Selangor · 29 July 2022
14th Assembly, 5th session, 2nd meeting · 200 turns · 17,644 words · official PDF ↗ · Digital Hansard ↗
ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.
(Opening)
Good morning and greetings. The Order of Business for the Second Meeting of the Fifth Session of the Fourteenth Selangor State Legislative Assembly on 29 July 2022 began with the recitation of prayers.
Bacaan Doa.
Oral QuestionsQuestions
The next item on the Order of Business is questions.
Assalamualaikum warahmatullahi wabarakatuh. Good morning. Greetings. I invite Subang Jaya.
Thank you, Deputy Speaker. Subang Jaya's question number 48.
Oral Questions — 48. Progress of LRA Langat 2Questions
48. To ask the Y.A.B. Dato' Menteri Besar:-
a)
Please state the steps being taken to expedite the activation of LRA Langat 2.
Thank you, Deputy Speaker. The Honourable Subang Jaya has raised a question regarding the issue of the Langat 2 Water Treatment Plant project. For the information of the Honourable Member, the Langat 2 Water Treatment Plant (LRA) project and distribution system are being implemented by the Federal Government through Pengurusan Air Aset Berhad (PAAB). Based on information provided by PAAB, the overall progress of the project as at May 2022 is 90.32% according to actual progress compared with 92.58% according to the work progress schedule, which means a delay of 2.26%. The Langat 2 Water Treatment Plant has a design capacity for treated water production of 1,130 million litres per day, and has been completed and activated since December 2019.
However, the distribution system of LRA Langat 2, covering the western corridor and the northern corridor, is still in the construction stage and will only be fully completed at the end of 2023. To ensure that treated water from the Langat Water Treatment Plant can be channelled to consumers, PAAB has made a connection from the new balancing pond of LRA Langat 2 at Bukit Enggang to the existing balancing pond of LRA Langat 1. Next, Air Selangor has also carried out two more pipe connection works downstream to further expand the flow system to more areas. At present, Air Selangor has distributed treated water produced from the Langat 2 Water Treatment Plant using the existing distribution system, up to 400 million litres per day. That is all.
I invite Hulu Kelang.
Soalan 49.
Oral Questions — 49. Developing Brain Bank SelangorQuestions
49. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What are the government's plans in developing the 'Brain Bank' Selangor?
b)
What is the projected future field and mastery of knowledge required?
Thank you, Speaker, and Hulu Kelang for asking what the plans of Selangor are for the development of the 'Brain Bank' Selangor. Honourable Members whom I love dearly, in previous terms we had a programme that we call the Selangor 'Brain Bank'. Under this Selangor 'Brain Bank' programme, the allocation that has been provided is for financing and sponsoring or funding doctoral (PhD) studies for children of Selangor who are able to reach, who attain, or who reach the PhD level after completing their first degree and second degree or Master's.
Honourable Members, in 2019 we enacted a slight modification to this programme by replacing the programme called the Bitara Programme. This Bitara Programme no longer looks only at the cream of the cream once they have reached the peak of their education, nor only at their opportunities to obtain learning, but looks at those, or whoever among the children of Selangor who study in Selangor, at the secondary education levels, so that when they reach the secondary level they can pursue a first degree or other studies. At the highest level, especially at the best universities in the world.
We target the world's top 10 universities. However, at this time, we have broadened this to 20 or 30 of the best universities in the world, and some of them in Asia. We have in fact sent a student, a child of Selangor who studies in Selangor, to study at the Royal Surgeons College in Ireland at this time, and he has already or is nearly finished studying. Recently I bumped into his father at Universiti Teknologi Mara, or Hospital Universiti Teknologi Mara, and he informed me that his child, whom we sponsored, has reached the final stage of his education.
Honourable Members, we sponsor at this stage to enter university first. However, the programme will actually start at the secondary level. There we will identify the cream of the cream among outstanding students. They will be nurtured and trained so that they can enter the best universities in the world such as MIT, Harvard or Cambridge, so that they are educated from secondary school until they qualify and are able to face challenging environments.
As for question (b), the projected future field and mastery of knowledge is based on developments or on the fields that are the focus in the state of Selangor. Among them are the scopes covered under Smart Selangor such as government, power and quality, water management, solid waste management, buildings and also housing, mobility or transportation, matters of safety and also security, health, disaster management, food, and also agriculture and education.
Meanwhile, the fields that are usually mentioned as existing in the state of Selangor are related to social development, cultural and environmental development, construction development, environmental security, retail business, as well as technology fields and also Islamic Fest. These are among the fields that are given attention and focus. If these fields are applied for by them, we will try to consider them. Thank you.
Soalan tambahan.
Hulu Kelang.
Thank you, the Honourable Dato' Menteri Besar. I want to raise this issue not because of a family matter or my child, but because it is an important matter of policy. He is in London today; three weeks after he returned from London. Actually, why did he go to London so quickly? Apparently he was assigned by Parliament to attend a course and a paper presentation. He has great potential. He writes a lot in newspapers and writes a lot in magazines. So when he went, I asked. What. When he first went back, I was informed that he had been offered a PhD. The first time, he was offered a PhD by Sussex University. This time, after a gap of 3 years since he returned, 5 years since he returned from his first master's, they offered him again. The same school, Sussex University, as the number one school in human rights. Perhaps we do not need that. What is important is that he is a child of Selangor, born in Selangor (Hulu Kelang), then he is in such a situation. The second offer came from Malaysia; he applied through MARA. So MARA said it is very likely...
Your question, Hulu Kelang?
The question is, what is our policy actually? The first 'Brain Bank' we made was so that we could obtain many children with potential. Second, what is the difference, I want to ask for an explanation from the Honourable Dato' Menteri Besar. Can this be utilised by all the children of Selangor?
Thank you. I. Perhaps the applications that were made, which were referred to by the Honourable Hulu Kelang just now, are applications that were made previously. Indeed the community, committee or selection panel for the Selangor 'Brain Bank' consists mostly of university professors who will review and examine the proposal papers or the qualifications or experience displayed or highlighted by each candidate applying for the Brain Bank. It is almost the same as the dissertation committee for every PhD candidate who wishes to reach the actual viva stage. That is why I have changed this community and committee so that it looks more futuristically and more openly, so that we now assess at the secondary level. Previously we mostly looked at those in their first degree or second degree, whether they were qualified for PhD level, or what PhD level they wished to apply for at that time. Therefore I believe what the Honourable Member asked a while ago is an application that was referred to some years ago, which was rejected, but that application was entirely decided by that panel. Which I observed, the panel, purely academicians overall, are academics. The academia gives their assessments based on their inclinations. Thank you.
Soalan tambahan.
Sijangkang.
Thank you, Deputy Speaker. The Honourable Dato' Menteri Besar, congratulations to the Bitara Programme, which takes into account secondary school students to be identified as input into this Brain Bank. Does the State Government also consider how, at State Government level, we can make it a platform not only to identify them but to provide a programme for them so that they too can be involved in a programme that ultimately makes them the Brain Bank for the State of Selangor, especially in schools under the State Government, yes, such as MITS. They are the selected cream of the cream, and perhaps also at university level. Thank you.
Thank you, Honourable Member. Indeed, in the end we do not want there to be a drain bank or loss, a blank bank Brain Bank that happens. Actually, that is the counter Brain Bank that occurs when they study overseas or obtain exposure overseas, and they do not wish to return. So what we require from the holders or recipients of this Bitara Programme or our Brain Bank programme is that they must return and serve our subsidiary companies or the State Government, or with the approval of the State Government. For example, if he is in the medical field, we do not yet have a hospital. The clinics we have are only 17 clinics. So if he wishes to serve as a surgical specialist, to work at Hospital Sungai Buloh and so on, we will give permission for that. That is the first point.
Second, the achievements mentioned by the Honourable Sijangkang just now are indeed being carried out closely, especially by Yayasan Selangor. We are not only approaching the Yayasan Selangor hostels now. We are also approaching Maktab Rendah Sains MARA (with permission) or MRSM. We also have an attachment with MRSM. Insya-Allah, I accept the view of the Honourable Sijangkang. Perhaps we can also explore MITS. At present, MITS has students who are managed by the Islamic Religious Department (Jabatan Agama Islam), Education Division. And usually they have outstanding students. Thank you.
Next question. Permatang.
Thank you, Deputy Speaker, my question is number 50.
Oral Questions — 50. Selangor Job Fair RoadshowQuestions
50. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What was the response received at the Selangor Jelajah Job Fair programme?
b)
What types of jobs offered were the main focus of applicants?
c)
How many applicants have successfully obtained jobs through the Selangor Jelajah Job Fair programme so far?
Thank you, Deputy Speaker, thank you, Permatang, regarding the Jelajah Job Fair. The implementation of the Jelajah Selangor (Job Fair) Programme is among the efforts of the Selangor Government in providing a platform and space for the public to obtain employment in line with the method of controlling unemployment below the rate of 4%. In 2021, there were six (6) Selangor Job Fair programmes that were successfully implemented in five (5) different locations, namely Shah Alam, Kuala Selangor, Kuala Kubu Bharu, Hulu Langat and Sungai Buloh. The organisation of this programme in 2021 was in line with the S.O.P imposed by the National Security Council (MKN), and for that reason attendance at the time was rather limited. Nevertheless, in 2021 the attendance recorded, of those registered to seek employment, was 2,726 registrants, of whom 1,178 were accepted for a second interview, while 716 were accepted for employment at the 2021 Job Fair. In 2022, in line with the easing of movement under the Movement Control Order (PKP), we held a Mega Job Fair which received a very good response, held on 11 and 12 June 2022 at the MBSA Convention Centre (Shah Alam City Council). In 2022, the total number of job offers was 20,490 job opportunities. Those registered for attendance were
8,201 in number, the total number of interviews conducted was 3,601, and the total number accepted for employment was 1,996, which is 55% of the attendance held at that time.
The next question is what types of jobs were offered and were the main focus of applicants. The types of jobs offered cover various sectors, starting from retail, manufacturing, food and beverage, and various other sectors. The types of jobs that became the main focus are in the field of engineering. Many jobs were offered, ranging from as low as cashier to the professional level at the Job Fair. So there are many lists, and if the Honourable Member is interested, I can send the Honourable Member the list by company that attended our 2022 Job Fair. However, at the next Job Fair, which is likely to be in September or October, we want to focus on existing job opportunities and additionally focus on the hospitality field. I will discuss with YB Hee, Kajang to implement the requests for them in the hospitality field and job opportunities in the sports field. For those with qualifications in the sports field, we will increase the sports sectors in our upcoming Job Fair this time. Besides that, the Honourable Member also had a suggestion and request from the Persatuan Orang Buta (Association of the Blind) to help them obtain employment. This we are still examining how best to approach the OKU (persons with disabilities) group so that together we can help at the Mega Job Fair expected to be held in the 9th or 10th month to come.
Soalan tambahan.
Permatang.
Okay, we have held the Job Fair. Is this OKU category accepted by companies to work with them?
For the information of the Honourable Member, in 2018 or 2019 at our Job Fair held at MAEPS, we had 20 booths focusing on this OKU group. So we do not reject employment opportunities to help OKU, and indeed if we help these OKU, especially among our younger OKU siblings, if we help them, JKM actually pays allowances to them. So in addition to opening opportunities for them, they also receive allowances. So in other words, Honourable Permatang, in addition to regular jobs that we offer, we also do not leave out OKU at our Job Fair.
Taman Templer. Can, Deputy Speaker, may Deputy Speaker allow me.
Yes, please. Permitted.
Thank you. I only want to ask the Honourable EXCO. Just now the Honourable EXCO mentioned matters relating to these 5 or 6 Job Fair programmes. Job, Job, Job, what is it? Yes, sometimes. We only learn the pondok (traditional Islamic boarding school) matters. I just want to know, those who come to register, those who come to look for work. We want to know from the nearby states, meaning from Perak, from Kedah, from Kelantan, from Negeri Sembilan. That means apart from the benefits obtained by the community and citizens of the State of Selangor, we also want to know, when we hold programmes in this Pakatan Harapan state, the benefits are also obtained by the community and citizens from outside the State of Selangor. We would like to ask for some comment or views from the Honourable EXCO. Thank you.
Don't be angry, Honourable Templer. Indeed every...
Not angry, not angry, because this red shirt is different. Different from Sabak, who wears a blue shirt, cowboy.
