the Honourable Member for Kinrara.
Thank you, Mr Speaker. Mr Speaker, the Honourable Member for Bukit Lanjan has touched on the need for more cycling lanes to be provided in the State of Selangor. For the information of the Honourable Member, the Local Authorities have built cycling lanes using their own allocations. However, throughout the provision of these lanes there are several constraints faced, apart from the limited allocations. First, cycling lanes cannot be implemented on roads or on JKR reserves and are not agreed to on grounds of safety. And second, the issue of misuse of cycling lanes as parking places cannot be controlled and enforcement actions cannot be carried out because the lanes have not been gazetted. And the State Government always encourages the Local Authorities to provide public transport infrastructure needs such as cycling lanes, and this implementation is monitored by the Selangor State Standing Committee on Public Transport based on the existing set targets or KPIs, namely 15 kilometres of cycling lanes for PBTs of city and municipal status, while at least 10 kilometres of cycling lanes for PBTs of district status. However, the provision of this uses the allocations of the PBTs, and the State Government is only able to provide incentives to PBTs that succeed in providing cycling lanes if there is a surplus or savings from the annual budget allocated for the Bas Smart Selangor service. Mr Speaker, the Honourable Member for
Sentosa requested that the State Government establish a Crematorium Centre in every PBT. At present, four PBTs in the State of Selangor already have their own crematoriums, namely Petaling Jaya City Council, Subang Jaya City Council, Klang Municipal Council and Sepang Municipal Council. Meanwhile, one PBT, namely Shah Alam City Council, has collaborated or entered into a JV with two private companies in providing crematorium services, namely at Bliss Garden and Nirvana Memorial Park. All rates at the Crematorium Centres are reasonable, between RM100 to RM200 for each cremation, subject to conditions at each PBT. However, as a result of the COVID-19 pandemic, the State Government has observed that the Crematorium Centres at the PBTs I mentioned earlier are unable to cope with cremation operations. This matter indirectly places a cost burden on the funeral management of non-Muslims for heirs or families with limited means if they go to private crematorium centres. Therefore, to reduce the burden on the people, the State Government of Selangor has agreed that all Local Authorities in the State of Selangor take immediate action to provide special burial grounds and crematoriums within their respective administrative areas. The Honourable Member for Bandar Utama requested that the exemption of entertainment duty be extended in 2022. For the Honourable Member's information, entertainment tax is one of the sources of tax revenue besides land tax. The State Government takes note of the constraints and challenges faced by entertainment premises operators during the implementation of the MCO in 2020 and 2021. In view of this concern, the State Government through the State Government Executive Council Meeting, MMKN, has made the following decisions. First, Theme Park Entertainment Activities. MMKN on 27 January 2021 agreed to give a full exemption from 18 March 2020 until 31 December 2021 and to impose a 5% entertainment duty rate for five years from 1 January 2022 until 31 December 2026. Second, Arts Activities and Stage Performances of Local Artists and Foreign Artists. MMKN on 27 January 2021 agreed to implement the collection of entertainment duty at a rate of 15% for local artists and 25% for foreign artists from 1 January 2021. And third, non-ticketed entertainment activities, MMKN number 40/2021 on 24 November 2021 agreed to give a full exemption of entertainment duty from 1 January 2021 until 30 September 2021 for 9 months and agreed to implement the collection of entertainment duty starting 1 October 2021 until 31 December 2021, and also agreed to make an adjustment to entertainment duty payments in 2022 by taking into account payments already made in 2021. MMKN also agreed that applications for full exemption of entertainment duty for other entertainment activities in the State of Selangor will be considered based on applications from time to time. That is all, thank you.
I invite the Honourable Member for Seri Sedang.
Baik, terima kasih Mr Deputy Speaker. Saya ingin mengucapkan terima kasih kepada the Honourable Member for Balakong, the Honourable Member for Kampung Tunku dan the Honourable Member for Bandar Utama yang membangkitkan beberapa isu. The Honourable Member for Balakong telah bertanya mengenai cara laporan ataupun cara anggaran perbelanjaan dibuat untuk PK6, Wanita, Kebajikan dan Kesihatan RM126,800,000 ini. Mungkin saya ingin menjelaskan bahawa sebelum ini memang Wanita, Kebajikan dan Kesihatan dipegang oleh seorang EXCO tetapi kini Kebajikan sudah masuk di bawah Kerajaan Prihatin. Jadi itulah yang melihatkan angka yang besar kalau kita tengok balik pada muka surat 200, PK6 Wanita, Kebajikan dan Kesihatan. Jadi kebajikan masyarakat sebanyak 64 juta ini dimasukkan di bawah PK6 juga sedangkan ia tidak berapa lagi di bawah Wanita Kebajikan Dan Kesihatan. Ini adalah hanya cara pengelasan yang sebelum ini dan kita akan berbincang dengan UPEN kalau ianya perlu untuk kita ubah pada belanjawan yang lepas. Bukan isu besar namun untuk makluman ia jadi nampak besar sebab 64,000 itu adalah juga BINGKAS ya peruntukkan untuk KISS atau BINGKAS yang sekarang di bawah EXCO Kerajaan Prihatin. The Honourable Member for Kampung Tunku telah membangkitkan isu berkaitan usaha dalam meningkatkan kadar vaksinasi kepada golongan Orang Asli. Sebenarnya Yang Berhormat, Kerajaan Negeri memang prihatin dan di bawah Jabatan Kesihatan Negeri Selangor (JKNS) sehingga 30 November 2021 pencapaian pemberian vaksin menerusi Program Jangkau Luar atau outreach di kalangan Orang Asli bagi Negeri Selangor yang berumur 18 tahun dan ke atas adalah 88.4% dan bagi dos pertama 86.9%. Bagi dos kedua termasuk pemberian Vaksin CanSino Single Dos ya. Jadi hampir semua, semua daerah yang mempunyai Orang Asli, semuanya telah di capai cuma Kerajaan Negeri melihat bahawa memang oleh kerana mereka ini tidak keluar untuk ke Pusat Pemberian Vaksin (PPV) maka memang dilakukan secara out reach di mana team ataupun pasukan-pasukan pemberi vaksin pergi ke tempat-tempat atau di komuniti mereka. Penempatan mereka juga mungkin mempunyai kita tahu kadar liputan Internet yang lemah, akses yang terhad. Jadi untuk Orang Asli memang out reach la sebagai jangkauan dan tidak datang ke PPV. Pada masa yang sama, Program Vaksin Bergerak yang dikendalikan oleh JKNS meliputi semua Perkampungan Orang Asli Yang Berhormat jadi tidak perlu dibimbangkan yang mereka tidak mendapat vaksin cuma antara mahu dengan tidak mahu sahaja. Kampung Tunku juga ingin membangkitkan isu berkaitan kaedah penyaluran bantuan Program Nutrisi Makanan Kanak-Kanak Anak Selangor Anak Sihat atau ASAS. Untuk makluman Yang Berhormat program ASAS yang dilaksanakan pada tahun ini adalah merupakan projek rintis yang menyasarkan 500 orang kanak-kanak dan bertujuan mengenal pasti kanak-kanak yang mengalami masalah kekurangan zat makanan atau KZM seterusnya membantu golongan ini melalui makanan dan nutrisi tambahan seperti susu formula dan multivitamin. Program ini dilaksanakan di beberapa lokaliti yang dikenal pasti antaranya melibatkan golongan B40 dan dilakukan di kawasan perumahan kos rendah. Para peserta ini dikenal pasti melalui Ketua-Ketua Komuniti dan Pusat Khidmat Masyarakat. Program ASAS pada tahun ini juga turut diperluas kepada kanak-kanak Orang Asli di Kampung Bumbung dengan penerimaan manfaat seramai 48 orang kanak-kanak. Bagi memastikan penerima manfaat ini dapat dipantau perkembangannya, program ini dilaksanakan dengan kerjasama dengan Jabatan Kesihatan Negeri Selangor, JKNS di mana setiap kanak-kanak yang pilih akan dipantau melalui aplikasi SELangkah dan buku program diberikan kepada setiap
ibu bapa atau penjaga. Mekanisme pemberian bantuan makanan tambahan susu formula dan vitamin juga dibuat secara berpusat iaitu kanak-kanak yang terpilih perlu hadir ke Dewan atau Pusat Komuniti berhampiran bagi tujuan rekod dan pengambilan makanan. Kanak-kanak tersebut juga perlu kembali ke lokasi yang sama bagi tujuan rekod setia bulan bagi memantau perkembangan mereka. Langkah ini bukan sahaja dapat memastikan tiada kanak-kanak yang tercicir malah membantu memudahkan petugas dalam memantau keberkesanan program ini. Untuk tahun 2022 dengan peruntukan berjumlah 1 juta program ASAS ini akan ditambah baik dan jumlah penerima manfaat akan ditingkatkan termasuk daripada golongan kanak-kanak Orang Asli.
