Selangor · 1 August 2022

14th Assembly, 5th session, 2nd meeting · 236 turns · 32,545 words · official PDF ↗ · Digital Hansard ↗

203 of 236 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.

(Opening)

Secretary of the HouseEN

Good morning and greetings. The order of business for the Second Meeting of the Fifth Session of the 14th Selangor State Legislative Assembly on 1 August 2022 began with the recitation of prayer.

Assistant Secretary of the House

Bacaan Doa.

Oral QuestionsQuestions

Secretary of the HouseEN

The next item on the order of business. Questions.

Deputy SpeakerEN

Assalamualaikum W.B.T. and greetings. Honourable Members, be informed that 3 EXCOs, the Honourable Ganabatirau a/l Veraman (State Assemblyman for Kota Kemuning), the Honourable Ng Sze Han (State Assemblyman for Kinrara) and the Honourable Mohd Zawawi bin Ahmad Mughni (State Assemblyman for Sungai Kandis) have been infected with Covid-19. Accordingly, all State Assemblymen and Heads of Department are requested to take self-containment measures to prevent the spread of the Covid-19 pandemic. For questions, I invite the Honourable Member for Pandamaran?

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Thank you, Mr Deputy Speaker. My question, the Pandamaran question, Number 66.

Oral Questions — 66. Joint Management Body (JMB)Questions

Tuan Leong Tuck CheeDAP · PHPandamaranEN

66. To ask the Y.A.B. Dato' Menteri Besar:-

a)

Can the State Government establish a body that can replace the existing JMB?

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you, Deputy Speaker. To answer the Honourable Member for Pandamaran, Act 757 provides that if, after a proper investigation, it is proven that the Badan Pengurusan Bersama, or known as JMB, in English Join Management Body, does not carry out the maintenance and management of its building satisfactorily, then the Commissioner of Building or Commissioner of Building (COB) may appoint a management agent to maintain and manage the building for the period specified by the COB. This is a provision under the Act that allows, yes, if the JMB cannot carry out its responsibilities. Therefore, in addressing the problem of JMB failure and the difficulty of appointing interested management agents, the State Government needs to conduct a careful study of several implications if it wishes to establish a special body that can replace the JMB. What I mean is that we cannot simply take over directly, but we need to conduct an investigation and make several findings first before the COB takes over the existing JMB. So, the main reason we see the failure of JMB in carrying out their role is actually due to limited financial resources, management, and also the care of the building, and apart from the efficiency in ensuring that management runs well, they also do not have technical parties who can actually help them.

Hence, the State Government currently views that existing programmes should be strengthened, and under the provisions of the Housing Board, we have now broken down several programmes. The programmes to help JMB parties carry out their responsibilities well, we have already started the e-COB programme or online management. We have also run the MEKAR programme, Mobiliti Ekononomi Rakyat, to help residents who cannot afford to pay, so that they can pay several overdue fees through programmes under the JMB and also several programmes that have actually been started. But apart from that, as EXCO, I feel there is a fundamental issue or more basic matter under this JMB management, because all this time we have given the responsibility to residents for this establishment but they do not have full power or authority. So the view that we have already workshopped, and we may, I have already raised with the Ministry, we need to take into account the possibilities that there are several methods adopted by developed countries, especially our neighbouring country Singapore, for example where this management is fully taken over by the local authority but they appoint management agents fully for implementation. So there, the collections that exist can be consolidated under one fund, and eventually it will be managed well, and there will no longer be buildings that are not managed well or insufficient collections and so on. But all this is still at an early stage where I, God willing, will make it a priority to prepare a working paper and also, on the legal side, what is the source of authority for us to make it a solution to ensure that there are no longer buildings without building management or JMB, because this efficiency and this collection are the main causes of the problems created. That is all from me, thank you.

Mr Speaker, may I interject briefly?

Deputy Speaker

Meru.

Can we, before we begin our sitting, extend our respects first to our late former Menteri Besar who has just returned to the mercy of God.

Deputy SpeakerEN

God willing, at 11.30 am we will adjourn the House for the visit and to pay our respects, and I invite all Members of the House to rise and recite Al-Fatihah, and also those who are Muslim.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Deputy Speaker, for the information of all, at 11.30 we will have a Motion, that Motion we will carry out a little tribute and I will also propose something, so it is better that we finish this Q&A session by 11.30. That is my proposal. Thank you.

Deputy SpeakerEN

Alright, thank you. Seri Setia?

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

Thank you, Mr Deputy Speaker. I want to ask the Honourable EXCO, as we know, if the area does not have a JMB, then an agent will be appointed. How long is the period of the agent who will manage the building, and we know that if this agent comes in, of course they will help to solve the problems of the area and there is a slight increase from the previous payments. So, is this also going to be a problem, and that is my question. Two questions: first, how long will this agent be there, and second, the agent will certainly increase the rate, will there not be problems?

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you, Honourable Member for Seri Setia. Yes indeed, if we look at the transfer of this responsibility from JMB to COB, it must be done in a situation where the period is not limited. As long as we see there is no good management at the JMB level, or MC, then that period will be held by the COB. That means it will appoint that agent until it feels, we feel that the management can be handed back. Under the Act, both are permitted. The JMB can do it, or it can be taken over by the COB and appointing the agent can be done. But indeed there are many places where there are increases. Even though it has been managed by the COB, or by appointing an agent, they cannot arbitrarily increase prices or increase fees without holding an annual general meeting to inform how much the increase is. So the process is taken over by the COB, the COB appoints a management agent, but before naming or stating how much the fee is, they must hold an AGM to announce and obtain the agreement of all residents, only then can the increase be made. So that is the process, that is all, regarding the quantum, how much it is, depends on the AGM to agree to the existing increase. Thank you.

Deputy SpeakerEN

Supplementary question. Pandamaran?

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Thank you, Mr Deputy Speaker. My question to the Honourable EXCO is, how can the Government help this JMB to ease their burden. Because, many residents in my area owe bills to Air Selangor, Tenaga Nasional Bhd, and they keep being cut off and come to face us to ask for help, they say they are threatened by residents if they want to cut off their water until they pay. So I welcome, Pandamaran welcomes the proposal for the PBT or Local Authority to take over JMB. But before taking over, how can we help resolve the outstanding bills that have reached RM 600 thousand, RM 700 thousand, it is really difficult for them.

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Okay, thank you Pandamaran. I think this issue occurs everywhere in Selangor, right. Not only here, perhaps the same thing also happens in other states. Because I repeat again, the main problem is when the JMB has the responsibility to collect fees but they do not have full power to immediately as soon as possible arrest or not arrest, give notice or impose any follow-up action on that, they must have a process, notices several times only then they can bring the parties who do not, what, do not pay the fees. Eventually the new problem that we see or that we commonly see, bills cannot be paid and so on. So what we are doing now under the COB is trying to facilitate it by holding discussions with the agencies involved. Not everything can be resolved, but at least we discuss how to find a way out. They do not need to pay in a lump sum, in instalments, but nevertheless I am confident this method is only temporary that we can resolve. So the more fundamental matter is how the responsibility and also the power should be returned to the competent party for collection, because why, because now the big problem is not only collection, the problem of, what is it, there is no harmony between residents, yes, fighting, abuse of power, all sorts of things happen, so we need to close this matter quickly by taking the responsibility to develop a new method on how integrated collection should be done and who is responsible for doing this, so that eventually we can manage this state in the best possible way. Because these strata houses now, not only is strata just one category, low-cost housing, we have low-cost, we have luxury, right, where the luxury ones are condominiums and so on, the problems are different. Having a lot of money is also a problem, having little money is also a problem. So eventually we need to adopt a fairer, better approach so that the management of these strata houses can be managed in the best possible way. That is my answer, Deputy Speaker. Thank you.

Deputy SpeakerEN

Next question. Ijok?

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Mr Deputy Speaker, I would like to take this question under Standing Order 24 (2) because Ijok is positive for Covid-19.

Deputy SpeakerEN

Alright, I accept. Please, Government.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Speaker, up to now the total gazetted permanent forest reserves in the State of Selangor that have been gazetted under the Enactment (Application) of the Selangor State Forestry Act 1985 amount to 250,250.33 hectares, which is equivalent to 31.65 percent of the total area of the State of Selangor. Based on the decision of the State Government MMKN 8th/2022, on 30 March 2022, to re-gazette the Kuala Langat Utara forest reserve. There will be no more Kuala Langat forest reserves that will be de-gazetted for development purposes. End.

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Mr Speaker, supplementary question.

Deputy Speaker

Bukit Melawati?

Puan Juwairiya binti ZulkifliPKR · PHBukit MelawatiEN

Mr Deputy Speaker, referring to the first question, namely forest reserves, I would like to ask the State Government, it is understood that an eco-tourism development at Taman Alam, Kuala Selangor will be carried out by the State Government soon. So, although many positive impacts will be felt by the local population, yes, employment opportunities, economic spillover and so on, so how can the State Government guarantee that the mangrove forest reserve at Taman Alam, Kuala Selangor and its biodiversity will not be affected? Thank you.

Tuan Hee Loy SianPKR · PHKajangEN

Thank you, Honourable Member for Bukit Melawati. For information, Honourable Member, the Selangor State Government through the Selangor State Government Executive Council Meeting Number 39/2021 dated 17 November 2021 has in principle approved the proposal to develop Taman Alam Kuala Selangor as an International Centre. However, several matters still need to be scrutinised and reviewed. So we see that in the north, especially Kuala Selangor and in Sekinchan, we lack star-rated hotels, that is why we cannot attract tourists from abroad to stay, live in Kuala Selangor. So they have to stay in Petaling Jaya, Subang Jaya or Kuala Lumpur and do day trips. So it does not give additional economic impact to the local area. That is why we propose, because there is a company that wants to invest and is proposed by the Selangor State Government, and we do not allow the de-gazetting of any permanent forest reserve, no. We only give usage permits for them to build, erect an international star-rated hotel only in certain areas that have no impact on the Forest Reserve. And I want to tell you here, many people try to take the story or give the impression as if the Selangor State Government will de-gazette the Forest Reserve, greedy, right. Wah, not at all. I want to give this example, this is not only happening at Taman Alam. Before that, it happened at Komanwel Forest Reserve too, there are chalets built in the Forest Reserve, we have Kanching Forest Reserve also the same. We have Sungai Congkak Forest Reserve where there are chalets built for usage permits, and outside Selangor too, such as in Langkawi, Taman Eko Rimba, Mat Cincang Forest Reserve Langkawi was also used for upgrading to a five-star hotel, in Taman Rompin, Pahang, also in Bako National Park, Sarawak and Sepilok Forest Reserve, Sabah, all were allowed to build hotels for tourist attraction centres. I hope that after we give such positions, no party uses this issue to attack the Selangor State Government, especially the irresponsible opposition who were before this.

Deputy SpeakerEN

Next question, Sijangkang.

Thank you Mr Deputy Speaker, question 68.

Oral Questions — 68. Religious School in Bandar Saujana Putra, JenjaromQuestions

68. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What is the status of the development planning of SRA BSP and what is the planned capacity?

b)

Does the State Government have plans to upgrade KAFA BSP?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you Mr Deputy Speaker and Sijangkang. I seek permission to answer on behalf of the Honourable Member for Sungai Kandis as he was found positive for COVID-19 today. Honourable Members, I would like to inform that the development plan for the Bandar Utama Saujana Putra Primary School has been listed in the 12th Malaysia Plan or RMK-12 with a capacity of two blocks of buildings for 40 classrooms that can accommodate approximately 1,600 pupils per session. For the second question, the State Government has no plans to upgrade KAFA BSP or Bandar Saujana Putra because due to security factors or the size of the site at KAFA BSP now is rather small and it is squatting on the site of a narrow surau and will probably require a larger size that we want to build in the 12th Malaysia Plan later. Thank you.

Thank you Mr Deputy Speaker. My question is whether the State Government can help somewhat for the current comfort at KAFA BSP, because with the situation using a cabin system which I think is not comfortable at all. Especially the teachers' rooms which may, from the perspective of comfort needs, be a little like air-conditioning and so on, and also the classes that only have those partitions, at least until the Religious School of Bandar Saujana Putra is developed, the comfort for students and educators can be considered to some extent. Thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. The State Government will consider that Honourable Member with several factors. The first factor is when the SRA Bandar Saujana Putra will be developed. If the timeframe is too close, the repair cost for the existing building may be wasted because we only use it for around two to three years. When it will start and when it will be completed is the main factor. The second factor is looking at savings. We do have certain savings that we can use, including savings from the Islamic Affairs Department and we will see how to upgrade it. Perhaps the facilities being upgraded do not involve large structures, perhaps they involve air-conditioning or involve other facilities while waiting for the completion of SRA Bandar Saujana Putra as in the 12th Malaysia Plan. We also look at the fact that the Malaysia Plan is usually listed but sometimes it takes time, sometimes it takes two Malaysia Plans before it can be implemented or sometimes it has to be dropped, this matter will be monitored from day to day. Thank you Honourable Member.

Deputy SpeakerEN

The next question, Sungai Panjang.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Thank you Honourable Mr Deputy Speaker, my question 69.

Oral Questions — 69. Selangor Smart Agro Park (SSAP)Questions

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

69. To ask the Y.A.B. Dato' Menteri Besar:-

a)

What is the latest status of the SSAP development plan in Changkat Menteri, Sabak Bernam District?

b)

Based on the current status, when is the projected completion of the project expected according to the planned phases?

ANSWER:

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Sungai Panjang, Mr Deputy Speaker. Sungai Panjang has asked a question regarding the progress of the Selangor Smart Agro Park Project in Changkat Menteri. For the information of Honourable Sungai Panjang, at this time the project is still awaiting approval of the Environmental Impact Assessment (EIA) report under Schedule 2, which was submitted to the Department of Environment (JAS), Putrajaya on 5 June 2022. So we are waiting for the report to be approved. The delay also, originally the delay was caused by the consultant's services having some problems in terms of their work commitment, and we have resolved that and the report has been submitted to Putrajaya. And based on the current status, our projection is that this project will be completed at the end of 2023, taking into account the delay in approval of the EIA report, which takes at least one year. Once approval is obtained, the development will be carried out, and we are confident it will be completed one year after that because the participants have already been identified, only waiting for the EIA decision. Thank you.

Deputy Speaker

Sungai Panjang.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Thank you, Mr Deputy Speaker, thank you Honourable EXCO for the latest update regarding SSP. As we know, it has been officiated, and this EIA issue came later. And if we look at the complaints and also the grievances of local residents, it seems as though work is being carried out on the site. So during the waiting period for the EIA approval, are there any categories of work that are permitted, or in fact work that is not permitted to be done there, because day by day I receive complaints and, seeing for myself in passing, the area is becoming increasingly obvious. So if possible, please provide an explanation. Thank you, Honourable Member.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member. In fact I too visited the site twice when the complaints were received, and we found that no work was being carried out. If there was anything at all, it was road works for maintenance, maintaining the roads there, because the area is quite peaty so it requires maintenance. And we have indeed placed security to guard entry and exit to that place, to ensure compliance with the EIA approval. And indeed there is none, up to today there is none; indeed in the surrounding area, other areas that also applied and some that have already obtained EIA approval, but for this area there is indeed no work for the implementation of this project. Because I constantly receive enquiries from these participants, asking when it will start, when it will start. So this means indeed there is none, and I have checked with PKPS and indeed no work has been carried out there. Thank you.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

A little, Honourable Member.

Deputy Speaker

Sungai Panjang.

Dato’ Mohd Imran bin TamrinUMNO · BNSungai PanjangEN

Thank you for the answer from Honourable EXCO. Only, the explanation just now concerning maintenance work and access work within the area, is road-clearing work something that is permitted while awaiting the EIA. Thank you.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

That is what I mentioned just now, maintenance work needs to be carried out to ensure the road can be used. But that is limited to the access within the launch site area and that road only. And for the others, we will indeed wait for approval from the EIA. Otherwise we cannot proceed, because the cost is quite high to manage that place. Areas with peat soil or peat areas indeed require high costs for their maintenance. That is all, thank you.

Deputy SpeakerEN

Next question, Sentosa.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Thank you, Mr Deputy Speaker, my question number 70.

Oral Questions — 70. Sitham ProgrammeQuestions

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

70. To ask Y.A.B. Dato' Menteri Besar:-

a)

What is the performance of the SITHAM Programme in assisting small Indian entrepreneurs up to the year 2021?

b)

State the total number of Indian entrepreneurs who have been assisted through the SITHAM Programme up to the year 2021?

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you, Mr Deputy Speaker, and Honourable Sentosa, who asked about the SITHAM programme that was first launched at the end of September 2019 until now, and the performance of this SITHAM programme, if we look at it, I can say it is very good, because it is one of the programmes that we specifically originally intended for the Indian people or community, and now there has also been an addition, namely I-SEED. So the performance of the SITHAM programme in assisting Indian entrepreneurs up to 2001 is, if broken down, into four. The details are actually too many, so I will read the conclusion. I will provide the detailing to Honourable Sentosa. Among the SITHAM programmes we break down into four, namely Entrepreneur Development Training, Skills and Manufacturing Courses, the Business Guidance Programme or GROW, and the Business Equipment Grant, where we see that in 2020 this effort was rather slow given that we all faced the COVID-19 pandemic, but in 2021 we began to accelerate or stimulate this programme again well. And finally, the Entrepreneur Development Training Programme has managed to train as many as 600 participants, who were involved in providing basic training to Indian entrepreneurs to learn techniques for increasing sales and understanding the latest intricacies in the business field such as business management, online marketing, loan opportunities, licensing applications, company registration, or they have also begun to be given exposure on how to obtain halal certification in their efforts if they make products related to food. The second, the Skills and Manufacturing Courses, as many as 1,331 participants have been involved since this course was conducted, and it is a short-term course that provides one-off training, with permission, for participants who do not have any prior business skills, but we give it so that we can see their interest can be nurtured among them, mostly these skills and manufacturing courses are taken up by women. The third, the Business Guidance Programme, 30 participants benefited from the GROW programme, which is a business guidance programme for participants who have no business experience, but we also pair them with industry players or companies who will specifically guide them. So if I look

actually, every year SITHAM is only provided with 1 million, given to HIJRAH Selangor for implementing the programme, and we see that the programmes that have been launched are quite good because we are more focused. As with GROW, we had 70 participants, and if we look at its impact, we can see that a large majority, 60%, have actually become self-reliant, and finally the Business Equipment Grant, as many as 112 persons have received business equipment grants with a value of RM 657,204.10, which is the total amount of assistance available. So the conclusion is that the number of Indian entrepreneurs who have been assisted by the SITHAM programme up to the end of 2021 is 2,113 persons, with the breakdowns that I have read.

So 2 million has provided a touch or contact to 2,113, and this programme we see has continuity where they have also received HIJRAH assistance, capital aid, and finally we see many, I am proud to record in this House, several, two or three, what is this, companies or individuals who have established companies and eventually we have been able to bring exposure, namely exhibitions or displays overseas. Thank you.

tambahan

Deputy Speaker

Sentosa

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Thank you, Mr Deputy Speaker. Thank you Honourable EXCO, for giving a very complete answer. My question, my follow-up question, concerns the provision of grant items. Grant items. I see it would be good if we gave them the equipment they need to run their businesses, such as SITHAM and I-SEED. My question is, do we follow up with the recipients of these items, and we need to, yes, we check whether they use the items fully or not. If not, can we take them back and give them to other users or other traders who need them.

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you Honourable Sentosa. In fact they have a responsibility for two years, yes, to use the equipment we provide. But we see that some of our SITHAM recipients, who were quite honest during the pandemic era back then, could not continue their businesses and they returned the goods to the Government. In fact the Government did not, nobody said, what, the condition that it must be returned, but we re-procure those items so that they can be transferred to other individuals. So if we look at it, within these two years monitoring is indeed carried out, with us not only providing equipment, we make them a list that must be given attention if we have training programmes other than those managed under SITHAM, namely under entrepreneur development or under

SIDEC, we will advance them to those. From there, we actually track whether they continue to do business or whether they have already stopped their business. So that is the answer from me, Honourable Sentosa, thank you.

Deputy Speaker

Sungai Pelek.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Thank you. Given the success of SITHAM and also the uncertain economic situation, does the State Government have plans to inject more funds to further ensure the success of SITHAM and this programme.

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you, Sungai Pelek. Sungai Pelek is indeed fond of issues related to finance, isn't he. I think this year, God willing, there may be a meeting between SITHAM and I-SEED, because, both of these programmes, indeed take a fairly similar approach, so there we may see the performance, if I am the one responsible for SITHAM, I see the need for this addition indeed, but it will be looked at specifically, how much and so on, we are confident it is not only by way of addition, perhaps by giving them some way out, do not look only at SITHAM or I-SEED funds. In fact there are many more funds available outside which have never been said to be specifically for any one race. So here the Government actually wishes to convey to the recipients of SITHAM and I-SEED assistance that apart from the initial funds specifically under SITHAM and I-SEED, in fact many funds are outside, we will ensure they will not be left behind in obtaining those benefits. That is what I think I suggest, if that, we see has already been running well. I think the need to add may not be necessary. That is my answer. Thank you.

Deputy SpeakerEN

Next question. Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Mr Deputy Speaker. Question 71.

Oral Questions — 71. Development plan for public facilities and public transportQuestions

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

71. To ask Y.A.B. Dato' Menteri Besar:-

a)

Will the Local Authorities within the State of Selangor plan to publish a master plan to increase the number and capacity of public facilities, in line with the standards set out in the Selangor State Structure Plan 2035?

b)

What is the outcome of the submission of the "Selangor Transportation Masterplan" to the Federal Government?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Bukit Gasing, for the question raised regarding the measures taken by the Local Authorities (PBT), namely the Local Authorities in listing public facilities so that they are in line with several important policies such as the State Development Structure Plan 2035. For the information of the Honourable Member and all Members of the House, the Selangor State Structure Plan 2035, formulated by the State Government through PLANMalaysia@Selangor so that the State Government together with agencies and the people of the state can see the context of the state's structural development towards the development of sustainable and prosperous urban regions. The formulation of these policies is based on the City Region Development Oriented Strategy and Concept, which is somewhat reflected in my presentation of the First Selangor Plan (RS-1). Honourable Members whom I hold dear all, for infrastructure development planning or public facilities at the PBT level, it will be translated into Zoning or into local plans. These local plans will be debated and discussed in the State Planning Committee and then determined in the National Physical Planning Council as a whole, but several processes such as hearings, and processes such as engagement with all parties involved will be taken into account before a local plan is translated. The Local Plans on the part of the PBT will publish and depict the infrastructure that has been raised and in line with Structure Plan 35, and this is also implemented at the level of the Councils such as MBSA, MBPJ and the Councils across the entire State of Selangor. For the last point I would like to inform here that in providing more comprehensive community facility needs and more optimal use in urban areas, the State Government through PLANMalaysia has also prepared the Study on the Needs and Suitability of Community Facilities in High-Density, Compact and Liveable Urban Areas, which covers the areas of Shah Alam City Council (MBSA), Petaling Jaya City Council (MBPJ), Subang Jaya City Council (MBSJ) and Klang Municipal Council.