Honourable Taman Templer, the Selangor Job Fair has attracted attention from people across the whole country, which is why we hold this Job Fair. They attend from as far north as Perlis, and there are also those from the south of our country who attend together. Never mind, what the Honourable Dato' Menteri Besar mentioned, that there was a crowd from Terengganu who came asking for the Job Fair, we celebrate that too. But I want to say that the Job Fair, the Selangor Mega Job Fair, is the focus of everyone from various segments of society and various places. I agree with that, and we have reports stating that they came from far away, from all states, to join our Job Fair together.
Bandar Utama.
Thank you, Deputy Speaker. Bandar Utama seeks clarification: apart from the Job Fair efforts, if the State Government has, for OKU applicants, collected data or information on them, so that if, for example, there are job opportunities afterwards, we can retrieve the information of OKU applicants. The reason Bandar Utama asks this is that many OKU applicants sometimes face difficulties in obtaining work, far more than ordinary applicants. So if the State Government has such data, then if there are companies or agencies within the State Government that open space for OKU workers, we can directly obtain their information. So Bandar Utama seeks clarification: do we have such data collection? Thank you.
At my portfolio level, there is no Honourable Member yet. But our cooperation is with associations, whether the Association of the Blind, the Association of Persons with Disabilities and various others. They have their own data and their own members. However, I will request from the Honourable Dr. Siti Mariah, Health, who looks after OKU, that perhaps there is data with which we can cooperate on the programme later, and I will convey it to the Honourable Member later.
Next question, Balakong.
Thank you Mr Speaker, Balakong question number 51.
Oral Questions — 51. Foreign Investment in SelangorQuestions
51. To ask the Honourable Dato' Menteri Besar:-
a)
What is the state government's strategy to attract more foreign investment into Selangor, especially investors from China?
Mr Deputy Speaker, the Selangor State Government is taking proactive steps in attracting foreign investment to Selangor. While Malaysia's borders were still closed, Invest Selangor held a series of webinars to meet and interact with foreign investors in the region, which are an important source of investment for Selangor State. For 2021, the State Government, through the state promotion agency, organised several webinar programmes as follows:-
NO. PROGRAMME OBJECTIVE SELANGOR INVESTMENT MISSION (WEBINAR)
1.
Webinar titled 'How Selangor, The Golden State of Malaysia is Thriving as the ASEAN Business Hub' on 12 March 2021 (Hong Kong). This virtual programme was co-organised by Invest Selangor and the Asia CEO Community, Hong Kong. A total of 55 association members, namely management of Hong Kong companies, joined this webinar.
2. 'Online Business Matching for Selangor & Ningbo Enterprises' on 8 April 2021: (China)
To create more business opportunities during the Movement Control Order (PKP), a virtual Business Matching session was held where 6 Selangor companies met and discussed with 13 importers from Ningbo, China.
3.
The Belt and Road Summit 2021 on 1 – 2 September 2021; (Hong Kong) The objective of participating in this programme is to promote Selangor State and find potential investors through the annual programme organised by the Hong Kong Trade Development Council (HKTDC). A total of 13 meetings were held throughout this programme and follow-up action was taken by Invest Selangor to introduce suitable companies to explore business and investment opportunities.
4. The Asian Logistics, Maritime and Aviation Conference (ALMAC) on 2 – 3 November 2021. (Hong Kong) Invest Selangor was one of the sponsors of the programme organised by HKTDC. A video recording themed 'Investment Opportunities in Halal Logistics in Selangor' by Dato' Hasan Azhari Hj. Idris, Chief Executive Officer of Invest Selangor, was placed on the official website throughout this programme. Besides that, ISB, namely Invest Selangor
To continue the promotion programme for 2022, a webinar titled 'Explore Selangor, the Golden State of Malaysia' was held on 26 April 2022. This webinar was jointly co-organised by Invest Selangor and MIDA Shanghai, Guangzhou and Beijing. Strategic partners included MAYCHAM Greater-Bay-Area and MAYCHAM Hong Kong & Macau. A total of 77 persons from Malaysia and China joined this webinar. In addition, the investment promotion mission programme to China that has been planned will be carried out once China's borders are reopened. Thank you.
Next question, Lembah Jaya.
Thank you Mr Deputy Speaker. Lembah Jaya question number 52.
Oral Questions — 52. Resolution of Strata Title IssuesQuestions
52. To ask the Honourable Dato' Menteri Besar:-
a)
What is the State Government's solution/approach to the issue of granting strata titles to buyers who have been waiting for more than ten years and longer?
Thank you Lembah Jaya, Mr Deputy Speaker, for the information of all Honourable Members. A check by the Selangor State Land and Mines Office (PTGS) found that all strata title applications submitted completely have been processed within the period stipulated in PTGS's client charter and current standard operating procedures (SOP). However, the State Government takes note of and is committed to resolving issues related to strata development schemes that still have the opportunity to run Selangor promotion campaigns at virtual booths and engage with potential investors from around the world.
have not yet obtained titles. As a result of public complaints and information from the Building Commissioner (COB), a special task force has been established to resolve problematic strata title applications in the state of Selangor. In addition, the State Government, through PTGS, may take action under section 8, Strata Titles Act 1985 against any original landowner or developer who fails to submit strata title applications within the stipulated period. However, approval of such strata title applications is subject to section 10, Strata Titles Act 1985.
For the information of the Honourable Member, among the steps that have been taken by the task force, or (task force), at PTGS are:
(1) Helping to list strata schemes that have not obtained strata in the State of Selangor; (2) Helping and coordinating the processes required in strata title applications; (3) Identifying problems and issues related to schemes without strata; (4) Monitoring problematic strata schemes; and (5) Implementing enforcement actions as provided under section 8, Strata Titles Act 1985.
Thank you.
Soalan tambahan.
Lembah Jaya.
Thank you Mr Deputy Speaker. What is the State Government's approach for developments where the landowner's developer has already gone and folded, but there is no solution to such situations? Second, will the State Government establish a fund to help ease the burden on those who want to obtain strata ownership, because they have to pay penalties and so on, involving very high costs. Thank you.
Thank you. Usually in such situations we deal with liquidators. Liquidators are the ones who take over the winding up of the companies concerned so that eventually we can settle strata ownership. At certain times, the winding up has not been done, or the liquidators chosen keep changing. This is normal in the management of strata ownership housing, especially housing developed in the past. And finally the State Government will make several decisions. Among the decisions the State Government has taken before is waiving or writing off certain securities or certain payments so that strata ownership can be completed. If I am not mistaken, we settled one case in Kelana Jaya. When the developer has left but no settlement has been reached, the charge should not have been imposed on the Developer. The Developer has finished, has wound up, and we, and in the end the victims are the owners of the houses. What we do is waive, which in reality is like a benefit to the developer, but it also gives an opportunity to the owners of those properties. However, we will review this case, case by case, because we cannot finance what is the obligation of the developer. Now we have to put certain conditions in place so that these things no longer happen, but this happened because of developments carried out in the 1990s.
That is only one (1). For the others, we will not do it again, or we will review them case by case, because it will repeat, it will repeat the problems that irresponsible developers eventually created and from which they enjoyed certain profits, but without settling matters with the Land and District Office, for example to settle lots or to settle the strata ownership transfer process that must be completed. Sometimes these costs are quite high and in the end fall back on the owners.
For the State Government, perhaps we do not create a fund. But in certain moments, such as certain charges, we can decide to waive them. The waiver will ultimately benefit them because they do not have to pay or only pay a small portion of the cost that should have been paid. We really do feel sorry for some of these buyers who have been cheated, deceived and manipulated by these irresponsible developers, but usually these developers sometimes hide behind new names. They use a new JV company and so on for a construction, then wind up and dissolve the company, and in the end those affected are the strata owners. Thank you, Honourable Member, you understand well enough.
Supplementary question. Mr Deputy Speaker.
Yes. Lembah Jaya.
Will the government use the successful model just now, which was said to be one case that was resolved by disposing of or exempting payment of certain charges, that's first. Second, indeed the approach or method used by companies that use subsidiaries, opening new companies to carry out development and then running away from responsibility. Will the State Government blacklist those who have carried out such actions?
Thank you. The success I spoke of just now is very specific, and the case must not be made into a general method, yes. If we use that method, the effect will be that people will use that loophole to employ the same method, enjoying profits, not taking responsibility and eventually not settling. We cannot replicate that in all places, Honourable Member. If we reproduce the method I mentioned just now, it means many more things will happen, and in many places people will present this as a precedent. The State Government's decision was also very specific at that time; it only referred to this case, and this case cannot be repeated or replicated in other places, and it only refers to case-by-case issues, or matters that refer to each case, so that it does not have an effect, because the funds that should have been paid, and should have been enjoyed or obtained by the Land Office or the Local Council and so on, could not be. Eventually we cannot provide better facilities or amenities as we should have.
However, we also try to evaluate whether, for cases that have been delayed for a long time, we can look again at them. I ask the Honourable EXCO for Housing to review them again, or the Selangor Housing and Property Board can review them again, so that we can resolve the outstanding problems. But do not let these outstanding problems be used as an example for the JV Developers mentioned earlier to neglect or betray the actions they should take or the responsibilities they should carry out. That is the first.
Second question, regarding blacklisting: KPKT is making a proposal to amend the Akta Pengurusan Strata so that MOT is paid when purchasing strata property. Ah, this is an example that will be taken by KPKT, and at the same time KPKT is making a proposal to amend the Akta Pengurusan Strata so that MOT, sorry, it's correct, written twice, I read it twice (laughter).
KPKT is amending the law, the Akta Pemilik Pengurusan Strata, where the MOT that should be paid is paid at an early stage. If this method is approved, because it is under the Act, it will be better and will reduce the risk and avoid delays in strata ownership.
Second question, Honourable Member: is it blacklisting? Yes. We are not only blacklisting the company names, but we will go to the shareholders and also the members of the board of directors so that the responsibility is shouldered together until they can ractify, if they have other projects or they want to develop in Selangor State. Thank you.
Sungai Pelek.
Thank you to the Honourable Dato' Menteri Besar for giving a complete explanation. I want to know the Honourable Dato' Menteri Besar's view. What is wrong if we see that there are cases that have been very long, 10 years, 20 years, but still cannot be resolved? At the same time, I understand that we cannot let the developers who did wrong escape just like that. But what is wrong with the State Government using the powers we have to solve the people's problems first, giving them strata titles first, and then we continue, we, we, then we continue to look for the guilty developers? In this way it will be fairer to buyers, because buyers are not the ones at fault. So what is wrong with the Government doing that? The Honourable Dato' Menteri Besar's view.
Honourable Member, the problem is when we take action such as the MOT exemption, for example, on what should be the responsibility of the Developer. The Developer enjoys large profits and benefits, because these developers enjoy the finances they have, use spending to a certain level, and do not fulfil their responsibilities, which affects residents.
We will help residents. Certainly. The State Government will not seize the residents' buildings, that is certain. We will not take a cruel attitude of seizing them. But we will deal with these Developers first so that they carry out their responsibilities. That is why the Building Commissioner, for example, is among the bodies that will identify this list of Developers and obtain this information. Our intention is indeed to help, which is why we gave the example just now. But the example I mentioned just now, one (1) case, we will do if it is possible and necessary, if it has been too long, if some of its board has also passed away and so on, because it involves very large costs. For example, issuing strata titles requires payment of fees to survey the strata plan and strata layout.
This is not an easy matter. Sometimes these developers leave, leaving everything empty, zero, nothing. Deserted, no problem at all, and survey fees cannot be exempted. This means the State Government has to pay the survey fees involved if we want to resolve the matter. Perhaps it can, but what about other payments? And the cost is very large because it involves every lot in strata buildings or high-rise buildings, with your permission, or multi-storey buildings. Thank you.
Next question, Sungai Air Tawar.
Thank you, Honourable Deputy Speaker. My question is No. 53.
Oral Questions — 53. Inflation of Goods PricesQuestions
53. To ask the Honourable Dato' Menteri Besar:-
a)
What steps has the State Government taken for the people facing rising prices of goods (inflation) in Selangor?
b)
What improvements has the State Government made to ensure that farmers and livestock breeders facing inflation are not affected?