Seterusnya Kampung Tunku telah membangkitkan isu mengenai gangguan seksual ya. Tentang perlunya penekanan diberi kepada isu gangguan seksual oleh Kerajaan Negeri. Saya kira ini di tujukan kepada Wanita Berdaya Selangor kerana memang saban hari kita setiap tahun kita melaksanakan program-program invokasi untuk keganasan rumah tangga tapi belum kedengaran lagi invokasi untuk mencegah, untuk mendidik ya, invokasi untuk gangguan seksual. Untuk makluman Yang Berhormat buat masa ini antara usaha pihak Kerajaan Negeri dalam menangani kes gangguan seksual di tempat kerja adalah dengan mengguna pakai Pekeliling Perkhidmatan Bilangan 22/2005 iaitu Garis Panduan Mengendali Gangguan Seksual Di Tempat Kerja Dalam Perkhidmatan Awam. Garis panduan ini mengandungi huraian lanjut berhubung kategori dan jenis perlakuan gangguan seksual. Kesan-kesannya tindakan untuk mengendalikan gangguan seksual di tempat kerja dan langkah-langkah pencegahan. Selain itu sesi invokasi dan juga kempen kepada masyarakat umum ini juga diadakan secara tidak langsung melalui aktiviti-aktiviti dan program-program yang dijalankan di peringkat komuniti melalui Pusat Wanita Berdaya, PWP. Akademi Kepimpinan Wanita, AKW, Perbincangan Meja Bulat, Round Table Discussion dan Forum Wanita dan Kepimpinan Hibrid 2021 yang di anjurkan pihak Wanita Berdaya Selangor bersama kerajaan dan juga NGO-NGO wanita. Untuk tahun 2022 pihak Kerajaan Negeri akan mempergiat usaha untuk menangani kes-kes gangguan seksual ini melalui pelaksanaan dasar dan juga polisi anti gangguan seksual yang lebih komprehensif di samping memperbanyakkan lagi pelaksanaan program dan aktiviti di semua peringkat untuk memberi kesedaran berkenaan isu gangguan seksual ini. The Honourable Member for Bandar Utama membangkitkan mengenai promosi program-program Perpaduan. Untuk makluman Ahli-ahli Yang Berhormat Jawatankuasa Tetap Perpaduan adalah antara portfolio baru yang diwujudkan pada penghujung tahun 2020 semasa pandemik COVID. Justeru agenda dan program-program Perpaduan mula dilaksanakan menjelang tahun 2021 termasuk gerak kerja merangka Dasar Perpaduan Negeri Selangor yang kini di peringkat terakhir. Portfolio Perpaduan juga sedang menghasilkan video-video kempen bertemakan "Perpaduan di Selangor" yang telah menggunakan khidmat pihak berkepakaran dalam bidang ini demi memastikan video promosi yang dihasilkan berkualiti dan berimpak tinggi. Manakala cadangan di antara cadangan yang telah kami terima adalah juga untuk melantik tokoh atau individu berpengaruh sebagai Duta atau Ikon Perpaduan Selangor demi merancakkan
lagi agenda promosi dan publisiti berkaitan perpaduan tetapi sehingga kini kita masih lagi di peringkat memikirkan siapa ikon yang sebaiknya untuk Selangor. Saya membuka cadangan kepada Yang Berhormat sekalian untuk menamakan ataupun mencadangkan siapa yang layak kita jadikan sebagai Ikon Perpaduan yang mungkin boleh membawa mesej ataupun membawa mesej perpaduan dengan lebih berkesan kepada masyarakat. Sekian, terima kasih.
I now invite Y.A.B. Menteri Besar.
Thank you, Honourable Members all, and also my EXCOs, whom I feel have for the most part already answered. So many questions have been raised by Members of the House, especially those relating to development management and development planning for the state, which will be planned starting from 2022. And indeed the State Government has laid down several important foundations for development so that this development becomes sustainable and enduring. Therefore, the strategy we have put in place is not only off being business (what is this) ins of being business, such as the facilities of the 100-Day Policy (Dasar 100 Hari) and several high-impact projects that we have presented in Sabak Bernam, in southern Selangor, among others. Sabak Bernam is not south, yes. In Sabak Bernam and in southern Selangor. And in southern Selangor we have laid several foundations such as Sepang Two Thousand, which was previously named, and which we now name the Selangor Aerospace Park, which insyallah will generate work and sustainable economic growth, and in addition revitalise the manufacturing sector and also the services sector, which are the roots and foundations of the economy in the state.
Alhamdulillah, I did not hear detailed debate from my colleagues, although we have not laid a large foundation. As an example, the construction of workers' housing. We have set it at a figure of 5 million, but we hope PFI will come, and I heard in several earlier debates that others said it seemed we wanted to build only for foreign workers. This is a rather sceptical view and does not look at it objectively. If we look at the State of Selangor, Selangor is a state that has become a melting pot. Many people from Sabah, from Sarawak, from other states need accommodation, and naturally workers' accommodation is not an accommodation reserved specifically for foreign workers; local workers can also take up places there, and we only want to ensure that what is called Act 446, which has been determined for the completeness and strength of workers, can be fulfilled. Insyallah Selangor will begin.
At the same time, we have also received feedback from entrepreneurs and housing developers who have seen that "oh, this aspect" also needs emphasis so that we can avoid the problem of residential areas and neighbourhoods that indirectly become
workers' hostels, which ultimately creates an unfavourable atmosphere, with workers placed in one house and unit, with their placement and presence being too numerous. So that is the intention of the State Government. We only want to build around 50,000 to 60,000, although the number of workers in the State of Selangor reaches millions. If not 2 or even 4 million, I think at a minimum we have 3 million who are very active working in the public service sector as well as the private service sector. And we believe with this method, our governance and our business dealings will engage with industry owners so that it can develop and revitalise the economy.
It is a double-edged sword that we are trying to launch. Besides resolving the issue of workers' accommodation, we can also drive the manufacturing sector. We can drive the manufacturing sector with manufacturing that gets good and healthy workers, and at the same time the construction sector will be revived with activities and launches of new high-impact projects that we will implement from time to time. Insyallah, with the east of being business plan, and alongside our establishing a department which will monitor the projects carried out as well as their procurement processes, it will be able to guarantee transparency and a check in bound process at the implementation stage and at the management stage of the State Government, especially in the implementation of projects.
This, I think, we must (I must emphasise) because I see in the debate that Members mostly touched on infrastructure, which has been touched on to some extent. But the development that we frame (philosophy) in the State of Selangor Budget also drives the people's economy with various programmes such as HIJRAH, entrepreneurship and so on, and is also driven by high-impact economic activities, besides venturing into and exploring new businesses online and so on, with the strengthening of elements and activities of digitalisation.