The objective of this study is to "Create an Inventory of Community Facilities in the Planning Promotion Zone (ZPP) for Compact and Liveable Urban Areas in the State of Selangor and to Propose Specific Standards Relating to Community Facilities in ZPP Areas". There are six (6) objectives outlined, among which are –

1. To study the potential of the ZPP within the study area including identifying the boundaries, population size and the needs and suitability of the community facilities required. 2. To prepare an inventory of existing and committed community facilities together with projected needs according to the specified areas. 3. To identify issues, supply and demand related to community facilities in the location concerned. 4. To make a comparison between the availability of community facilities in PP areas against the established standard. 5. To identify the locations of existing community facility sites that are yet to be developed. 6. To propose guidelines for community facility standards that are specific and suitable for ZPP areas in line with land needs and availability.

So if I simplify it, we have the Structure Plan, on the part of the State Planning Committee or State Planning Committee will outline and determine according to the zones and zones that have been determined in the Local Plan, and in the Compact and Liveable Urban Area Plan, which we set up, we also determine a specific study carried out by PLANMalaysia and if necessary I think it should be published for everyone's knowledge. Thank you.

Deputy SpeakerEN

Next question. Seri Setia.

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

Mr Deputy Speaker. Question number 72.

Oral Questions — 72. Golden Age Friendly Scheme (SMUE)Questions

Tuan Halimey bin Abu BakarPKR · PHSeri SetiaEN

72. To ask Y.A.B. Dato' Menteri Besar:-

a)

Can the death aid claim process be extended to a period of one year so that beneficiaries can make a complete claim?

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Deputy Speaker. Honourable Seri Setia, whether the death aid (khairat kematian) claim process can be extended to a period of one year so that beneficiaries can make a complete claim. The answer is that, for the time being, death aid claims can only be made within six months from the date of death only, as has been determined in the Death Aid Claims Meeting. However, if there is another decision from the State Government, it will be announced later. Thank you.

Deputy SpeakerEN

Next question. Sungai Pelek.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Want to answer again?

Deputy SpeakerEN

Already answered, yes, together.

Deputy SpeakerEN

Next, Sungai Burung.

Thank you, Mr Deputy Speaker. My question number 74.

Oral Questions — 74. Flood Victims Assistance and Flood Mitigation PlanQuestions

74. To ask Y.A.B. Dato' Menteri Besar:-

a)

What is the total amount of aid and compensation that has been disbursed and received by flood victims according to the affected areas?

b)

What are the plans and action plans to ensure that major floods do not recur in the future?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Sungai Burong, for the question, particularly concerning assistance to flood victims and the State Government's plan to overcome the flood problem. First, overall, the household contributions we have distributed under the name Bantuan Selangor Bangkit to 126,041 Heads of Households (KIR) and households in the State of Selangor, and to 17 next-of-kin of flood victims who died during the December 2021 floods, to ease the burden of these victims, amount to RM132,628,000.00 for the 126,041 households and the 17 next-of-kin of flood victims who passed away at that time.

Honourable Members whom I hold dear, apart from that, the State Government has implemented several projects which, in detail, I think the EXCO for Infrastructure can explain, mainly to address existing problems, including the implementation of RM31 million to resolve landslides, which have caused the area between the boundary of Negeri Sembilan and the State of Selangor to remain cut off until now, which was caused by the flood disaster. Nevertheless, several river repairs and so on have been carried out and are nearly complete, I think almost fully complete, and we can see that the atmosphere and the lives of the community have returned to normal. Moreover, the Department of Statistics Malaysia (DOSM) has described that more than 60% of the people of the State of Selangor have returned to living normally. Not much more or less than a month after the flood that struck last December. Several strategies implemented by the State Government so that solutions to the issues of solid waste and flood debris collection have been successfully carried out as well as possible and have restored the spirit and lives of the people for the next implementation. Other projects that we, some other funds are managed according to each respective EXCO, house repairs and so on, we act as intermediary and facilitator for the allocations that have been channelled by the Federal side.

For question (b), the State Government of Selangor, through the Department of Irrigation and Drainage (JPS), has 2 methods, namely a method of implementation involving structures and a method of implementation that is non-structural. For structural implementation, we have looked at several strategies, among them:-

(i) Construction of flood banks, flood walls (flood wall), flood tunnels (flood tunnel), bypass channels and barrages for flood control purposes.

(ii) The Raw Water Assurance Scheme (SJAM) to provide sufficient treated water supply and, in addition, for flood management purposes. Additional information on SJAM I will attach for the Honourable Member.

(iii) Construction of flood retention ponds such as underground storage, elevated ponds, vertical and horizontal storage in multi-storey retention ponds.

(iv) Construction of water control gates and number of pumps integrated with the Supervisory Control and Data Acquisition System (SCADA) for water gates in areas at high risk of flooding. These Water Gates

will be controlled automatically and can also be controlled and monitored via computer and smartphone.

(v) Widening and deepening rivers as the "Klang River Deepening and Widening Project Including Raising the Klang River Banks" with an estimated cost of approximately RM700 million was presented by JPS in February 2022 and is under consideration by the State Government to be implemented by the State Government-linked company (GLC), namely Landasan Lumayan Sdn. Bhd., particularly in the areas along the Klang River which caused several floods at Bukit Lanchong, Kampung Tengah, and Kampung Lombong during the last flood event.

Meanwhile, for non-structural implementation, these are:-(i) The National Flood Forecasting and Warning Programme (PRAB), which is able to forecast monsoon floods 7 days in advance, give monsoon flood warnings 2 days in advance, water level forecasting accuracy (+/- 0.5m) and flash flood forecasting 1-3 hours in advance. This was developed by JPS at the federal and national level, and God willing, if it is perfected quickly, the faster it is implemented, the better for us to see flood forecasts.

(ii) Development of a Hydrological Station Network including a Siren and Flood Warning System to collect and process hydrological data for the purpose of flood forecasting and warning, and

(iii) Development of a Flood Monitoring System through the Infobanjir Selangor State website to give early flood warnings to the public regarding river water level status, rainfall distribution and flood status monitoring cameras.

In addition, there are several matters that have been determined, and for the year 2022 alone the State Government has approved the Flood Mitigation Plan Project with a current annual cost of RM12.0 million and a total cost of RM253.15 million. This we have approved RM12.0 million this year. Drainage System Development with a current annual cost of RM9.2 million out of a total cost of RM113.0 million. River Basin Development with a current annual cost of RM15.6 million out of a total cost of RM83.9 million. Water Resources and Hydrology Development with a current year cost of RM1.2 million out of a total cost of RM6.0 million. Environmentally Friendly Drainage Development with a current year cost of RM9.0 million out of a total cost of RM53.3 million. Coastal Development with a cost of RM5.2 million out of a total cost of RM24.9 million. And also Mechanical and Electrical Infrastructure Development with a current year cost of RM4.0 million with a total cost of RM11.75 million.

I would also like to inform you that, following the last flood event, I announce that the follow-up action taken by the State Government is 32 urgent works amounting to RM39.675 million covering the scope of river dredging, pond dredging and procurement of mobile pumps. 12 critical works amounting to RM19.18 million covering the scope of repairing banks and procurement of generators and siren systems. 70 post-flood works amounting to RM12.2 million using state development allocations covering the scope of river bank reinforcement and stabilisation works, and river and coastal maintenance. This is what I mentioned earlier, and 293 post-flood works amounting to RM70 million using federal development allocations covering the scope of river conservation and structural repairs.

I also inform you that a large portion of the allocations to tackle floods, a large portion of it has been channelled to Selangor as announced by the Federal Government recently, involving an allocation of approximately RM15 billion, but some of it will be channelled down to Selangor and monitored by the State Irrigation Department and the state side so that these projects can be implemented as well as possible within the context of 'value of money' and so on.

Thank you.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai Pelek

Ya.

Soalan tambahan.

Deputy Speaker

Meru.

Thank you to the Honourable Deputy Speaker. I would like to ask the Honourable Member for Sungai Tua. Regarding whether there are any efforts by the State Government to press the Implementation Coordination Unit (ICU) under the Prime Minister's Department (JPM) to expedite the assistance that was promised. Because this has become slander against the State Government, many of the flood victims think that we are the ones doing that. So, at the state level itself, what efforts has the State Government made to press ICU to expedite the assistance that has been promised, because many more have not received it.

Secondly, I would like to ask about the status of the project worth RM20 million that was presented in the last Budget. Concerning the flood mitigation project in Meru that was awarded to JPS.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

As for the second matter, I think the Honourable Member for Pandan Indah can answer, because he tracks the details day by day. Regarding the additional RM2,500 contribution added by the Federal Government.

Actually, when the Federal Government announced, we announced RM1,000, the Federal Government announced RM1,000, and it went very smoothly, Honourable Members all. When it was implemented through one counter at the district and land office. But when the Federal Government added another RM2,500, we could not coordinate it from the early stage because the announcement came early and it is still being managed. I am not sure, perhaps it is still going through the district and land offices, and we only pass that list to the SU because the allocation is released by the ICU and also by the Federal Government.

I inform you that, in this House, time and again, people have asked us directly that it is a Federal Government allocation. And we have also informed each time, when it comes from our district office or our information comes, that this is a Federal Government allocation that must be disbursed, namely RM2,500, based on the promise and also the Prime Minister's announcement which has not been fully settled. Regarding verification and so on, our district office and also our networking, including village heads and penghulu, have done their best to list those who are involved. If there is a checking process and so on, our officers from the lower level will try to check it as carefully as possible. That is our level, Honourable Member. We want to urge here, they have also heard, the announcement has also been heard, so to urge in writing and so on, that is ultimately a decision for the department. Because the ICU deals directly with the Prime Minister's Department. As for the RM20 million, I think the Pandan Indah side can answer later in writing to the Honourable Member because of our time. Thank you.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai Pelek

Terima kasih.

Deputy Speaker

Sungai Panjang.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai Pelek

Sorry.

Deputy SpeakerEN

Sungai Burong. Apologies.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai Pelek

Sorry.

Thank you, Deputy Speaker. My supplementary question is, first of all, thank you to the Honourable Menteri Besar for giving an explanation regarding the flood victim assistance that has already been provided to the people of the State of Selangor. This will certainly have a very important effect in reducing their burden. I would like to draw attention to long-term planning, namely structural development that the Honourable Menteri Besar has mentioned. Recently, we have seen rain falling too heavily and frequently, and it is possible we are also worried that large floods will occur due to excessive rainfall.

I would like to look at long-term planning. First, besides widening and deepening rivers to further smooth the flow of water during excessive rain. The construction of these water retention ponds is indeed very important in the long term to ease the flow of water due to excessive rain. However, I would like to know, firstly, in terms of the priority of constructing these.

Secondly, will large developers in the Klang Valley who carry out these projects be required to build retention ponds. Because I see some examples of developers, such as the development in Bukit Raja that built its own retention pond, which can help, can reduce the situation during heavy rain and flash floods. Thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. I think in the earlier answer, I already explained that among the strategies we implement are through retention ponds including multi-storey retention ponds, underground retention ponds and so on. And these are included in the projects we implement and also the projects announced by the Federal Government.

And among the examples we use is when we look at our dams, one of my dams as an example is the Klang Gate Dam. The Klang Gate Dam has been upgraded to a situation not only to handle water retention ponds but also to handle flood overflow. That is why during the last flood event, it did not have an impact on the Gombak area, especially the Hulu Klang area, Kampung Kemensah and so on. Although there was a rise, that rise was very well controlled compared to other places. Therefore, one of our long-term approaches is retention ponds including at our main dams. The Selangor River Dam and Langat Dam, Semenyih Dam and so on, we will also involve flood mitigation projects there before it flows down to the downstream. This means it is addressed at the upstream level, and this is among the very effective strategies, looking especially at the model built at the Klang Gate Dam.

Secondly, areas that are made focal points are certainly areas that were previously flooded. In our area at Sungai Damansara, for example, in the area around the stadium involving Giant and so on, there is some involvement of State Government land and there is a request for us to release that area. Certainly we will give priority to the areas concerned. Sri Muda area, Honourable Member. Which received fairly severe impact, Meru and the surrounding areas, not counting other affected areas. So, JPS has a ministry and a checklist that looks at the priority of those places where we need to develop, and we refer to the last major flood event and also several events that occurred recently for those flood mitigation projects. Thank you.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai Pelek

Terima kasih.

I would like to ask whether developers are also required, large developers like Sime Darby and so on.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. It will be included in the feedback submitted by the Department of Irrigation and Drainage. I will ask the infrastructure standco to look at these facilities because any proposed developments will receive feedback from the department, and one of its departments is the Department of Irrigation and Drainage. So the Department of Irrigation and Drainage must propose this matter. On the approval side, the local authority (PBT). Before the planning permission or building permission is granted, a control aspect must be put in place and also address overflow of water and floods in future. I agree, we will bring the Honourable Member's proposal for consideration. Thank you.

Deputy Speaker

Sungai Pelek.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Thank you. Sepang is an area that often floods because many villages such as Labu Lanjut, Kampung Giching, Kampung Chincang are at the same level or almost lower than the river. So we rely heavily on embankments, we rely heavily on water gates and so on. But often the embankment breaks, the embankment breaks. So, I also cannot answer the question from the village folk. What is a better way, or is there a new method for embankments that do not break easily, and another thing, we all know that the authority for flood mitigation is actually the authority of the Central Government, the Federal Government. But unfortunately, for the past many years, JPS has usually been short of funds. So, Sepang actually has a masterplan on how to do flood mitigation and so on. But I fear that if the government does not change, it will continue to have no funds. So, we hope the State of Selangor will provide funds for all flood mitigation projects. What is the view of the Honourable Menteri Besar?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

For Sepang and Kuala Langat, the situation of Sepang and Kuala Langat is an area downstream, or in the lower reaches. That is why these areas will receive floods after the upstream areas are struck by floods. Every event in the upstream area will end up in the downstream area. This is a basic matter that we must know. That is why when events strike areas upstream in Selangor, in Klang, in the Kajang area and so on, the ultimate impact will reach the Bukit Changgang area, it will reach the Sepang area, the Dengkil area and also several other areas. So it is due to the flow of water, when Klang floods it will ultimately come to the Kuala Selangor area, Bukit Kuching, Bukit Hijau and the other hills

. So, Honourable Members all. I want to inform you here, among the findings we have made is regarding the quality of embankments, and indeed it has been determined by the Honourable EXCO, the Honourable EXCO also reported in this House time and again, that when the embankment is built using only earth structures, that structure is what caused it to overflow and so on. However, the construction of retention ponds is the best strategy available at the state level so far.

Because we do not have a sufficiently large area, so retention ponds are what we rely on. And our retention ponds also do not have large land sizes; if there were large land sizes we could take them over. Land acquisition is not easy. For example, when we carried out the flood mitigation project at Sungai Kedondong, at Sungai Pelepas. It took us many years, and eventually when we did it at Sungai Kedondong, there was objection from certain parties, including attempts to take advantage by the opposition. Alhamdulillah, today the flood mitigation project at Sungai Kedondong has been completed, and it has prevented the flood areas in Sungai Buloh and the Paya Jaras areas in particular.

So, Honourable Members all. Tackling floods is not an easy matter and it sometimes involves land acquisition and deepening processes and also involves plantings, and sometimes we have to deal with just 2-3 banana trees, which sometimes leads to quarrels, Honourable Member. We have to resolve them. So it is not easy, but I see the matter as a whole. That is why when the Federal side says there is an allocation, I know, but ultimately its implementation will involve the state side, especially when dealing with land solutions and also implementation solutions carried out by JPS. Thank you.

Deputy SpeakerEN

The next question, Meru.

Thank you, Deputy Speaker. My question is number 75.

Oral Questions — 75. Budget for Domestic Waste Disposal to KDEBQuestions

75. Asked to the Y.A.B. Dato' Menteri Besar:-

a)

What is the allocation for solid waste disposal in 2022 to KDEB for the State Constituency of Meru?

b)

What are the waste companies, the number of assets, and the operating zones of the contractors in Meru, in detail?

c)

Does the State Government intend to increase the allocation for this waste disposal in line with the increase in Selangor's population?

Tuan Hee Loy SianPKR · PHKajangEN

Deputy Speaker, in accordance with the decision of the 7th/2016 State Executive Council Meeting (MMKN) held on 24 February 2016 and endorsed by the 8th/2016 MMKN on 2 March 2016. Integrated solid waste management and public cleansing by Klang Municipal Council (MPK), including the Meru State Constituency area, is under the management of KDEB Waste Management Sdn. Bhd. as the project management company (PMC). In 2021, the council made payments of RM 26,137,749.27 million for domestic solid waste management and RM 39,911,597.53 million for public cleansing. As for 2022, the allocation for domestic waste management is RM 27 million and for public cleansing is RM 41.837 million. On average, each household pays RM5 a month for waste management.

For the information of the Honourable Members, no specific allocation has been given to KDEB Waste Management for managing waste disposal in the Meru State Constituency. For the Meru area, KDEB Waste Management has appointed four (4) companies through an open tender process to carry out domestic waste collection. To ensure that domestic solid waste collection can be carried out systematically according to the set schedule, the Meru area has been divided into four (4) service zones. Collection operations in each service zone are run by one (1) company, each using one (1) compactor lorry. On average, the Meru area generates 70 metric tonnes of waste a day, requiring at least two (2) collection trips every day.

The details of the collection zones and the number of assets for domestic solid waste collection in the Meru area are as follows:

Waste management at the sanitary landfill sites is under the maintenance of Worldwide Holding Sdn. Bhd. (WHB) and does not involve KDEB Waste Management, which is the company appointed to collect waste from the sources to the sanitary landfill sites.

The disposal cost (tipping fee) is paid by the local authority (PBT) to WHB based on the weight of waste delivered for disposal. The total budget allocated for waste disposal costs each year refers to the current waste disposal records within the council's area. In 2019, the total waste disposal cost was RM 65,668,950.90. In 2020, the total increased by 3.86%, bringing the total cost to RM 68,302,245.69. Meanwhile, in 2021, this disposal cost only increased by 0.06%. The increase in these costs each year is in line with the growth of residential, commercial and industrial development, which will generally involve an increase in population. Thank you.

Deputy SpeakerEN

The next question, Sementa.

Puan Dr. Daroyah binti AlwiPKR · PHSementaEN

Thank you, Deputy Speaker. From Klang to Sabak Bernam, my question is number 76.

Oral Questions — 76. Spread of HFMDQuestions

Puan Dr. Daroyah binti AlwiPKR · PHSementaEN

76. Asked to the Y.A.B. Dato' Menteri Besar:-

a)

What is the rate of increase in HFMD infections in Selangor by district? What are the main factors contributing to this spread?

b)

What special measures does the State Government take to contain this problem so that it does not drag on and victimise children?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. This is not a session of exchanging pantun, let alone a marriage proposal. If it were a marriage proposal, I could consider it. Honourable Members whom I hold dear, for the information of the Honourable Member, the overall HFMD infection rate in Selangor, or hand, foot, mouth disease, or hand, foot and mouth disease, in all districts shows an increasing trend compared with 2021, namely comparing epi weeks 1 to 27, from weeks 1 to 27 during the MCO period and the current period of 2022.

In 2022, this upward trend was detected as early as epi week seven and was seen to become increasingly significant after epi week 13 in all districts. The breakdown of the increase in cases by district is as follows:

If we compare the overall figures, in 2021 during the MCO there were 644 cases, but in 2022, specifically from epi week 7 to epi week 13 just mentioned,

the total is 33,864. This means there is a very high increase and a very alarming trend. So, we are monitoring this situation from time to time, including circulating and maintaining coordination with the Ministry of Health Malaysia, especially in efforts to either issue closure orders or specific directives to prevent a bigger outbreak, particularly when the school term has resumed. Some of the factors are that when schools reopen, childcare centres, kindergartens and nurseries are among the strategic locations, and we see that among the factors is the attitude of parents who still send their children even though the children show symptoms. Also, the results of risk assessments at childcare centres and kindergartens that have experienced HFMD found that gatekeeping activities, namely checking children at the entrance of care institutions and isolating symptomatic children, are less effective. And thirdly, personal hygiene practices, whether at home or in family institutions, are given less emphasis by families. Other factors such as the overcrowding of care institutions, with a very high number of children and inadequate facilities, and the natural nature of children, namely close interaction among children especially in care institutions such as playing together, sharing toys, and the tendency to put toys and objects into the mouth, especially those aged two years and below, increase the risk of infection among them.

Among the actions taken by the State Health Department (JKN) and the District Health Office (PKD) are daily discussions by JKN on the case situation in Selangor; holding town hall meetings with agencies such as the State Education Department, the Department of National Unity, and the Department of Information to address issues at kindergartens and childcare centres; conducting HFMD webinars with kindergarten operators; a Bernama Radio interview programme with HFMD on 3 June 2022 to remind people about these risks; and conducting on-site guidance sessions where PKD officers actively hold briefing sessions and demonstrate risk assessment methods for care institutions. For every outbreak, JKN will carry out a thorough investigation including risk assessment and targeted health education at kindergartens and childcare centres, order the closure of outbroken kindergarten and childcare premises under the CDC Act, totalling 318 premises, and also voluntary closure of 51 premises. There were about 318 that were ordered to close, and 51 closed voluntarily. Health education has been intensified at district and state levels since 2022, the guidelines for the handling of children in childcare centres and preschools have been re-disseminated through the website, and press statements on HFMD have been issued from time to time. Decisions on closure or operation are made by PKD, based on PKD's advice to the District Education Department. Thank you.