Thank you. Sorry just now. Answering the tiers, I forgot the inflation increase. Honourable Members all. The State Government, together with the Ministry of Domestic Trade and Consumer Affairs (KPDNHEP), constantly carries out monitoring and enforcement to ensure that the prices of goods in the market are reasonable. Among the efforts taken and to be strengthened is implementing firm enforcement under the Price Control and Anti-Profiteering Act 2011.
Enforcement against profiteering or unreasonable profit-taking by traders under the Price Control and Anti-Profiteering Regulations, a mechanism for determining high profits that are unreasonable 2018, which came into force in June 2018.
Second, more aggressive monitoring and enforcement covering the entire distribution chain of goods and services nationwide under Operation Catut 9.0, which began on 7 January 2022. This operation has mobilised all the Ministry's enforcement personnel throughout the states to curb the issue of rising prices of goods in the market. Written notices are issued under Section 21 of the Price Control and Anti-Profiteering Act 2011 to any party found to be raising prices unreasonably, to obtain written responses and explanations for the price increases of the goods, and if an element of profiteering exists, legal action may be taken under Section 11 of the Price Control and Anti-Profiteering Act.
Next, enforcement of the Price Marking Order for goods and charges for services 2020, which requires traders to display the prices of their goods and services for the goods and services sold. Implementation of a maximum price scheme during the festive season to control the prices of goods and certain necessities, and subsequently the fixing of maximum prices for refined white granulated sugar, face masks, liquefied petroleum gas (LPG), RON 95 petrol, diesel, wheat flour for general use, and 1 kilo cooking oil cartons, to ensure prices sold do not exceed the prescribed prices. However, the Ministry will expand controls over other essential goods according to circumstances and needs. Holding engagement sessions to provide explanations and advisory services to those involved.
Third, implementing collaborative measures with relevant Government agencies such as the Ministry of Agriculture and ensuring adequate supply offered at reasonable prices. Increasing the presence of enforcement officers at key locations, and finally facilitating the public in lodging complaints through the Ministry's media channels such as the WhatsApp application, KPDNHEP 019-2794317, the e-Aduan Portal, the EZ Adu smartphone application, the KPDNHEP Hotline 1800 800 86 800, and attending in person at any nearby KPDNHEP office.
To help farmers and breeders who face inflation without being affected, the State Government has taken the following steps:-
(i) Continuous intensive giving and assistance, focusing on assistance to reduce operators' costs, such as the provision of crop inputs such as seeds and also the provision of animal feed, due to the increase in costs of up to 25 to 100%.
(ii) Adding direct sales outlets for fresh produce through the Agro Prihatin Programme such as the Selangor Agro Market and the Ihsan Programme, at better selling prices that remain low compared with sales to middlemen.
This is in line with my answer at Semenyih the other day, and it means we have implemented more than 53 State Assembly seats during the festive season, more than 8. We have sold more than 63,000 packets of cooking oil. We have sold more than 123,000 chickens and this has been able to reduce the impact on operators among our society. However, in the current uncertain economic situation, the State Government is trying its utmost to reduce the impact caused by inflation, which has begun to be felt by all groups, including farmers and breeders.
In the State of Selangor there are more than 50 thousand operators registered with the relevant departments and agencies in the agricultural sector, including farmers, breeders, fishermen and agro-based industry operators, as well as sellers of affected agricultural produce. Thank you.
The next question, Sungai Ramal.
Thank you, Deputy Speaker. My question is number 54.
Oral Questions — 54. Taman Mini SelangorQuestions
54. To ask the Y.A.B. Dato' Menteri Besar:-
a)
Melaka has the Taman Mini Malaysia. It would be good if Selangor had a Taman Mini Selangor representing the 9 Districts in the State of Selangor, displaying arts and culture, delicacies, traditional games, heritage and others as a tourist attraction. When can this Taman Mini be realised?
Mr Speaker. At present the State Government (KN) has no proposal to establish a Taman Mini Selangor. Several factors need to be studied before the implementation of projects of this kind. Among them are land issues, financial allocation, public transport and the sustainability of this project. So, to ensure that any project truly has an impact on development.
However, there are several cultural centres that have been established, displaying the arts and culture, traditional games and also the heritage of a certain community or place, as follows:
1. Royal Klang Heritage Walk 2. Sabak Bernam Mini Museum 3. Mahmeri Cultural Village Pulau Carey 4. Bukit Malawati Kuala Selangor 5. Kuala Selangor District Museum 6. Orang Asli Village Sungai Rasau, Hilir Batu 14 Puchong (Temuan Tribe) 7. Kota Seni Petaling Jaya 8. Selangor-Japan Friendship Park, Shah Alam 9. Malaysia Chinese Museum in Seri Kembangan.
That is all.
The next question, Sabak.
My question, 55.
Oral Questions — 55. Status of District CouncilsQuestions
55. To ask the Y.A.B. Dato' Menteri Besar:-
a)
Why is the Sabak Bernam district, the only district in the State of Selangor that still has the status of a District Council?
b)
What are the short-term and long-term plans to change the status of the District Council to a Municipal Council?
Mr Speaker.
Circular of the Secretary General of the Ministry of Housing and Local Government (KPKT) No. 4 of 2008; New criteria for upgrading Local Authorities provides explanation and guidance to the State Authority and local authorities regarding the new criteria used for applications to upgrade local authorities. The upgrading of local authorities is in line with the provisions of Section 4 (2) of the Local Government Act 1976, Act 171, where the State Authority, after consultation with the Minister and the Local Authority, may, by notification in the Gazette, change the status of a Local Authority. Among the new criteria for upgrading a Local Authority are the population and the annual revenue of the Local Authority.
Sabak Bernam District Council has a population of 132,000 people, compared with the minimum municipal criterion of 150,000 people. In addition, the annual revenue collection of Sabak Bernam District Council is still low compared with the minimum municipal criterion of RM20,000 million.
The short-term and long-term plans are as follows:
1. Opening opportunities for outside investors to invest in and develop the Sabak Bernam District with large-scale projects. 2. Increasing housing, commercial and industrial projects in the district to open job opportunities for local residents and increase revenue through the collection of door taxes. 3. Further expanding development zones in the District Local Plan so that potential land can be developed to boost the district's economy. 4. Upgrading public amenities and basic facilities of the district. 5. Proposal to enlarge the town boundary; and 6. Planning strategic district projects such as the Sabak Agropolitan Complex, the 2nd Sabak – Hilir Perak Bridge and the Basic Agriculture R&D Centre.
That is all, thank you.
Sabak.
My supplementary question. Through the short-term and long-term plans, in what year is it expected that the Sabak Bernam District will change to a Municipal Council?
Secondly, we are often blamed for rejecting the proposal for paid parking in the Sabak Bernam District, causing MDSB's revenue not to increase. I would like to ask how much revenue from parking charges would be if implemented in Sabak Bernam within one year? Thank you.
For the first question, in fact many plans have been outlined by the State Government to further develop the economy in the Sabak Bernam District. Honourable Sabak Bernam may refer to this book (Rancangan Selangor Pertama (RS-1), page 97. That is the sixth driver of change. The Sabak Bernam Development Area, or SABDA (Sabak Bernam Development Area), aims to stimulate the economic growth of this district through 5 core activities:
1. Adding high-value communities and increasing the level of productivity through the use of the latest agricultural technology. 2. Developing industrial chain growth and creating job and market opportunities. 3. Developing tourism products related to agro-tourism and eco-tourism. 4. Attracting new investors to develop downstream industrial activities. 5. Developing infrastructure and public amenities.
Projected revenue of approximately RM248 million a year from the economic core activities and creating approximately 3,600 jobs through recruitment in the economic core activities. All of this is in the RS-1 book.
For the second question, I want to emphasise here that there is no direct connection between parking charge collection and the upgrading of the PBT. And as for the question of how much revenue could be obtained from parking revenue collection, I do not have that information because it has not been implemented. If you want an estimate, I would need to check with the Sabak Bernam District Council. Thank you.
The next question, Hulu Bernam, is not present. Next, Seri Kembangan, is not present.
Deputy Speaker, I refer to the Standing Orders of the Selangor State Legislative Assembly No. 24 (2), and seek permission from the Deputy Speaker to take up the Seri Kembangan question.
Saya benarkan.
Oral Questions — 57. Flash Floods in Urban AreasQuestions
57. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What developments and projects have been or will be implemented to overcome flooding in urban areas?
b)
What actions will be taken to resolve the flood issue in Seri Kembangan and Seri Serdang?
Thank you, Deputy Speaker. Thank you, Honourable Bukit Tungku, who is representing the Honourable Seri Kembangan. Seri Kembangan asks a question regarding the flood issue in the areas of Seri Kembangan and Seri Serdang.
For the information of the Honourable Member, the projects being implemented by the Department of Irrigation and Drainage (JPS) to overcome flooding in the Bandar Seri Serdang area are as follows:
No.
Title Cost (RM) Start Date/ Completion Date Status 1. Cleaning Works for the TNB Flood Detention Pond and Other Related Works at Taman Serdang Jaya, Seri Serdang, Petaling District 199,650.00 24.1.2022 – 23.5.2022
LAD Start Date: 24.5.2022 In Implementation
Work Progress: 90% 2. Pond Excavation Works 336,750.00 25.3.2022 – 15.7.2022 In Implementation
No.
Title Cost (RM) Start Date/ Completion Date Status Seri Serdang Reservoir and Other Related Works at Taman Andalas Seri Serdang, Petaling District
LAD Start Date: 16.7.2022
Work Progress: 80% 3. Pond Excavation Works for Reservoir A and Other Related Works Near Taman Universiti Seri Serdang, Petaling District 341,149.00 25.3.2022 – 15.7.2022
LAD Start Date: 16.7.2022 In Implementation
Work Progress: 60% 4. Pond Excavation Works for Reservoir B and Other Related Works Near the Department of Agriculture Seri Serdang, Petaling District 345,001.00 25.3.2022 – 15.7.2022
LAD Start Date: 16.7.2022 In Implementation
Work Progress: 60%
Total 1,222,550.00
Site observations by the Subang Jaya Municipal Council (MBSJ) found that the causes of flash floods in the urban area are:-
1. There are blockages along the drainage system alignment, especially in the culverts.
2. The size of the existing drains and culverts at the site is unable to accommodate the flow rate during heavy rain.
MBSJ will resolve the flash flood problem in the area through the following solution methods:-
1. Annual Maintenance Project: Maintenance of the drainage system through the current annual maintenance contract.
2. One-Off Quotation Project
Upgrading the drainage system, especially in flash flood hotspot areas.
Based on observations by MBSJ, the flood issue in the Seri Kembangan and Seri Serdang areas as a whole is caused by high rainfall intensity, causing the water level of the Sungai Kuyoh and its tributaries (Anak Sg. Kuyoh, Sg. Rekah, Sg. Pati Liat and Sg. Jinma) to rise and overflow into low-lying areas.
For long-term proposals, JPS is currently implementing the following development projects:-
No. Title Affected Area Estimated Cost (RM) Source of Allocation Status Tender Period Project Duration 1. Kuyoh River Basin Flood Mitigation Plan, Selangor Seri Kembangan
SK Seri Serdang, Taman Seri Serdang, Taman Serdang Jaya
Besraya Highway (KTM Serdang) and Bluwater Estate
Serdang Agriculture Department Complex 300,000,000.00 Federal Development Peringkat Reka Bentuk (Laporan Konsep) Second Quarter 2023 40 months 2. Upgrading the Drainage System of SK Seri Serdang, Taman Seri 15,000,000.00 State Development (P13) Appointment Stage Fourth Quarter 40 months
No. Title Affected Area Estimated Cost (RM) Source of Allocation Status Tender Period Project Duration Seri Serdang Area Serdang, Taman Serdang Jaya Tendering Year 2023 3. Construction of Bluewater Retention Pond, Seri Kembangan, Selangor Besraya Highway (KTM Serdang) and Bluwater Estate 4,000,000.00 Parit Contribution Trust Account (CP) In Tender Evaluation Process Tender Closing Date: 7 June 2022 24 months
4. Upgrading the Drainage System at the Engineering Division Building, Serdang Agriculture Department Complex Serdang Agriculture Department Complex 2,000,000.00 Federal Allocation JKR
Design Stage by JKR - -
Total 321,000,000.00
Meanwhile, for local flood issues, MBSJ is implementing the "Drain Construction Project at Jalan BS 3/8 for Flood Solution at Jalan BS 3/1". Continuous action is also being taken to ensure the drainage system under MBSJ's supervision is in good condition together with JPS. That is all, thank you.