One thing we want to develop is the Selangor Digital School (as an example). This Selangor Digital School is to provide certification, or provide valid accreditation, for how e-commerce or online trading processes are carried out, which are so numerous. And today there are plenty scattered about, charging high fees, and we have the Selangor Business School under UNISEL, and the Selangor Digital School will be placed there, and at the same time we will be able to issue up to diploma or degree level if they are interested in being expanded and continued.
Honourable Members all,
I am aware that this is not an easy matter, because Selangor is in fact studying and drafting how we want to rejuvenate new areas. This
is a challenge we have not yet been able to implement. This is among our major challenges because we face the problem of brown fields (areas that have already been developed). There are several settlements developed with the formulas and frameworks of the 80s and 90s which are no longer suitable at this time, especially in city centres and densely populated areas. We need a large number of houses, but we are hindered by several regulations (I think, I have met personally with the Minister of KPKT, and the relevant EXCO has also discussed with KPKT); policy changes are needed. With such policy changes, which are beyond our jurisdiction, we will not be able to develop areas in Petaling Jaya especially, in the Pandan area, in the Ampang area, in the Shah Alam area, which house settlements that are no longer suitable at this time due to population spillover, due to the large population growth and the very large number of people from various strata/groups/communities and so on.
Honourable Members all,
I want to give specific feedback on several specific questions raised by Honourable Members all, especially if I may refer to the statement regarding the education of Orang Asli. This is among the matters raised by Sijangkang, which asked whether additional programmes were being implemented by the State Government. Starting two years ago, the Sagong Tasi Programme no longer focused on tertiary education or education after secondary education. We also focus on education at secondary school because through this method we can actually educate these students so that they enter the tertiary education level, rather than only selecting one, two, three crane who have passed or who have qualified for tertiary education, because when we implemented Sagong Tasi, we found the take-off was very low, or the application method was rather low. Why low? Because not many were able to get through to tertiary education.
Therefore the State Government considers it better that we allocate this allocation for secondary school education, and we can guide and train these students (children of Orang Asli) so that they can be brought to higher education at tertiary level (at the third level). And basically, what is implemented by the State Government is as a complement to the assistance provided by the Department of Orang Asli Development. And if I may outline the assistance schemes for Orang Asli schools: at primary school level there is personal assistance of RM80 a year and personal needs at boarding of RM250 a year. At secondary school level there is miscellaneous assistance of RM120 a year, personal needs at boarding of RM250 a year, pocket money of RM2 per day each month according to the number of school attendance days. Thirdly, transport fares for the primary/secondary school level from villages (from the village to school) and 42 routes for 2021 in the State of Selangor, and uniforms for Standard 1/Form 1 students who do not receive KWAPM (Poor Students Trust Fund (Kumpulan Wang Amanah Pelajar Miskin) under the Ministry of Education Malaysia).
At IPT level there is matriculation at RM3,000, pre-diploma certificate RM3,500, diploma RM8,160 and also RM8,360, this is the maximum between RM8,160 and RM8,360, and for degree level it is RM9,560 minimum and the maximum is RM11,200 a year. And for private IPT level, a food allowance is provided at RM900 a day. This is what has been provided under the Department of Orang Asli Development, or JAKOA, at state level, and partly we top it up with the programme I mentioned earlier, namely the Sagong Tasi Education Programme, which has also been achieved not only for tertiary education but also secondary education, that is, at secondary school level. Hopefully this will encourage the involvement of Orang Asli children in educational institutions. I also want
May I ask for a little clarification. Thank you, Dato' Menteri Besar.
Sijangkang.
Mr Deputy Speaker. What is YAB Dato' Menteri Besar's view if we could perhaps allow some leniency for the admission of these Orang Asli children into universities under the Selangor State Government? For example, perhaps not three credits, but three subjects passed, placed in a course foundation that we develop, which will ultimately give them at least some stimulus, that is what I mean. Thank you.
Thank you, Honourable Member. We must also uphold the standards set by the Malaysian Qualifications Agency (MQA). Our universities must obtain MQA verification in terms of syllabus and student admission methods. However, I am prepared to raise that issue for us to discuss. Whether the minimum standards we have set are able to allow these students, or allow them. However, we also have training education programmes such as Selangor Technological Development Centre (STDC) and also what we named INPENS previously, to provide skills training to them, and the proposal of the Honourable Member for Sijangkang, we are ready to submit it as long as it does not violate or differ from the criteria that have been set by MQA.
Honourable Members all,
I also want to refer to Bukit Lanjan regarding Taman Rakyat. This has been raised several times in the House, that the construction of Taman Rakyat, and we have two proposals. Two proposals. The first proposal is to be placed in an area near Perpustakaan Raja Tun Uda (in the surrounding area) at a cost of RM40juta. That is the first proposal. At the same time, we are also proposing, or giving consideration, to developing the area around Section 14 (in the area from Padang Kemerdekaan to Tasik Shah Alam, Padang Kemerdekaan A and B, in the surrounding area that has already become the focus and settlement of the people). In our imagination of development, like High Park or Central Park in New York. It should be located in the central area of the city that becomes the focus. But if we focus on the Section 13 area, which is also developing and perhaps the cost is somewhat high because it is still fresh and needs several improvements (needs some construction). But the area we proposed is also quite good because it has already become the focus of many people and should be upgraded and enhanced, and perhaps trees and plants need to be added to be made. We are actually waiting for the report from the consultant. And to some extent, this pandemic has affected the completion of those reports. Once they are complete, we can actually launch it at any time, whether upgrading the whole of Section 14, covering Padang Kemerdekaan A, B and C, followed by Tasik Shah Alam and also the surrounding area up to the mosque area, or we build a new area close to Perpustakaan Raja Tun Uda, for which in this year's Budget we have also made provision for new construction.
And I think Bukit Lanjan also mentioned the mobile library. Bukit Lanjan did mention the mobile library. Actually it is not that there is none. Its operations exist, and in fact this year we have added new ones. The allocation last year was because we purchased new units to increase the number of mobile libraries. I forget the exact number, but in the new library exhibition we have also upgraded the capacity of these mobile libraries, which can also cope with pandemic problems such as COVID-19 in the future, including by installing ventilation aspects and so on. So, God willing, if I mention the Tasik Shah Alam area, the pocket at Laman Kemerdekaan, Presint 2.1, 2.2, 3.1 and 4.2, Persiaran Perbandaran in the Seksyen 14 City Centre. These are among two locations that we are considering for development, and we also want to take that spirit so that it is truly enjoyed and used by the people. And indeed the area at Section 14, on weekends now, is quite crowded with residents, who sit there, including on weekends. On weekends, the (what is this) car free day has been reinstated at Shah Alam City Council, and hopefully it will become one of the programmes we want to implement.
Next, I would like to refer to the statement and also the question raised by Pelabuhan Klang regarding the land-use zone plan for BP6 Telok Gong. The RT or local plan proposal of Klang Municipal Council (MPK) 2035, replacement. This is among the triggers for the question raised when the local plans for 2020 to 2035 were presented by the Municipal Council so that they receive attention and consideration from Members and all the gentlemen and ladies. And as is well known, each RT will also have a committee, yes. An objection committee, a hearing committee. And these committees will then submit their proposals to the SPC (State Planning Committee). So, whatever the final decision is, it is not a unilateral decision by the division or leaders, but it originates from the State Planning Committee, and the State Planning Committee is also attended by all the departments involved. Whether the Selangor Water Management Authority, whether the Irrigation and Drainage Department of Selangor, whether Klang Municipal Council, and also other local councils to come and look at the aspects. Including environmental aspects, facilities aspects and so on.