Soalan tambahan.

Deputy Speaker

Sementa.

Puan Dr. Daroyah binti AlwiPKR · PHSementaEN

Thank you, Deputy Speaker. Since we know that the victims of HFMD are children aged 12 and below, and the Dato' Menteri Besar just now mentioned 33,864 cases that occurred throughout this year. So, this is a very large number, and the effect or impact is also big on parents, apart from the kindergartens, nurseries or care centres themselves. The impact is that parents have to look after these young children, from the age of one to six, who are in these kindergartens or nurseries, and they need more care for these children because HFMD is very sensitive and very painful in the mouth, on the hands and on the feet of these children. So they need more care from parents for these children. So, what is the action of the State Government? Does the State Government give leeway to parents who are State Government employees, to allow them to perhaps work from home or to give special leave to these parents? Thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Honourable Member. It is generally based on the wisdom and discretion of the Heads of Departments, whether to grant special exemptions and so on. However, in daily practice, in disaster situations, in urgent situations or certain situations, of course the Heads of Departments will give leeway in accordance with the regulations and the Standard Operating Procedure for office management and so on. We understand that HFMD has an effect on children. What we are worried about is that it may cause cases such as deaths. Alhamdulillah, the cases are fairly under control because the swelling only involves itching and also fever causing pain and so on. But it appears that parents' concern about this disease has also been increasing from time to time. Therefore, we see that cases are high but within control, and HFMD only needs control with some medical treatment. Antibiotics cannot be used. This disease can be controlled. However, the training provided by PKD is really very necessary for PKD, for the operators of childcare centres and kindergartens, because that is where the spread usually happens. If we can control it there, the source is also at home. If children show signs of symptoms, avoid going to school or to care centres to control the spread. As for emergency leave and so on, EL (emergency leave) is a common practice which I think is sufficient so far, and it is not yet necessary for us to hold a special leave or special exemption so far. Thank you.

Deputy SpeakerEN

Next question. Kota Anggerik.

Mr Speaker, invoking Standing Order 24 (2).

Deputy Speaker

Saya benarkan.

Oral Questions — 77. Construction of Mosque in Section U12, Shah AlamQuestions

Tuan Mohd Najwan bin HalimiPKR · PHKota AnggerikEN

77. Asked to the Y.A.B. Dato' Menteri Besar:-

a)

When will the State Government build a mosque for the needs of the kariah (congregation) of Seksyen U12, Shah Alam?

b)

Where is the actual site of the mosque proposed by the State Government for the kariah of Seksyen U12, Shah Alam?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Honourable Members, I beg to answer on behalf of Sungai Kandis. He is unwell.

a) The construction of the U12 Mosque will be arranged and planned according to merit and according to the overall priority of the Petaling District and the overall merit of mosque construction needs across the State of Selangor. For now, the Friday prayer needs can still be accommodated by Surau Al-Amin and Surau An-Nur in the area concerned. The U12 mosque site is at Lot 4005, measuring 2.65 acres, which was gazetted on 24 April 2016. The location of the mosque site is situated midway between Surau Al-Amin and Surau An-Nur. Based on Google Map, the location of the mosque site will be attached for the Honourable Member for Kota Anggerik who asked this question. Thank you.

Deputy SpeakerEN

Next question. Gombak Setia.

Tuan Muhammad Hilman bin IdhamBERSATU · PNGombak SetiaEN

Thank you, Speaker. My question is number 78.

Oral Questions — 78. Outstanding TaxesQuestions

Tuan Muhammad Hilman bin IdhamBERSATU · PNGombak SetiaEN

78. Asked to the Y.A.B. Dato' Menteri Besar:-

a)

What are the efforts of the State Government to deal with the problem of outstanding tax liabilities faced by the subsidiaries of Menteri Besar Incorporated (MBI)?

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

After this, 79, another person, Speaker, not me. Honourable Members whom I hold dear, I wish to inform you that the profit recorded or the loss recorded by the management of Air Selangor Sdn. Bhd. is a cumulative loss totalling RM1.23 billion, and the total profit collected by PNSB (Permodalan Negeri Selangor Berhad) ending 31 December 2021 totalled RM232 million. For the same period, Air Selangor did not record any tax liability, and there is no outstanding tax liability that needs to be paid at this time by Permodalan Negeri Selangor Berhad. I believe the question raised by the Honourable Member for Gombak Setia concerns the tax assessments that have been imposed on the two companies, namely PNSB and Air Selangor, in respect of the profits and the achievements made in previous years. Among them, PNSB has been assessed since 2012, 2013, 2014 and 2017. Meanwhile, Air Selangor refers to what was achieved by the ABAS Consortium from 2009 to 2018, PNSB Water until 2018, Syarikat Bekalan Air Selangor (SYABAS) until 2015, Syarikat Pengeluar Air Sungai Selangor until 2015 and until 2019, and Puncak Niaga in 2011. What is our strategy? Our strategy is certainly to implement two methods. First, we open a channel with the Inland Revenue Board to justify some of the assessments imposed, because we consider that some of the assessments imposed are not right. For example, the assessment imposed on MBI. Let me take an example. This is just the question first. MBI, MBI was assessed, and we compared it with MBIs in other states that were not subject to property assessment tax. Or not subjected to non-assessment tax. Tax assessment by the Inland Revenue Board. And why did this situation happen to MBI Selangor and not to MBIs in other states?

The same goes for water. This is because water involves the process of acquisition and restructuring of these companies. I have been informed that in the master agreement or the basic agreement that is being explored and discussed, why these matters should not be included in the liabilities or burden that must be borne by Syarikat Air Selangor, now taking over from the company, because it involves profits achieved in 2009, 2010, 2011 until some are still to be evaluated after the full acquisition in 2018 last year. At the same time, we are also using legal channels to ensure that the assessment process can be temporarily deferred, while we carry out a re-evaluation and discussions either with the Inland Revenue Board or with the Ministry of Finance or with the Court if there are urgent needs. Thank you.

Tuan Muhammad Hilman bin IdhamBERSATU · PNGombak Setia

Soalan tambahan.

Deputy Speaker

Gombak Setia.

Tuan Muhammad Hilman bin IdhamBERSATU · PNGombak SetiaEN

Thank you, Menteri Besar, for the answer just now. However, I would like to ask a follow-up on the assessment mentioned earlier that was imposed on MBI: what is the actual value of the assessment imposed on MBI, and I would also like to ask, finally, how much of that assessment, and also what liability must be borne by either MBI or the two subsidiaries as stated in the Menteri Besar's answer just now.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

I need to obtain the total assessment. For the total assessment imposed on PNSB, the tax disputed in total is RM 247 million, and another one in 2017 amounting to RM 68.924 million. These are the two imposed on PNSB. Meanwhile, for Syarikat Air Selangor, the amount is large because it involves subsidiaries, and the overall figure nearly reaches RM 2 billion. However, the liability borne by these subsidiaries in detail, I feel I need to submit in writing to the Honourable Member because it involves more accurate figures. If I mention them in summary, he may make a mistake. But in the view of the legal team, both of our subsidiaries have room to apply for a request to all of them, because recently the Inland Revenue Board is indeed looking into everything. We see what was looked into for the years assessed on the subsidiaries of Syarikat Air Selangor, which were formerly vendors and management holders of Air Selangor since 2009. Since 2012, since 2015. Why was 2015 only assessed now and it became an unreasonable burden, but we have certain reasons.

Some of these reasons have been brought to court, and the court will determine certain conditions as to whether payment is required or not required, and it will look at the whole matter. At the same time, we are also opening the door to the Inland Revenue Board to submit counter-offers to us, because there are some reasons that have been given as stated in the answer. Their liability, I do not remember in detail, Honourable Member, because the figures are large, and I do not want to give an incorrect answer. Thank you.

Tuan Muhammad Hilman bin IdhamBERSATU · PNGombak SetiaEN

Speaker, if possible, since the Dato' Menteri Besar said just now that he will provide it in written form, I ask that the total liability of MBI also be attached. Because I think MBI also has a very large debt liability. Therefore, we need to summarise MBI in detail. Likewise the subsidiaries, so that we can know how we can move from here to settle, especially to implement the First Selangor Plan. Thank you.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

We will answer according to the method of the answer that has been given. Your two basic questions, Honourable Member, are PNSB and Air Selangor. We will provide them. The MBI that I mentioned here, we will provide in full, because what was imposed was not on the subsidiaries; what was imposed was on MBI, Honourable Member.

Deputy SpeakerEN

Next question. Jeram.

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Thank you, Deputy Speaker. My question is number 79.

Oral Questions — 79. Village RoadQuestions

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

79. Asked to the Y.A.B. Dato' Menteri Besar:-

a)

How will the government develop and repair the village road infrastructure that is often damaged due to the soil being prone to waves (subsidence)?

b)

Can village roads be widened to accommodate the vehicles that villagers use, such as MPVs?

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member for Jeram, Mr Deputy Speaker. The Honourable Member for Jeram asked a question on the issue of developing or widening village roads.

For the Honourable Member's information, the Kuala Selangor District and Land Office, as the administrator responsible for the development and repair of village roads, takes note of any damage to village roads. At present, advice and views from technical agencies such as the Public Works Department (JKR) and the Department of Irrigation and Drainage (JPS), especially for agricultural roads, will be obtained to assist the Kuala Selangor District and Land Office in developing and repairing village road infrastructure that has been identified as having structural issues and rather severe ground conditions. The advice and views of these technical agencies will be used as a guide in the implementation of village road projects that will be carried out.

Also for the Honourable Member's information, village roads actually have a width of around 2.44m to 4.27m, that is approximately 8 feet to 14 feet. That is for village roads. So it is subject to this specification, and any widening of village roads is subject to this specification, and also takes into account whether road shoulders are required, together with road reserves for utility corridors. These are the considerations that will be taken into account when we need to determine whether widening can be carried out or not, and also look at the needs of the road itself. Whether it is suitable to be widened or not, and in general this width can be traversed by vehicles including MPVs as mentioned by the Honourable Member. If existing village roads are to be widened further, the maximum is up to 4.27 m or 14 feet. Widening can be carried out after taking into account the width of the road reserve and the need to relocate utilities such as electric poles and water pipes. That is all.

Tuan Mohd Shaid bin RosliBERSATU · PHJeram

Soalan tambahan.

Deputy Speaker

Jeram.

Tuan Mohd Shaid bin RosliBERSATU · PHJeramEN

Honourable Member, Tuan EXCO, the last sitting stated that there would be a provision of 10 lamp posts. So have they been provided yet? Thank you.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

I had intended to mention that during the winding-up later, but never mind, for this purpose I can mention it here. The State Government has approved, for phase 1, 30 State Constituencies (DUN). The 30 DUN will receive 10 solar LED lamp posts, which are currently in the procurement process, and the Service Centre (Pusat Khidmat) will contact them, the ADUNs will be contacted. These 30 are for phase 1, to determine and decide which roads are suitable to be illuminated with these lamps. These lamps are high-specification ones, valued at around RM 10,000.00 each. Very, very high quality, and they will be given to these 30, and the remaining 26 DUN will be in phase 2. So this is what has been allocated: we have allocated RM 3 million for this first phase, which will be carried out in the near future through the procurement process, and I am confident that some of the ADUNs' Service Centres have already been contacted to identify suitable locations for these lamps. Thank you.

Deputy SpeakerEN

Next question. Sungai Air Tawar.

Datuk Rizam bin IsmailUMNO · BNSungai Air TawarEN

Thank you, Mr Deputy Speaker, my question is number 80.

Oral Questions — 80. Investment Projections 2022Questions

Datuk Rizam bin IsmailUMNO · BNSungai Air TawarEN

80. To ask the Most Honourable Dato' Menteri Besar:-

a)

What is the estimated total of incoming and outgoing investments in the first and second quarters of 2022?

b)

What are the State Government's plans to add new investments in 2022 and 2023?

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Yes, Mr Deputy Speaker.

a) For the period January to March 2022, a total of 72 manufacturing projects have been approved by MIDA in Selangor with a total investment value of RM 3,268,156,313 (RM 3.27 billion).

The State Government has no information on outgoing investments in the first and second quarters of 2022.

b) In an effort to add new investments, the State Government, through Invest Selangor as the investment promotion agency, is constantly implementing various programmes in an effort to ensure that the State of Selangor remains relevant and continues to be trusted by investors. Among the strategies planned are the following:-

1.0 Strategic Planning; 1.1 First Selangor Plan (RS-1) 2021 – 2025, which has already been tabled by the Dato' Menteri Besar. 1.2 Establishment of the Selangor Golden Triangle Development Special Task Force Committee. In an effort to boost economic and property development, the State Government has established the Selangor Golden Triangle Development Project Implementation Task Force Committee, which

will be enlarged after the State Government. This House approved the Selangor Plan 1 and will be modified after IDRISS is announced. 1.3 Selangor Biotechnology Action Plan (Selangor Biotechnology Action Plan). A holistic plan will be drawn up as well as possible to strengthen the growth of selected industries such as biotechnology, which has great potential to develop in Selangor. The Selangor Biotechnology Action Plan that is published will outline a comprehensive development plan to drive the growth of the biotechnology industry in the State of Selangor, in addition to preparing the State of Selangor as a major investment location in the Southeast Asian region. To implement the development plan in the biotechnology industry, the State Government has set up a special division known as the Selangor Biotechnology Coordination Office (SBIOCO), placed under Invest Selangor. This new division will play a role in coordinating the development of biotechnology-based projects in the State of Selangor and also the development of the related industrial ecosystem. 1.4 Establishment of the Selangor State Rail Industry Council. The State Government has established the Selangor State Rail Industry Council to ensure that this industry receives attention, as this industry is seen as capable of having a major impact on the Selangor economy in the future. The establishment of the Selangor State Rail Industry Council is to ensure that strategic reform initiatives become an important foundation for the state's prosperity agenda and improvement of the quality of life. The objectives of establishing this council are to:-a) Provide support for strengthening the development of the rail industry in the State of Selangor; b) Provide views to the State Government on the direction of the rail industry in the State of Selangor; c) Develop the rail industry ecosystem in the State of Selangor;

d) Make the rail industry in Selangor one of the industries that has a major impact on the state economy. 2.0 Implementation of Investment Promotion Programmes. In an effort to retain and attract new investments, investment promotion programmes have been planned as well as possible to be implemented throughout the year. Although the country is currently hit by the pandemic, the planned programme implementation that has been decided will continue and be adapted to the current situation. Engagement programmes, discussions, webinars, promotions and advertising in print and electronic media are continuously implemented so that investment promotion programmes do not stop due to the spread of the pandemic. 2.1 Investment Promotion Programme. Through investment attraction programmes such as Trade & Investment Missions, both physical and virtual, will be further strengthened, along with emphasis on focus industries such as Life Sciences, Food & Beverages Manufacturing, Electrical & Electronic Products Manufacturing and Machinery & Equipment, which are seen as industries that are increasingly growing in Selangor. In addition, 2 new industries have also been identified and have the potential to propel Selangor as an investment destination, namely Logistic Services and Digital Investment such as Global Business Services (GBS), Data Centres and Creative Content Technology. 2.2 Selangor International Business Summit (SIBS). The State Government of Selangor, through Invest Selangor Berhad as the organiser, held the fifth edition of the programme 'Selangor International Business Summit Hybrid 2021 (SIBS 2021)' on 7 – 10 October 2021 at the Kuala Lumpur Convention Centre and also virtually at www.selangorbusinesshub.my. For 2022, the organisation of SIBS for the sixth edition will continue, and this exhibition and conference programme is scheduled

to be held on 6 – 9 October 2022 at the Kuala Lumpur Convention Centre, Kuala Lumpur. 2.3 Selangor Aviation Show (SAS). The aerospace sector in the State of Selangor will continue to be driven and strengthened with the aim of making the State of Selangor a major investment location for the aerospace industry, targeting 70% of aerospace-related companies in this country to operate in Selangor. Accordingly, for 2022, the organisation of the Selangor Aviation Show (SAS) will continue and is planned to be held on 8 – 10 September 2022 at Subang Skypark RAC. 2.4 Encouraging the Opening of New Industrial Areas based on the Managed Industrial Park (MIP) concept. This policy has already been approved and applications have already been received. 2.5 Programmes for Investor Engagement & Resolution of Investment Issues. These will continue to be held through networking and other meetings. That is all, thank you.

Deputy SpeakerEN

Honourable Members all, the time has reached 11.30 a.m. I hereby adjourn the question session for the next business.

Speech of Condolence by Yang Amat Berhormat Dato' Menteri Besar

Secretary of the HouseEN

Next order of business. Condolence speech by the Most Honourable Dato' Menteri Besar.

Dato’ Seri Amirudin bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Honourable Members all, I wish to inform you that the Honourable Tan Sri Dato' Seri Abdul Khalid bin Ibrahim, who was a former State Assemblyman for Ijok from 8 March 2008 to 5 May 2013, who was also a former State Assemblyman for Pelabuhan Klang from 6 May 2013 to 9 May 2018, and former Menteri Besar of the State of Selangor from 13 March 2008 until 22 September 2014, passed away yesterday, 31 July, at approximately 11.08 p.m. As a mark of respect, I request that this House observe a one-minute silence in accordance with each person's religious beliefs. Honourable Members, please stand. (Recitation of Al-Fatihah)

All Members of the House are invited to be seated. Honourable Members, in appreciation of his services that were devoted in this State Assembly and the State of Selangor for 2 terms, and as Menteri Besar of the State of Selangor, coordinating several programmes that have had an impact on the people from the past until now, among them the formulation and establishment of Merakyatkan Ekonomi, now known as Iltizam Selangor Penyayang, the establishment and the idea of developing the Klang River Riverfront area, which is currently known as Selangor Maritime Gateway, and also the establishment and strengthening of MBI as a competitive institution. I hereby request, in accordance with Standing Order 26 (c) and the Standing Orders of the Selangor State Legislative Assembly, that the sitting be suspended until 2.30 p.m. to give an opportunity for the funeral ceremony of the late Tan Sri Abdul Khalid bin Ibrahim and to give an opportunity to Honourable Members in particular, and anyone involved in this House, to pay their respects at the funeral. Accordingly, I wish to propose this matter. Thank you.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Deputy Speaker. I support the motion brought by the Dato' Menteri Besar. Mr Deputy Speaker, I had the opportunity to serve as Speaker throughout the time the late Tan Sri Khalid was Menteri Besar of Selangor, and also had the opportunity to serve as EXCO during his time in 2013 to 2014, in the second term. He was the first Dato' Menteri Besar of Selangor after the first change of State Government since Merdeka, who brought remarkable reforms to the administration, including legislation that is still appreciated and remembered by the people. I pray that God shower His mercy upon his soul. Thank you.

Deputy SpeakerEN

Honourable Members all, this motion has been supported. I put it forward for approval.

Honourable Members who agree, please say YA. Honourable Members who do not agree, please say TIDAK.

This motion is approved.

Honourable Members all, I hereby adjourn this House until 2.30 p.m. The House is adjourned.

(THE HOUSE IS ADJOURNED)

(THE HOUSE RESUMED) (MR SPEAKER IN THE CHAIR)

Continuation of Motion No. 14 of 2022Motion

Secretary of the HouseEN

Next order of business, continuation of Motion No. 14 of 2022. Motion on the First Selangor Plan 2021 – 2025.

SpeakerEN

Yes, greetings. I ask the Government side to wind up, if there is any. Please proceed. Honourable EXCO Member for Bandar Baru Klang. Please proceed.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Thank you, Mr Speaker. Mr Speaker, I would like to thank all the Honourable Members who have taken part in the debate on the First Selangor Plan and raised issues under my purview. Mr Speaker, the Integrated Development Region In South Selangor (IDRISS), or, with permission, originally involved projects under the development proposal we named the Selangor Golden Triangle. The eligibility criteria for projects under the Selangor Golden Triangle are as follows:

1. Property development for industrial, commercial and residential purposes that has an economic impact on the State and the local area;

2. The minimum area for the development proposal for each project is 200 acres and must be within a single title. For developments of less than 200 acres, special approval from the State authority is required. If the title is less than 200 acres and involves several titles, a consolidation process must be carried out first before it is tabled at the Meeting of the Selangor Golden Triangle Project Implementation Task Force Committee for the support process.

3. Strategic high-value and high-impact development projects with the application of Industry 4.0 may be considered even if the development area is less than 200 acres. Currently, there are 6 development project proposals listed under the Selangor Golden Triangle with a total development area of approximately 7,914.74 acres. Among these projects are the following:

i. Selangor Business Capital – Developer PKNS, area of 143.24 acres in the district of Sepang;

ii. Sepang Gold Coast Global Village, developed by Sepang Gold Coast Sdn Bhd, area of 988 acres in the district of Sepang; iii. Sepang Aeropark – Developer Sime Darby Properties, area of 2,000 acres in the district of Sepang; iv. GuocoLand Emerald Sepang – Developer GuocoLand (M) Berhad, land area of 2,373 acres in the district of Sepang; v. Putrajaya Holdings – Putrajaya Holdings (PJH), area of 1,678 acres in the district of Sepang; and vi. NCT Smart Industrial Business Park – NCT Land Sdn Bhd, 732.5 acres in the district of Kuala Langat. With the announcement of IDRISS, the Selangor Golden Triangle will be replaced, where the original area of 7,914.74 acres will be expanded to approximately 40 thousand acres, covering the Carey Island port and the Carey Island special economic zone, as well as proposals for two institutions of higher learning in Sepang Gold Coast, namely Unisel Global Campus and a university college at GuocoLand Emerald, Sepang. The total number of project proposals so far is ten. Of these ten project proposals, two have reached the stage of nearly submitting applications for planning approval, namely the NCT Smart Industrial Park and the Sepang Gold Coast Global Village. However, we are not limiting ourselves to the ten projects above. We have also received applications and enquiries from owners and developers with potential proposals in the districts of Sepang and Kuala Langat who wish to join this programme. If these applications meet the criteria that have been set, we welcome them. We hope that with the coordination and monitoring carried out at the State level, development in this area can be accelerated more quickly.