Meru.
Supplementary question. Thank you, Deputy Speaker. I would like to ask the Honourable EXCO about the status of (a) regarding the Flood Mitigation Project in Meru, which was approved in the budget at RM20 million. That is the first.
Secondly, a few years ago, the Honourable EXCO and I had discussions about overcoming the flood problem in Meru related to Jalan Kenangan, to upgrade the drains in Pekan Meru, Jalan Kenangan. So I would like to know its status too. Perhaps I know it cannot be answered at this time, but a written reply can be given later.
Thank you, Honourable Meru. He has no connection with Meru, yes. This is directed to Seri Kembangan. However, in general I can tell you that we have indeed received news of the implementation of a large project at Sungai Kapar involving Sungai Kapar, which, if I am not mistaken, amounts to RM300 million and has been approved by the Federal Government, a major Flood Mitigation Project involving a barrage. This is a major project and the first of its kind in our country. The use of a barrage at Sungai Kapar Besar. So that is what I need to announce.
This will involve implementing a comprehensive flood mitigation system for the Meru area. But as for the rest, the internal ones, the internal drains under the Klang Municipal Council are being worked on, and I cannot specifically say, but they are being implemented, as well as the others that I have announced before are also in implementation. I will obtain the details later. Thank you.
The next question, Taman Templer.
My question is number 58.
Oral Questions — 58. Masjid Selayang PandangQuestions
58. To ask the Y.A.B. Dato' Menteri Besar:-
a)
The process of building the New Kg Selayang Pandang Mosque, the progress status of construction.
Thank you, Deputy Speaker and Taman Templer. There is one (1) minute left. The proposal to build the Selayang Pandang Mosque on the new site at Lot PT 11120 measuring 1.88 acres and the additional site at Lot PT 87368 measuring 0.49 acres has been approved by the Selangor Islamic Religious Council (MAIS) through the Board of Management Committee Meeting (JATUM) No. 2/2018, which sat on 28 June 2018. The cost of building the mosque is estimated at RM12 million. The Mosque Construction Sponsorship Committee has not yet been permitted to submit an application for a Planning Permission from the PBT because the collected funds have not reached 50% of the estimated construction cost.
The proposal to build this mosque is not listed in the Malaysia Development Plan 12th and the Distribution and Development Division, UPEN needs to look at the priority merit of building this mosque for Gombak District as well as the merit of need for building mosques for other districts to be listed in the RMK-13. Thank you.
Honourable EXCO, thank you for the answer given..
Taman Templer ........
I think the matter regarding the mosque no longer has a problem. However, the issue now is that the mosque site has been taken, and there is the KAFA Religious School next to it. So the issue now is the matter concerning the KAFA Religious School. Now, if the school land is taken, we will no longer have a site to establish the KAFA Religious School, so I hope that the State Government, through the Honourable EXCO, can give attention to the matter of building a new KAFA Religious School in Kampung Selayang Pandang.
Yes, thank you. We will give a written reply to the Honourable Member later.
The next question, Pelabuhan Klang.....
Thank you, Honourable Deputy Speaker, question on Pelabuhan Klang No. 59.
Oral Questions — 59. Issue of pollution of Sungai Chandong Pulau Indah, Sungai Tengkorak Telok Gong and Sungai Udang Telok GongQuestions
59. To ask the Y.A.B. Dato' Menteri Besar:-
a)
What action will the State Government take to prevent the frequent and recurring incidents of river pollution in the Sungai Chandong Pulau Indah, Sungai Tengkorak and Sungai Udang Telok Gong?
b)
What is the effect of such pollution on the ecological system and environment of those rivers?
Mr Speaker. For the information of the Honourable Members, the State Government, through the Selangor Water Management Authority (LUAS) and also the Department of Environment (JAS), is carrying out continuous enforcement to prevent pollution incidents in all three rivers, by targeting manufacturing activities that produce industrial effluent and scheduled waste, following the recent frequent cases of pollution. The JAS has increased its visibility, namely the presence of enforcement personnel, by conducting daily and weekend patrols to the industrial areas of Telok Gong and also Pulau Indah to detect any suspicious activities. Monitoring at pollution hotspots using drones has also been carried out. To control pollution at the source, control at source. The State Government of Selangor, through LUAS, has already introduced the Polluter Pay Principle (PPP) and the Zero Discharge Policy (ZDP) to reduce pollution problems from industrial activities and also to improve the quality of the state's water resources. In addition, the State Government, through the Klang Municipal Council (MPK), has already begun controlling the types of industries permitted to operate in the Telok Gong area starting 1 September 2021. This is limited to light and medium industries, and heavy industries are no longer newly permitted. To answer the second question on the effects of pollution on the ecosystems of those rivers, a specific study is needed to determine precisely what effects pollution has on the ecological system of Sungai Chandong, Sungai Tengkorak and also Sungai Udang in Telok Gong. This includes information on the inventory of pollution sources, the water quality status of Selangor's rivers, data on aquatic and marine life, the river's assimilative capacity, namely the carrying capacity of the river, and so on. Accordingly, the Department of Environment (JAS) has already carried out an initial investigative study in Telok Gong last year, whose findings can help the State Government to continue with a more comprehensive river study and also propose short-, medium- and long-term river mitigation and rehabilitation action plans, thank you..
Pelabuhan Klang ........
Yes, thank you, Honourable EXCO. Pelabuhan Klang would like to ask whether the State Government receives cooperation from the Federal Government, such as the Ministry of Environment, in tackling the environmental pollution problems that frequently occur in the Chandong, Sungai Tengkorak and Sungai Udang rivers in Pelabuhan Kelang?
Yes, this question was indeed prepared by the Department of Environment. So, for the Honourable Member's information, the result of the JAS investigation into the complaint about the red colour of the Sungai Chandong water the other day, that is, the Department of Environment succeeded in stopping a tanker lorry suspected of discharging red paint and pigment waste, which caused the Sungai Chandong to turn red on 13 June and 29 June 2022. The surveillance operation succeeded in locating the tanker lorry, which was placed in a premises in Pelabuhan Klang that was also being used as a scheduled waste disposal centre without JAS approval. During the raid on 5 July 2022, which was also joined by MPK enforcement personnel, 100 intermediate bulk containers (IBC) filled with various wastes such as paint waste, ink waste, spent acid and spent black oil were found. In addition, the JAS found traces of coloured pigment waste on the upper cover of the tanker lorry. Several waste samples have already been taken to be sent to the Chemistry Department Malaysia (JKM) for chemical analysis. The offences under investigation were made under section 34B and section 34A and sections 18 and 19 of the Environmental Quality Act 1974. So now the focus is on the owner of the premises and the illegal operation involved. For the record, since the incident on 29 June 2020, a total of 14 premises around Klang and also Shah Alam have been raided by Department of Environment officers, but no suspicious activities were found.
Next question, Dusun Tua.
Thank you, Deputy Speaker, my question is no. 60.
Oral Questions — 60. KPI in Taking Action on Illegal Land WorksQuestions
60. To ask the Y.A.B. Dato' Menteri Besar:-
a)
Will the government establish a KPI to ensure that action against earthworks without permits is taken within a specified period, rather than allowing them to drag on for several years?
b)
Will the government ensure that the PBTs promptly bring cases of earthworks without permits to court?
Thank you, Deputy Speaker, and Dusun Tua who asked questions regarding actions against illegal earthworks by the local authorities. Honourable Members all, the Key Performance Indicator relates to the performance or achievement of an organisation, and is in fact an indicator of the implementation achievement of each organisation within a certain period of time. Therefore, I would like to explain that the State Government implements KPIs for each local authority (PBT) through the setting of time limits for resolving complaints, scheduled periodic monitoring and enforcement action. These are the KPI measures that we set for the local authorities, including for illegal earthworks or earthworks without permits, which were asked about by the Honourable Member for Dusun Tua, without delay. The PBTs must comply with procedures, and at the same time must also comply with enforcement action procedures. The first procedure is enforcement against the offence of carrying out work without permission on privately owned land. The second SOP is the procedure for enforcement against the offence of unapproved building on privately owned land. The third SOP is the procedure for enforcing the offence of carrying out development without permission, earthworks or existing structures on reserved open space land. SOP four is the procedure for the operation of seizing machinery on the owner's land. SOP five is the procedure for integrated enforcement action at illegal dumping and waste disposal sites. Monitoring and enforcement action is taken under Section 70(a) Earthworks Without Approval under the Street, Drainage and Building Act 1974 (Act 133), and refers to the Town and Country Planning Act 1976 (Act 172). Earthworks must first be submitted to the PBT for approval, as provided under Section 19(1) of Act 172, namely that no PBT other than the PBT itself may commence, undertake or carry out any development unless planning permission for the development has been granted to it. Breaches of development without planning permission may also be subject to prosecution under paragraph 26(1)(b) of Act 172 and enforcement action under Section 27 of Act 172. For earthworks carried out without permission, the PBT will first issue a compound offer under Section 70(a) Earthworks of the Street, Drainage and Building Act 1974 (Act 133). This is offered to the landowner or developer, and directs the landowner to submit an application for an earthworks approval plan to the PBT. If the developer or landowner fails to do so, the next step is that the PBT's legal unit may bring these cases before the court order, as the question raised by Dusun Tua asks. What is the sequence? The sequence is that we will offer a compound so that they carry out the regularisation process for the work they have done. But if they still refuse, the offer is rejected and the next step is action towards the court, because we also want to give these landowners the opportunity to rectify the proper process they should have followed. Thank you.
Soalan tambahan.
Dusun Tua
Regarding the KPI just now, one of the matters being looked at is the resolution of a complaint. In cases of earthworks without permission or illegal earthworks, what is meant by, or understood as, resolution? Is it merely identifying the landowner, is it merely a compound, or how far must it go before it is said to be resolved?
Honourable Member, when a compound has been issued and they pay the compound and carry out the regularisation process or obtain approval for the earthworks, that is what is considered resolved. That means if they remain obstinate, it must be brought to court. Once it is brought to court, it is no longer under the council's purview, because it is under the court's purview to decide, although it is still connected with the council. So resolution means when we have imposed a compound, they pay it, and they carry out the regularisation process, or the correction of their permit application process. Thank you.
Next question, Jeram.
Thank you, Deputy Speaker. My question is no. 61.
Oral Questions — 61. Rumah SelangorkuQuestions
61. To ask the Y.A.B. Dato' Menteri Besar:-
a)
How many Rumah Selangorku units will be built in the Jeram State Constituency in 2022?
b)
Up to today, how many applicants have received the Rumah Selangorku Scheme in the Jeram State Constituency area?