The area referred to, namely Plot A and Plot B, is for the resolution of the overlapping issue. There was an issue of overlapping land there previously. And we replaced the overlapping area with that area on April 2020 at the 11th Meeting of the State Executive Council (MMKN) of 2020 in that area. Why? Because the decision was made as the Technical Department and the relevant departments did not have strong objections except for the Selangor Water Management Authority. With the hope that we can preserve the context of the river and water catchment area in the area concerned. The reason the area concerned was considered suitable for development afterwards is that behind it, at Telok Gong, are areas that can be considered industrial areas. I think the Honourable Member is also involved in the Telok Gong area because Telok Gong is an area that is mixed between settlement and industrial areas. So, how do we do it? Do we relocate all these factories, or do we have to rehabilitate them? It is a lengthy discussion. I think Pelabuhan Klang also objected on several points. The placement of factories in front of schools, in front of residential settlements. And we must be consistent on this. Do not agree with factory operators in front, but then say we object in front of residents. We must be consistent on this. Therefore, we must rehabilitate the issue there, alongside the potential areas ahead, and that is part of the causes of what is called flood areas or flood-path areas. But the overflow of water in that area still occurs because there are no mechanical engineering elements capable of diverting the water in that area. And if we look at all the big cities in the world, along river banks are now already allowed as development areas. And the JPPD has also prepared a guideline for development along river banks,
because at the same time that area can also be developed as a recreational area or tourist area and as a retention point, with permission, or areas of temporary ponds to prevent floods that continuously occur by simply letting or us letting those things happen.
So, if the allegation says all departments objected, I don't care, I don't think that happened. It was decided when all departments agreed to the development, and in front of the area raised, Plot A and Plot B, is an area that we call bio-bay. Bio-bay, a new area to be developed for bio-technology development in Selangor State, and that area, if combined with the Telok Gong area, which is just across from it. Automatically, I, we believe the Telok Gong area will change its face from a mixed settlement area to an area that is more orderly and organised. So, it was decided through certain stages. Local plan, amendment, followed by a committee. The committee raised not just one matter at that time. There is one area in Bukit Raja, and in the North Port area. North Port is an area that is almost the same and was agreed. And the same agreement was also decided for Plot A in the area raised in that area. Which we believe does not destroy the whole. It indeed solves problems such as flash floods and floods that occurred and are still continuing there, with approvals for engineering, mechanical engineering to overcome the flood problem.
Thank you, Honourable Member, the Most Honourable Member for Sungai Tua. What the Most Honourable Member for Sungai Tua said actually concerns that there indeed are stages during the preparation of the local plan 2035 for the Telok Gong area. I agree. And during the preparation of that local plan, the ecological area that we had set was 30%. And it remained so until 2019. I have to say this because the Most Honourable Member still keeps saying I said this, no.. But this is the reality that I have to state in this august House, namely that in 2019, the Land Office submitted an application for the disposal by alienation of government land under Section 76 of the National Land Code 1965, an area of approximately 80.307 acres of Plot B for industrial purposes, to obtain MPK's comments. And the Council received that application on 13 May 2019. And on 3 May 2019, the Klang Land Office again submitted another application for the disposal by alienation of government land under Section 76 of the National Land Code 1965, an area of approximately 121.721 acres of Plot A for industrial purposes, to obtain the comments of Klang Municipal Council. And the Council received the application on 13 May 2019. And the Klang Municipal Council rejected this application because this area is a green ecological zone that we had agreed upon through public hearings and objections
that we held in 2018. And this is what we want to maintain as a forest reserve that was gazetted in 1914. And then there was an attempt to acquire the land in 2001. 2001! UMNO, Barisan Nasional. At that time, the minister came from UMNO, and declared that the land area described as the Telok Gong forest reserve, and declared as such through gazette notices Number 2581 of 1914, and Number 610 of 1970, is no longer a permanent forest reserve, done by UMNO and Barisan Nasional in 2001. Attempts to acquire this land by certain individuals began in 2001.
That is why I am present in this House. I want to defend what the British Government did in 1914, namely maintaining this and proposing this zone as a green ecological zone. Which until today, has become the, what is this, natural river bank. Which has greatly helped solve flood problems. And even the Irrigation and Drainage Department knows that in this area there are water gates, in this area there is, what is this, what, the fishermen's jetty settlement and everything that does not greatly disturb the existing mangrove swamp forest. But if 200 acres of this mangrove swamp land are touched, what will happen to the Telok Gong area? Right? If it is for relocation, the Most Honourable Member, let me say. Because this is not a problem of me objecting to factories, I do not object. That is why we set up this community infrastructure master plan to solve the overlaps between village residents and also factory operators. And thankfully many have begun, and there is now consensus. I spoke with the Honourable Member for Bandar Baru Klang. Indeed we cannot satisfy all parties, but we try our best. That is why the technical committee exists, the master plan for infrastructure and the community of the Telok Gong area was established because this area indeed has problems. And through this master plan committee we will resolve, in stages, the issues arising in the Telok Gong area, especially infrastructure problems and public facilities. And this infrastructure includes roads and also the existing drainage and sewerage systems which often experience flood problems. This mangrove swamp forest is there, but if it is touched, how? And I want to state here that this matter was referred to the Selangor State Planning Committee Meeting number 2 of 2020 dated 30 June 2020. And the recommendation for zoning the land plot from ecological zone to industrial takes into account the approval of the 12th Selangor State Government Executive Council Meeting of 2020, on 1 April 2020, through disposal by alienation of government land for industrialisation purposes. And Klang Municipal Council was requested to make a zoning amendment to industrial zoning for the site applied for. Two companies in Alor Setar Kedah, the Most Honourable Dato' Menteri Besar. I have already seen who applied. And I hope this does not happen and that it is reversed. I ask, I want to hear from the Most Honourable Dato' Menteri Besar to reverse the ecological zone, the industrial zone that has been proposed in the MPK 2035 local plan, which
allegedly was gazetted on 18 February 2021, to be reverted to green ecological zone.
Alright, Honourable Member.
Honourable Member, what you have mentioned, I have already mentioned. No need to say it loudly. Indeed the decision of April 2020, we have approved it. Why was approval given? Approval was given after looking at the proposals from each technical committee. There were indeed objections from certain committees or certain agencies, but we looked at the potential of the area there. And if we say it is a flood buffer area, floods still occur. So we need mechanical engineering for that area to release those areas. And it can be stipulated in the planning permission for construction in the area concerned. If surrender, alienation occurs, it means that the area is not one gazetted as a forest reserve. It can be given because it comes out or comes out from the forest reserve gazettement area. If it is a forest reserve gazettement area, we have to hold a hearing to gazette its exclusion, or what is called degazettement, in English called degazettement. Yes, that is what happened. So, it goes through process after process that is carried out and obtains the views of each relevant department. However, there is still room to submit this matter if they are not satisfied to maintain it as ecological zones. And the ecological zone can be made and we have to pay back, because it involves the replacement area I mentioned. It involves replacement of overlapping land in another place. Placed there to solve the overlapping problems caused by the land management system under conditions previously.
But the local plan must be changed back, if it is to be withdrawn as ecological and so on, because we have a local plan. In the local plan, amendments, modifications are made at every time, and actually every two months the State Planning Committee or what kanun is this, the State Planning Committee has a provision to do so. Because if we look at that area, across from it, all have been given ownership for bio-bay. Above it there is already bio-bay. Behind it are industrial areas and so on. Is the ecological area there all taken? No. That is why we maintain that 30% remains. Not in the Telok Gong area only. If we look at every zoning 30%, every zoning 30%, it cannot be. It will look at the whole area of Telok Gong.
Most Honourable Dato' Menteri Besar, it is true, Most Honourable Dato' Menteri Besar, that you said through the public hearing process, but in 2018, it was not stated that this zone would be gazetted or requested to be changed to ecological zone. There was none. Eh, industrial zone.