Mr Speaker, in efforts to attract investors to invest in projects under IDRISS, the State Government has identified incentives that can be provided under the authority of the State Government. The incentive proposals are currently under review for approval by the State authority. The incentive proposals are as follows:

1. Proposed Special Premium Scheme – The State Government authority will decide later;

2. Proposed exemption from assessment tax on vacant land for a period of 5 years from the date of approval of the development issued by the local authority;

3. Proposed 50% discount on assessment tax on vacant buildings for a period of 5 years from the date of certification of completion and compliance or, with permission, Certificate of Completion;

4. Proposed exemption from business licence fees for a period of 5 years.

These incentive proposals are still under further study and will be announced after obtaining the approval of the State authority in due course.

Mr Speaker, to ensure that the development projects proposed under IDRISS can be implemented smoothly, the State Government will establish a Special Task Force Committee to help coordinate, monitor and assist in resolving issues that arise. The existing committee that facilitates and monitors the Selangor Golden Triangle will be modified, and its scope of authority and work expanded, to become the IDRISS Special Task Force Committee. Meetings of this committee will be held regularly, and its members will consist of technical departments at the district and State levels as well as at the Federal Government level. Each developer will give a briefing on the progress of the project and the issues that arise during the meeting through this briefing session. The technical departments will directly know the status of the projects and the assistance required by project promoters so that development projects can be implemented smoothly and completed according to the set timetable. The proposed development projects under IDRISS are planned projects, and developers must go through the development approval process according to the procedures set by the technical departments to ensure that all needs and infrastructure facilities are adequately provided by the developers.

Mr Speaker, IDRISS is an integrated private investment development in the districts of Sepang and Kuala Langat. Driven and supported with facilities by the State Government and backed by State and Federal incentives, covering a total area of 42 acres, with an estimated gross development value (GDV), or, with permission, Gross Development Value, of RM1 trillion. This estimated RM1 trillion is a rough estimate based on a fairly conservative GDV calculation of RM250 million per acre. This figure will change depending on actual development. Therefore, the financing of the projects proposed under IDRISS will come entirely from the private sector and will not involve government funds. The State Government only assists in terms of encouragement through premium incentives and assessment tax, as well as coordination of development, monitoring of project implementation, facilitating applications, project promotion and so on.

Mr Speaker, the State Government will continue to support start-ups, or, with permission, local start-ups, by giving clear messages on financing, policies and the roles of the various agencies responsible for developing the ecosystem. The State Government will also ensure that programmes that help expand start-up businesses will continue to be implemented consistently. Since 2018, the State Government, through the State Government agency Selangor Information Technology and Digital Economy Corporation (SIDEC), has implemented the Selangor As A Rator Programme (SAP), a structured programme lasting 3 months aimed at preparing 30 early-stage technology start-ups selected to be ready to receive investment. This programme helps participants refine not only their products and businesses, but also their core teams, through classes and mentors who share knowledge, experience and advice. Of the 120 former participants in this programme, approximately 34% of the start-ups have received financing, and this is considered a high level of success for start-ups. According to SIDEC's informal estimate, based on the experience of veteran digital industry players, 80% of start-ups in Malaysia operate from Bangsar Selatan to Petaling Jaya and Subang, and they have naturally formed a Malaysian version of a Silicon Valley corridor. Meanwhile, digital logistics and warehousing companies are concentrated in Shah Alam and Klang. The State of Selangor certainly has a perfect start-up ecosystem. The key element for encouraging the growth of more unicorn companies is ensuring that start-ups have sufficient financing to continue expanding. The Selangor start-up ecosystem is growing further with two venture capital partners, or VC – venture capital, namely Permodalan Nasional Selangor Bhd (PNSB) and The Hive South East Asia. SIDEC plays the role of intermediary between Selangor start-ups with potential to make pitches to them. Meanwhile, the Ministry of Finance, through its agency Penjana Capital, has provided a total of RM600 million and channelled it through 8 selected venture capital companies. The Hive is one of the venture capital companies that focuses on seed-stage companies, and this is highly suitable for most start-ups in Selangor. It is estimated that most start-ups that will receive Penjana Capital start-up funds will be companies based or operating in Selangor, in line with the Malaysian version of the Silicon Valley corridor mentioned above.

Mr Speaker, the State Government routinely offers various physical incentives, including cash grants and rebates, to ensure that start-ups remain operating in Malaysia. The State Government, through State Government agencies such as Selangor Information Technology and Digital Economy Corporation (SIDEC), is also increasingly active in overseas trips to attract investment for technology start-ups under SIDEC's supervision. Since 2018, SIDEC has organised visits together with outstanding technology start-ups selected under the Selangor As A Rator Programme to Beijing, Hangzhou, Jakarta, Dubai and Silicon Valley to introduce them to venture capitalists and foreign technology start-ups in China, Indonesia, the UAE and the United States of America. For the information of Honourable Members, of the 120 former participants in this programme, approximately 34% of start-ups have received financing or investment. In addition, since 2016, SIDEC has also organised the Selangor Smart City and Digital Economy Convention (SDEC) to encourage the use of technology among start-ups and small and medium enterprises. This will further expand the business potential of a company by encouraging them to attain silicon status and, subsequently, unicorn status. SDEC is one of the events under the Selangor International Business Summit and is an annual event that brings together industry leaders, academics, SMEs (PKS) and the government and private sectors to explore ways to strengthen and expand the digitalisation ecosystem of Selangor's SMEs (PKS) in shaping existing and future smart city and digital economy frameworks and solutions. To overcome the shortage of digital talent, the State Government of Selangor, through SIDEC, has introduced the Selangor Digital School, or Selangor Digital School, which is expected to begin operations in September 2022. The country's digital economy sector needs about 1.5 million digital talents, but at present the market has only around 50% of the talent and skills in the digital economy sector. SDS is expected to solve the shortage of skilled workers in the field of technology.

Although, in principle, the Investment EXCO Portfolio focuses more on investment activities in the industrial, services and business sectors, there are also tourism-based investment projects that have been brought in. We are also always ready to assist if there are proposals to develop tourist areas in the State of Selangor. One of our efforts is listing the Sepang Gold Coast Global Village Project under the IDRISS development projects.

Mr Speaker, the Government's investment in the e-wallet company Wavpay Systems Sdn Bhd is through the wholly owned subsidiary of MBI, Selangor e-Wallet Sdn Bhd (SEW), which holds a 49% equity stake in a Special Purpose Vehicle (SPV) company, namely Wavpay Fintech Holding Sdn Bhd (WFHSB), which owns 100% equity shareholding in the following companies, namely Wavpay Systems Sdn Bhd (an e-wallet company under the approval of Bank Negara Malaysia), Wavpay Credit Sdn Bhd (a licensed credit company under the approval of KPKT) and Wavpay e-Commerce Sdn Bhd (an e-commerce company). The justification for the State Government of Selangor's equity investment through the Menteri Besar Selangor (Incorporated) (MBI) is based on the following considerations. First, the decision of the State Government at the State Government Executive Council Meeting (MMKN) held on 3 June 2020 approved in principle the implementation of the State Government of Selangor's e-wallet project for the Cashless & E-Services Selangor Agenda, and MBI was entrusted to present detailed proposals for the e-wallet investment to ensure the sustainability of the project, establish a subsidiary, and an allocation of RM10 million was approved for investment in the development of the State Government of Selangor's e-wallet project. Second, the selection of investment in Wavpay Fintech was the result of the Request for Proposal (RFP) process by MBI, in which MBI invited 53 e-wallet companies to express interest in participating in the RFP regarding investment in the development of the State Government's e-wallet project. A total of 23 e-wallet companies expressed interest and were invited to participate in the RFP. A total of 14 e-wallet companies submitted proposals through the RFP, which closed on 2 October 2020, and were evaluated by the consulting firm PWC, and 11 companies qualified for RFP evaluation.

The RFP evaluation process was carried out based on important criteria to ensure the sustainability of the State Government's e-wallet project, namely: first, the e-wallet company must have approval from Bank Negara Malaysia (BNM) as an e-Money Issuer. Second, the investment proposal must not use the 'White Labelling' method. Third, the investment must be to own an equity stake in the e-wallet company. Fourth, the investment must not exceed the RM10 million allocated. Fifth, the financial position of the e-wallet company must not have too large a loss, and sixth, the e-wallet company must offer value-added features such as credit cards, wallet size and others. Based on the RFP evaluation criteria, a total of 3 companies were shortlisted for the selection of e-wallet companies for the development of the State Government's e-wallet project. The three shortlisted companies were invited to present their investment proposals and business development plans for further screening to ensure the suitability of the proposals. Wavpay Systems Sdn Bhd was selected as the successful e-wallet company for investment in the development of the State Government's e-wallet project, subject to the results of due diligence carried out on the companies in the Wavpay Group. SEW appointed Crowe Growth Consulting or Crowe and Chooi & Company, Cheang & Ariff (CCA), namely a law firm, to carry out due diligence on Finance, Taxation, Technology, Business and Legal matters, as well as an evaluation of the investment. As a result of the due diligence carried out, no negative findings were found. The evaluation of the companies in the Wavpay Group was carried out by Crowe using 4 valuation methods, namely Discounted Cash Flow, Customer Lifetime Value, Revenue Multiples and Price Earnings Multiples. Based on the median value of all the valuation methods used, the overall value of the Wavpay Group investment is between RM30.3 million and RM33.2 million, with a median value of RM31.8 million as at 18 October 2021. Therefore, the value of the 49% equity stake in Wavpay Fintech is RM15.58 million, which means an excess investment value of RM5.58 million. This means that for a company valued at RM31.8 million, we take 49% by paying RM10 million for a value of RM15.58 million. Do you understand? Given that there are 53 e-wallet players in Malaysia, it has been reported that BNM prefers the consolidation of e-wallet players rather than granting new applications for e-Money Issuer or e-wallet licences. Due to the uncertainty of obtaining approval from BNM for new e-wallet company applications, e-wallet approval through the white-labelling method is considered high risk, with a likelihood of not receiving approval from BNM, and if the application is considered, it would take too long, up to 3 years, and must go through a complicated application process. The value of the Wavpay Systems e-wallet licence at the valuation date was RM31.8 million during the valuation period.

Since no new e-wallet approvals have been issued by BNM, the value of the Wavpay e-wallet is estimated to be more than RM31.8 million. This is proven by the sale of an e-wallet company that was still in the beta-testing stage and had not yet obtained a licence, which was sold for RM30 million in 2021. Regarding the financial statements of Wavpay Fintech Holding Sdn Bhd and Wavpay Systems Sdn Bhd for the financial year ended 31 December 2021 according to the SSM search on 15 July 2022, which was certified by the solicitors of SEW, the position is as follows. For Wavpay Fintech Holding Sdn Bhd, the parent company's share capital is RM10,200,000, Financial Statements 31 December 2021, and its assets are RM5,002.00, liabilities are RM10,180.00, share capital is RM2.00, retained earnings are RM5,180 (deficit), and losses are RM5,180.00. Wavpay Systems Sdn Bhd: share capital is RM10,840,000, Financial Statements 31 December 2021, assets are RM5,426,309.00, liabilities are RM1,107,658.00, share capital is RM9,040,000.00, retained earnings are RM4,721,349.00 (deficit), revenue is RM52,766.00 and actual loss is RM1,908,464.00. Comparison of e-wallet companies with Wavpay Systems Sdn Bhd. Based on the SSM search, for the financial year ended 31 December 2021, Wavpay Systems recorded revenue of RM52.7 thousand and a loss of RM1.9 million, compared with other e-wallet companies such as Touch n Go, which recorded revenue of RM53 million and a loss of RM202 million, Boost recorded revenue of RM47 million and a loss of RM107 million, Kiplepay recorded revenue of RM15 million and a loss of RM22 million, while Setel recorded revenue of RM45 thousand and a profit of RM14 thousand. Wavpay Systems' share capital is recorded at RM9 million with accumulated losses totalling RM4.7 million, while Touch n Go recorded share capital of RM934 million and accumulated losses of RM720 million, Boost recorded share capital of RM682 million and accumulated losses of RM580 million, Kiplepay recorded share capital of RM79 million and accumulated losses of RM72 million, and Setel recorded share capital of RM134 thousand and accumulated losses of RM48 thousand. Clearly, Wavpay Systems' losses can be considered low compared with other e-wallet companies. As with Setel Ventures, Wavpay Systems' revenue and accumulated losses depend on the company's strategy. Since Wavpay obtained e-wallet approval from BNM in December 2019, Wavpay has taken a conservative approach, choosing not to launch the Wavpay e-wallet on a 'big bang' basis, and opting instead to improve the application system and apply to BNM to increase the wallet size from RM200 to RM10,000. In this way, Wavpay was able to reduce losses in the face of the COVID-19 pandemic.

With regard to concerns about personal data and State Government data, Wavpay, as an e-Money Issuer given approval by BNM, is subject to the Personal Data Protection Act 2010 and the Risk Management in Technology (RMiT) security compliance imposed by BNM on e-wallet companies. In addition, all State Government data belongs to the State Government and Wavpay Systems is only a data processor. In terms of the use of data for e-wallet processing, the risks exposed by the use of the Wavpay e-wallet are no greater than the risks to the data and information used by the existing payment gateways for State Government services.

Although the State Government's equity stake is only 49% in Wavpay, the State Government still has control over the companies in the MBI Group through the State Government's representation on the Board of Directors of each Wavpay company, whose membership is distributed equally among the companies concerned. Furthermore, through the rights under the Golden Share held by the State Government, it will be empowered on matters that threaten the interests of the State Government or the Nation. The 51% share holding owned by Wavpay is to ensure that Wavpay takes responsibility for remaining committed to managing and developing the e-wallet business, and provides guarantees for any loans required by the company from banks, if necessary. As of 29 July 2022, SELANGKAH is still not listed as an e-Money Issuer approved by BNM, whereas Wavpay Systems Sdn Bhd is listed on BNM's website. This may be because SELANGKAH still uses the White Labeling or Wallet-as-a-Service facility offered under the Kiplepay wallet. In other words, SELANGKAH is merely an ordinary application that does not have an e-money issuer licence but only rents a licence from Kipple. In terms of becoming a Super App for State Government services, Wavpay already has the required features and is ready to offer a wide range of e-wallet services, with a wallet size totalling RM10 thousand, including payments under State Government initiatives, online credit loans, a marketplace, insurance and so on. The investment in Wavpay is an initial step in preparing to develop a Fintech company in line with the shift towards the digital economy and realising the State Government's Cashless Agenda. So far, the SELANGKAH application is an information portal and registration platform for recipients eligible to receive benefits or assistance from social and health programmes organised by the State Government. The SELANGKAH e-wallet only uses the Wallet-as-a-Service or White labelling services offered by Kiplepay, which is an e-wallet company or e-Money Issuer approved by Bank Negara Malaysia ("BNM").

Wavpay Systems Sdn Bhd, on the other hand, is an e-wallet company or e-Money Issuer approved by BNM, like Kiplepay. Therefore, whether SELANGKAH uses the Kiplepay e-wallet or the Wavpay e-wallet, it involves 2 registration processes. The first is registration with SELANGKAH for approval of eligibility to receive benefits, and the second is with Kiplepay or Wavpay for payment through the e-wallet. In conclusion, while the SELANGKAH application is not under BNM's regulation, Wavpay and Kiplepay are e-wallet companies under BNM's approval and regulatory compliance supervision.

As additional information, the State Executive Council (MMKN) mandated MBI on 10 June 2020 to develop the e-wallet application and, in line with this, issued a directive that no separate development of e-wallet applications by State Government agencies and subsidiaries is allowed.

Selcare Healthcare Sdn Bhd SELANGKAH should have complied with the MMKN directive by not launching its rented e-wallet in December 2021.

In conclusion,

(i) Wavpay Systems is the holder of an e-wallet licence or e-money issuer licence issued by Bank Negara Malaysia. MBI's investment in Wavpay Systems has gone through evaluation at 2 levels, namely selection through the RFP and implementation of due diligence by an independent consultant.

(ii) SELANGKAH is only an ordinary application that does not have an e-wallet licence or e-money issuer licence from Bank Negara Malaysia, but rents that licence on a white-label basis from Kipplepay. It was not eligible to be considered under the criteria in the RFP-level evaluation, and it launched its service contrary to the MMKN directive.

As additional information, the main shareholder of Kipplepay, namely Greenpacket, is also facing challenges of confidence and finances, where the share price of Greenpacket on Bursa Malaysia Securities has fallen from RM0.69 in 2020 to RM0.05 last Friday. The main shareholder of the company has also reportedly been facing a bankruptcy notice.

One clear advantage when the State Government uses the Wavpay Systems service invested in by MBI is the significant cost saving. In the implementation of BINGKAS, SELANGKAH was paid a management fee of 3%, amounting to RM3.24 million. In addition, for integration with Kipplepay and other services, more than RM2 million is required, and a system maintenance payment of RM500 thousand a year for each subsequent year. This means that for maintenance over 5 years alone, RM2.5 million is required. The total amount is approximately RM4.5 million. Meanwhile, the expenditure for payment of BINGKAS through Wavpay, which covers integration, maintenance and operations, is only RM1.4 million for 5 years. The difference is RM3 million.

For the information of this honourable House, the MMKN confirmed the MMKN decision No. 11/2022 on 11 May 2022 to recognise the Wavpay e-wallet as the preferred e-wallet and payment gateway of the State Government of Selangor, and for that purpose all departments, local authorities (PBT), statutory bodies, agencies and State Government companies must complete the integration process to adopt the Wavpay e-wallet within 3 months of receiving notification. This is a step forward to realise the objectives of RS-1, among them,

(i) realising the Smart Selangor initiative by 2025;

(ii) realising the Industry 4.0 goal by digitalising part of business affairs, especially small and medium industries (IKS); (iii) building e-government and Smart Government including Local Government; (iv) diversifying State revenue sources; and (v) pioneering cashless and e-service activities.

For the BINGKAS programme, it is informed that from 1 July 2022 until 28 July 2022, a total of 20,974 people eligible to receive BINGKAS assistance have received payments through the Wavpay e-wallet, amounting to RM6.3 million. Payments to 282 people are still in the process of re-verifying information relating to identity cards and telephone numbers by the BINGKAS initiative team. In response to the proposal to provide grants to research teams to help them produce new innovations in biotechnology, it is informed that a fund has already been established previously and has now been approved by this honourable House last week to be made into a trust fund for the development of various sectors. Meanwhile, strategies, initiatives and programmes have been formulated in the Biotechnology Action Plan 2021-2030 to overcome the challenges of shortage of talent and funds in the development of the biotech industry, which has been entrusted to S-Bioco under the management of Invest Selangor.

SpeakerEN

Thank you, EXCO Bandar Baru Klang. Please continue. Honourable Batu Tiga

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you, Mr Speaker. I actually wish to respond to, or wind up, matters other than the portfolio entrusted to me. God willing, I will wind up the issues raised by all the Honourable Members relating to the women and family portfolio. For the information of the Honourable Member and all Honourable Members, I want to say here that if we study the First Selangor Plan (RS-1), which has been tabled and which runs to 214 pages in detail, we find that there are 2 strategic themes, or 2 pillars, that touch on the Housing and Urban Wellbeing and Entrepreneur Development portfolio. Firstly, the first focus area, income generation and social welfare, with the main strategies: first, to focus on efforts to encourage entrepreneurial activities and various other entrepreneurial assistance to increase household income and eradicate poverty. The 4th focus area also touches on the same issue, which relates to housing development, namely affordable housing, and main strategy number 12 on exploring new models for affordable housing, including working with financial institutions so that a special financing scheme exists for the people of Selangor, especially the B40 group, to own homes, and main strategy 13 on expanding the rental and home repair programmes.

So if I may state here: if the micro targets in RS-1 are achieved by 2025, especially in the average GDP (KDNK) growth that we target at 6.5% to 7%, then the contribution to Selangor, which we target at 30%, will become a reality. Honourable Members, I would like to inform you that, as a big believer in this portfolio, it targets more non-micro goals within RS-1, where the emphasis is especially on increasing the building of dream homes and Rumah SelangorKu, with homes of 1,000 square feet, complete with various amenities and facilities, and cultivating a modern way of life that low-income groups can afford. God willing, we will see that this will provide fairly comfortable housing units. But at the same time, the emphasis in the new policy of RS-1, or within RS-1, one of which is the Rumah SelangorKu three-months-vacant policy, will also be presented to meet the needs and, more appropriately, we need to look at how to adjust to the demand and supply that we always raise, so that Selangor can ensure that every family has a home. So it will also take into account several issues relating to changes that may alter some components and housing strategies that we will see in the near future. So RS-1 also affirms the continuity and sustainability of various micro-financing schemes, from RM1,000 increased to RM100,000, with very facilitating and non-burdensome repayment terms and conditions over a period of 6 to 36 months. When we, when the government has already arranged loans that open up a little space, not only for categories of businesses such as food, workshops and so on, the government has opened a policy space to provide assistance to agriculture, for example, to further encourage those involved in agriculture to apply for or request space, or apply for capital for this agriculture, without having to start repaying before it can generate income. So the Government, as a result, has changed agricultural loans for borrowers. Instead of repaying immediately, repayment is deferred for 6 months, and after 6 months they can begin repaying again. So although one of the main objectives of strategy theme 1, namely strengthening the economy, is to align economic growth and Selangor's investment strategy in order to attract world-class companies, the Selangor Government has never forgotten these small and medium entrepreneurs, so that they do not go astray by remaining only in micro types of business. Therefore, under this strategy 1 we will strengthen the economy, in line with economic growth in the context of ports and logistics, the digital economy tourism, aerospace, automotive, electrical and electronics, as well as civil engineering machinery and engineering, as well as the halal industry and life sciences and agrotechnology; so we will align and harmonise the entrepreneurial development programme of strategy 1.