Thank you, Honourable Member, and thank you, Deputy Speaker. Jeram always likes to ask about only his own area. He does not ask about other people's areas. So, for that reason, for the information of the Honourable Member, there is 1 project that was actually completed in 2021, namely RSKU type D: 170 units at Shah Alam 2 Sendirian Berhad under IJM Land. I think I went there and saw this area. But for the Honourable Member's knowledge, regarding the next question on what will be built in Dun Jeram, there are actually 4 projects with 903 Rumah Selangorku units currently being built near the area I mentioned just now. And also under the supervision of the Kuala Selangor Municipal Council. This means that 4 projects are currently being built, covering 903 units. Apart from that, if Jeram wishes to know about these projects, they are under:-
No. Developer / Location Number of Units 1 Sejati Inti Sdn. Bhd. Mukim Ijok, Kuala Selangor District 65 units 2 Serambi Padu Sdn. Bhd. Mukim Hujung Permatang, Kuala Selangor District 392 units
No. Developer / Location Number of Units 3 Soon Sin Hin Dev. Sdn. Bhd. Mukim Api - Api, Kuala Selangor District 52 units 4 OIB Properties (CV) Sdn. Bhd. Mukim Ijok, Kuala Selangor District 394 units Total Total: 903
So, apart from the 16 projects, and also those we approved in the first and second batches, 4 projects, in total 10 projects have been approved, namely 16 projects covering 12,761 units of RSKU. Rumah Idaman or Harapan that are in the plan and have been approved by the State Government and are now under the supervision of the Kuala Selangor Municipal Council. The 16 projects are:-
No. Developer / Location Number of Units 1 Kota Kelang Development Sdn. Bhd. 91 units 2 Geostream Sdn. Bhd. 272 units 3 Landasan Harta Sdn. Bhd. (Perfect Eagle Development Sdn. Bhd.) 76 units 4 Sejati Inti Sdn. Bhd. 75 units 5 Worldwide Holding Berhad 161 units 6 Kelana Kualiti Sdn. Bhd. (Glomac Berhad) Phase 6B 178 units 7 Permodalan Negeri Selangor Berhad (PNSB) (Phase 1A) 80 units 8 Permodalan Negeri Selangor Berhad (PNSB) (Phase 1B) 80 units 9 Kemudi Ehsan Sdn. Bhd. 747 units 10 Hillpark Resources Sdn. Bhd. (Plot 1) 384 units 11 Hillpark Resources Sdn. Bhd. (Plot 2) 396 units
No. Developer / Location Number of Units 12 Hillpark Resources Sdn. Bhd. (Plot 3) 424 units 13 Hillpark Resources Sdn. Bhd. (Plot 4) 180 units 14 KL-Kepong Country Homes Sdn. Bhd. 631 units 15 Elmina Equestrian Sdn. Bhd. 343 units 16 KLK Park Homes Sdn. Bhd. 954 units Total Total: 5,072
There is more, Honourable Member. I will provide these details to the Honourable Member. Those 16 projects will contribute 5,072 units. And this additional batch is only the second phase, or whatever, the second group consists of 4 additional projects, namely a total of 7,400 more units. In the planning stage that has been approved by the State Government, they will be supervised under the Kuala Selangor Municipal Council. And these 4, these are rather big projects. That means these are under Harapan and Idaman, namely under:-
No. Developer / Location Number of Units 1 Kemudi Ehsan Sdn. Bhd. (PNSB Construction Consortium) 1,258 units 2 PNSB Construction Consortium (Worldwide Property Management Sdn. Bhd.) 1,349 units 3 Paragon Pinnacle Sdn. Bhd. 4,637 units 4 Jernih Kejora Sdn. Bhd. 156 units Total Total: 7,400
Therefore, in total, there are 10 projects in the planning stage that will contribute a total of 12,472 units of RSKU Idaman and also Harapan. Thank you.
Soalan tambahan.
Jeram.
Thank you. Among the many housing developments that will be built or have already been built, is there any house priced below RM100,000.00 in the Jeram area? Thank you.
Yes, Honourable Member, because the projects I mentioned are mixed projects. So I will present to the Honourable Member, apart from those under Harapan, RM250,000.00, we also have projects that were approved previously, which I stated, that must implement A, B, C, D. And most of them are in your area, Honourable Member, we, I see, apart from the stratified ones, most of them we maintain as projects on land or landed property. Thank you.
Next question, Banting.
My question, 62.
Oral Questions — 62. Kuala Langat Public Transport Development Structure PlanQuestions
62. To ask the Y.A.B. Dato' Menteri Besar:-
a) The problem of traffic congestion in several PBTs has become increasingly serious, especially after the MCO, and this is worsened by the ineffective quality of public bus services. Does the government intend to establish a Public Transport Development Structure Plan for Kuala Langat?
Based on the Kuala Langat Local Plan (RTKL) 2030 gazetted on 5 July 2018, the proposal to upgrade the level of public transport services through Project T-12 (Upgrading of Bus Services) has been outlined, namely:-
At present there are 2 private operators currently operating, involving 4 routes:
For the Smart Selangor bus service, 2 routes are provided in the MPKL area, namely:- i. Route BTG 1 (Banting – Mitsui – KLIA 2 – Banting) ii. Route BTG 2 (Banting – Taman Banting Baru – Permatang Pasir – Chodoi – Banting)
Based on current performance, user response to the use of public transport has been unencouraging following the decline in passenger numbers, especially after the MCO. MPKL intends to expand public transport collaboration between MPKL-MBSA-MBSJ to facilitate accessibility for users, for example from Kota Kemuning-Bandar Rimbayu-Bandar Saujana Putra-Putra Heights. Thank you.
Soalan tambahan.
Banting.
Thank you to the Deputy Speaker. I would like to ask the Honourable Member for Kinrara, will the State Government ask the Kuala Langat Municipal Council to carry out, not only a study, but also the identification of suitable sites, perhaps not just one, perhaps two or three, to be used as a bus terminal. What is happening now, for the Honourable Member's information, in the Banting area and perhaps Kuala Langat, Sijangkang, and also Morib, including, there is no suitable bus terminal. Most of the land in the Banting and Bandar areas has already been given ownership to GLC companies in the previous government. And this has caused the Council and also the bus operators to have no suitable site for dropping off and picking up passengers and so on. I would like to ask, if there is such a plan, when can it be implemented? Because this site is very important, and they perhaps, the Council perhaps needs financial assistance or capital injection from the government to buy, sometimes, maybe we need to buy that land, to be developed as a bus terminal. I would like to ask, Honourable Member.
The State Government is very much aware of the lack of a bus terminal in the Kuala Langat district. I think the site is actually not a major issue, but the construction cost of the terminal involves quite a large cost. Therefore, the Kuala Langat Municipal Council has submitted an application to the Ministry of Transport to request assistance in terms of construction funds for the bus terminal. But so far, no positive response has been received from the Ministry of Transport yet. Thank you.
Second supplementary question.
Banting.
There is a piece of land, if I am not mistaken. Correct me if I am wrong. If I am not mistaken, the land is in the Sungai Lang area, near the Banting Public Market. That is the first site. Second, there are plans in the area around Kota Seri Langat. Perhaps there are plans there. Actually, two places have been discussed before. So, can the State Government discuss with the council, if there is nothing further from the Ministry of Transport and perhaps the Federal Government, and after this it is not from Pakatan Harapan either. If we can include this project in the First Selangor Plan, so that, perhaps, it is not even a government project itself, it can be carried out as a private partnership. We build a terminal. Is that possible, is there an opportunity to get it into RS-1? That is all my second question.
All projects, in fact, have an opportunity to be included in the upcoming Malaysia Plan. But whether it will be approved by the Central Government is another question. But if we want to include that project, there is no problem in including it in the proposal from the State Government to the Federal Government. There is no problem in including it.
Soalan tambahan.
Sijangkang.
Thank you, Deputy Speaker. Earlier, the Honourable Member mentioned that the usage rate of this public transport has decreased, during the MCO and after the MCO. What is the Honourable Member's view, is there a need for a study. Apart from our wish to build a terminal. I am worried that the terminal will be there, but its usage rate will be low. Today, as one of the things I observe, is the confidence of these users. The consistency of the transport itself causes them to be less confident in using this service. So what is the Honourable Member's view, regarding this, a comprehensive study needs to be carried out.
I think the confidence of residents to use public transport because of Covid-19 no longer arises. Everyone is confident that the Covid-19 pandemic has been well controlled. We can see the demand, LRT, MRT, recently. There are indeed many passengers. But the situation in Kuala Langat is slightly different. I believe there is a discontinuity between public transport in the Kuala Langat area. It is possible, and there is certainly no problem, to prepare a master plan, or a structure plan, or however the plan is made. But its implementation is a major challenge. We all know that public transport involves very large costs. And it is the responsibility of the Central Government to implement all the plans that have been prepared or will be prepared. I will give one example, in the area of the Petaling Jaya City Council, which has prepared a public transport master plan specifically for Petaling Jaya alone. And if I am not mistaken, in that plan, throughout Petaling Jaya it requires 120 bus routes. But now we only have about 60 to 70 bus routes. The remainder have no bus service anymore. And how can we meet this need, according to the proposals in the Petaling Jaya public transport master plan. We need a commitment from the Ministry of Public Transport to channel more funds and help Selangor obtain more buses, to provide service to the people of the state of Selangor. Thank you.
The next question, Semenyih, has been answered together with the number, question number 33. Next, Hulu Kelang. Not present. Next, Rawang.
Thank you, Deputy Speaker. My question, question 65.
Oral Questions — 65. Ailing ProjectQuestions
65. Asked to Y.A.B. Dato' Menteri Besar:-
a) How does inflation affect the implementation performance of government projects? b) How many projects have been affected due to the increase in the price of construction materials? c) How is the State Government overcoming this problem?
Thank you, the Honourable Member for Rawang, Honourable Deputy Speaker. The Honourable Member for Rawang asked a question on the issue related to inflation, whether it affects the implementation performance of government projects. For the information of the Honourable Member, inflation not only has a negative impact on the construction sector, but also affects various other sectors related to manufacturing and services. The impact of inflation on the construction sector will cause the prices of construction materials to rise. Besides that, the supply of materials becomes difficult to obtain, due to the shortage of construction material supply from within and outside the country, because the production costs to produce materials have increased. This is also caused by disruptions or obstacles in the supply chain. In addition, inflation also causes excessive costs, or cost overruns, on other matters related to construction projects. Such as, for example, the rental rates of machinery and so on. Accordingly, this inflationary phenomenon will cause an unexpected increase in the overall cost of a construction project, thereby affecting the smooth running of the project and it cannot be completed according to the planned schedule. I can give examples, such as among the main materials for construction, which are iron, reinforcing steel, reinforcement bar, which have increased by more than 35% in price. And also for roads, for example, the construction of bitumen roads, which has increased by more than 43%. So, besides that, the implementation of planned projects that have not yet started also has to be postponed due to this inflation. This rise in the price of goods. For the information of the Honourable Members as well, for the works involved there are indeed many, but I will take the example of the JKR. A total of 29 JKR projects, which are being implemented by the Selangor State Public Works Department (JKR), involving several other departments and agencies, such as the Islamic Religious Department, the Mines Land Office, the District Office and also PADAT, the Malay Customs and Arts Corporation. These are projects managed by JKR, for example. There are 29 in total, at present. Of the 29, those involved with the cost increase, contracts, that is Variation Orders, VO, are 27, out of 29, 27 are involved. And of these 29, those caused by this increase, which caused delays, are 17. So it is high, and it affects everything. And also, there are some that caused things to become too expensive, too high, so when we call tenders, open them and so on, the costs cannot be managed, cannot be accepted, too far off. So we have to re-tender or postpone. 2. Of these 29, 2 had to be postponed because the costs were too high.
In connection with this, for the information of the Honourable Members, the Federal Government has issued a treasury circular, PP Perolehan, PK 2.4, which took effect from 1 January 2021 until 30 June 2022. Concerning Variation Of Price, VOP. This is to temporarily address the increase in the prices of these construction materials. So the State Government also complies with this circular. The list of construction materials involved is as follows, namely:-
i) Reinforcing steel, that is re-bar. ii) Crust aggregate – crusher run iii) Miles steel pipe, that is iron pipe iv) Cooper / copper.
These are the four that were notified. There are other materials not included, which I mentioned earlier, bitumen. Which has a major impact on road construction. It is not on this list. So indeed we are facing a problem. Furthermore, on 14 July 2022, the Honourable Prime Minister announced that 11 more construction materials were added to the implementation of VOP. These are the ones I mentioned earlier, namely cement, bricks and glass walls, bar, ceiling materials and roofing materials. In this regard, the State Government very much welcomes the announcement by the Honourable Prime Minister, because with the addition of these construction materials, it can help contractors who face rising construction material prices. In addition to ensuring projects are completed on time. However, this cost increase will have a major impact on the financial position of the State Government, because the State Government has to spend more to implement a project and also has to accept the reality of delays in projects due to the increase in the price of these goods. Thank you.
Honourable Members, the time has reached 11.00 a.m., and I hereby adjourn the question session for the next business.
Continuation of Motion No. 14 of 2022Motion
The Order of Business for the next sitting: Continuation of Motion No. 14 of 2022. Motion on the First Selangor Plan 2021 – 2025.
I invite the Honourable Member for Taman Medan.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Peace and good morning. Thank you to the Honourable Deputy Speaker for the space given to Taman Medan, and to resume the debate supporting the Motion on the First Selangor Plan which was started yesterday only at the preliminary stage. Yes, this opportunity is also taken to share views and also to voice several aspects that need emphasis and also attention in the process of implementing the First Selangor Plan, and what excites Taman Medan about this First Selangor Plan is as a plan for the process of preparing a state that is placed at the level of smart, liveable and also prosperous.
Although, actually, if we look from one angle, the State of Selangor is known as a state called Darul Ehsan. A state full of Ihsan. Yes, and the nature of ihsan is enjoyed by many parties, not only the people but also other creatures and other creations, and I believe that those who are in the State of Selangor are also involved in driving the direction of the process for implementing this First Selangor Plan into something that can be realised.