There was none. That is why there was no objection to the industrial zone; if there had been during the exhibition, during the public hearing and so on, which was chaired by the Honourable Member for Lembah Jaya at that time. Three days, at most the longest for a public hearing. During that public hearing, the diagram shown, the map shown, was 30% ecological area. That is why almost everyone agreed, although there was a minority who did not agree. That is why I was shocked at how suddenly this industrial zone came in, so much so that I and the Honourable Member of Parliament for Klang were slandered so badly, as if something was being hidden. Why was it not exhibited again if it is true that at SPC level there were requests for changes and so on, no one objected. Why was the local plan or the draft local plan not exhibited again, stating that there was a proposal to change this area to ecological zone, this industrial zone from green ecological zone.
We need to discuss this again. Honourable Member. I understand.
If there was such a hearing, I am sure many objections would have been raised at that time.
No. I understand. I understand. In 2019 there was indeed ecological zoning. The SPC decided that Klang should change the zone. The process of changing the zone will go through a modification process. The modification process will be carried out again by the party in the manner and with the modifications permitted under the regulations. At that time there was indeed no proposal in 2019. It only arose after 2020. And when 2020 came, the grant was given and the zone modification had to be carried out through a specific process. Its process, if a hearing is needed and so on, must be carried out as it normally is, as is customary. That is what we should understand. So we cannot jump and skip as if the State Government is trying to hide something. There is nothing being hidden. If we were hiding it, the Honourable Member would not know what happened regarding the change of zone and also the surrounding area.
No, Most Honourable Member.
All right, Pelabuhan Klang, please shorten it.
I, I have to say, Mr Speaker. I have to speak about this matter.
I do not want to prolong it.
It is not a matter of prolonging it. The Most Honourable Member, this will certainly become lengthy. This matter will be lengthy. That is why I want to settle it in this august House. I certainly want to hear the Most Honourable Dato' Menteri Besar on changing the zone back.
Honourable Member, it cannot be settled in the House. It must return
I want to hear the Most Honourable Member say he will try to change it back, that is all.
There is no problem if we want to change it and bring it back to the SPC. That is what I want to tell you.
Yes, bring it back to the SPC and change it.
Yes, bring it to the SPC, and what is the problem?
Yes, bring it back to the SPC and change it.
Honourable Member, the Honourable Member cannot pretend to know everything.
No, it is not a matter of wanting to know everything. The process...
Wait, wait Honourable Member, first listen.
(House in uproar)
Honourable Member, the Government has spoken. Honourable Member, please sit down first.
I know, the Honourable Member needs to understand that when a report is handled, it is a technical report. Technical Department. We cannot say this is ecological just because of our own feelings, that is not allowed. I want to tell you it is not allowed. That's why the process has to go back to the process of the Council submitting again, oh, this area cannot be changed for certain reasons, and we have its medium. Its medium is the SPC.
It is not the Menteri Besar who says change, shift, direct all the roads in an instant, it cannot be like that. We have a system. If we do not comply with that system on the pretext that we want to hold power, it is not allowed. That's why I mention why the land ownership was granted in April 2020? Because the area was no longer a permanent forest reserve. Could it be granted? Is it allowed by law? Why was it granted? Because from the reports of several departments, they saw its potential for development because it is across from Bio-bay, and if the areas there are connected, the surrounding area would be developed better. That is the basis. So when the grant was given and it is to be changed to industrial status, the zone must be changed. The process of changing to an industrial zone must be carried out, and at that time the SPC must make that proposal. So if there are objections from the Council, the Council resubmits them to the SPC so that we can change the zone again. How can everything be changed in this House? It is not like that, there is a system. We must scrutinise every report.
Most Honourable Member, earlier the Most Honourable Member said that we are changing it to industrial zoning supposedly to relocate the factories that are not located in the industrial zone to here, but why was it given to only two (2) companies? The plot is so big. And the company is from Alor Setar, Kedah, moreover.
Sabar.
Pelabuhan Klang.
I misunderstood. Not yet, wait.
Sungai Pelek, please sit down first.
(House in uproar)
This is clear.
It is not for relocation.
Wait, wait, wait. I want to tell you the relocation refers to the land areas that overlap, not the factories inside there. The factory inside is the factory inside. That too we will resolve. We will resolve it. The Honourable Member also does not agree whether we move it or not move it. Never mind, let us discuss and resolve them one by one, but that is a relocation from the land areas that previously overlapped, so that they can be moved there. It is an overlap of land. We move them there, find land. Which land is suitable? This area in front of Bio-bay is suitable for development, and the District Land and Mines Office (PTG) and the Land Office consider the area suitable to be used as a relocation area. So we relocate them. Once we have relocated them, why do we give people land but not allow them to develop it? We request that it be changed. Are there objections? There are, and we listen, but for those objections we look at whether the area can be developed and whether it can rectify flood problems if they occur, subject to the conditions in the planning permission.
Thank you. I agree with the Menteri Besar that this case cannot be resolved in the House. There is an SOP. So I agree that the way is that if the objection is genuine and true, the decision made by that department can be reviewed, with leave. That is the way. I suggest Pelabuhan Klang use that way. Thank you.
I need to explain the system. I myself have no interest. I clearly have no interest, and those two companies have none either. But I will explain its original intention, its history. The original intention was to replace the overlapping land. So identify with Klang there? Why? Can that area be given ownership? It can, and we give ownership. They must pay a premium, must pay the premium, and once it becomes ownership and we have to change its zoning, when the zoning is changed the process must be carried out, and objections are made, not that all objections must be rejected once. We must look at the technical report; the basis was made. So it is not as the Honourable Member's view in the debate, that oh, all this is an instruction from the Town Planning Department. It is not that simple, because it goes through several processes. That process is carried out in the State Planning Committee, and all departments are in the State Planning Committee. If all departments are there, then hearing those views will certainly be considered, because at that time we also approved the North Port area. We also took into account the development at North Port and also the Sime Darby development in the Bukit Raja area, if I am not mistaken, to expand the development area, if I remember correctly. If I can still recall the June 2020 decision, but can objections from the local residents for that area be made? It cannot. From where can it come? From Klang, lah. Klang, the Klang Municipal Council (MPK) must bring it back if they do not agree, if there are reasons, what? A, B, C, D, E, submit them to the SPC. The SPC can reconsider, withdraw, remove, but the land must be withdrawn from the grant of ownership. If it is given to others, we must look for land, perhaps next to the Honourable Member's house or something. If possible, for example, it is better that we find another place, we would not need to search, but that is the limitation we have in land management, and that is why we give land. So it is not something that violates, but there is an incompatibility.
But Honourable Members all, that is why the JPPD or PLANMalaysia set out certain methods and approaches for development along riverbanks, that is why we develop SMG as an example. All of this is moving forward so that we can develop in river reserve areas in a manner and with methods that firmly protect the environment, although there will certainly be impacts. Not everywhere can we follow that, that's all.
Thank you, Most Honourable Member.
All right, I think there is no need to prolong it.
Just a moment, Mr Speaker. Just a moment. Only briefly, my last point. After this, the Honourable Member may speak.
Last, yes, I will give you the last one.
The Most Honourable Dato' Menteri Besar and I are both from Parti Keadilan Rakyat, and our struggle has 18 aims and objectives. The party's struggle, point 17, is to protect nature from destruction, prevent damage, improve the quality of the environment and ensure sustainable development, and I very much hope that the Most Honourable Dato' Menteri Besar will re-examine the decision that has been made and bring it back for review at the SPC level. I request, and I appeal on behalf of the residents of Kampung Telok Gong and the residents there, please solve the infrastructure problems first, please solve the community's welfare first, then we can talk about the system or this green ecology which is to be changed to industry.