Among the many debates that I have heard from the beginning, I want to highlight and I am interested in all the ideas that have been put forward by all the Honourable Members, but there is one that is quite special, namely that raised by the Honourable Bukit Lanjan, who was formerly EXCO for Environment for two terms. It is a policy, or a view, that I think revolves around sustainability, namely one of the 4 strategic pillars in RS-1, where we see that climate change and also the environment need to be given focus. So with this, I want to focus my winding-up on the interconnection between sustainability and housing and urban wellbeing, especially environmental conservation initiatives and combating climate change in the property industry, particularly the housing segment, spearheaded by the State Government through PBT or Local Authorities. So, guided by the Action Plan for Implementing Liveable Cities in Selangor that has been completed, the Green Building Programme Towards Urban Wellbeing, and the Low Carbon City Action Plan, the installation and maintenance of LED lights and solar systems in residential strata buildings, especially the Rumah SelangorKu project, has begun to be implemented through a Pintar partnership between the Selangor Housing and Property Board (LPHS) and 3 private companies, namely Ordessy Cob Sdn Bhd, Sumi Capital Sdn Bhd and Synergy ESEO Sdn Bhd. So with investments of RM400 million for LED lights and also RM120.0 million for solar energy, I am confident that this can be accelerated further. Low-carbon index measures and so on are achieved, and I would like to especially praise or congratulate MBPJ, which has given incentives to buildings that have begun installing LED lights and solar in this way, by giving rebates on assessment tax. So I feel these programmes can be expanded further to all PBTs, and in the end what I want to say here is that what we are doing, we must, I must call on all, not only the efforts of the Government, but let us, Honourable State Members and all government agencies and PBTs, pledge to further expand the campaign for installing LED lights and solar systems, SPA and everything else that we mention in this House, so that in the end we can achieve the required index. And I can also give assurance that day by day many Government policies that we have worked out and changed, so that the affirmation and establishment of this implementation is taken up not only by the government or local council, but must also be taken up by all developers building affordable homes, for this implementation to be carried out or in commercial development. So for that, I am confident that strategy, green planning, implementation, monitoring and evaluation will become a main pillar in the formulation and implementation of all State Government policies. So that is a little of what I have worked out and summarised under the First Selangor Plan (RS-1), but for.

Tuan Lau Weng SanDAP · PHBanting

Minta penjelasan.

Puan Rodziah binti IsmailPKR · PHBatu Tiga

Silakan.

Speaker

Ya, Banting.

Tuan Lau Weng SanDAP · PHBantingEN

Thank you.

I feel sorry for the answer given by the Honourable EXCO, not only Batu Tiga but also Bandar Baru Klang, because it was packed with facts, but it seems the other side was not very interested in the answer. It is as if the questions about their debate two or three days ago were like throwing stones and hiding the hand. My question to the Honourable is about the price of affordable housing. I understand that recently a component party on that side, which has no representative in this House, stated that when they govern the Selangor government (if they get the chance, if ever), they will give a 50 per cent discount on affordable housing to the people of Selangor State. I would like to ask the Honourable Batu Tiga, is it true that this is in fact an accusation or a populist ploy, where even in the state governed by themselves, they are not able to offer a 50 per cent discount to the people of their state, yet they want us to do it in Selangor State? What is the Honourable's opinion?

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Thank you, Banting. It is common that when we speak as the opposition, we may propose many ideas, but in the context of implementation we must be fair. As the administration, can it be done or not? The proposal mentioned, a 50 per cent discount, in my view, is it populist or not? We must look at it carefully. If we look at the current situation, with what is happening with the rise in goods and the rise in various things, we feel it is quite impossible to maintain the existing house prices through a discount method. Instead, the proposal should be other approaches that we should take. Perhaps from the perspective of other Honourable Members, regarding how the development we carry out can produce affordable homes that are no longer far away in location, then we will gather some existing land that can be developed and there is a good cross subsidy for the people. But in any case, for me, it is good that Banting asked that question, because I can answer Air Tawar's question, but I want to record in this House a point about the accusation. Their accusation says that under the First Selangor Plan, there may be plans that are just left there and not implemented. That, we will ask the Speaker to make a ruling. I don't know what to do, right.

But what I want to state here is about Sungai Air Tawar, when speaking of that. I am not sure whether Sungai Air Tawar has gone to the ground or not. Because when he talks about the Taman Air Manis issue, for example, he says it is a government promise that was never implemented. We take up this problem; I think I chaired this problem after the last Sitting of the House, from 2020, when we immediately held a special meeting. And now the Taman Air Manis project is already 30 per cent completed and progressing well. All the approvals from the old days that were never obtained have now received full approval, yes Mr Speaker. So for that, I want to say, for the decision.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Honourable EXCO. Repeat that a bit more, I can't really hear. Again. Again.

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Ah, still looking at the Hansard, aren't you.

SpeakerEN

Why can't you hear? Why can't you hear? Is the mic not loud enough?

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Ah, not really loud. Not really loud, this Honourable EXCO.

Puan Rodziah binti IsmailPKR · PHBatu Tiga

Okey.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Indeed, today we are sad, but the answer must be a bit firmer. I can't really hear. Haaaa. Please let me hear a little.

Puan Rodziah binti IsmailPKR · PHBatu TigaEN

Okay, I will repeat. The phrasing may be a little different. But I want to repeat that what was said in this House by the Honourable Sungai Air Tawar, that our government, the current government, only talks and cannot implement. I want to record here that Taman Air Manis, which was said to have done nothing, is now 30 per cent implemented. All the planning permissions, the building plans for phase 1 and phase 2, the land plans, the road plans and the drainage plans have been approved by the local authorities (PBT).

So now, please go down to the ground and see for yourselves. Witness that this project is progressing smoothly, and that these planning permissions, God willing, were approved on 31 May, which has just passed, and we will witness 183 units of MBI dream homes of the terrace type. Terrace, not strata, yes, terrace. Level 1, 20x70, while the building plans covering 54 units of MBI dream homes have been approved and are already being implemented. So, on that point, I want to stress this, because I listened carefully, yes. As the leader of the opposition, I too feel disappointed when matters that have actually been done correctly are said in this House to be wrong. If it is wrong, we accept it, but if the facts are wrong, I feel that a little reprimand is needed, because it will create a wrong impression among the people about the current government. So we are serious, and I want to record here that the projects abandoned for 20 years by the previous Barisan Nasional, affecting the village folk who number 8,000, are actually... Now, there are eight (8) projects, alhamdulillah. God willing, I will announce that six (6) of those projects will be completed by the end of this year. Yes.

So this shows that we are serious. The problems of the past require a slightly different approach. That is why I am confident that the Dato' Menteri Besar, in announcing the Rancangan Selangor Satu, has made it an innovation and creativity in the approach to solving the people's problems. That is also why I am giving a little good news. Pandamaran also does not seem to have a problem. In Pandamaran, regarding the Jalan Papan issue, which has long been a problem for him, namely the issue of how the urban settlers, who should have been developed in that area, are to be handled. And I want to record in this House that after three or four meetings with the developer, namely the developer Melati Ehsan Consolidated Sdn Bhd, or MECSB, the developer has agreed to surrender 11 acres of land that should have been developed to the government, the value of which we are confident here can show a little of a new approach.

However, after we obtain that land, which is to be handed over to the Selangor State Government, I have already asked the government to take a slightly different approach to how the studies can be done, given the land and the settlers, and what new solutions we can implement. From the previous State Executive Council meeting (MMKN), we put forward two options, and from the outcome of those discussions we see that the government has taken into account the squatter issue and the existing land structure. So we cannot possibly implement a high-scale project of more than 18 storeys, and likewise we see that there are certain risks. Therefore, I wish to say here that the Jalan Papan issue, God willing, we can resolve if after this we hold the next meeting, taking into account the studies that have already been found. We will then propose an approach that can produce a win-win for all parties, especially for the issue of the existing urban settlers under the State Government, as well as for the developer, the saviour who will take over or develop the existing project. That is what I concluded in my portfolio. With your permission, Mr Speaker, I will take part directly in the winding-up for the women and family portfolio.

To all Honourable Members, I find that on behalf of the Honourable Seri Serdang, eight Honourable Members have touched on or raised issues relating to women and the family. So I thank everyone, and we see here that from the eight (8) matters that were raised, I have condensed them into only three (3) major categories of women's issues that were debated.

First, mainstreaming and gender equality. Second, the composition of 30 per cent women's participation as policy and decision makers, and also the issue of

specific support assistance for working women. The Selangor state government is always committed to giving attention to women's issues through various initiatives, especially those touching on support assistance and also women's empowerment. Apart from that, the State Government also strives to provide the support system needed to help women contribute actively to the state's development, whether through direct participation in the employment sector or indirectly through the development of other sectors. So, the State Government, since 2020, has already taken steps in driving gender mainstreaming in Selangor by carrying out two (2) programmes, namely the Gender programme or gender mainstreaming. This programme has already reached its second year, in which seven (7) pilot departments have been involved and two (2) groups, the gender focal point officers, or gender focal points, and the gender focal team, have been appointed.

I would like to elaborate a little on the GFT and GFP, which are actually very important in a country. These women's issues are not only understood and discussed by women. It is important that there are also men who understand and champion these issues together. That is why since 2020, the EXCO has already proposed the GFT and the GFP to ensure that every agency can become a spokesperson on related issues and can even formulate suitable policies on gender-related issues.

So, for the information of all Honourable Members, all the GFPs and GFTs have been appointed to go through the following process throughout the implementation of the gender mainstreaming programme, namely undergoing training, and secondly, there is a gender audit so that they truly understand what role they must play, and they can analyse the results of the gender audit together with WVS or Wanita Berdaya Selangor to be presented to the Director. In other words, they are not only trained, but they can also analyse whether there are aspects or views given that are gender-biased, or issues that are not related to or do not contribute to the true gender perspective. Likewise, with the GFT and GFP in place, they can draft a gender action plan and then implement the gender action plan that already exists.

So the second issue raised or related is the composition of 30 per cent women's participation as policy makers, and this policy is among the policies that have actually existed for a long time. Selangor was among the earliest states to make this 30 per cent policy. So for that reason, we see here that to accelerate the participation, representation and decision-making in public and political life among women, the women's policy has also set specific targets for this matter. So for that reason, the Selangor Women's Policy Action Plan 2017-2020 should be viewed in terms of its achievements.

Whether it has achieved its goal, I find here that the Honourable EXCO has already proposed a group of researchers from Universiti Teknologi Malaysia to re-evaluate whether the 30 per cent target has been achieved. So for that reason, the debate on the motion of the Rancangan Selangor Pertama (RS-1) will be given further attention by Wanita Berdaya Selangor to ensure that the new women's policy to be formulated is aligned with what is outlined in the Rancangan Selangor Pertama (RS-1).

The third issue raised by the Honourable Member, namely the specific support assistance for working women, covers several aspects as mentioned, relating to nursing rooms, flexible work arrangements, child-care and kindergarten facilities, and so on. In the details of the Rancangan Selangor Satu (RS-1), emphasis has been given to improvements to child-care centres and kindergartens, to ensure that the important support system for women in this regard can be improved. So, as for the other proposals, I would like to record my appreciation to Mr Speaker, who has given the space to ensure that the State Assembly also has these facilities. But I also feel that the other proposals put forward will be refined, including creating a women-friendly city by increasing facilities and amenities specifically for women. I am very grateful, because I recall that since 2008, when we discussed women's issues, many Honourable Members did not take part, especially the male Honourable Members, but this time the issue has become part of the topic of discussion, and for this I offer my congratulations. Hopefully the Rancangan Selangor Pertama (RS-1) will later provide a more micro-level concept and implementation that will make the issue of single mothers no longer just an issue that we raise, but something we measure in terms of how far we have achieved, and perhaps the 30% target will become a floor target, no longer a target that people say is still being chased, but we want to set that target with a floor of 30%, and a ceiling perhaps of 30%. So, that is when it can be said that Selangor women, or the State of Selangor, are so attentive to gender issues, and finally Selangor has reached that 30%. Thank you, Speaker, I conclude this debate.

SpeakerEN

Thank you, Honourable EXCO Batu Tiga. I invite the Honourable Tanjung Sepat.

Tuan Borhan bin Aman ShahPKR · PHTanjong SepatEN

Thank you, Mr Speaker. In answer to the question about the Shah Alam Theatre building. The Shah Alam Theatre building was handed back to the Shah Alam City Council (MBSA) in May 2021, and the MBSA carried out minor maintenance on the building, namely the air-conditioning system, repairs to the toilets and also repairs to damage to the roof. The cost of the minor repairs that were incurred was RM40,000.00, and the MBSA also provided utility operating costs, security, and cleaning totalling RM21,000.00 per month. This allowed the programmes that had been booked from the time of handover to proceed. The programmes were extended until September 2022. They cover works to upgrade the building's acoustic system, and the seats and carpets, which have become worn. Apart from that, it is proposed to build an amphitheatre outside the theatre building. The exterior facade of the building is to give attention and make the building more attractive. The target programmes proposed for the theatre are cultural performances, theatre productions and concerts, as well as TV programme recordings. It is expected that the upgrading works for this building will be carried out in the second quarter of 2023 at an estimated cost of RM12 million.

Furthermore, regarding SAMAG (Shah Alam Modern Art Gallery), it is an initiative arising from the idea of the Y.A.B. Dato' Menteri Besar in developing artistic talent, especially among students and young people in Shah Alam and in Selangor generally. It is a gallery that houses works by arts practitioners, young people, students of public higher education institutions (IPTA) and private institutions, to create through paintings, sculptures, or any artistic imagination that can be expressed in the form of an exhibition. On 26 November 2022, during the budget presentation, the Y.A.B. Dato' Menteri Besar announced that the Selangor State Government would establish SAMAG. The State Government also agreed to purchase the building owned by Bank Negara, Seksyen 14, Shah Alam, at a price of RM33.4 million, and by the same decision it was also stated that the agency proposed to manage the SAMAG Gallery is Yayasan Seni Selangor Galeri Shah Alam. Thank you.

SpeakerEN

Thank you, Honourable Tanjung Sepat. I invite the Honourable EXCO Paya Jaras.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of God. Thank you, Mr Speaker. Honourable Paya Jaras would like to take a little time to answer several questions briefly. I will begin with the problem statement raised by Honourable Sungai Panjang in his debate, who said that I code the Hansard on page 102. These three major issues are still not being addressed thoroughly by the Selangor State Government even though it has entered the Third Term of the Selangor State Government, that is the word. Referring to the three issues, the first is related to the high cost of living caused by the rise in the inflation rate. I would like to tell Honourable Sungai Panjang that the control of prices is under federal authority and has nothing to do with the State Government.

Second, what was raised by Honourable Sungai Panjang is that the unemployment rate in the State of Selangor has doubled from 2.9% to 4.3% in 2020. I think Honourable Sungai Panjang is not updated on the figures stated, because in the second quarter of 2022, the first quarter of this year, our unemployment rate is 3.2%, below the rate of 4%. In 2020 it rose to 4.3 because of the pandemic we experienced. So, although 4.3 is above 4.3%, 4%, it is better than Malaysia's unemployment rate of 5.2%. We are still at a good level, Honourable Sungai Panjang, and it cannot be used as a basis to claim that our state cannot control the unemployment rate. We are still at a good level, and why? Our supply is large. Our demand is also large. Our supply, the people who want to ask for work, is large. The demand from people to take on workers is also large. Where is the bridge? That is the task played by me, Honourable Kota Kemuning and several other EXCOs. Bridging between supply and demand, we have Job Fairs. A Job Fair is an effort to give jobs to those who are not yet employed. Once they are employed, Honourable Ganabatirau will take over empowering the workers themselves, whether physically, through Job Fairs attended by more than 12,000 to 15,000 people, or online through Selangor Kerjaya organised by MBI. So, my basic answer is that the quotation of the 2020 rate of 4.3 is an old number, Honourable Sungai Panjang, because our first quarter of 2020 and last quarter of 2021 was 2.9%. In 2022 it rose slightly to 3.2%, but the government is satisfied because we are still controlling the rate and we have alternatives to overcome our unemployment rate.

Third, what was mentioned by Kampung Tunku about the promotion of Job Fairs. I think I will correct our information method, but I thank all the Local Authorities (PBT) who helped promote our Job Fair programme through the LED of each respective PBT. In addition to the Job Fair, Honourable Kampung Tunku also proposed a 30% quota of youth in government. In the Job Fair we held recently, we were also attended by the Public Service Commission (SPA), we have MBI, we have federal positions, and we have the Public Service Department (JPA) attending our Job Fair programme. So, this is a bridge, this programme is a bridge between supply and demand so that we can control the unemployment problem in our state.

I want to go to Sungai, I want to go to Sungai Tawar. Honourable Sungai Tawar also gave an inaccurate picture in his debate. I also want to begin with the problem statement mentioned by Honourable Sungai Air Tawar on page 94 of the Hansard. He gave the impression that our sports facilities are bad. He then asked how we are going to produce good athletes when we know that previously we produced athletes of international standard in the State of Selangor in gymnastics. Honourable Sungai Air Tawar portrayed that the failure of the Selangor Government to manage the building caused the performance of our athletes to be bad. I want to point out, and I think this is agreed by Honourable Dr. Yunus or Sijangkang when he was EXCO for Youth. I want to tell you that among the buildings mentioned is Section 6, Shah Alam, also known as the SUKSES Sports Complex, which was built in 1992 and is now 30 years old. Who uses SUKSES? In SUKSES, among our training centres, we train artistic gymnastics, gymrama, karate, sepak takraw, judo, wushu, muay thai, kabaddi and pencak silat. So I want to answer that if this building is so terrible that we have failed to produce good athletes, I want to read out the results produced by our athletes who train at SUKSES. The number of trainees, let me say, let me read them. We use the SUKMA Perak 2019 as a benchmark to answer. Artistic gymnastics collected four gold medals, one silver, two bronze. These are the athletes I mentioned who use SUKSES as their training venue. Gymrama, one silver, two bronze. Judo, three bronze. Karate, one gold, three silver, three bronze. Wushu, one silver, three bronze. Muay thai, one silver, three bronze. Pencak silat, three silver, five bronze. Sepak takraw, two bronze. In other words, Honourable, all our athletes who use SUKSES as a training venue won medals in our SUKMA Games. So, the picture painted by Honourable Sungai Air Tawar, as if the Selangor Government is bad, is not right. It is true that this building is an old building, 30 years old, and MSN allocates RM200,000.00 every year to repair the building. So, I think the picture is untrue and we are always repairing and improving the venue, and the impression that we use gymnastics mats taken from a flood area is also not correct. That is not right. We did not take it from the stadium's water. Taking water and placing it at SUKSES, that is not right. We moved it to save the mats in a better place, that is all. So, the picture given by Honourable Sungai Air Tawar is not correct, and secondly, he also gave an impression about ABMK. Honourable Sungai Air Tawar also mentioned in his speech about ABMK, which seems to be being developed now at a private college. For the information of the Honourable Member, all ABMK have now been handed over to Red Giant Sdn. Bhd., a team under the management of the Selangor Football Association. The State Government's decision dated 27 October 2021 agreed to approve the takeover of this ABMK in Puncak Alam by Red Giant Sdn. Bhd. In other words, from now on it is not given to a private agency, but to the Selangor Football Association through Red Giant Sdn. Bhd.

The third issue raised by Honourable Sungai Air Tawar is also related to Hotel Carlton. Honourable Members all, if there are weaknesses we will correct them, and I agree with Sijangkang that there is some discomfort at the back of the building, and we have checked whether the land is under MBSA or under MBI. I accept that the site is still under our review and I will take appropriate action. I will ask MBSA to clear all the forest at the back of Carlton, as that is our main road. If MBSA cannot do so, I will use my own allocation and I will clear all the places at the back.

A brief explanation, Mr Speaker.

Speaker

Sijangkang.

What I meant in my debate speech is the parasitic trees at the parking area, which I think are not few, but far too many. If possible, please resolve this so that it is pleasant to the eye even when passing by. Because these parasitic trees, I think, are not just one or two years old, but have been there for many years. Thank you.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

I think during Dr.'s time as EXCO, those parasitic trees were also there, I suppose. So, let us handle this together. Yes, Honourable Member, I will ensure the area is more pleasant to the eye. I ask Shah Alam City Council (MBSA) to take immediate action to clear the parasitic trees there. So, Honourable Mr Speaker, I have nothing else, the matter that was mentioned by...

Speaker.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

Sabak is related to young farmers. This I will discuss with the Honourable EXCO for Agriculture on the involvement of young people in...

SpeakerEN

Sijangkang. Honourable Sijangkang is here. Sijangkang has a little.

Thank you, Mr Speaker. In my debate, I also raised whether the government has plans in terms of preparing perhaps the workforce that can be considered today? Because if we look at economic capacity, it will provide so many job opportunities, especially perhaps there are programmes that can be specifically targeted at demand, types of jobs, for example, I would say there may need to be professional drivers when the port in Carey is developed, the logistics needs. Perhaps the State Government has plans to mobilise the CIAST workforce like that. Only, I, one more thing, I want to ask if the government has information as was debated or raised by Honourable Taman Medan regarding the mass release from the Terengganu State Government by EXCOs to come to Selangor to the Job Fair, because this I see, although perhaps as a debate on social media, it seems there are ..

Please correct me. I did not say a release to the Job Fair, a release for work. The Terengganu Government sent representatives to the Job Fair; the participants did not go to the Job Fair. So please correct it.

I think this is perhaps where the EXCO can give information, because that is what caused the debate. I think it is very wrong because what we associated is a government that cannot answer in our House. The injustice that I think may not be true needs to be corrected. If it is true, then okay. That means there is a solution to it. Thank you.

Speaker, I ask for an addition.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

I was not clear just now, Sijangkang, what is the point you want to raise? Is it the State Government's response to this news? Is that it?

If there is information clearly, let's say there is on the part of the Terengganu Government, a request for release to send such a large delegation to get work in the State of Selangor and so on. Perhaps if there is on the part of the government. Thank you.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

I did not specifically mention release and so on, because our stance is that this Job Fair is open to anyone. How they send people is not our concern. In fact, the issue raised by Sijangkang is news we heard on social media, and it is not specifically G to G with us. So for us, whatever we can do to help the people in Selangor and the people in Malaysia, we will continue to help to facilitate or further boost our country's economy. Please proceed.

Excuse me, I want to refer to what Sijangkang just mentioned, yes, in my debate last Friday about, I touched on how the action of a state government, which we know is the Terengganu State Government mentioned by the Honourable EXCO in the previous sitting, based on the answer that information obtained from the organiser under the Standing Committee of Honourable Paya Jaras stated that there was information that representatives of the Terengganu State Government also came and looked. But, within a day, Taman Medan apologised for being attacked on social media, and among them is one from a website trdi.my, we know trdi.my is Terengganu Darul Iman, these are the groups that stated that the EXCO of the Terengganu Government had to go to the Jom Kerja Selangor Carnival to look for work, which is not true. I am not saying EXCO, but I refer to the answer by Honourable Paya Jaras in the previous sitting that there was information that representatives of the Terengganu State Government came and obtained information and negotiated with participants of the Jom Kerja Carnival or Job Fair organised by the Selangor Government, and the actual focus of my point is to show that it is also benefited by another government.