Yes, I want to look at how the core that has been arranged among all the aspects that have been listed by the Most Honourable Member for Sungai Tua in his presentation speech is about aspects related to strengthening the economy, improving well-being and social inclusiveness, driving sustainability and SMART and effective governance. So the focus sectors are indeed something that is the focus. If we look at how to create a balance among each of the listed aspects. So I want to look, for example, at the focus sector related to strengthening the economy, yes, among which is the sector related to port activities and also logistics. We know that the State of Selangor has a port which, if in the Geography lessons learned by all of us at basic education level, yes, Port Klang. Port Klang, is there? Isn't there? Port Klang, yes. If we look at how this is a place that needs no introduction, but how it was then developed and then how it has affected many aspects. Including, ah, long life, yes, mention the name and it immediately appears. So if we look, it should be utilised to the fullest, so much so that we see many activities related to the existence of this Port influencing the population, influencing how other development networks work. So its benefits are proper, but the nearby areas also need to be utilised.
Recently, for example, I went to an island near Port Klang, yes, but within the area of the Honourable Member for Sijangkang, its name is Pulau Carey. I saw for myself that although Pulau Carey's main activity is the production of commodities, namely rubber and also oil palm, not far from there with my own eyes I saw a cruise ship carrying tourists anchored and then transported, yes, transported by what we call a shuttle. An intermediary service, yes, intermediary boats to carry tourists. So what is wrong if, for example, we look at efforts to improve facilities and also physical aspects that can help further smooth these activities.
Likewise, about, I want to give a view on the halal industry which was launched yesterday as one of the activities, yes, to introduce the halal industry to provide encouragement, impetus for the halal industry as something that can be utilised. Because when the word halal is mentioned, people understand it as something exclusively for those who are Muslim. But the reality is, if we want to know, the halal industry is something that is an attraction, yes, so that those involved in it also benefit in terms of how we know to say halal, halal is a good thing, a matter from aspects related not merely to what is understood as something avoided or free from pork. Free from what is listed, but from aspects related to preparation, from aspects of cleanliness, from how smooth all those things are, which is something associated with halal, so the focus on the halal sector is something to be enhanced and we want, for example, the people of Selangor to benefit from this industry. Yes, those who can become suppliers, feeders and so on.
Boleh celah?
Yes, I invite you, my friend, but do not take long.
Please, Seri Setia.
I want to, thank you Mr Speaker, I want to ask my friend from Taman Medan. When speaking about halal, if we look, what is Taman Medan's view if I give an example that there is a restaurant that has a halal certificate, and there is a restaurant that does not have halal, but especially Muslims choose the restaurant that does not have a halal certificate because it is stated that the halal restaurant is not for Malays or Muslims.
Thank you to Seri Setia. Yes. Perhaps the perspective or perception is something that must be given some correction, because I see the halal aspect, for example, in my constituency, there is a food manufacturing industry that produces a burger called Purnama Burger. They once came to ask me for help to obtain that status. Yes, how serious they are, not because they are bound by the matter of halal and haram. But it is how seriously they meet the need, yes. I see, for example, the purpose is so that we can utilise the State of Selangor as the core state in the country of Malaysia, which is something that can be given focus for this industry as something that can be realised together. Yes, we can take an approach so that those involved in small food preparation industries, for example, are given encouragement, are given enlightenment, yes, in an effort, why? Yes, also related to how to strengthen the economy. Yes, because we see now, because of the economic problems that have befallen, it also affects other aspects. Security aspects, yes, if, for example, the economy has problems among families, then there will be other social ills, yes, yesterday, for example, my friend, the Honourable Member for Port Klang, two nights ago went to catch people stealing cables. Why steal cables? Yes, why? Because we are sure that although it causes a problem for residents, yes, because dark roads can cause danger, but other aspects also possibly mean these people are among those facing such costs.
Taman Medan, it's true we look for halal.
Ask permission first, ask permission first.
Even stealing...
Ask permission first, did not ask permission first.
Stealing, robbing too
No, no. Mr Speaker, I request permission.
Stealing, robbing too is not allowed, want to ask, want to ask
No, no, ask permission first.
Want to ask Taman Medan this,
Ask permission, you can ask then.
What about if the type of person steals a government? Ah, how is it if they steal a government? If stealing cables earlier was not allowed.
If robbing, if plundering a government that has been given a mandate by the people, what is the ruling? But this is what I want to tell, no, it did not happen here, it happened in Venezuela. Ah! I want to ask for a little view from the Honourable Member for Taman Medan.
Thank you, my friend. I apologise if my voice is loud, it's normal, sometimes there are reactions. I find it a bit difficult to comment, but actually that is something immoral, yes. Kidnapping a government or whatever. I agree, yes. Once again I apologise to my friend, the Honourable Member for Taman Templer, forgive me.
Dinda, forgive Kanda.
Baiklah.
Mohon mencelah
Allah, okay, never mind, but I give the floor to Sijangkang.
Taman Medan, but time is short, yes.
May I? Thank you, Mr Speaker. Earlier the Honourable Member for Taman Medan mentioned. I apologise if I am rather late to respond. Because I was thinking over and over that if Taman Medan earlier mentioned going to Pulau Carey, yes, there was a process of transporting tourists from a ship to Pulau Carey which I think perhaps I may have overlooked in my own constituency. I am not sure whether that actually happened or whether it is human smuggling or what? Because I have never known at all that there is a process of bringing tourists from a ship down to Pulau Carey all this time. From the ship to Pulau Carey. Thank you.
What residents of Pulau Carey have told me is that Pulau Carey is truly fortunate. I went to see for myself, and once I went to an activity at Amerton Cove, yes, and when I went I saw the word Cruise written on the boat. Surely this Cruise is not smuggling people, is it? And it is understood that the boats providing the service of transporting the tourists bring them to Port Klang. Isn't that far? The port at Pulau Indah, because the location of Pulau Indah and Pulau Carey is side by side, yes. So I thought, Sijangkang need not worry about people smuggling (laughter). No, I just saw it. So, in other words, Pulau Carey should be thankful to me because I raised this. Perhaps Pulau Carey, in its state assembly seat, can also benefit from it. Yes, okay. I agree. So, back to what was said earlier, the focus, our focus, is on how we can make use of it from the perspective of balance.
Likewise, the State of Selangor, as a state that targets the welfare of the people and the happiness of the people. I think just a few days ago, a person, the number two in the state administration, stated that his state is happier than Selangor, according to a study index. So I was puzzled. Yes, if it is true, how is happiness in his state measured? One aspect of happiness, if I may quote the Hadith of the Prophet SAW, says, "one aspect of happiness is (Quranic verse) that sustenance in the land is sufficient, but that state..." If I may say, many of its people come to Selangor. Yes, I/C, sorry to say, I/C is in the middle, 03. They come, yes, but on polling day they return to their state and the roads are jammed. Yes, when they live in Selangor, these people have problems in Selangor finding their representatives in Selangor. Is that right, Taman Templer? That's right, isn't it? Many come, and when you look, they are voters for Bachok. Ah, Bachok. Do you know the Member of Parliament for Bachok? So what then? Because it is a state of compassion, yes, because I agree, yes, among the programmes contained in the commitment of Selangor Penyayang is that the Selangor Plan includes placing those registered as voters in the State of Selangor.
Honourable Taman Medan, please summarise.
Alright. Give me another one and a half minutes because I have been interrupted, four people have interrupted me. So, if we look at the ability of the State of Selangor to provide any facilities, that is related to the implementation process of the First Selangor Plan, and the last thing I want to cite is the field of improving social welfare and social inclusiveness, and its focus area is
Taman Medan
Hah, Speaker must add time for me.
Taman Medan, during the election campaign, I did hear our friends say that if Pakatan Harapan wins, there will be no development. If Pakatan Harapan wins, there will be no royalty in this State of Selangor. If Pakatan Harapan wins, Malays will not be in this State of Selangor. I would like to ask for a little views from the Honourable Member, because the Honourable Member just mentioned that there are people from outside who come to this State of Selangor.
What I mean is, when Pakatan Harapan wins, there will indeed be no development. Selangor folk, if they want to go from Klang to Shah Alam, they take a sampan. They take a sampan. Hah! From Klang to Kuala Lumpur, they take a buffalo cart. Because there is no development. No roads, no schools, no mosques, because there is no development, because we in Pakatan Harapan are not able, do not know how to develop. So I would like to ask for a little views from Taman, Taman, Taman, Taman Medan.
Taman Templer, yesterday my supplementary question to Bandar Baru Klang was related to the Aerospace Industrial Hub, reported in SelangorKini. The one who asked was Taman Templer. I was puzzled. I, Taman Medan, asked, you know, and suddenly I thought Bandar Baru Klang was in the report, Taman Templer was the one who asked. Goodness, he is very popular. So
Don't, don't be jealous. He is popular because he really is popular.
Ya lah.
Taman Medan must stand out. Taman Medan must stand out, then he can
We become representatives of the people not with the intention of being popular. We want to serve. Sincerely.
Hah! That is a great statement, continue. Final minute. Final minute.
Why did Taman Templer say, he said we want to say a lot, there isn't any, see for yourselves, see for yourselves. Yes, why are those who claim, they themselves are also staying quiet in the State of Selangor. Yes, if you do not believe, for example, if the happiness index is measured, why, why choose to stay here? Choose to buy a house here, choose to work here, choose all sorts of things. Even find a spouse in Selangor too, right?
Yang Berhormat.
Goodness, Honourable EXCO.
Briefly. I think like this, the people of Kelantan, perhaps those in Kelantan who are not happy, have to migrate, yes. The Deputy Menteri Besar of Kelantan also said that Kelantanese like to migrate. They migrate because they are unhappy in Kelantan, so they have left to migrate to Selangor to look for happiness. That is why their rate, their happiness rate, is high. Because the unhappy ones have come to Selangor. That is what makes ours low.
(Laughter).
Okay. Thank you, Bandar Baru Klang. So, for example, the last thing I want to cite. What the Honourable Paya Jaras said about the Job Fair question this morning, yes. People from other states, I am not surprised if those looking for jobs do so as individuals. This is at a Job Fair in Selangor, representatives of other state governments, yes, I will not say which state, but everyone knows they came to the Selangor Job Fair to find jobs for their people. Why?
Taman Medan
Allah interrupting again
I don't know, I don't know. Which state is that? I don't know. Hah! Please state that state, I don't know.
(Laughter). It has already been made clear in the previous session by the Honourable Paya Jaras, the Terengganu State. The Terengganu State EXCO for Human Resources. Indeed, I asked how they did it, because it appeared in a newspaper report that the Terengganu State Government EXCO released a group of Terengganu people who obtained employment at Matsushita Shah Alam. I was shocked, eh, why did they come here? Eh, it turns out they went to the Selangor Jom Kerja karnival to find jobs for the people. They did not organise their own job karnival. It's not wrong.
Taman Medan
I believe the benefit of the First Selangor Plan is something that can show strength, showing that the people's confidence will continue to be obtained in the times to come, including for us to achieve success in Putrajaya, insyaAllah. With humility, I support the Motion on the First Selangor Plan tabled by the Most Honourable Sungai Tua. That concludes my speech, thank you. Assalammualaikum Warahmatullahi Wabarakatuh.
One, two, three, four.
I will stand first, Mr Speaker.
Gombak Setia, go ahead.
Thank you, Mr Speaker, for the opportunity given to Gombak Setia to take part in debating an important document which, for the first time, has been introduced by the State Government with the intention of taking steps towards the sustainable progress of the State of Selangor.
Mr Speaker, First Selangor Plan 2021 - 2025
Honourable Gombak Setia, ten minutes only, yes.
Under the theme of a Smart, Liveable and Prosperous State, it is a progressive endeavour that must be supported by all parties. Taking into account past experiences, whether when we were at the peak of success or our experience facing crises, we must always be prepared with strategic, constructive and pragmatic planning, not only for the short term but also for the medium term and the long term.
Therefore, Gombak Setia wishes to invite all Honourable Members of this august House to debate this extremely important document with honesty, sincerity and humility, to achieve the one common goal for the prosperity of the state and the welfare of the people of the State of Selangor Darul Ehsan.