Honourable Member, let us look at the term used. Sustainable development, not no development. The term is sustainable development. What is sustainable development? It is development that takes into account the overall aspects, that is, sustainable development. That is indeed the pillars of development in the State Government. If we want to develop SMG as an example, SMG will also develop several areas like that, which were disposal sites, which were not developed, which faced swamp problems but became traps for rubbish. So the term is not no development, but sustainable development that takes environmental aspects into account. If we say 30%, we have evidence of 30%, and in fact our permanent forest reserve is 31%. Moreover, recently, if I may mention, at the National Land Council, the Federal Government presented a proposal to amend Section 11 for the degazettement of forests. Degazettement of forests. To change it there must be a Public Hearing. In Selangor we started early in 2005 and have carried it out until now, and you can all hear the Public Hearings with various views. State Assemblymen from the Government also object. Opposition State Assemblymen sometimes support. Opposition State Assemblymen also object, and the Government has to consider, because we must be prepared for the expansion of development. We cannot let the expansion of development remain as it is. Otherwise, it will not progress. It will not move. Because it changes. Previously it was indeed not allowed, the river reserves existed. At one time we went to Thames in the UK, we went to Korea, everything is developed along rivers but with their own technology and methods. Do we dare or not dare to do it? That is all. Otherwise it will not progress, it will not expand, and we will remain static in development areas.
I agree, I also understand about protecting the environment. That is why we are at 31. When the public hearing was proposed by the Federal Government, the Selangor State Government was the first to agree. The Penang State Government was the second to agree. All other governments did not agree, even though they were proposals of the Federal Government. The Federal Government proposals of NM and PN, but the Pakatan Harapan Government agreed, and we firmly held to those policies and principles. That is why I want to explain that the processes carried out are valid and clear, and we listen to various views, and we take all views into account, including development potential. Do not only look at the ecological aspects or environmental aspects, because every development must also go through the planning permission process, and the planning permission process will take into account all conditions, including the construction of roads to connect Telok Gong with the Pulau Indah area. Are we going to let Telok Gong be left behind while Pulau Indah is developing rapidly? That is also a question of sustainable development, so that those here benefit from development there, not just watching. So, the whole aspect becomes a consideration, but if the Honourable Member insists that the Honourable Member does not agree, the Honourable Member may refer back to the MPK, the MPK can bring it back to the SPC. That is all. At the SPC we will reconsider every aspect, because nothing has yet been done. Nothing has yet been done that involves zoning. If we say this is residential zoning, Telok Gong cannot be changed. Telok Gong is a mix of houses and, and, and factories, so that is why we change it.
That is why it is given the name RT Re-zoning. The RT modification, all of it has schemes. Modification and local planning. If we stay static, the box and local plan will finally become the same box, we cannot see comprehensive development of a single development. So I think, I have answered many questions. What was raised in Terentang we have answered, what was raised in Taman Rakyat we have answered, and I also thank Kinrara for explaining about the entertainment tax. The entertainment tax, in fact the State Government lost more than 50 million because of the absence of entertainment tax, because the entertainment we imagine, cinemas for example, are not the kind of entertainment we have in mind. We have lost it. So that reduction will certainly also affect progress and state revenue. So when state revenue is reduced, we in turn ask for more contributions from the allocation, so it must be balanced, our minds must be coherent with what we say so that we are clear about what we are planning. Thank you, Honourable Member.
All right, thank you, Most Honourable Dato' Menteri Besar.
Honourable Members all, the matter before this House is a Motion which reads:
"That, pursuant to section 9, subsection 4(3) of the Development Fund Act 1966, this House resolves that the allocation of One Billion, One Hundred and Twenty-Three Million Ringgit (RM1,123,000,000.00) stated in the Development Expenditure Estimate, tabled before the House under Section 4(1) of the same Act, as contained in the Schedule, be approved."
SCHEDULE
DEVELOPMENT EXPENDITURE ESTIMATE 2022
Vote Title Amount (RM)
P.01
Office of the Menteri Besar and State Secretary
823,711,000.00 P.04 Selangor State Treasury
180,000.00 P.08 Selangor State Department of Agriculture
12,528,000.00 P.10 Selangor State Forestry Department
6,080,000.00 P.12 Selangor State Public Works Department
138,130,000.00 P.13 Selangor State Irrigation and Drainage Department
57,950,000.00 P.14 Selangor State Islamic Religious Department
76,716,000.00 P.16 Selangor State Town and Rural Planning Department
1,650,000.00 P.17 Selangor State Veterinary Services Department
6,055,000.00 Total 1,123,000,000.00
Honourable Members who agree, please say YA. Honourable Members who do not agree, please say TIDAK. Agreed.
The next Motion is Motion No. 3 of 2021, Selangor Youth Policy 2020 Motion.
Silakan.
Mr Speaker and all Honourable Members. I wish to move a Motion which reads as follows:
"This Honourable House resolves to approve the implementation of the Selangor Youth Policy 2020 to empower the youth movement in Selangor over the next 10 years."
Honourable Mr Speaker and all Honourable Members
The Selangor Youth Policy 2020 in the national language version is as distributed to this honourable House. Youth is the age category with the largest share of the population in most countries of the world. In 2020, the Malaysia Youth Index statistics through IYRES found that 1.5 million residents of Selangor are youth aged 15 to 30. In 2021, based on data from the Department of Statistics Malaysia, the estimated population of Selangor was 6.55 million people. Of that total, 2.92 million people were youth aged 15 to 39, representing 44.58% of the population in Selangor. This makes up 20% of the youth population in Malaysia. Of that same total of 2.92 million, 54.1% were Malay or bumiputera, 21.1% Chinese, 10.9% Indian, 0.7% others, and 13.2% non-citizens. Also of that total, by gender, male youth numbered 1.5 million, or 51.8%, while female youth numbered 1.4 million, or 48.2%. Youth are the true foundation, or the backbone, of the strength and resilience of a race and a nation. Therefore, efforts should be focused on enhancing their capacity and their competence. This is very necessary considering that the future challenges that youth will face are heavier and more sophisticated, requiring a great deal of personal preparation or readiness.
According to Kooler and researchers, youth development is a process of development, knowledge, behaviour and positive attitudes that helps the process of positive youth development. According to Mohd Mursyid Arshad, Ismet Arif Ismail, Nuraihan, as well as Nasrin, in 2019, youth development is a structured and continuous process capable of producing youth as leaders and partners in national development. According to Azimi, in 2005, youth activities must be responsive to the current needs of youth, and also proactive in focusing on bringing out the potential of youth, for present and future benefit.
Honourable Members, when youth do not have the necessary knowledge and skills, it is rather difficult for them to navigate the hardships of life in the future, let alone to advance the nation. This may undermine the continuity of development efforts to be achieved in line with the goal of making Malaysia a developed nation in this era of the 4.0 revolution. According to Zulhelmi and others in 2012, who stated that the formulation of a policy, including policy development relating to youth, must be based on high-impact research so that its implementation can be carried out systematically together with the target groups. And according to Mursyid Arshad in 2021, who stated that the main essence of youth competency development programmes must emphasise the aspect of developing new skills, namely Up-Skilling, strengthening the existing skills of youth, Re-Skilling, and cross-training youth with other skills, or Cross-Skilling. So that youth are able to carry out a variety of tasks in line with current needs. This is important in ensuring the youth development process, covering the cultivation of external assets of youth in the form of support from adults, in order to strengthen the internal assets of youth themselves.