That means this is a success of Pakatan Harapan, that means the success, I want to focus also on the creation of job opportunities in states administered by Pakatan Harapan, by Pakatan Harapan. They are also benefited by other state governments. So, but actually I took the information from Honourable Paya Jaras in the previous sitting that information was stated by the organiser that representatives from the Terengganu State Government also attended to obtain information and negotiate on how job opportunities could be given to the people of that state, who benefited, but their names were publicised as those who successfully obtained job opportunities. I seek clarification from Honourable Paya Jaras.

Tuan Mohd Khairuddin bin OthmanPKR · PHPaya JarasEN

I need to check the earlier Hansard for the specific words I used. But I do not recall mentioning any individual from Terengganu who came, only that I was informed there were delegations who came to our Job Fair, which for us is not wrong, we welcome them. It only shows that our sustainability or our fundamental, our economic fundamentals in Selangor are good. That is all. Under our administration, it is strong. So, anyone can come to us. Likewise, we also went to Baling, Kedah. Under the name of the Selangor State Government, to help them. So this is the relationship between us and the people. So whatever we are able to do, we help them. Also, Kuala Kubu Baharu proposed encouraging young people in agriculture, which I have already mentioned. Likewise with Sabak, I will discuss with the Honourable EXCO for Agriculture to find or obtain one suitable scheme for us to help young people through agriculture today.

SpeakerEN

Thank you, Honourable EXCO Paya Jaras. I invite the Honourable Kajang. Please proceed.

Tuan Hee Loy SianPKR · PHKajangEN

Thank you, Mr Speaker. I will answer the questions raised by the Honourable Members for the environment and tourism portfolio, including the local authority section, Honourable Kinrara. To answer the question raised by the Opposition Leader, Sungai Air Tawar, regarding the Hutan Simpan Paya Bakau issue, in which he said this was for the purpose of abandoned oil palm cultivation, the habitat of wildlife in the area has already been disturbed and has damaged the crops of nearby villagers. The Selangor State Government would like to give some explanation on the issue raised by Honourable Sungai Air Tawar.

For information, the Hutan Simpan Paya Bakau area in question is of State land status and not a permanent forest reserve. The land in this area has already been approved since gazettement through State Executive Council Meeting No. 21/2012 dated 6 June 2012 under Section 62, Kanun Tanah Negara, as plantation land, and the Honourable State Secretary of Selangor was appointed as Controlling Officer and it is administered by the Selangor State Economic Planning Unit (UPEN) and leased to the Selangor Agricultural Development Corporation (PKPS). In 2013, PKPS carried out site clearing work for the purpose of an oil palm plantation project on the land. However, there was objection from the residents of Sungai Tengar Utara, who stated that the area should be retained as a well-planned village area and to preserve and maintain the ecology of the wildlife found on the land. In line with this, PKPS decided to return the land to the State Government on 19 February 2016, and until now the area has been restored naturally and subsequently the area is made a area for wildlife ecological conservation and restoration. In this regard, the State Government will request PKPS and also the Selangor State Forestry Department to review the condition of the area. Appropriate restoration measures will certainly be taken. If necessary, the area will be gazetted as a permanent forest reserve, in line with the current commitment of the State Government to increase the percentage of forest reserve areas in Selangor State.

To answer the question raised by Seri Kembangan regarding waste management, higher-quality infrastructure and also online permits for mountain climbers, when they want to apply for permits from the Selangor State Forestry Department. The Selangor State Government, through the Selangor State Forestry Department, will ensure that eco-tourism services are continuously improved in line with current needs. Among the efforts that are being and have been carried out by this department for these improvements are as follows:

1. Carrying out maintenance of the Taman Eko Rimba areas under the management of the Forestry Department on a contract basis. In 2022, a total of RM542,577.38 was allocated for maintenance purposes involving the scope of area cleaning, rubbish collection, building cleaning, landscape maintenance and so on. This work involves 6 Taman Eko Rimba, namely Taman Rimba, Kota Damansara, Sungai Tua, Sungai Sendat, Komanwel, Sungai Tekala, Taman Eko Rimba, Gunung Nuang.

2. Implementing infrastructure improvement projects at the Taman Eko Rimba areas involving an allocation of RM1.26 million in 2022. The scope involved is the re-surfacing of roads, parking areas, repair of office buildings and toilets, electrical wiring, rehabilitation of walkways, pruning of hazardous trees and so on.

3. Developing an online forest entry permit system in collaboration with the Smart Selangor Development Delivery Unit. This project was identified at the end of 2021 and is currently undergoing the system design process, so we hope that by the end of this year, this software will be able to help those who want to climb mountains to apply online directly. There will be no need to go to the Selangor State Forestry Department office anymore.

For Sungai Pelek, the Selangor State tourism fund. The Selangor State Government has already allocated a total of RM3.78 million for tourism promotion and events. The allocation is not only focused on promotion programmes and events overseas, but also on the series of domestic promotions. Among the best mechanisms to attract the interest of Selangor people and people of other states to visit tourist areas in Selangor State is through the following:

1. Organising the campaign 'Nak bercuti pusing Selangor dulu'. This focuses on promoting tourism to the domestic market. This campaign provides exposure and also awareness with marketing content to attract foreign tourists to travel to Selangor State.

2. Providing tour packages such as the Experiential Tourism packages run by 51 Selangor State community hosts, where these packages focus on rural tourism products. These packages will also be used by local and foreign tourism agencies.

3. New normal tourism promotion activities through participation in tourism promotion programmes using digital and online platforms, such as organising the e-travel fair promotion programme.

4. Participation in domestic promotion programmes such as Jelajah Negeri, in Sabah, Penang, Johor and Kedah. MATTA Fair and also tourism exhibitions.

5. Digital and online initiatives such as organising serial webinars and live streaming on the social media pages of Tourism Selangor.

6. Organising tourism VR programmes. Virtual reality for tourism products in the 9 districts of Selangor State.

7. Organising the Fan Trip programme involving media, local and international tourism agencies.

To answer the question raised by the Honourable Semenyih, the State Government will always work together with the Local Authorities and ensure that cycling route facilities are properly provided by taking into account safety factors, traffic during the time, and giving priority to areas of visitor focus. The State Government has also allocated

RM4.05 million for upgrading public amenity infrastructure, and RM1.35 million has been allocated under POT for upgrading tourism products. For the Honourable Kuala Kubu Baharu, the mural painting at Tapak Warisan, KKB. The Selangor State Government takes note of and agrees with the proposal. For the information of the Honourable Member, Kuala Kubu Baharu is included in the Selangor State Tourism Master Plan 2021 – 2026. The area has already been included under the heritage and cultural tourism products of Hulu Selangor District, and Tourism Selangor together with MPHS and the Hulu Selangor District Office will promote the area in the Kempen Pusing Selangor Dulu. Honourable Sijangkang, regarding inland forest, peat swamp forest and also mangrove forest. The area of Permanent Forest Reserves (HSK) in Selangor up to now is 250,250.33 hectares, of the total area 148,590.41 hectares or 59% is inland forest. Meanwhile, 82,621.92 hectares or 33% is peat swamp forest and 8% of the total permanent forest reserves is marine swamp forest, namely 18,998 hectares. Regarding Taman Alam, Kuala Selangor, it was approved by the State Government through the MMKN in 2018 to be gazetted as a permanent forest reserve. At the moment the gazettement process is being carried out and is at the stage of preparing the gazette plan. The area to be developed as the International Eco-Tourism Centre involves only 84.13 hectares or equivalent to 28% of the total area. The development proposal for this Eco-Tourism Centre is still at the development plan study stage by UPEN, the Selangor State Forestry Department, TOURISM Selangor Sdn Bhd and also other technical agencies.

Mr Speaker. Thank you, Honourable EXCO, I just want to get a bit of clarification. From the area that will be developed as the International Eco-Tourism area, will it also be gazetted as a forest reserve, or will it not be gazetted as a forest reserve?

Tuan Hee Loy SianPKR · PHKajangEN

Yes, we only give permit applications. So, the entire Taman Alam remains within the permanent forest reserve area. We are not gazetting one inch of land. So, the area still has permanent forest reserve status.

That means we are allowing hotel development as the EXCO answered this morning in this permanent forest reserve area.

Tuan Hee Loy SianPKR · PHKajangEN

Yes, not a hotel but a chalet. A chalet in the form of ...

Because the Honourable Member mentioned a hotel this morning. My picture is that this hotel is not ...

Tuan Hee Loy SianPKR · PHKajangEN

Not multi-storey, no. Only one or two storeys in the form of wooden chalets.

Ok, thank you for the explanation.

Tuan Hee Loy SianPKR · PHKajangEN

So, I hope this explanation is clear, don't let the newspapers, the Party is attacking us on this issue. I am indeed disappointed.

I raised this matter because the Honourable Member mentioned hotel development this morning in the Honourable Member's answer.

Tuan Hee Loy SianPKR · PHKajangEN

No, because the question asked about a hotel. So, I say this is not a hotel. This is only a chalet that involves only wood.

No, I have never mentioned the matter of hotel development and so on.

Tuan Hee Loy SianPKR · PHKajangEN

We are not like Langkawi. Langkawi is all hotels.

Ok, thank you.

Tuan Hee Loy SianPKR · PHKajangEN

This is only, we only give permits for the development of the Eco-Tourism Centre using chalets only. Ok, for Kampung Tunku, Honourable Kampung Tunku. The Selangor State Government always prioritises and looks after the welfare of its people, and this includes the Orang Asli community. As a caring government, the State Government will ensure that the Carey Selangor Change Developer project will not affect the lives of the Orang Asli community in the area. Moreover, it can open up more employment opportunities and give priority to the Orang Asli community in Pulau Carey. For Sijangkang, the Canal City development issue that caused problems for Orang Asli settlements, where the Orang Asli were relocated to the Desa Kemandol area, while the Orang Asli settlement in the Rayau area was replaced in an area outside Selangor, namely in Rembau.

The State Government believes that when a development is carried out in certain areas, including Orang Asli villages, various aspects have already been taken into account, including returns to the Government. Returns

to the Orang Asli community and agreement between the developer and the Orang Asli community before a development is approved. So, I think this is not an issue, I think this issue has been resolved, where the Government, during the Pakatan Rakyat period was also joined by Parti PAS. Because the Taman Desa Kemandol has been gazetted under Section 6 of the Orang Asli Act, the issue is resolved. And secondly, agricultural land has been replaced with land with title located in Rembau, Negeri Sembilan with the agreement of the Orang Asli involved. So, now the problem arises because that land has title and some Orang Asli are selling this land. Selling this land, that is why I have already disagreed if we want to give land to the Orang Asli, we should not give title. Gazette the land forever, not for title, otherwise they will sell it. Certain people will lobby them to get the house and land. That is what is happening now, so the problem at the Orang Asli settlement near Kemandol.

So, to answer the question debated by the State Assemblymen (ADUN), Honourable Bukit Lanjan, Honourable Bandar Utama, Honourable Subang Jaya, Honourable Kota Anggerik, with many matters relating to environmental sustainability. Including policy matters from Kuala Selangor, this is a bit lengthy so, I hope the Honourable Member can review the latest developments relating to the state, which is carbon. So, as we are well aware, climate change is a complex issue that cuts across various sector fields such as energy, agriculture, transport and forestry, public impact, water resources, biodiversity conservation and others that need to be addressed urgently, by taking into account the impact of the global warming phenomenon that causes an increase in Greenhouse Gas emissions, namely GHG. Therefore, it is important for Selangor State to remain committed and progressive in tackling this climate change issue.

The climate change agenda and green technology are a priority of Selangor State as has already been stated in the document Rancangan Selangor Pertama (RS-1). For information, Malaysia through the Ministry of Environment and Water (KASA), has already submitted the national position to reduce the intensity of GHG emissions across the economy by 45% by 2030. And to achieve zero GHG emissions as early as 2050. To meet this GHG emission reduction target, Malaysia needs to implement litigation measures to reduce GHG emissions in accordance with national policies and agendas in line with the objective of sustainable development, namely the SDGs. The determination of carbon intensity targets has already been stated in the urban framework, which is carbon, namely LCCF, developed by the Ministry of Environment and Water (KASA), which is a guide for all Local Authorities (PBT) and developers in making decisions regarding the implementation of this carbon intensity reduction.

With this commitment, the Selangor State Government will take continuous action by making improvements to the sectors identified as the largest contributors to carbon emissions in the state through

state policies. Among them, the first is to improve and also adopt the low-carbon city framework LCCF in all policy planning at the PBT level by focusing on elements such as energy, waste, water, mobility and also greenery. And the second is to develop a carbon reporting mechanism for industry and also the development of a framework for the use of Greenhouse Gas to enable better low-carbon planning at the local level. And third, establishing low-carbon zones in cities and also in the Municipalities. And the fourth, PBT is advised to give incentives to households and offer suitable incentive packages to industries that use green technology, apply energy and water efficiency elements. The fifth, transit-oriented development (TOD) is tested to encourage the use of high-intensity public transport within walking distance, namely walking distance, as well as improving public transport efficiency, accessibility and also traffic management through smart traffic management in cities.

Taking into account the increasingly extreme climate change situation, the Selangor State Government through the Climate Change Action Council, or its name Iklim Selangor, is planning to develop the Selangor State Climate Change Policy and action plan 2030 based on existing policies whether at the national or state level. Taking into account existing local policies, the method of collecting this information will be implemented by involving various departments or government agencies, only involving views that are appropriate, and these policies are unified in one main document and to avoid any overlap of roles at the implementation level and to optimise the success of implementation.

For the issue of Electric Vaguer (EV), namely electric vehicles, yes. This is also a policy of the Selangor State Government where by the end of this year or starting next year, on our roads we will see more electric vaguer being used. Are we prepared to answer this challenge where the number of electric vehicles will increase. Taking into account the important role of EVs in reducing carbon emissions, the State Government has already set a target of 10 thousand EV charging units to be installed by 2025. With an initial 1,000 first to be implemented in 2022. At this time the State Government is in the discussion phase with private companies and PBT, where for the initial stage 5 PBT will start installing EVs in their respective areas until December 2022. Namely Shah Alam City Council, Subang Jaya City Council, Petaling Jaya City Council, Ampang Municipal Council and Sepang Municipal Council. Therefore, in drafting new EV charging policies, among the matters the State Government can consider are, first ...

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Honourable Kajang. The matter relating to electric cars just now?

Tuan Hee Loy SianPKR · PHKajangEN

Let me finish first. Let me finish first.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Just a short question, electric cars are very expensive, RM220,000.00. Why are they so expensive? Even though they don't use petrol, they are still expensive. So perhaps the State Government can look into it, how we discuss if they make it a bit cheaper, if it is cheaper, insyaAllah perhaps the people can buy it and we can use it on the roads.

Tuan Hee Loy SianPKR · PHKajangEN

The price control is under the Federal Government. Because the Government has already not allowed any, its tax, any tax, has been abolished, and it is expected that the price of this electric car will fall by about RM200,000.00. So, we hope, I understand, that Proton will launch an electric car at the end of this year at a very reasonable price. We can wait and see how its price will persuade people to buy this EV. We must not say that this EV costs zero; no, even though the car is expensive, you still have to pay when charging, it is not free, you have to pay for electricity. Before this, we pumped petrol for RM100 or RM120, but to charge this car now it costs about RM20 to RM30, you still have to pay, it is only slightly less. So, as for all those taxes under the Federal Government, we hope the Federal Government can give a more reasonable tax, one that is more tax-free, for these EVs, and we encourage electric car factories to come to Malaysia to make their cars here and assemble them here. If we hope to import these EVs, they certainly carry tax and are also expensive. If we want to encourage the people to use these electric cars, the price is about RM180,000.00 and above. We must not expect them to be very cheap.

Puan Wong Siew KiDAP · PHBalakongEN

Excuse me, excuse me Mr Speaker, I wish to interject.

SpeakerEN

Yes, please, Balakong.

Puan Wong Siew KiDAP · PHBalakongEN

I feel there is one more thing that may encourage the people to use these EVs: charging facilities are insufficient, and also in Selangor, many people live in condominiums or apartments where they actually cannot charge their cars at home. So perhaps the Selangor State Government can do something to increase charging points for this Vaguer Electric, with permission, thank you.

Tuan Hee Loy SianPKR · PHKajangEN

Ok, I have not yet finished that point, which is why I want to answer that question. Because of that, the new EV charging policy framework is among the things the State Government can do: establishing EV courses zones in Selangor, for example in Subang Jaya, Shah Alam, Petaling Jaya and Sepang. In addition, providing incentives for low-carbon vehicles such as priority parking for EVs and also hybrids. Second, introducing a zero emission mobility policy, which emphasises investment in the EV charging development ecosystem at the local authority (PBT) level. Third, introducing policies and also support incentives to increase the use of electric vehicles, EVs, especially motorcycles, which are cheaper and also more economical. Fourth, encouraging State Government departments and agencies to hold major Government events using EVs and also to use them as official Government vehicles.

To answer the question raised by the Honourable Member for Balakong, we indeed have a problem in condominium and apartment buildings because certain parking areas exist. If we want to install these electric chargers, you have to increase the electricity volume; is there enough? TNB must play a role. And TNB must play a role, we cannot simply set up electricity in public places. If we do that, that means vehicles of members of the public coming to the condominium will not have enough parking, because charging takes 2, 3 or 4 hours. So if one vehicle occupies that parking, there is indeed a problem, residents will quarrel because there is not enough parking. And there are many more problems about vandalism, and about who will be the authority to monitor, because of safety. If there is flooding, or if children touch it, it will create problems for locals. We will take all of these into account and, going forward, for the forest.

On the question of forests and also biodiversity, the Selangor State Government affirms that the gazettement issue of the Bukit Cherakah Forest Reserve started in the year of the Barisan Nasional Government and has been considered settled through the Gazette notice for the gazettement of the Bukit Cherakah Forest Reserve at Section U10 Shah Alam on 5 May 2022. In addition, the State Government will also ensure that all development activities around the Bukit Cherakah Forest Reserve area comply with the procedures and regulations in force. Among them are requirements such as an environmental impact assessment under the Perintah Alam Sekeliling 2015 and also the Akta Perancangan Bandar Dan Desa 1976, which will be imposed on every landowner who wishes to develop the land.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

Kajang, just a little, may I? Thank you, Mr Speaker. I propose that for Bukit Cherakah, which has been gazetted, to certain companies, if the premium has not yet been paid, they must pay it. I think the Government can revoke, can revoke it, if the premium has not been paid. I still remember that the former Menteri Besar, the late Tan Sri Khalid, had a forest land given to Yayasan Kemiskinan, and he also revoked it because they did not pay the premium or were late in paying it.

One more thing, what is the harm if the Government has negotiations with the companies and also engagement with the NGOs who are now saying they want to file a judicial review? If possible, let us avoid judicial review by the residents of Shah Alam. We have engagement with those NGOs, that is my proposal.

Tuan Hee Loy SianPKR · PHKajangEN

That is my problem, Sungai Pelek. Previously, when Sungai Pelek was EXCO, he did not want to resolve this issue, until now we have resolved it. For the information of Sungai Pelek, because of the earlier actions, we took back the land. We had to pay compensation, Honourable Member. Let me give an example, I have not finished yet. Because of the logging moratorium, we started from 2010 until 2035. We did not allow loggers, now the companies are claiming, the Government of the Pakatan Rakyat era brought it to court. After the High Court, the Court of Appeal, the Federal Court, we lost. We had to pay RM51 million, Honourable Member, and in a recent case we had to pay RM26 million. Our action, sometimes we look at taxpayers: can we afford to use taxpayers' money to pay these logging companies? Easy to say, easy, but. So, we need to pay RM1 billion now because of this action, because of what problem, because of legal action. The companies, the names are already in the MMKN paper, already awarded. Company A, B, C, D were given because they had not paid the premium, because the last step, the gazette notice, had not been completed, they did not want to pay the premium, they have the right to claim back. In the end, taxpayers' money has to be paid to them. Do we want to do all this? If we start, all future ones, can we afford to pay for this? All this we have to look at again. It is not easy, Honourable Member. Previously, when you were EXCO for five years you did not want to do this, now I am doing it.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai PelekEN

It is not that we do not want to do it. You understand too, it is not that we do not want to do it.

Tuan Hee Loy SianPKR · PHKajangEN

That is the lesson for us.

Tuan Mohd Najwan bin HalimiPKR · PHKota AnggerikEN

Honourable Member, you may interject briefly. I want the views of the Honourable EXCO: do you agree or not that the problems we are facing now are in fact the result of the irregularities of the previous administration before we took over in 2008? That means we inherited many problems from the Barisan Nasional government, and now we are the ones who have to clean up all the filth that was left behind, the mess that was left behind. What is the comment of the Honourable EXCO?

Tuan Hee Loy SianPKR · PHKajangEN

I agree, Honourable Member for Kota Anggerik. We have still not resolved the problems raised during Barisan Nasional. Land was simply given to companies. That is why I am not sure why the Honourable Members from the opposition side are all silent. They do not dare raise this issue because all of this is their wrongdoing. We must not repeat all these problems, we must move forward, and if possible, discuss,

we discuss. If we want to discuss with that company, we discuss, no problem, we continue to discuss, but if we want to pay compensation, we can no longer afford it, Honourable Member, discussion must be done.

The Selangor State Government has already reviewed the rates of various forest service charges through amendments to the Selangor State Forest Rules 2017. The amendments include entry fees to the forest recreation park, site rental, tents, stalls and so on. At present, the Selangor State Forestry Department (JPNS) is reviewing these rates so that they are suited to current conditions and also to the improving quality of the forest. With these new rates, forest management and maintenance will be more efficient in the future. The main commitment of the Selangor State Government at this time is to maintain and increase the area of permanent forest reserves to not less than 30% of the state's land area. In fact, several efforts are being implemented to increase the area of permanent forest reserves in Selangor by identifying and gazetting State lands that have the potential to be made permanent forest reserves.