Mr Speaker, Gombak Setia has often reminded that any economic planning must be based on an accurate framework and projection so that we can produce realistic plans and blueprints that truly generate benefits for the people and the State of Selangor. We do not need to cite big figures to attract attention or merely to create excitement for political interests, but in the end fail to achieve the goals, and even more unfortunately, show the delusional attitude of the State Government. I wish to emphasise that planning is indeed important, but to achieve organic and sustainable growth, but do not let us be considered delusional just because we want to impress with big numbers, with permission. I have carefully examined the First Selangor Plan document, as well as the presentation text of the Most Honourable Dato' Menteri Besar, which stated the commitment
of the State Government to contribute 30% of the national GDP by 2025. With 14 macro indicators, as indicators of the overall achievement of the First Selangor Plan.
However, based on the framework presented, I see there is a very obvious contradiction between the goals and the key indicators outlined in this First Selangor Plan. Selangor recorded a contribution of 24.3%, namely RM 343.5 billion, to the national GDP in 2020. Meanwhile, in 2021, Selangor contributed 24.8%, namely RM 327.1 billion, to the national GDP. This means that to increase Selangor's contribution to the national GDP to 30%, we need to record an additional growth figure of approximately 7%.
I would like to invite all wise and discerning Honourable Members to pause and think, whether with the projected growth of 6.5% to 7% that has been outlined and made an indicator, is it enough to realise the goal of a 30% contribution to the national GDP within a period of five (5) years ahead. Let us calculate how much the state's contribution will be increased based on each percentage increase in this growth? Based on my calculation, Mr Speaker, to achieve this 30% contribution, Selangor must record growth of at least 9.5% every year in compounded annual growth or CAGR, with permission. Taking into account all the other processes and plans implemented 100% without fail within a five (5) year period, as tabled by the Most Honourable Dato' Menteri Besar.
Mr Speaker, this is very unrealistic. First, the goals and indicators outlined here contradict one another. Second, the total growth of 9.5% every year is unreasonable. Because it is far higher than the national average growth, the regional average growth, the global average growth, and even higher than the average growth rate of developed countries. So Gombak Setia would like to ask, what are the main plans of the State Government and what are the detailed calculations of the main components of GDP in an effort to achieve the additional growth of approximately 7% mentioned earlier to realise this First Selangor Plan. What are the new economic development plans, because based on the efforts presented, I still see that they relate to existing ideas and matters such as digitalisation, efforts towards a smart state, and development projects that are sometimes unreasonable. For example, the Integrated Regional Development Project in South Selangor or IDRISS, a nice name. The development is estimated to cover a total area of 40,000 acres with an estimated gross development value GDV of RM 1 trillion. This 40,000 acres is 1/3 of the total area of the district of Sepang, and this 1 trillion is worth 1,000 billion ringgit. Is the State Government really confident
that this development can be realised within a period of five (5) years, because indicator no. 12 clearly outlines that the project completion rate is at the level of 100%.
Mr Speaker, let us check, or let us find which project in the State of Selangor has a GDV, let us not take the 1,000 billion mentioned earlier. Let us take 10 billion, the GDV is 10 billion. Can be completed within a period of 10 years. This is only 10 billion. What we discussed earlier is 1 trillion. That means 1,000 billion ringgit. I request the State Government to provide details of this project based on the figures given.
Mr Speaker, a Malay proverb says, "measure the cloth on your own body", likewise with our plans to realise a particular goal, especially the 19 game changer projects. I have examined one by one the proposed projects that I am confident will be implemented with cooperation from both government and the private sector, which surely have investment values of billions with GDVs of trillions. I request the Most Honourable Dato' Menteri Besar to elaborate on the physical capacity of the State Government. The capacity of the State Government's subsidiary companies, or with permission committed capital from the private sector that has already been obtained to realise this aspiration. What are the results of the what-if analysis or sensitivity analysis to measure the ability to obtain funds in implementing these efforts. Again, where is the element of risk assessment as well as what-if analysis and sensitivity analysis taking into account the impact of the war between Russia and Ukraine, disruption in supply chains, with permission. The impact of global inflation and various others, as in the report of this First Selangor Plan. I wish to emphasise once again, that the projected target of 30% national GDP mentioned earlier is based on the indicator of implementing 100% of the projects in the First Selangor Plan.
Mr Speaker, I wish to refine this debate towards the Government's efforts in implementing digital infrastructure and digitalisation, which is also one of the agendas in the First Selangor Plan. Gombak Setia would like to ask what is the justification for the State Government's equity investment through Menteri Besar Incorporated (MBI) in Wave Pay System Sdn. Bhd., for the purchase of 49% equity shareholding at a value of RM 10 million. This is because, based on the report by the Companies Commission of Malaysia (SSM) regarding the financial statements ending 31 December 2021, for this company, it appears that the investment made is of a deficit value in nature. Based on the check I made, Wave Pay System Sdn. Bhd. is merely a company with a paid-up capital of RM200,000.00. Annual revenue or income is only about RM 52,766.00. This company recorded a loss of RM 1.9 million for the financial year ending 31 December 2021. The accumulated losses of this company from 2017 to 2021 amount to more than RM 4.7 million.
Moreover, Mr Speaker, this company in which we are investing, the State Government is investing in this company, this company has liabilities of nearly RM 1 million exceeding the capacity of its current assets cash flow, which amount to only RM 184,462.00. I would like to ask where is the reasonable justification for the State Government to inject as much as RM 10 million into a company that has no assets and even no income. What is more shocking to me is that through such a large investment of RM 10 million, the State Government only obtains a 49% shareholding and possibly a golden share. I am very confident that the due diligence reports carried out by government officers as well as consultants would surely show a significant value gap between the amount of investment and the company's financial position.
I would like to ask, does the State Government doubt the ability and capacity of its own state-owned subsidiary companies? For example, Selgate Healthcare Sdn. Bhd., which is the owner of the SELangkah Application that has been approved by Bank Negara Malaysia to provide e-Wallet services with the Selangkah e-Wallet product.
Mr Speaker, honestly, in my view, a 49% shareholding cannot guarantee the interests and security of the personal data of the people of the State of Selangor, because without a majority shareholding, the State Government will not have control over management, over operations, over assets and, most importantly, over the information and strategic data owned by the company. Moreover, WavePay e-Wallet is set to be used as the main payment gateway for the State Government, its departments and agencies. This means all types of tax transactions, bill payments and other transactions between the people of the State of Selangor and the State Government will go through WavePay e-Wallet, which cannot be regulated by the Selangor State Government. Therefore, what is the State Government's guarantee for the interests and security of state government data and the personal information of the people of the State of Selangor, given that this project, I have been informed, has already begun to be implemented?
Therefore, Mr Speaker, Gombak Setia requests the State Government, as I mentioned earlier, that we have the same goal. Our aim is to generate the prosperity of the state and also to generate welfare for the people of the State of Selangor. But it is important for us to ensure that this good effort is reviewed so that it uses accurate projections and correct data, so that in the end we can achieve the goals as we have outlined in the First Selangor Plan 2021-2025. With permission, thank you, Mr Speaker.
Speaker.
Kampung Tunku.
Thank you, Mr Speaker. I will proceed directly to the debate. The first matter that Kampung Tunku wishes to touch on concerns Pillar 1 – Economic Strengthening, specifically the strengthening of the port and logistics sector. In 2020, during the early phase of the Covid-19 pandemic, we saw that the shipping, logistics and supply chain (with permission) industries suddenly seemed to be jammed. Apart from the pandemic issue, the Suez Canal blockage by the giant ship Ever Given between 23 and 29 March 2021 showed that the logistics and supply chain (with permission) sectors must change their perspective and operations from a Just In Time (with permission) to Just In Case (with permission) model, which involves resilience and the ability to carry out local sourcing. Selangor State is home to several major ports that facilitate local and international trade. So I am pleased to see the projects, programmes and key initiatives under RS-1.
My question to the government is this: what is the State Government's plan to ensure that our port and logistics industry is resilient should there be a pandemic in the future? My second question concerns the Carey Island Project in Selangor. What is the impact on the Orang Asli community on Carey Island? Secondly, can the Orang Asli community be absorbed as part of the workforce in the Carey Island Project in Selangor so that the State Government can provide employment opportunities to the local community there?
Secondly, regarding the digital economy. Two weeks ago, my side, together with the Councillors of MBPJ, newly organised the PJ Startup Festival together with the Selangor Information Technology and Digital Economy Corporation (SIDEC) as partners in the fields of venture capital, private equity (with permission) and others. This programme also ran concurrently with the Selangor Digital Entrepreneur Roadshow (Jelajah Usahawan Digital Selangor) at the Petaling District Level organised by SIDEC, and it attracted approximately 5,000 people over two days. At a time when neighbouring countries are increasingly becoming a destination for startup unicorns and potential unicorns, I would like to ask the State Government what steps we are taking to ensure these unicorns remain in Selangor, and remain in Malaysia. We have seen the most prominent example: Grab moved to Singapore, and now we only have one, which is Carsome. So the State Government must make it attractive (with permission) so that the unicorns remain in the State of Selangor.
One suggestion is to, (with permission), improve our story telling and share our success stories. Many panellists from companies and agencies such as MDEC, BSAF, cryptocurrency exchanges such as Luno and others who took part in the PJ Startup Festival were of the view that Malaysia's digital economy ecosystem must improve our story telling (with permission), so that startup unicorns are confident that the State of Selangor is the most suitable place for them. In addition, the digital economy led by the Selangor State Government must be inclusive (with permission).
I was very interested and moved by the sharing of the Honourable Senator Dato' Ras Adiba Radzi during the panel at the PJ Startup Festival, entitled (with permission) Digital Economy Global Opportunities For All. The Honourable Senator Ras Adiba shared about persons with disabilities (OKU) who had started their own businesses online during the Covid-19 pandemic, and the persons with disabilities were also surprised because they had not expected that they could participate and succeed as small digital entrepreneurs. Listening to the Honourable Senator's sharing, the assistance they need generally includes upgrading of skills (with permission) in marketing, branding (with permission) and also networking (with permission). In our journey to become more aware of the challenges and needs of persons with disabilities, I hope SIDEC and other agencies that run the digital economy under Selangor Plan 1 will think inclusively (with permission) in the formulation of policies, programmes and also communication materials. Matters that are easy to implement, for example OCTEX, or using a colour scheme (with permission) that is friendly to colour-blind people, can also encourage the participation of persons with disabilities in the digital economy.
Finally, I would like to raise the SELangkah App. Honestly, I loved SELangkah (with permission). In my view, SELangkah has so far been better than MySejahtera, and during the pandemic, the Kampung Tunku team was actively promoting the use of the SELangkah Apps. In the previous sittings, SELangkah was publicised as likely to become a super app (with permission), for Selangor citizens to obtain information and conduct transactions with the Selangor State Government. I recall that in the early stage of SELangkah, there was a plan to develop SELangkah based on the year's solution, unified payment to facilitate digital transactions, and in addition, there was the SELangkah Wallet.
So I would like to ask, for example in the Selangor Sejahtera Livelihood Assistance Scheme (BINGKAS), why do we need to use an external provider (with permission) such as WavePay? I think it is not wrong if we work with them, but we should absorb and integrate them into the SELangkah App rather than requiring people to download the WavePay App. The need to download two applications affects the user experience (with permission), and we have experienced this before with Selangor Mental Sihat, where originally users had to download the Wat Dot Apps if they wanted to make an appointment with a mental health specialist, and a small number of users gave feedback that the transfer process (with permission) from SELangkah to Wat Dot was rather troublesome. So, I see that the same thing may happen with the transfer process from the SELangkah application to WavePay. I really hope the State Government will take this factor into account. Again, I love SELangkah (with permission). But I think SELangkah must continue with strong branding, do not let the branding become diluted, and we need to produce a solution that is simple and elegant (with permission), because not everyone is tech-savvy and aware of digitalisation.