Honourable Members, the first objective of the Youth Policy 2020 is to produce Key Performance Index standards, or KPIs, within the Selangor Youth Policy 2020, to monitor youth development activities across stakeholder agencies under the State Government. The second is to produce a draft framework for the Selangor Youth Policy 2020 based on youth for youth, to face the Industrial Revolution 4.0 as outlined in the Smart Selangor policy itself. And the third is to produce a draft Selangor Youth Policy 2020 that is comprehensive and flexible to guide youth development activities under the responsibility of the state government, and thus track youth development through rapid change in line with the factor of globalisation. Therefore, a holistic positive youth development framework or policy, from the individual youth level to the level of stakeholders, must be established. This policy will act as a manual guiding the direction of youth development. Besides that, it will also function as a benchmark for the current status of youth development. The question is, to what extent the capacity of youth development programmes that drive youth as development partners is reflected by the policy that guides them. It cannot be denied that there are shortcomings in youth development programmes, caused by many factors. But the most basic matter that causes them to occur is that the implementation of programmes is not anchored to specific guiding policies. Youth development programmes certainly need to be intensified or diversified. But are they monitored against a performance indicator standard, to ensure that every investment yields the desired results? Actions taken without concrete policy make failure in any undertaking possible.
Honourable Members, Mr Speaker, not every policy succeeds. So if we look back, return, to the foundation in Selangor, it is the Youth Policy 2015. It was introduced by the Most Honourable Dato' Menteri Besar, who introduced the Youth Policy 2015. This 2015 policy clearly emphasises the close examination of every detail of more than 30 strategies. This is in contrast to the policy introduced by the federal government, which was regarded as a failure.
Honourable Members, if we look at the policies that were created before, namely the 1997 weakness policy, which was seen as a policy that did not develop the nation's own youth. As the ADUN for Templer put it, salt or experience is an important matter to certain parties. Therefore, the State Government learned from the experience of formulating previous policies.
At the federal level, the existence of the National Youth Development Policy launched in 1997 has a long history, as far back as when it was raised by the Malaysian Youth Council since 1967. What is saddening is that a study by IPSAS researchers in 2011 found that the 1997 National Youth Development Policy was hardly referred to by most stakeholders in some agencies of the Ministry of Youth and Sports. The same government also found that the national youth development policy failed to be internalised and translated through programmes that have youth as the target client. This may have happened because the policy was more academic and far removed from reality, or perhaps stakeholders were not ready to bring the inspiration of youth policy at that time. Therefore, in 2015, the Selangor Youth policy introduced by the Most Honourable Dato' Menteri Besar at that time, this 2015 policy, clearly emphasised the close examination of aspects, more than 30 strategies contained in the Youth Policy 2015, which had layers of incentive-based approaches that had been planned in the policy development carried out. With reference to the Selangor Youth Policy 2015, there were 10 areas that were priorities in the youth development agenda, covering 10 main pillars as the guide to the optimal policy at that time. The Selangor Youth Policy launched in 2015 led to the establishment of a local youth facilitator, now known as Penggerak Belia Selangor. However, findings obtained from focus group discussions found that the Penggerak needed greater internalisation of the youth development agenda, so that their approach would be felt by youth in the state of Selangor. Apart from changes in the leadership structure of the State Government, which ultimately also created limitations on the internalisation and understanding of youth policy. Previously, there was [sic] among stakeholders and policymakers on youth in the state of Selangor. Based on that emphasis, the question arises as to what suitable mechanism should be used as the basis of specific policy to shape youth development in the State of Selangor.
Honourable Members, for that reason, based on the passage of time and changes in the phenomena within the environment of youth itself, the government wishes to further empower the Selangor Youth Policy 2015 through the formulation of the Selangor Youth Policy 2020, especially involving new matters that the government must approach. The formulation of the Selangor Youth Policy 2020 also needs to consider the current changes faced by our youth in Selangor, and the advantages they possess, their direction, the methods for achieving that direction, and the time frame for achieving a holistic youth development direction. Therefore,
the State Government believes that the government has policies or guidelines that are in line with the dynamic current needs, specifically post-pandemic 2019, or the new norm, which we believe can reach these youth. But what is more important later is that the policy formulated can be translated into state youth development programmes by taking the element of Return on Investment. To reach these youth, political capacity, or political will, in developing important areas of development, will generally be assessed through the specific policy that is followed.
Honourable Members, therefore, taking lessons from the situation that has occurred, the formulation of a comprehensive Selangor Youth Policy 2020 can be seen as an advantage from the perspective of positive youth, specifically, in addition to the perspective of political capacity in general. Considering how important the existence of a state youth development policy is, a scientific study towards the formulation of the Selangor Youth Policy 2020 has already been carried out in cooperation with Universiti Putera Malaysia. This policy takes into account the needs of the Industrial Revolution 4.0, taking into account initiatives such as Smart Selangor, and the needs of Selangor youth to face the very challenging demands of post-COVID life, which must be implemented before a comprehensive and inclusive policy can be formed. Therefore, the development of the Selangor youth policy will explore the continuity of previous policies, through the collection of qualitative and quantitative data. The Selangor Youth Policy 2020 has taken into account the development of technology and cyber in Selangor, guided by the Smart Selangor action plan and guided by the experience of our past policies. The outcome of the Youth Policy 2020 has outlined the need for youth to be involved in smart government, smart economy, smart community and smart digital infrastructure initiatives or incentives, which are in line with the needs of the Industrial Revolution 4.0. Accordingly, there is a need to improve the Selangor youth development agenda, which was outlined in the Selangor Youth Policy 2015 earlier, so that the planning and work of formulating the Youth Policy 2020 is relevant to the current situation, leading towards future life.
Therefore, Honourable Members, with the existence of this Youth Policy 2020, it creates a youth action development plan in Selangor. It opens a wider platform, such as courses to bring out youth potential and talent. It creates a new age group within the youth category, which will replace the controversy relating to the actual youth age limit, and according to a more accurate definition and international standards, while also taking into account the realities of the current situation in Selangor. Studies have found that these two groups, namely those aged 15 to 30 years, and those aged 30 to 40 years, still hope that they will not be marginalised in youth development in Selangor. For that reason, through this youth policy, we recognise the role of youth by giving two new classifications, namely youth among those aged 15 to 30 years, and we introduce adult youth, namely those aged 31 to 40 years. And this becomes the basis for the future Selangor development plan. So that policy proposals and youth development action plans safeguard the rights and needs of youth based on appropriate legal provisions. Establishing the implementation of a training module within this Youth Policy 2020. Emphasising the spiritual element that encompasses religious and spiritual components within the domain of health, wellness and sports as a reinforcement to the development of the Youth Policy 2020. Therefore, this youth policy is suitable and applicable to school-going youth, youth in institutions of higher learning, youth in professional careers or entrepreneurs, at-risk youth, minority youth, youth in associations, youth of the day, and youth between times.
Mr Speaker and Honourable Members, with this, I propose support for the Selangor Youth Policy 2020 that has been drafted and formulated.
Mr Speaker, I support.
Honourable Members, the matter before this House is a Motion brought forward by the government, namely the Selangor Youth Policy 2020 Motion. Therefore, I put forward this Motion for debate. Rawang, I give you 5 minutes.
Ok. Thank you, Mr Speaker, for giving the opportunity to debate the Selangor Youth Policy for 2020. Congratulations to the State Government, with the cooperation of UPM Universiti Putra Malaysia and Penggerak Belia Selangor Majlis Belia Selangor, in completing the study to produce this policy. 10 important domains are clearly in the youth policy. It has mentioned the issues faced by young people and also provided policy strategies as ways of resolving each issue. With this youth policy, it serves as a guideline and reference, and as a KPI implementation reference for the next 10 years, comprehensively. Suitable for today's needs. When the Most Honourable Dato' Menteri Besar Selangor held the EXCO post responsible for youth and sports, he introduced the Selangor Youth Policy 2015 in 2014. And it succeeded in building a strong and firm relationship between the State Government and youth. The Selangor Government and youth are inseparable. Various youth programmes have been carried out since 2018 when the pandemic was implemented. During the Covid-19 pandemic, various challenges were faced by young people. The State Government also extended assistance to ease the burden of living, such as the RiDE programme and Jelajah Kerjaya to help them obtain employment. Since 2009, the Government has introduced the Penggerak Belia Tempatan for the purpose of producing young leaders of quality and credibility. After 12 years of implementation, the State Government has succeeded in training leaders in various fields including business, arts and politics. In this sitting there are also many young State Assembly Members who were former PeBT, such as Balakong, Bukit Malawati, Pelabuhan Klang, Rawang and others.