The Selangor State Government has already been and is currently implementing several efforts towards conserving forest resources in Selangor. Among them are the following. First, a policy of logging moratorium for a period of 25 years covering permanent forest reserves and State land forests since 2010. Second, the amendment of Section 11 of the Enactment (Application of the Selangor State Forest Act 1985) in 2011 by inserting a condition of public inquiry for any permanent forest reserve that is to be gazetted. Third, the approval of the gazettement of the Selangor Public Inquiry Rules (2014), whereby the State Government gazette under the Selangor State rules, and more, which was gazetted on 30 January 2014, Selangor is the first and only state in Malaysia that has enforced the public inquiry rules as a condition where the process of degazetting permanent forest reserves was carried out for the Kuala Langat Utara permanent forest reserve.

Fourth, supporting policies and also resolutions at the Federal and International levels, such as the Malaysia green programme initiative already launched through the Campaign to Plant 100 million trees for the period 2021 to 2025. Fifth, implementing the concept of carbon credits, which aims to reduce forest emissions and also increase carbon stock in forests. Sixth, the carbon market and also the carbon tax are very, very important matters and we will implement them, this is policy.

The green movement agenda is now stronger, and the State Government is planning strategic carbon reduction based on the principles of environment, social and also governance practices, namely ESG. Such as carbon policy and integrating strategic

low-carbon into the Development Policy Plan as well as State Government environmental programmes.

Second, the State Government will introduce economic instruments such as a carbon pricing mechanism, or carbon pricing, a mechanism based on the voluntary carbon market, namely the Voluntary Carbon Market (VCM), which has already been announced by PERKASA earlier. It is in line with the domestic carbon trading scheme, namely DETS, which will be implemented by PERKASA in cooperation with the Ministry of Finance (Kementerian Kewangan) and also PUSAR Malaysia. With the development of this pillar platform, the private sector can utilise DETS to carry out carbon trading transactions domestically, compared with the international market which has high transaction costs and stricter technical opportunities. The Government expects that with the implementation of a carbon pricing mechanism such as DETS by Malaysia, it will increase the capability of industry players and produce products and services that are competitive at the international level. Therefore, the State Government through the local authorities (PBT) and also State departments or agencies is in the preparation stage to participate in applying the carbon market and carbon tax at the state level. A detailed study must be carried out, taking into account the views of stakeholders before policy is developed at the state level.

Overall, the State Government is considering developing instruments that can enable actions against climate change to be implemented as follows. First, the establishment of a special committee to regulate and monitor the implementation of red carbon project agreements in this state. Second, setting emission limits that must be reduced by the key sectors identified in the State Government's environmental policy or policies. Third, a carbon reporting mechanism for industry and the development of a framework for calculating greenhouse gases as well as developing a local GHG inventory. Fourth, a study on the feasibility of carbon pricing and also exploring payment for ecosystem services, including carbon offsetting.

The State Government also introduces a carbon credit programme initiative which will become one of the new financial sources of the State Government through the Selangor Maritime Gateway (SMG) project. In line with this, a Carbon Credit Management Task Force Committee has been set up through the Selangor State Forestry Department (JPNS), which will focus on the conservation of mangrove forests. Where in the State of Selangor ...

SpeakerEN

Honourable Member, Honourable EXCO for Kajang, please sit down for a moment. Honourable Members, as the business of this House is still lengthy, the House today needs to be extended in order to continue the business of the House. I invite the representative of the Most Honourable Dato' Menteri Besar to move this motion.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Speaker and Honourable Members, I wish to move a motion as follows. Whereas the House sitting today, pursuant to Standing Orders 11 and 26, paragraph 4, of the Standing Orders of the Selangor State Legislative Assembly, shall be extended until 5.30 pm.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Mr Speaker, I second the motion.

SpeakerEN

Honourable Members, this motion has been seconded. I put it for approval. Honourable Members who agree, please say yes. Honourable Members who do not agree, please say no. The motion is agreed. I invite the Honourable EXCO for Kajang to continue.

Tuan Hee Loy SianPKR · PHKajangEN

Thank you, Mr Speaker. Besides that, the State Government has currently also implemented several initiatives in line with the policy at the Federal level, namely the National Biodiversity Policy 2016 to 2025, namely DKBK. Among the initiatives that have been implemented to support the green financing mechanism, namely the Green Financing Mechanism, is the first one. Ecological Fiscal Tranfer For Biodiversity Conservation, namely EFT. The Federal Government has introduced the EFT initiative with an allocation of RM60 million to encourage State Governments to gazette protected areas which are important ecosystem areas, including water catchment areas and wildlife habitats. This allocation has been distributed to State Governments through the granting of levels of economic development, infrastructure and well-being, that level. As an additional incentive to implement programmes and also projects that ensure the sustainability of biodiversity. For the record, the Selangor State Government has received EFT totalling RM2.47 million in 2019, while in 2020 a total of RM3.666 million was received, and in 2021 up to July 2022 a total of RM1.832 million has been received by the State Government.

Fifth, regarding the environmental impact risk assessment, this is also a question directed to the Honourable Member for Bukit Lanjan, Bandar Utama, Subang Jaya, Kota Anggerik. The State Government welcomes the proposal to establish an Assessment Panel for each GLC company to carry out an assessment of the risk of environmental impact arising from a development project. However, for development projects that are subject to environmental quality orders or prescribed activities, the environmental impact assessment, or the EIA Order 2015, already has an existing mechanism in which an EIA Report Evaluation Committee will be established, comprising government agencies, geology experts and Non-Governmental Organisations (NGOs). The function of this Committee is to ensure that the EIA Study prepared by the Consultant has identified all environmental impacts and mitigation measures and that they are adequate and effective. The establishment of an Assessment Panel in every GLC on a voluntary basis is strongly supported to ensure that checks and balances can be achieved towards sustainable development. For the question raised by the Honourable Member for Bukit Lanjan, it also concerns the Zero Discharge Policy (GDP). In line with the 6th goal under the Sustainable Development Goals (SDG), introduced by the United Nations Development Programme (UNDP), namely improving water quality by reducing pollution, it is proposed that the Zero Discharge Policy be introduced. Referring to the tabling of the Selangor Budget 2022 under Pillar 4, creating a Green Environment, expanding sustainable development. The Most Honourable Dato' Menteri Besar also stated the State Government's commitment to improving water quality for major river basins through the GDP. Through the implementation of the GDP, this means that the party that causes pollution, or the polluter, must bear the cost of preventive and pollution control measures. Fourth, it is also an incentive for premises to implement recycling of wastewater in order to minimise the discharge of effluent into water sources, and further as a commitment to involvement and also contribution, namely participation and also contribution, in the restoration of water resources in the State of Selangor. Five, the charge calculation is based on the total volume, namely cubic metres of effluent discharged into water sources regardless of compliance with effluent quality standards, and the proposal is through two (2) methods, namely the first: a) Block charges according to discharge volume. First, RM0.10 for the category of less than 1,000 cubic metres per month. Second, a charge of RM0.15 for 1,000 – 100,000 cubic metres per month. Third, a charge of RM0.20 for those exceeding 100,000 cubic metres per month. b) Bulk charges, a determination for activities unsuitable for the installation of measuring equipment. So, first, municipal activities at RM5.00 per month for each premise. Second, development areas or land works at RM100.00 per acre. Third, poultry farming, namely RM0.01 per acre, eh, per bird, minimum RM5.00 per month. Fourth, ruminant farming RM0.10 per head or minimum RM5.00 per month. The proceeds obtained will be reused for the purposes of restoration and also restoration of water resources in the State of Selangor in line with moving towards Smart Selangor. I, here I would like to answer on behalf of the Honourable Member for Kinrara, regarding the issue of the Local Authority. To answer the question raised by Kuala Kubu Baharu regarding the Re-grant to KDEB, the Selangor State Government has taken note of the proposal submitted regarding the granting of a Re-grant to KDEB Waste Management Sdn. Bhd. for the purpose of making it a best refuse collection company. At this time, the State Government is reviewing the contract period of KDEB Waste Management with all 12 Local Authorities, PBT, the payment of tipping fees by PBT to KDEB Waste Management will also be reviewed to ensure that KDEB Waste Management is paid at a rate appropriate to the refuse collection services provided. A comparison of the rates received by other concession companies throughout the country and other factors that need to be considered, among them such as the Minimum Wages Order 2022 that came into effect on 1 May 2022 by the Federal Government. Apart from these matters, the State Government will duly consider the need to grant a Re-grant to KDEB Waste Management. For the question raised by the Honourable Member for Sabak, regarding parking, yes, this too is an issue because the residents of Sabak Bernam object and do not want parking, so at this time, the Sabak Bernam District Council (MDSB) has not implemented parking fee collection in MDSB areas. However, should MDSB implement such parking fee collection, it will involve a total of 3,362 lots covering three (3) main MDSB areas at a rate of RM0.50 per hour. The estimated revenue collection that MDSB would obtain is RM79,477.00 per month or RM957,724.00 per year. So, it will generate revenue of about RM1 million for MDSB if the parking implementation is carried out. Meru, regarding foreign nationals. The Selangor State Government, through the Local Authorities, is always concerned about the problem of land misuse by foreign nationals within the administrative areas of the respective PBT, taking up the issue raised by the Honourable Member for Meru, the Klang Municipal Council (MPK) constantly carries out monitoring and enforcement actions in the Meru area. Nevertheless, foreign hawkers will resume trading even though they are frequently raided, because first, there is demand from groups of foreign nationals in that area for daily necessities such as grocery items and also intoxicating drinks. Two, the spillover of foreign workers in factories in that area, for example, the Top Glove factory which has as many as 8,000 foreign workers. Third, the limitation on the power of PBT, which does not have the power to arrest foreign nationals. So, MPK is always striving to curb this problem to ensure the comfort of the residents, especially in Meru. Among the actions that have already been taken this year, 85 seizures have been carried out under By-law 3 (Hawkers) Offences, By-law 3 Licensing of Trade and also Industry, By-law 3 (I) PM Liquor and also premises, which involved a total of 63 cases of foreign nationals. MPK also frequently carries out enforcement actions and integrated operations with the involvement of the District and Land Office, the Royal Malaysia Police (PDRM), Air Selangor Management and Tenaga Nasional Berhad, including internal units such as the Building Department, Environmental Services Department, Engineering Department, Licensing Department and also the Markets and Hawkers Department. This includes taking action to issue notices under Section 72 (1), Section 22 (6) of the Street, Drainage and Building Act 1974, Act 133, to vacate and also demolish building structures erected without approval, with a compliance period given of 30 days. The Immigration Department was also invited but, due to a shortage of manpower, the Immigration Department was unable to take part in most of the operations carried out. In this regard, we can see the seriousness of PBT in taking action against any building structures erected without approval. Operations to demolish building structures on the land lot will be carried out if the owner or operator of the premises fails to comply with the instructions in the notices issued. This is also reminded to all landowners and premises owners to always comply with existing laws by obtaining planning approval and also building plan approval first before planning to erect any building structure.

Honourable Member, I would like to interject, yes. Thank you, Honourable Member, Mr Speaker. I acknowledge that the MPK is indeed prompt and has carried out these seizures many times, so, I congratulate MPK, especially the Enforcement team led by Encik Shahrul, a great deal has been done, but we see that these actions taken do not have any direct effect on these foreign nationals. I propose in my earlier debate that we impose stricter action. With the laws we have at our level, for example carrying out seizures, in fact in the area I raised, specifically Jalan Teratai, Meru, which is an illegal structure that had been demolished, and they rebuilt it. Not only did they rebuild it, they even challenged our authorities, some used vulgar language and so on. And for the information of the Honourable Member too, for me the proposal I wish to put forward here is to carry out direct seizure of premises including land or houses, residences that are converted into shops, that is under our authority. Or at the level of our authority, for example Air Selangor, we are also puzzled how they could obtain water supply, for illegal buildings like these, and also electricity supply? I think at our level, we can do that. I propose stricter action because seizing goods does not have an impact, because they still make much more profit than the seizures made. So, in my view our action, it is time we take tougher and more severe action, and I am confident they also know this and in fact I am confident that if we succeed in overcoming the problem of these foreign traders, Selangor will become a model State for other States, because we can no longer cope with the Pati and also, as people say, foreign traders who take advantage.

SpeakerEN

Honourable Member, be brief.

Enough, enough, it's finished.

SpeakerEN

This matter has been repeated over and over, be brief.

I have already been brief.

Tuan Hee Loy SianPKR · PHKajangEN

I take note, but the problem of foreign nationals is not only, it is a problem, causing problems for the State but also the Federation. Do we need foreign nationals for workers whom local citizens are unwilling to do? So, we must, sometimes we must not discriminate, sometimes we need to know the problems that arise because enforcement is not only involving the State but also the Federation. If, for example, the Ministry of Home Affairs does not give cooperation, it is difficult for us to take action. So, unless we do not want foreign nationals. Our jobs will be taken over by local workers, but no.

What I mean is like this, Honourable Member, I apologise, Mr Speaker, they come to work, not to trade. What happens today is, they come to our place to trade. Not to work. We understand there are certain sectors where local citizens are not interested in filling positions, such as plantations, manufacturing, which are indeed filled largely by these foreign nationals just mentioned, that we understand, and industry needs too. I do not prevent that, but those who misuse permits, although I know that is under Immigration, but we, if we follow, that is, we use at our level, the powers we have, as I mentioned earlier, premises used illegally, and I do not deny that there are local people themselves who take advantage in this issue. So, we can also impose penalties on these treacherous local citizens, who trouble us and also local citizens. If one says local citizens are not interested, I am confident many local citizens are interested in trading because many say along the roadside there are many of our local citizens trading illegally, because there is no place, but this place has been taken by them. Thank you.

Tuan Hee Loy SianPKR · PHKajangEN

Honourable Member, foreigners are not prohibited from doing business. There are also luxury restaurants run by foreigners. So, we should not take that view. So, it is only a matter of licences: are they using the proper channels or not? So, we must not say that foreigners cannot do business in Malaysia; they cannot say that. Many luxury restaurants are run by foreigners too. Not Malaysians. So, Templer, the Honourable Member for Templer, also concerning the environment, regarding the stoppage of the Water Treatment Plant's work. The State Government takes the issue of illegal dumping seriously. In line with this, the State Government, through the Local Authority (PBT), always enforces the law against parties who dump rubbish everywhere, by obtaining sufficient evidence and monitoring supplies to prevent uncontrolled or repeated rubbish dumping activities. Among the activities carried out are implementing integrated operations with the agencies concerned against illegal rubbish sites, closing illegal rubbish sites with ribbon barriers,

putting up signboards prohibiting rubbish dumping, and implementing incentive programmes for complainants who provide information on illegal rubbish dumping within the PBT's areas. As a preventive measure, the PBT has also installed a Closed-Circuit Television System, namely CCTV, at illegal rubbish sites that are hotspots, to monitor the vehicles of parties who dump rubbish. Among the laws in force and used by the PBT against companies found guilty of dumping rubbish in public places are, first, notices or compounds under the Local Government Act 1976, Act 171, relating to any nuisance, among them Section 69, which concerns causing nuisance in a river tributary, and also as a person who commits a nuisance or brings any filth into a, on the bank of any river tributary, public drain or other waterway within the area of the Local Authority commits an offence and may be convicted of an offence not exceeding RM2,000.00 or imprisonment for a term not exceeding one (1) year or both, and an additional fine not exceeding RM500.00 for each day of the offence, that is, continued after conviction.

Second, notices and compounds under the By-laws (UK) Collection, Disposal and Disposal of Rubbish Waste 2007 under Provision 4, namely a person who commits an offence under these By-laws for which no penalty is provided may, upon conviction, be fined not exceeding RM2,000.00 or imprisoned for a term not exceeding one (1) year or both, and in the case of a continuing offence may, in addition, be fined not exceeding RM200.00 for each day of the offence that he continues to commit. Third, seizure under the By-laws on Collection, Disposal and Disposal of Rubbish Waste 2007 under Provision 27 (1), namely any officer empowered may seize or remove any goods or things that contravene these By-laws, at the risk of the person who dumped them. In line with the decision of the Selangor State Executive Council Meeting (MMKN) No. 4/2019, the State Government agreed that the Legal Advisory Chamber (PUU), together with the State Economic Planning Unit (UPEN), should table a draft policy of the Solid Waste and Public Cleansing Management Bill (RUU), namely the PSPPA of the State of Selangor. To continue the drafting of the Selangor State PSPPA Enactment, the State Government will also hold discussions with the Federal Government through the National Solid Waste Management Department (JPSPN) of KPKT, to realise the State Government's aspiration. However, the draft Enactment is still undergoing detailed scrutiny by the Legal section at State Government level and is under consideration to be brought back to Federal Government level. Should this Enactment be passed and come into effect in future, any individual who commits an offence and is sentenced by the Court may be fined not less than RM10,000.00 or not exceeding RM50,000.00, or imprisoned for a term not exceeding one (1) year, or both. Besides that, this Enactment also states that an offence may also be punished with the order of Community Rehabilitation Work as deemed fit by the Court. At the same time, the Selangor State Government, through the PBT, always reviews existing By-laws, ensuring that the legislation at Local Government level remains relevant from time to time. The By-laws on rubbish collection will be improved, and are being refined should it be appropriate to amend an existing By-law into a new one.

Last, regarding WTE, Waste To Energy. To answer the questions raised by the Honourable Member for Seri Kembangan, Rawang and Sungai Pelek. For Seri Kembangan, let me begin with the Special Area Plan for Kampung Baru. The State Government has considered the area, considered and is also always concerned to improve the well-being of the people, particularly regarding the infrastructure development of Kampung Baru Bagan Tersusun. The preparation of a Special Area Plan contains proposals and specific actions for an identified area, for the first, special and detailed treatment by way of development. Second, redevelopment, third, management, fourth, conservation or management practice, partly by one method and partly by another, for the whole or part of that Special Area. Fifth, the type of management proposed. The State Government takes into account and is aware of the proposal raised by the Honourable Member for Seri Kembangan, but this proposal needs to be properly refined to identify Kampung Baru, Kampung Bagan, Kampung Tersusun which truly need this SAP for the purpose of more planned area development. For the time being, there is no SAP planned involving Kampung Baru Bagan Tersusun. Although at this time there is no SAP for any Kampung Baru Bagan Tersusun, the State Government is prepared to be concerned and has already spent a total of RM10.9 million since 2019 for the implementation of small projects in 77 Kampung Baru Bagan Tersusun through the Land District Office (PDT) and also the Local Authority (PBT). Among the projects that have already been implemented are repairs to bridges, jetties, community halls, sports courts, installation of solar lights, and upgrading of roads and drains in the Kampung Baru Bagan Tersusun area. The priority of projects is always refined according to the needs of the Kampung Baru Bagan Tersusun community from time to time. Besides being suitable to be implemented under the administration of the PDT and PBT. So, at the same time, to ensure the comfort of the environment for the village residents, the State Government through the Local Authority has already allocated a sum of RM7.3 million a year, specifically to manage rubbish collection in the village at Bagan Pulau Ketam and also Bagan Sungai Lima. Through the channelling of allocations and the implementation of projects like this, the State Government will ensure that Kampung Baru Bagan Tersusun is given the same priority and kept in step with other sectors that will be developed by, and maintained as already drawn up in the First Selangor Plan.

Regarding the Solid Waste Treatment Plant (WTE) project at Taman Beringin, Kuala Lumpur to Rawang, Rawang Landfill Selangor. Before the approval of this project, the State Government had already obtained technical comments from the relevant agencies such as the Selangor State Irrigation and Drainage Department (JPS), the Department of Environment (JAS), the Selangor State Town and Rural Planning Department (Plan Selangor), the Selangor Water Management Authority (LUAS), the Gombak District and Land Office and the Selayang Municipal Council. Among the comments received related to the environment are as follows: for the Department of Environment, subject to the preparation of an EIA Report, namely Environment Impact Assessment, and approval from this Department under Act 14 (B) (i) Second Schedule (sub) Paragraph 3 (1) Environmental Quality Order, Prescribed Activities (Environmental Impact Assessment 2015). Comments from the Selangor State Irrigation and Drainage Department (JPS): the proposed site is located adjacent to a highway, and the nearest settlement is located 1/4 kilometre from the proposed site. The developer must provide flood control measures such as a retention pond structure to ensure that water from the developer's area can be controlled and does not burden the existing drainage system. The developer must also maintain the natural water bodies near the area and ensure that pollution control measures are taken into consideration. Third, comments from Plan Malaysia Selangor: it must comply with the policies set out in the Selangor State Structure Plan 2023 for developing solid waste management facilities, namely MP30 policy on Solid and Toxic Waste Management System and more effective and environmentally friendly, namely implementing disposal methods that practise recycling, such as recycling for all types of WTE waste, and also providing material recovery facilities at all disposal sites, while considering and implementing the use of thermal treatment plants in high-density residential areas. Second, to add or upgrade transfer station facilities for the purpose of solid waste disposal in the Gombak district. And third, ensuring that all solid waste or toxic disposal facilities to be used by the premises concerned are suitable and in accordance with the guidelines and conditions already set by JAS.

Fourth, comments from the Selangor Water Management Authority, namely LUAS. First, the location of the proposed site is estimated at 18 kilometres from the intake of the Rantau Panjang water treatment plant. The developer is advised to use environmentally friendly technology that does not have an impact on water resources and the environment. Second, the developer must ensure that the sediment trap pond is completed before any earthworks are started, especially for cutting and filling work, such as design in the form of an erosion and sediment control plan, namely ESCP. Third, the developer must ensure that development is carried out in phases and provide pollution control and mitigation measures so as to minimise the impact of surface runoff on nearby water sources, especially in terms of the total suspended solids (TSS) parameter. Fourth, the developer must provide a systematic drainage system by taking into account

the position of surface water flow at the site to avoid flash flood or landslide problems that affect water resources. Fifth, the developer is required to ensure that there is no river diversion, straightening, removal or other activities involving water bodies, as well as any development activity within 50 metres of the river reserve, except with the written permission of the Director of LUAS, in line with the strategic implementation of river management in the State of Selangor approved by the Selangor State Executive Council Meeting (MMKN) on 30 May 2012. Sixth, control, mitigation and effluent implementation control measures must be carried out by the developer effectively and continuously to avoid any pollution to rivers and nearby water bodies. This is in line with the Environmental Quality (Discharge or Release of Pollutants) (Selangor State) Regulations 2012, and a breach of these Regulations is an offence that may be subject to a fine. Through this information, it can be concluded that the State Government has considered thoroughly and properly before any project is supported or approved, and this is consistent only with the consideration and approval of the Solid Waste Treatment Plant (WTE) project at Taman Beringin, Kuala Lumpur to Rawang, Rawang Landfill Selangor, which is a project at Federal Government level.