The third matter I wish to touch on concerns the ageing society. Generally, in the culture of Asian people, senior citizens have a negative mentality about ageing. For example, my own grandmother often says, "oh, I am already old, I cannot do anything," even though she can still eat, sleep and move in line with her age. In contrast to the West, senior citizens there have a different mentality. Age is not an obstacle for them to take part in activities such as hill climbing and adventure sports. The population projection of Malaysia towards 2025 and beyond sees Malaysia becoming a country with an ageing population, or aging society (with permission). And DUN Kampung Tua, eh, Kampung Tunku, not Kampung Tua, is among the DUNs with a high elderly population. Additionally, many experience the symptoms of emptiness (with permission), namely living alone in a house while their children have migrated to another state or country. Therefore, I am pleased to see the initiatives of the State Government such as the Selangor Senior Citizens Workforce (Tenaga Kerja Warga Emas Selangor) employment platform, the Selangor Ageing Activists (Penuaan Aktivis Selangor) platform, building retirement facilities and others. So I hope we can change the mentality of senior citizens and give them an assurance (with permission) that they are not simply being set aside. So, I say thank you to the Selangor State Government.
The fourth matter concerns women. During the question session yesterday, I was pleased to hear that the Women's Leadership Academy (AKW) has produced five Women's Council members and 26 women who are actively involved in NGOs. I was also pleased to hear the news that AKW is seeking accreditation from MQA so that women's participation in AKW will be recognised by employers and other agencies, thereby providing more employment opportunities.
In this honourable House, I would like to remind everyone that Selangor is the first state to raise the minimum marriage age from 16 to 18 years. During the pandemic, health experts reported an increase in the number of child marriage cases, especially among the extremely poor families. Therefore, I think that the amendment under the Selangor government under Pakatan Harapan has a positive effect, in that young girls in Selangor are encouraged to continue their education and join the work force in Selangor. However, I hope we do not stop here, but plan towards a women-friendly city or women-friendly state (with permission). For example, breastfeeding facilities, childcare centres (taska) and kindergartens (tadika), and I want to emphasise that they must be designed properly. It must be designed (with permission), not in hidden places or done merely perfunctorily, last minute (with permission). For example, we install curtains and consider that sufficient.
Finally, the issue of youth. I see in RS-1 that unemployment and jobs that do not match qualifications are among the main causes of youth dissatisfaction in Malaysia. Therefore, I suggest that the State Government should further intensify programmes such as Job Fair, Job Care and upskilling programmes. Promotion must be enhanced. For example, I have a resident who was interested in the Job Fair in Shah Alam, but by the time she saw the advertisement, the programme had ended. I also wish to make a radical suggestion regarding the list of civil servants under the State Government, the Selangor State government service, that each department must have a quota of 30% women and/or 30% youth. We may set the age limit at 35 or 40 for convenience (with permission). In this way, we will have a diverse civil service machinery (with permission) that can bring fresh perspectives and ideas to the Selangor State public service sector. In addition, youth will feel that they have space and a voice in formulating the Selangor State Government's policies, especially those related to youth policy. The feeling of belonging (with permission) is very important among the youth, you know. And I think it is important that with the Undi 18 (voting age of 18) and...
Kampung Tunku.
Ya, saya.
Ayat akhir.
Okay, can. Okay, so the last matter I want to touch on concerns sustainability and water resources. Recently I wanted to ask about the status of the suspended operation of the LRA Bukit Tampoi due to oil flowing into the sauk (drain). I want to ask: how many user accounts were affected, and how do we prevent this from happening again? So, that is all the issues I wanted to raise. Kampung Tunku respectfully requests to support Motion No. 14 of 2022 – Motion on the First Selangor Plan 2021-2025. I hope all our plans become reality for the benefit of the people of Selangor. Thank you.
Kuala Kubu Bharu.
Thank you to Mr Speaker, who has given me the opportunity to take part in the debate on the motion on the First Selangor Plan 2021 to 2030 in this honourable House. From now on I will use the abbreviation RS-1 only. I congratulate Dato' Menteri Besar, who tabled RS-1, making Selangor the first state to draft a five-year development plan. I want to touch on the four focus areas drafted in the RS-1 book. Firstly, I look at the tourism focus sector, which has a map stating the diversity of tourism activities in Selangor on page 65. Among them is the Kuala Kubu Baru Heritage Site. I would like to thank the Hulu Selangor Municipal Council for beautifying the Kuala Kubu Baru Heritage Site. I would like to inform this honourable House that the town of Kuala Kubu Baru is full of murals. Recently, the well-known Orang Asli painter Sheikh Koyok and his brother Ramlan Koyok were invited to produce artworks with the theme of the life of the Temuan Orang Asli community on the walls of the back lane of Jalan Dato' Muda Jaafar, Kuala Kubu Baru. Sheikh Koyok may be from Pulau Carey, yes, he is from Banting. Their paintings will become the first Orang Asli cultural mural in Malaysia. I propose a "Pusing Selangor" campaign to promote the murals so that the public can better understand the life and culture of the Temuan Orang Asli. I found that the issues and challenges of the ageing (slaid hayat) that are written in RS-1 really reflect the current situation, namely the shortage of talent, skills and funds resulting in a lack of innovation. Does the strategy drafted address the issues and challenges faced? In my view, the role of SBIOCO is very important. I suggest that SBIOCO provide grants to research teams for the purpose of innovation.
Mr Speaker, the special laboratory collaboration programme is a very good initiative. I take as an example China. The China Pharmaceutical University (CPU), or in Chinese "Cong Kuo Yao Keta Shi Dinan Qing", which collaborates with 10 major companies, where the companies provide scholarships to selected students in this way, these companies will continuously have talent to work in drug discovery, (with permission) and the results of research can also be used commercially easily by those companies. I would also like to inform this honourable House that CPU, that university, also collaborates with UiTM. Both universities have signed an MOU. With this, I am confident the special laboratory collaboration programme will increase the competitiveness of our smart, liveable and prosperous state. Mr Speaker, agrotechnology is one of the focus sectors in RS1. Soil fertility is a basic matter for soil science and the agricultural sector. Therefore, the Selangor government must take the soil seriously, and I suggest that PKPS, namely the Selangor Agricultural Development Corporation (PKPS), produce more bio-organic fertiliser to replace chemical fertiliser. I would like to inform this honourable House that Indonesia has restricted the use of chemical fertiliser in stages. India, meanwhile, encourages its farmers to use bio fertiliser and bio pesticides through a subsidy scheme in which farmers can obtain investment money (with permission) by showing evidence, including receipts for buying those products. Selangor should be the first state to reduce bio-organic fertiliser by one hundred percent under RS-1. Apart from that, Mr Speaker, the Selangor government needs to encourage younger youths to adapt to the world of technology and venture into the agriculture sector. Agrobank offers a financing scheme of up to RM500 thousand for young agropreneurs. The Selangor government does not have a bank, but it has RS-1. I am confident the Selangor government can also help our young agropreneurs in terms of capital and technology to strengthen Malaysia's food security. Finally, I would like to give my views on women, families and communities, which are focus areas of RS-1. I am very proud of this very honourable House. Throughout my nine years as a State Assembly Member representing the people of Kuala Kubu Bharu, there has never been a State Assembly Member who uttered words insulting women or who did not respect women, as happened in Parliament.
Recently, Parliament was in an uproar because of a Member of Parliament who showed very great disrespect towards women. He used a word beginning with P. That P does not mean Pandamaran, during the debate on the Anti-Sexual Harassment Bill. This did not happen in this House, and I hope that in this term and the next term it will not happen in this honourable Selangor State Legislative Assembly. The situation is different, this is what we have. I thank the male State Assembly Members, who not only respect women but also support all the efforts of the Selangor government to empower women. Let us cultivate awareness of gender equality for the sake of well-being.
HONOURABLE MEMBERS: Long live women. Long live women. We love women.
Thank you. Thank you. My women colleagues in this honourable House and I will always ensure that the ten programmes and initiatives outlined in the women, families and communities field, which are enshrined in the RS1 Book, are implemented well. That is all I have to say, I support this motion.
Yes. Thank you, Kuala Kubu Bharu. Before I continue, I would like to inform this honourable House, Honourable Members all. This morning we also received a visit from undergraduate students who are volunteers at the Service Centre of the DUN Meru State Assembly Member, from the Kolej Universiti Islam Antarabangsa (KUIS), numbering six persons. Welcome to the Selangor State Legislative Assembly. I will give to, oh, this is long, yes. Sijangkang.
Thank you, Honourable Member, Mr Speaker, for giving me the opportunity to also debate the Motion on the First Selangor Plan by the Most Honourable Menteri Besar of Selangor. Firstly, I congratulate the State Government for producing a copy of the First Selangor Plan, which forms the basis of the Motion at this sitting. I see that documents like these are indeed very valuable, but some of the agendas that took place before were, in the end, a question of how far we could take action afterwards. This includes several agendas by the State Government or by the Most Honourable Dato' Menteri Besar of Selangor himself relating to clusterisation and so on, which I believe were tabled at the early stage of his tenure as the Most Honourable Dato' Menteri Besar of Selangor. But in subsequent budget sittings, the clusterisation plans were not carried out or were not shown to us, to the point that I recall raising in the previous sitting what had become of the clusterisation plan. That is why I see that the action taken afterwards is something that is very important. So, Honourable Member, Mr Speaker, I would like to touch on several matters to give views, proposals and suggestions on the matters discussed in the First Selangor Plan. And of course, I believe, I have considered why this plan was issued, which is mainly related to when crises occur, not only in our country, not only in Selangor, but in the world. It relates to the role of the great powers of America, China and Russia. It relates to the climate change that is happening in the world. It relates to the Covid-19 pandemic that has occurred in the world and in the end has, to some extent, paralysed our economic system and our health, and also relates to the need for food nutrition or food security today.
So, Honourable Members, firstly I want to touch on issues or matters relating to economic strengthening. Specifically, I want to touch on Carey Selangor, which involves roughly 6,000 hectares to be developed in the development of the special economic zone of Pulau Carrey. However, what I see there is that the time frame set is 2025 to 2060, whereas if we look, the plan or the First Selangor Plan is from 2021 to 2025. But I do not deny any development that will be carried out; it will not happen tomorrow, we want to do it new today. Planning, of course, within the current period, perhaps at the level of this Government, is planning how the implementation of the Carey Selangor development will take place in the anticipated period of 2025 - 2060. I also want to get a response from the State Government, actually. Because as a State Assemblyman, the area where Pulau Carey is located is part of my constituency. Until today, I have not received any information or briefing on how the master plan to be developed in the special area of Pulau Carey will be, or on the development of the Third Port that was mentioned before, especially from the Federal Government. Whether the plans to be drawn up by this Government depend only on the port development plan, which I believe is the backbone of development there, which may have been discussed with the State Government and may not have reached us as ADUN or myself as the local State Assemblyman. Or does Selangor plan how Selangor, as a state with land interests there, will complement that development or become support for that development. Only what I hope is that there will be some information from the State Government on how the development that will take place there will be, at least. Inputs from the local community and from the ADUNs can help shape the development of a port that will be developed as the special economic zone of Pulau Carey itself. However, I also want to draw attention to the State Government's consideration through the experience or history of development in our area. First, I want to mention that when the State Government earlier planned the development of Canon City, part of the land involved there was Malay reserve land, as well as Orang Asli settlement areas and roaming areas. In the end, if I see, perhaps, this is not my view, but it seems that local interests were not viewed thoroughly. What happened when the plan took place was that the Orang Asli settlements were relocated to a Desa Kemandul or residential land, and roaming areas were replaced with areas not only in the state but outside the state of Selangor. How can these Orang Asli be expected to have roaming areas that may be their source of income when they live in the State of Selangor at Taman Desa Kemandul? What I see is that, in the end, their interests were not placed as the first priority. The second concerns the Malay reserve land, which in the end, because of the project, had to be replaced, and I recall this replacement also had a very adverse effect. Some of it was replaced in the area of Hulu Selangor district, which was an area of land clearing, which I believe is also a problem, the issue of resolving the settlers there. Secondly, some of it was replaced as Malay reserve land at the Malay Orang Asli village. This area had previously been cleared by some Orang Asli, uh, Malays, and some Indians who had planted sources of income for them, which in the end also became an issue, because when the Malay reserve was reserved for Malays, the interests of the Indians were no longer there. And I was informed that there were guarantees to replace it, which until today we have not been able to resolve. I recall that during the time I was involved in the State Government as an EXCO as well, we tried to plan, but we failed, we still have not succeeded in replacing places like this.
Honourable Member for Sijangkang, please sit down. We will continue later, five minutes for the afternoon session. Honourable Members all, the time has shown 12.00 noon, so I adjourn the House until 3.00 in the afternoon. The House is adjourned.
(THE HOUSE IS ADJOURNED)