However, the State Government's programmes are still running. The new brand Penggerak Belia Selangor has a new structure to adapt to present-day aspects. After the Federal Government defined the age limit for youth as 18 to 30, it also received negative responses from various associations and political parties. Among the reasons is that fixing the youth age limit will kill youth activism and also affect the progress of nation-building. The youth policy based on the Selangor Youth Policy 2020 gives a new definition to the age group between 30 and 40, namely adult youth, so there is no worry that this group will be neglected in the Selangor Youth Policy. Mr Speaker and Members of the House, I am interested in the core issue relating to the lack of youth participation in leading various communities in Selangor, as mentioned in the Selangor Youth Policy 2020. Young people constantly face competition from adults, which is one of the reasons given for rejection. Rejecting youth involvement in leadership matters is on the grounds that they are not mature enough to make decisions. This is not true. Young people today are exposed to various information and are also easily involved in issues earlier than previous generations. Thank you to the State Government, in its strategy in the Selangor Youth Policy 2020, which also mentions that a quota of 30% should be given to capable youth to provide opportunities to hone their talents in the arena of community leadership across sectors, including the political, social community and corporate sectors. My view is that the strategy for youth participation with a 30% quota should begin in the State Government of Selangor's affairs, so as to provide space for involving youth in making decisions or taking part in various state committees. The quota appointment of Members of the House has long been implemented in the state of Sarawak for the purpose of strengthening the stability of state administration. Recently, special discussions on gender for State Assembly Members have also begun. In Selangor, the State of Selangor has 4.5 million residents, more than half of whom, 3 million, are young people. This means Selangor has the highest youth voter population in Malaysia.
I would also like to propose that the State Government of Selangor consider and study the suitability of implementing a 20% quota of Members of the House for youth. If the quota specified is not achieved or is insufficient, then appoint youths as part of the Members of the House to make up 20%. To ensure there is a sufficient voice of young people in the formulation of state policy and to increase young people's participation in the field of politics. Congratulations to the people of Selangor: now in the Selangor State Assembly, one in four, or twenty percent, of Members of the House are made up of young people. Mr Speaker and Members of the House, in the fast-moving digital era, young people today face various challenges that they have never faced before. Socio-economics change rapidly. In 15 years, technology has also changed from the 2G, 3G and 4G era to now entering the 5G era. The State Government of Selangor has taken steps to become the first smart city in Southeast Asia by 2025. Ideas
and youth participation are an important element in making this mission a success. This is because they are among those affected by these various development changes. I welcome the Government's efforts that always involve groups in consultation sessions on the budget so that state development does not attempt to meet the needs of the people only partially. Friends would like to propose that consultation and dialogue sessions with youth should be increased so as to include their voices. Young people are the backbone who will one day lead the nation and our state. This means that every development is closely linked to young people, so it is important to have a policy suited to today's times so that youth and state development move in tandem. Although at the federal level a national youth development policy has existed since 1997, what is very sad is that this policy has never been used as a reference by the Government all this time. Successful development should indeed involve the voices and interests of youth. I also hope that every implementation of Government programmes can take the Selangor Youth Policy 2020 as a reference so that the state remains a progressive and competent state. Therefore, in conclusion, Rawang supports the Selangor Youth Policy for 2020. Thank you.
Alright, Rawang. I invite Kampung Tunku.
Thank you, Mr Speaker. I will go straight to the point. The first point I want to touch on relates to Domain 1 in the Selangor Youth Policy 2020, namely leadership and political literacy. I welcome the efforts of the State Government of Selangor to nurture leadership and literacy among Selangor youth through the setting up of the Selangor Youth Congress, as well as leadership and political and democracy programmes. In the meantime, I hope that we do not, with permission, reinvent the view. There are many NGOs currently implementing this programme, whether for a day or in series, and I hope the State Government of Selangor will take the opportunity to cooperate and, with permission, tap into their expertise. For example, the Undi 18 NGO, which has broadened its scope to cover various matters through interest groups, with permission, through the One One Initiatives, with permission, to encourage young women to understand and venture into the field of politics. Semi 18, which raises the reform of the Dewan Negara, and My Hutan, which is based on forest protection. Through cooperation with NGOs such as Undi 18 and others, we do not need to start from zero, with permission. We can adapt their programmes to the needs of the state. Regarding the Selangor Youth Congress, I would like to ask about the selection of key stakeholders. I hope we will take into account marginalised youth groups, for example persons with disabilities (OKU), Orang Asli and others. Likewise with the implementation of a youth representative quota as members of community leadership across sectors. When we talk about representation by merit, it is important for us to take into account socio-economic gaps and, with permission, leave experiences. Compare, for example, a young person from a wealthy family who studied at a private university and obtained straight As, with permission, with a young person from a B40 family who struggled until succeeding in gaining a place at a local university but whose grades were just okay. But we should not set aside the life experience and potential of the second student even though they do not look perfect on paper, with permission. The second part: I would like to congratulate and also touch briefly on Domain 7, namely religion, health and well-being. I am interested in the second point, namely improving services and awareness of psychosocial support.
I am very grateful to the Honourable EXCO for Generasi Muda, Sukan & Pembangunan Modal Insan for taking this mental health issue seriously, and I fully support it if the State Government can provide incentives for students to pursue studies in mental health to address the shortage of mental health experts, not only in the State of Selangor but across the whole country. I also propose one improvement, where I hope we will also bring youth closer to career prospects as social workers. We all know that the Department of Social Welfare often lacks manpower, and they also provide psychosocial support. While we try to encourage students to enter fields such as becoming mental health experts and so on, we must not forget careers in social work. I am also pleased to see the proposal to add psychiatric services to the Peduli Sihat insurance scheme. I would like to ask whether the State Government will set up a panel of doctors, and if not yet, I hope the State Government will liaise with associations of mental health experts, for example Persatuan Kaunseling Malaysia, Malaysia Society Clinical Psychology, with permission, and Malaysia Secretariate Associate. Finally, Domain 8 and social media. I propose that the cyber safety education and social media literacy programme be brought forward to age 13. It would be better if it starts from primary school. This is because for many youths, life in the virtual world is almost equal to their reality; they have grown up surrounded by iPads, smartphones and so on. Therefore the risk of youth being exposed to sexual predators and online scammers is very high. Apart from Facebook, Instagram, Twitter and TikTok, I think we are fairly familiar with them. There are some fairly popular social platforms that we do not discuss, namely Discord and Twitch. Discord is an instant messaging and digital distribution platform where many youths hang out in chat rooms and chat about various topics, for example e-sports, drawing comics and others. Twitch, meanwhile, involves live streaming, especially streaming of sports and others. And both these platforms have faced issues of sexual predators and, with permission, hate speech and harassment. And these predators, especially sexual ones, are cunning; they are skilled in grooming, with permission, young people. For example, on Twitch concerning comics, a predator may start by asking the young person to draw ordinary comics. Once they have befriended them, the predator will up the level, with permission, until the comic requested contains pornography. Apart from this danger, the psychological impact on these young people is not something that is easily resolved.
Yang Berhormat
Ya.
Boleh duduk.
This is the last point. One minute.
Not enough time. Cannot sit down first. Continue tomorrow. Mute the mic. Honourable Members all. The time now shows 4.30 pm. I hereby adjourn the House until tomorrow, 9.12.2021, Thursday, at 10.00 am. The House is adjourned.
( THE HOUSE ADJOURNED AT 4.30 PM )