The State Government is now moving towards the development of WTE by Worldwide Holdings Berhad, which will be developed at Jeram and also at Tanjung 12. WTE is the future of solid waste management that will ultimately generate income for the State and the Nation. The State Government supports the use of this WTE technology, which is in line with the direction towards empowering the circular economy. WTE technology will not only be used and adopted in the State of Selangor, but has also been widely used internationally, built in urban areas rather than rural areas, owing to its minimal impact on the environment. Thank you.

SpeakerEN

Thank you, Honourable EXCO Member for Kajang, for your lengthy remarks. I invite the Honourable EXCO Member for Pandan from Pandan Indah to proceed, you may go on until 5.30, please.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Mr Speaker. Thank you also to the Honourable Members who have participated in the debate or raised, referred to, or touched on matters relating to infrastructure and agriculture. Due to limited time, I will go straight to the important matters, some of which I have already answered in the morning question-and-answer session. I will first mention the question raised by the Honourable Member for Sungai Pelek regarding the issue of burst embankments. The project to upgrade the embankments and strengthen the banks of the Langat River is being implemented to address burst embankments and collapsed banks. This project is expected to be completed on 30 June 2023. Bank-strengthening works under post-flood allocations are also being actively carried out at locations at risk of embankment bursts and flooding, and they will be completed in October 2022. For the information of the Honourable Member for Sungai Pelek, the State Government has, for the past two (2) years, adopted a new approach in managing burst embankments. Where places that frequently burst or collapse were previously rebuilt using earth, which was then compacted, we have replaced them with new materials, including the use of armour rock, which has successfully resolved the issues of embankments that repeatedly collapsed. We will also consider other technologies, including anchored systems and gabions, which we use to help reduce recurring collapses, but costs also have to be taken into account, and so on, in order to avoid making the embankments too long. For the long-term solution, the Langat River Flood Mitigation Plan Phase 1, which is currently undergoing re-tendering, will have its tender finalised in the second quarter. This is for action under the Department of Irrigation and Drainage (JPS) Malaysia under the federal budget, and for activities at Langat River 2. This is under off-budget funding, which we only recently received notification of from the Federal Government, valued at RM2.074 billion, approved for implementation, and which will also cover the Sepang area next year. This project falls under Federal Government allocations. As for the question raised by the Honourable Member for Kota Anggerik regarding the issue of what is called SASuD, or the Shah Alam Flood Action Plan, I have also been informed by the Mayor about this programme, which will be tabled at the Selangor State Economic Action Council meeting in the near future. I understand and have carefully examined what has been proposed and what we will table, which in fact involves various agencies, not only what is being undertaken by the Shah Alam City Council (MBSA), but also all technical agencies, and takes into account the views of the Federal Government. For that reason, under the Infrastructure Portfolio, we have already established what was previously called SeJAM, the Raw Water Assurance Scheme (SeJAM), a programme for us to monitor our water resources so that our water supply is not disrupted. We have proposed that this meeting is to expand the scope of SeJAM, or WARAS, Water Resouces Assurance Scheme, to cover all aspects related to our water resources, including issues related to flooding, drought, and pollution that may disrupt water. So we are coordinating it to make it holistic. This is to avoid overlaps or contradictions between projects that the State Government wants to carry out, those that will be carried out by the private sector, and those carried out by the Federal Government. This is what is happening, and we have started the process of bringing together or consolidating all technical agencies, including the private sector, so that there is no duplication, because if flood water is not managed holistically, it will cause many problems. So that is what we will go into, including what is being undertaken by Shah Alam, what is called the Shah Alam Flood Action Plan, which I understand is valued at RM300,000,000 to be spent, and that will be tabled.

Next, regarding the question raised by the Honourable Member for Permatang about the issue of the Irrigation Act 1953. In fact, the Irrigation Act 1953 remains in force, and the Integrated Agriculture Development Area (IADA) is fully responsible for agricultural area development in the north-west, which focuses mainly on paddy, but it is more than that. Paddy is the main area because around 19,000 hectares of that area are paddy agricultural land. So in fact, IADA, a Federal Government agency, does have powers, working closely with the State Government and assisted by JPS, because JPS has two divisions: one division of JPS manages flood mitigation issues, and the other JPS manages irrigation for agricultural drainage. They cooperate and indeed carry out all relevant aspects. One of its functions is to ensure that agricultural systems and infrastructure function well and perfectly towards efficient water use. This is one of its tasks, so whatever is related to encroachment issues, or issues especially along the canal banks, falls under IADA's jurisdiction, assisted by JPS, and the Department of Agriculture also helps. As for what the Honourable Member for Meru raised regarding the issue of flood mitigation, where the figure of 20 million was mentioned, it is true that I did mention in the previous sitting the approval of this 20 million. For the Honourable Member's information, this 20 million for Phase 1 covers the Upgrading of Kampung Budiman Retention Pond and the Upgrading of the Drainage System at Sungai Bakul, which started on 26 July 2022 and will be completed on 26 July 2024. This is for Phase 1. For Phase 2, the Upgrading of the Drainage System along Jalan Kenangan, measuring 1.5 kilometres, the construction of a flood retention pond at Ferry Park, and Sekolah Kebangsaan Meru 2, valued at 12 million, which was earlier 7.8 million, making the total 20 million. Land acquisition is currently in progress. Regarding another piece of good news for the areas around Meru, especially in DUN Meru, the Federal Government is at the approval stage, this is off-budget, earlier off-budget, for Sepang, Langat River, which is 2 billion. For Sungai Kapar Kecil and Sungai Kapar Besar, this is under off-budget, and it is a project that is being implemented for the first time in Selangor, namely the use of barrages in flood mitigation plans, valued at 220 million, and has been approved, namely the construction of 2 barrage structures at the estuary of Sungai Kapar Besar and the estuary of Sungai Buluh. This project covers the area from Meru to Kapar, including the industrial area and the catchment areas of both rivers up to the river mouths. This is an off-budget project that has been approved by the Federal side.

Regarding the issue of retention ponds that are not maintained, raised by Sentosa. The flood retention ponds that I have mentioned before number more than 600 in the State of Selangor, and only around 120 of them are under the Department of Irrigation and Drainage. We are constantly working to add to or take over the other ponds so that maintenance can be carried out properly, but that process is not easy. Some ponds are located under the local authorities (PBT), some are under third parties, and JPS was once sued for entering this area to carry out maintenance work, but the landowner took legal action against JPS. This has happened before, which is why we must be careful. Nevertheless, there are also ponds still under the PBT that we enter, JPS enters because their condition is extremely bad, including in Bandar Puteri, which I personally visited to see. JPS had to enter even though it has not yet been handed over to JPS, because the handover process involves drawings, engineering matters and so on before they accept it. That is why for projects started in the last two years, we have indeed required that before obtaining the CCC, the pond must first be handed over to JPS. These are the stories about the old ponds, which I had earlier asked JPS about. If necessary, we have to engage consultants to redo the drawings for that place or re-measure, do the survey and so on, to ensure that the land is indeed included in the land to be handed over. So these are matters that take time to resolve, and for the ponds raised by the Sentosa State Assemblyman, some ponds are maintained once a month, and some ponds are maintained once a year, depending on the ponds. So I have a list of the work carried out at that pond. Perhaps I will hand it over to Sentosa in writing, as it would be lengthy if I read it all out, concerning the ponds..

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

May I interject, Mr Speaker.

Speaker

Nanti dulu.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

So the maintenance work involves the Taman Sentosa flood retention pond and the Bandar Puteri flood retention pond in Klang District. These are two retention ponds, and in fact Bandar Puteri has not yet been handed over, but maintenance work has been carried out by JPS. Please, Honourable Member.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Thank you, Honourable EXCO. This is in fact my question about the catchment ponds built by developers. After the developer builds the catchment pond, they build houses around it, sell the houses, and hand them over to the municipal council, but before they hand over, before they maintain, they dig it out again, ensure that the pond areas and all the furniture in the surrounding park are in good condition before handover. This is the problem, and I raised the issue of the Botanik catchment pond not being maintained for more than 20 years. What is the explanation from Y.B. EXCO?

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

That is what I meant earlier. The handover will indeed be made to JPS for management, but the handover involves ... drawings and also meeting all technical criteria before it is accepted, just like a road. When a road is completed, before we take over and hand it over to the PBT, they will check whether the correct furniture is in place, whether the specifications are correct or not. They will not accept it if it does not meet the specifications that were set earlier. Likewise, what has happened here is that some of these old ponds have been damaged, so the biggest challenge we face in handing them over is first of all the drawings, because we received information that the drawings were not paid for by the consultant, so the consultant does not want to hand over the drawings because of additional costs and so on, so they have not submitted them to JPS, and there is no pressure on them to hand them over because the CCC was already obtained early. That is the reason why they were so lax in handing over these retention ponds earlier. However, as I mentioned earlier, we continue to work together with the PBT and JPS to find a way for which ponds we can take over, and which require time and high costs and must be taken over, because under the scheme I mentioned earlier, it involves not only river drainage, drains and tunnels, but also involves detention point areas in these retention ponds, because we have already approved, we have many of these ponds that we will connect to the drainage system so that we ensure they are part of the flood mitigation plan, and some of these large ponds are not only for flood mitigation, but in times of drought we will use them to raise the level of water in our rivers. This is because previously this did not exist, these many lakes were stand-alone, and the large ones were not connected to river network systems. This is why the State of Selangor will be the first state to connect this system into one drainage system. This is an ambitious effort that Selangor has to consider, because in the past the storage was located upstream, but now rainfall downstream is greater than upstream. As happened in the big flood in December, Klang received 500mm of rain while Hulu Langat received only 250, so downstream has more water. Therefore, the ponds wherever they are in the State of Selangor play an important role as one system in managing our water resources during floods as well as droughts. But they must be connected, whether through tunnels or pipelines, to the river system, otherwise they are stand-alone and we cannot use them. Why? Because the cost of bringing in a mobile pump of 1 million litres a day is small pump capacity, no large pump can be operated. So we are working on this under the Raw Water Assurance Scheme or WARAS, Water Resouces Assurance Scheme, and also regarding the road issue raised, I was interested in the proposal brought by Pelabuhan Klang regarding the issue of the Special Committee on Infra, I always... Please.

Before going to the road issue, I have delegated in my debate, regarding what the Honourable Member mentioned about WARAS, I think we have also heard before in previous sittings that the State Government has already discussed it and brought it to the EXCO Retreat to discuss a holistic solution method. It would be best if the State Government could table it and inform the public so that people know the solution and what will happen to them. Today, I think the flood issue is a major issue. Every time it rains, people are already worried, and apart from the drought that we may face. Thank you.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Thank you, Honourable Member. We do intend that, but we are in the process of resolving it from the technical side, because this is a major effort, not a small one. It involves the federal side, the State Government, the GLCs, and the private sector as well, so all of this needs to be coordinated. For example, in Shah Alam there is a private proposal to bring water from the Sungai Damansara straight to Tasik Ladam. Then there is an effort from the Federal Government through a tunnelling method using the same water, there is an effort from a GLC to deepen the Sungai Klang, and there is also a local authority (PBT) with a roughly similar method. So all of these need to be coordinated, otherwise we will duplicate and cause wastage of our resources. That is why we have to focus. Of course we say the major flood is indeed a great calamity, but at the same time it has its blessing. The blessing is that everyone is ready to provide a budget for us to solve the issue, only we need to coordinate. Under this framework is what we are currently finalising, and we will present it holistically to the State Government, and we will continuously socialise it to the people of Selangor in the near future.

Another thing, on this flood matter I want to mention: firstly, because of this changing and unpredictable weather, the rain is erratic and so on, we have seen that there are two aspects in terms of flood mitigation. The first is bringing water from the upstream, from Kuala Lumpur mainly, so that it goes straight to its discharge point at the sea. So there is actually no choice here. If we do it piecemeal, as people say, for example the Smart Tunnel, it diverts the water there but it brings it to Selangor. So it has no solution. And we have to bring that water to the final discharge point, which is the sea. As for the localised ones, such as the one in Meru just now, that is local, like the flood issue in Selayang. That is local, and we have to solve it there. But the other big ones involving the Sungai Klang, Sungai Langat and Sungai Selangor need the water to be ensured that it is brought directly to the State of Selangor. This is what we are giving attention to in order to resolve.

I also want to touch on the question from Rawang. Is Rawang here? Already left. I will say it briefly. The road raised is in relation to FT 01, Jalan Rawang – Kuala Lumpur, with severe congestion over a distance of 10 kilometres, taking 2 to 4 hours. The road referred to is a federal road, FT 01, where the congestion occurs. I came back from Klang, Port Klang, where there is high traffic flow, mainly during peak hours involving Taman Aman Siara, which causes the route to be an uphill route, an uphill route, and the proposed upgrade has been estimated to cost RM63.3 million and has been tabled for approval in Rolling Plan 3. As I mentioned earlier, it was rejected before; we had applied before, it was rejected, and it was submitted again for RP3 and the Malaysia Plan 12 at the JKR Malaysia Headquarters. So the application is still under consideration and review by the relevant parties.

As for Port Klang just now, what I said earlier regarding the establishment of the Special Infrastructure Committee, I have indeed received many complaints from Port Klang. Congratulations in a way, yes, there are many of them. I understand the position of that place, which has many heavy-duty vehicles that are used, and I have also been there many times and seen that the roads are not only easily damaged but dangerous. I have proposed in meetings, either with the Malaysian Highway Authority (LLM) or with JKR Malaysia, that we must think long term so that the separation between these heavy vehicles and light vehicles is no longer shared, because the accident rate and road damage are so significant. I have also proposed that they make extensive use of elevated, or elevated... what is the Malay word? Bertingkat. It is bertingkat. Why? Because the soil there is marine clay, marine soil, marine clay, which is very difficult for us to stabilise. So if we use foundation piling costs, no matter how many piles we drive, it will not actually help because it will still sink.

So we must use elevated, in the manner of an elevated highway. That is what was proposed to be used for Klang. I have proposed that, but for the short term we have, I will consider establishing a Special Infrastructure Committee for Port Klang as proposed, because it involves many parties: MPK, involving West Port and North Port, and after this there is also the Third Port, and what other ports there are I am not sure, in that area, which will be from what was brought by the Honourable EXCO Dato' Teng regarding IDRISS. Development there is even more rapid, which requires proper scrutiny of the infrastructure so that we do not neglect the aspects related to roads and also related to flooding in the area. So I will consider making it a Special Infrastructure Committee for Port Klang to look at this matter in detail. And Taman Templer mentioned the 10 lights, please hold on for now.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Pandan Indah, Pandan Indah mentioned a lot in relation to Port Klang. Yes, that is right, but I want to say that if only Port Klang wins in the coming general election, the other housing estates lose and that is unfair too. So there must be fairness. We also need to ask for help from this EXCO for Infrastructure, please help, because I have been carrying this road issue for a long time. Sometimes I don't know where to put my face when we go down to meet the community and the people ask about these lights. I conveyed that if, say, these lights are not installed, I will allocate my own allocation to install lights on the road between Selayang and also Rawang, and I will ask for help from the ADUN for Rawang to share the money together to buy lights to install from Selayang to Rawang. I am that serious, I want to, because I want to say that this safety matter we cannot compromise. Cannot. We love, we cherish the people of the State of Selangor. Every life is very precious to us. But do not be upset, Honourable Member for Pandan Indah, no. Just please, dear, dear. Just please, if possible, please, if possible, because that road is very dark and this road is indeed used by residents who want to go to Kuala Lumpur.

SpeakerEN

Honourable Member, Honourable Member for Taman Templer, the road is indeed used by residents.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Yes, yes, that is right, but not only that, not only that, Speaker, because sometimes it is also used by animals, by beasts.

SpeakerEN

That is rather few, rather few.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

So what I mean now is, I am asking about these lights. I am asking about the lights, and if possible, the Honourable EXCO's line too. Not only are there no lights, there is no line either. If possible, please do not keep saying Port Klang, Port Klang, please also look at Taman Templer.

SpeakerEN

Templer, Templer, that's enough, that's enough. We have heard the voices of Templer, we have heard them. We sympathise.

Tuan Ronnie Liu Tian KhiewDAP · PHSungai Pelek

Templer dianaktirikan.

SpeakerEN

We sympathise with Templer. I ask the Honourable EXCO to continue.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

I have stirred up a hornets' nest by mistake, but I see that you are already drowsy, so let the Taman Templer speaker say a little. I will poke a little. If Taman Templer tells me they got 10, and Rawang got 10, that makes 20, that's enough.

Tuan Mohd Sany bin HamzanAMANAH · PHTaman TemplerEN

Not enough, EXCO, not enough, because this road is long.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Seriously, we indeed see what...

SpeakerEN

Honourable Member, please shorten it.

Tuan Ir. Izham bin HashimAMANAH · PHPandan IndahEN

Yes, the complaint brought by Taman Templer, we will give attention to the lights. I too am worried because it has been mentioned many times, lights, lights, I wonder what it is. So we will consider it, and under JKR we have also discussed this lighting issue at length, and we will replace it. We do not want to go back to the ordinary lights or the sodium ones. Because we will go solar, because in terms of cost and also maintenance, in the long term it is indeed profitable. Because the cable, sometimes the light is good but the cable is damaged, so people steal it. The light does not come on either, so if one burns out or is damaged, only that one, the others still light up. So this is among the matters we have decided just recently, to ensure that going forward we will use valuable, high-specification solar LED lights to ensure our roads are bright and so on, and durable too.

And I want to touch on a little, although the Leader of the Opposition is not here, but I will mention it briefly, even though this matter will be referred to JP-ABAS regarding the issue that PKPS allegedly felled mangrove trees, which was denied by our former EXCO before. It is true that there was no such felling actually. For this I will say just a little, because JP-ABAS will handle it. The area referred to is Sungai Tengar Selatan. That place actually has 120 acres in total. The area involved in mangroves is 22.5 acres, and 67.5 acres was then a grazing area. From the objection of the residents at that time, because they wanted to build more houses there. That was the only issue, not because of mangroves.

So that is what I have to mention here. The second aspect I need to touch on is this tyre issue. I went there myself and walked along that embankment. The issue with this embankment is not because the mangroves were felled, or the embankment burst, no. This gives the impression, as if the embankment burst because the mangroves were felled, but there is no connection at all. That embankment, even on mangrove land, if it wants to collapse it will collapse. Here the main cause is that if you stay there for a while, within an hour there are big boats passing through there, and it is rather narrow there. That area and these big boats, we can see the waves, and these waves are what largely cause this embankment to break. The breakage in this area is not due to mangroves and so on, but because of the many boats that go back and forth, the large ones, which cause the waves that break this barrier.

However, that matter is not a small wave, okay, so we have already taken a first stance. At the initial stage the JPS indeed repaired this embankment, but after that we thought that because this area of 22.5 acres, we want to make it a buffer zone for biodiversity. That involves mangroves, api-api trees are there, berdembam trees, so we leave it there and let it break, and the water that comes in can flow in and out. So that place is indeed a rather low-lying area, so the issue of flooding there no longer arises, nor the issue related to mangroves, because we have already begun to plant mangroves.

JPS, in cooperation with NGOs, is adding more mangrove trees in the 22.5-acre area.

So finally, there is a little more, I will touch a little on agriculture, which was raised a lot by Honourable Members from Sabak Bernam, although they are not here, and besides Sabak Bernam, those who asked from Sungai Pelek also mentioned agriculture, and Sijangkang also mentioned agriculture too, and Sijangkang quite a lot. So I will partly answer in the question and answer session regarding food security, but here I want to touch on this, that under the Agro Transformation Plan (PETA), its abbreviation PETA, I did ask that if possible this matter be included, because I feel this was left out in RS1. So I would like to request that the wording can be included there. We indeed explain it, we detail how we want to make Selangor these 5 things.

The first is that we want modern agriculture to become the foundation. It is not an easy thing to change the mindset of our farmers, because the foundation of PETA has 3 important components. First, we want to increase the production output of the SSL, which I mentioned just now. So we have our Self Sufficiency Level (SSL). As I said, for our goat meat, the SSL is less than 1%, beef less than 5%, and the others we import. We want to increase this SSL, and we will increase the SSL that we consider strategic. For example, I will give an example: in crops, we have identified 12 high-value types of crops, because we also want, besides increasing the SSL, that it also raises the income level of our farmer community. That is the second important point. The third is that it contributes to our Gross Domestic Product (KDNK), because at present agriculture is extremely low, only 1.4% of our KDNK. So we want to raise it.

And the fourth is that we want more young people and women to be involved in agriculture, because with this modern agricultural method, women can find it very friendly. I give an example, like the use of rain shelters, or IOT, Internet of Things, in agriculture we can bring. Anyone who is interested, I can take you to visit Perapat at Kapar, which is a modern one. Inside, you just wear an overall coat, like a laboratory technician. The agriculture there uses hydroponics, only water, and when the temperature rises, automatically water flows down from the wall, it draws in from this side, and the temperature goes down again to stabilise. This is fully IOT use inside, and there is no use of pesticides anymore. So you can eat it straight away, there are no pesticides. So these things, and the good thing is the return from this investment. The cost is small, in just over 2 acres it costs about RM3 million. It is recovered in just 3 years. These are among the matters we can give attention to. Tomorrow I will continue in the question and answer session tomorrow.

SpeakerEN

Pending first, Honourable Member.

Tuan Ir. Izham bin HashimAMANAH · PHPandan Indah

Silakan.

SpeakerEN

Honourable Members all, the time has shown 5.30 pm. With this I adjourn the House until tomorrow, the 2nd day of the 8th month, 2022, Tuesday, at 10 am. The House is adjourned.

(THE HOUSE ADJOURNED AT 5.30 PM)